Painting Inspection Test Record

This document records the inspection and testing of a painting project. It lists the items that were inspected at various stages, including surface preparation, application of undercoat, second coat, and top coat. Measurements were taken of ambient conditions, wet film thickness, and dry film thickness. The inspection found that the specified dry film thickness ranges were met. Representatives from the subcontractor, company, and client all accepted the results.

Uploaded by

kerons
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views1 page

Painting Inspection Test Record

This document records the inspection and testing of a painting project. It lists the items that were inspected at various stages, including surface preparation, application of undercoat, second coat, and top coat. Measurements were taken of ambient conditions, wet film thickness, and dry film thickness. The inspection found that the specified dry film thickness ranges were met. Representatives from the subcontractor, company, and client all accepted the results.

Uploaded by

kerons
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Record No.

Inspection and Test Record


for Painting
Client:

Subcontractor:

Project No.:

Subcontract P.O. No.:

Project Name:

Item painted (Tag No./Line No.):

Reference Document:

Subcontractor

Items to inspect

inspected
initials/date
1.0

Company
Hold
Point

Remarks

inspected*
initials/date

Ambient conditions

2.0

Time of measurement

............................hrs

Relative humidity

..............................%

Dew point

............................. oC

Surface temperature

............................. oC

Surface preparation

3.0

Cleanliness level SA

.................................

Profile/anchor pattern

.....................microns

Undercoat
Make/type/batch No.

.................................

Application/workmanship
4.0

Second coat
Make/type/batch No.

.................................

Application/workmanship
5.0

Top coat
Make/type/batch No.

.................................

Application/workmanship
6.0

Testing
Wet film thickness
Dry film thickness
Specified

.....................microns

Measured:No. of points .................................


Maximum .....................microns
Minimum .....................microns
Average .....................microns
Adhesion test

H - Companys presence is mandatory for all activities in section.

Attachments, No. of pages:

h - Companys presence is mandatory.

Accepted for Subcontractor


Name:

Signature:
Date:

Accepted for Company


Name:

Signature:

Date:

Accepted for Client


Name:

Signature:

Date:

*Company only initials for holdpoint