0% found this document useful (0 votes)
560 views1 page

April 19 2019 Weekly

The document outlines the anticipated work schedule from April 22 to 26 and April 29 to May 3 for the Broad Channel Reconstruction Project in Queens. The schedule details that installation of a retaining wall will occur on West 13th Road between April 22 and 26, and again from April 29 to May 3. Private property restoration will take place on West 11th and 12th Roads between those same dates. The schedule is subject to change due to field and weather conditions.

Uploaded by

Peter Mahon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
560 views1 page

April 19 2019 Weekly

The document outlines the anticipated work schedule from April 22 to 26 and April 29 to May 3 for the Broad Channel Reconstruction Project in Queens. The schedule details that installation of a retaining wall will occur on West 13th Road between April 22 and 26, and again from April 29 to May 3. Private property restoration will take place on West 11th and 12th Roads between those same dates. The schedule is subject to change due to field and weather conditions.

Uploaded by

Peter Mahon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

4/22/19 - 4/26/19 and 4/29/19 – 5/3/19

BROAD CHANNEL RECONSTRUCTION PROJECT PROJECT #: HWQ1182A BOROUGH: QUEENS DATE ISSUED: 4/19/19
The following is an anticipated work schedule for the upcoming week. However, due to unforeseen field
and weather conditions, it may become necessary to change some scheduled work locations, operations and dates.

DATE WORK HOURS LOCATION OPERATION

4/22/19– 7:00 am– West 13th Road between Cross Bay Boulevard and Jamaica Installation of retaining wall on south side
4/26/19 4:30 pm Bay

4/22/19– 7:00 am– West 11th Road between Cross Bay Boulevard and Jamaica Private property restoration
4/26/19 4:30 pm Bay

4/29/19- 7:00 am- West 13th Road between Cross Bay Boulevard and Jamaica Installation of retaining wall on south side
5/3/19 4:30 pm Bay

4/29/19- 7:00 am- West 11th Road between Cross Bay Boulevard and Jamaica Private property restoration
5/3/19 4:30 pm Bay

4/29/19- 7:00 am- West 12th Road between Cross Bay Boulevard and Jamaica Private property restoration
5/3/19 4:30 pm Bay

PLEASE NOTE: THE HWQ1182A project field office has


relocated. The new location is: 11 West 20th Road.

WATER SHUT-OFF NOTIFICATIONS: In addition to a 72-hour Advisory, a prior 24-hour notification will be distributed / posted to any / all affected locations(s).
NO PARKING SIGNS: Will be distributed / posted 72 hours prior to the temporary elimination of street parking. Please observe posted parking regulations in construction areas.
FOR FURTHER INFORMATION: Contact Fern Weinreich, the Community Construction Liaison at (917) 854-8341 or broadchannelccl@gmail.com