Skip to content

Tags: letoram/xarcan

Tags

0.6.3

Toggle 0.6.3's commit message
WndSynch Rules adjust and Synch present logging

Some metadata and synch timing needed to change for better arcan-
appl integration.

Eventually we will need to harmonise the tracing here so it merges
better with what is going on in Arcan and attaches well to tracy.
This is a first step towards that.

0.6.1

Toggle 0.6.1's commit message
glamor- bo regression + cleanups

This fixes a number of nits and opts-in the mouse and present code
(since it is still being worked on), as well as rebase+synch to upstream
xorg.

0.6.0

Toggle 0.6.0's commit message
synch to arcan-0.6

No real changes needed other than pulling in upstream and undo
some build changes. Time to get back to improving this thing.

0.5.4

Toggle 0.5.4's commit message
tagged xarcan for packaging