Engineering journal
Blog
Notes from building Revetment and running it on our own production. Each entry has a date, and each figure says where it came from.
28 days from shadow to blocking
We attached Revetment to 18 routes on our own production on 26 September 2026, in shadow mode. On 24 October 2026 all 18 were blocking. This is what the shadow events showed us, what we had wrong, and the order we turned things on.
Why Revetment exists
ingress-nginx was retired in March 2026, and its ModSecurity integration went with it. Envoy Gateway, where we moved, has no WAF of its own. Revetment is the one we wrote to run inside it.