Thank you for sending your enquiry! One of our team members will contact you shortly.
Thank you for sending your booking! One of our team members will contact you shortly.
Course Outline
Foundations of Allen Bradley Architecture and Ethernet Integration
- Key elements of the Allen Bradley automation ecosystem.
- Core concepts of Ethernet/IP and its communication layers.
- Strategies for planning connections between PLCs, HMIs, and network equipment.
Setting Up Ethernet Communication for PLCs
- Configuring Ethernet modules and IP addresses within Studio 5000.
- Incorporating and overseeing Ethernet nodes.
- Verifying communication links between PLCs.
Integrating HMIs over Ethernet
- Linking FactoryTalk View Studio to PLC tags.
- Setting up RSLinx communication drivers.
- Confirming data exchange between HMIs and controllers.
Connecting Servers and Routers in Industrial Networks
- Configuring servers to support data collection and monitoring tasks.
- Considering router-level segmentation and VLAN implementation.
- Maintaining secure and reliable communication across different subnets.
Connecting PLCs, HMIs, Servers, and Routers within the Allen Bradley Ecosystem
- Constructing complete network pathways between all connected devices.
- Mapping out communication routes and data flow paths.
- Ensuring data synchronisation across multiple system components.
Diagnostics, Monitoring, and Troubleshooting
- Utilising the diagnostic features available in Studio 5000 and RSLinx.
- Identifying communication errors and packet-related issues.
- Addressing and correcting problems with addressing, cabling, and configuration.
Security and Best Practices for Ethernet-Based Automation
- Overseeing access control and user permissions.
- Strengthening network configurations for OT environments.
- Applying redundancy and high-availability measures.
Practical Workshop: Comprehensive Device Integration via Ethernet
- Connecting PLCs, HMIs, servers, and routers to form a unified network.
- Configuring communication parameters across all hardware components.
- Executing tests to confirm end-to-end data transmission.
Conclusion and Recommended Next Steps
Requirements
- A solid grasp of fundamental industrial automation principles.
- Practical experience in configuring PLCs or HMIs.
- Working knowledge of basic Ethernet networking.
Target Audience
- Automation engineers.
- Control system technicians.
- Industrial IT and OT integration specialists.
21 Hours
Testimonials (2)
All in general
Daniele Donzelli - ITT ITALIA S.r.l.
Course - CANoe for CAN Compact Training
PLC basic knowledge