0% found this document useful (0 votes)
326 views5 pages

Project Cost Estimates: Site Works

The document provides a cost estimate for the proposed renovation and addition of a residential building in Tagbilaran City, Bohol. It includes itemized estimates for site works, forms and scaffolding, ground floor reinforced concrete works, second floor reinforced concrete works, masonry works, cement plastering, and steel trusses. The total estimated cost is over ₱1 million.

Uploaded by

KwinieGem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
326 views5 pages

Project Cost Estimates: Site Works

The document provides a cost estimate for the proposed renovation and addition of a residential building in Tagbilaran City, Bohol. It includes itemized estimates for site works, forms and scaffolding, ground floor reinforced concrete works, second floor reinforced concrete works, masonry works, cement plastering, and steel trusses. The total estimated cost is over ₱1 million.

Uploaded by

KwinieGem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project: Proposed Renovation and Addition of a One-Storey Residential Building

Owner: Sps. Rodolfo And Concordia Acar


Location: Poblacion, Tagbilaran City, Bohol
Date: March 11, 2019

Project Cost Estimates


Item Description Quantity Prices unit Amount
Site Works
Excavation
- Column Footing 20 1,500.00 cu.m 30,000.00
-Wall Footing 10 1,500.00 cu.m 15,000.00
-Tambak/ Lime stone 20 400.00 cu.m 8,000.00
-Labor for Site Clearing and Tampering 30,000.00

Soil Poisoning (LENTREK T) 1 5,000.00 lot 5,000.00

Total ₱88,000.00

Forms and Scafoldings


- 1 1/2" sched. 20 G. I. Pipe 150 560.00 length 84,000.00
-Fixed Scaffolding Clamp (1 1/2"ᴓ) 200 57.00 shts 11,400.00
-Freewell Scaf. Clamp(1 1/2"ᴓ) 150 63.00 shts 9,450.00
-1/2" Phenolic Board 6 670.00 shts 4,020.00
-Coco Lumber 2"x3"x10' 100 121.00 length 12,100.00
-Coco Lumber 2"x2"x10' 100 82.50 length 8,250.00
-Common Wire Nails No. 2" 5 56.00 kgs 280.00
-Common Wire Nails No. 3" 10 53.00 kgs 530.00
-Common Wire Nails No. 4" 10 50.00 kgs 500.00
-Concrete Nails No. 3" 5 79.00 kgs 395.00
Material Cost: 130,925.00
labor cost: 58,916.25
Total ₱189,841.25

Ground Floor
Reinforced Concrete Works
A. Column Footing
-Cement (Portland) 40 273.00 bags 10,920.00
-Sand 2 1,400.00 cu.m 2,800.00
-Gravel 4 1,400.00 cu.m 5,600.00
-16mmØ def. bar 36 362.00 lgth 13,032.00
- tie Wire 2.5 67.00 kgs 167.50

B. Column
-Cement (Portland) 58 273.00 bags 15,834.00
-Sand 3 1,400.00 cu.m 4,200.00
-Gravel 6 1,400.00 cu.m 8,400.00
-16mmØ def. bar 144 362.00 lgth 52,128.00
-10mmØ def. bar 184 153.00 lgth 28,152.00
- tie Wire 12 67.00 kgs 804.00

C. Wall Footing
-Cement 11 273.00 bags 3,003.00
-Sand 0.5 1,400.00 cu.m 700.00
-Gravel 1 1,400.00 cu.m 1,400.00
-10mmØ def. bar 16 153.00 lgth 2,448.00
- tie Wire 1 67.00 kgs 67.00

D. Beam
-Cement 33 273.00 bags 9,009.00
-Sand 1.8 1,400.00 cu.m 2,520.00
-Gravel 3.6 1,400.00 cu.m 5,040.00
-16mmØ def. bar 70 362.00 lgth 25,340.00
-10mmØ def. bar 70 153.00 lgth 10,710.00
- tie Wire 11 67.00 kgs 737.00

E. Slab on Grade (Ground Flooring)


-Cement 70 273.00 bags 19,110.00

Page 1 of 5
-Sand 4.25 1,400.00 cu.m 5,950.00
-Gravel 8.5 1,400.00 cu.m 11,900.00
-10mmØ def. bar 78 153.00 lgth 11,934.00
- tie Wire 4.5 67.00 kgs 301.50

F. Stairs
-Cement 30 273.00 bags 8,190.00
-Sand 2 1,400.00 cu.m 2,800.00
-Gravel 4 1,400.00 cu.m 5,600.00
-12mmØ def. bar 40 202.00 lgth 8,080.00
- tie Wire 2 67.00 kgs 134.00

Material Cost: 277,011.00


labor cost: 124,654.95
Total ₱401,665.95

Second Floor
Reinforced Concrete Works
Floor Slab (Second Floor)
-Cement 70 273.00 bags 19,110.00
-Sand 4.25 1,400.00 cu.m 5,950.00
-Gravel 8.5 1,400.00 cu.m 11,900.00
-10mmØ def. bar 78 153.00 lgth 11,934.00
- tie Wire 4.5 67.00 kgs 301.50
-Steel Deck 1 53,250.00 lot 53,250.00

Roof Beam
-Cement 28 273.00 bags 7,644.00
-Sand 1.55 1,400.00 cu.m 2,170.00
-Gravel 3.1 1,400.00 cu.m 4,340.00
-16mmØ def. bar 43 362.00 lgth 15,566.00
-10mmØ def. bar 57 153.00 lgth 8,721.00
- tie Wire 10 67.00 kgs 670.00

Canopy Slab (Second Floor)


-Cement 20 243.00 bags 4,860.00
-Sand 1 1,400.00 cu.m 1,400.00
-Gravel 2 1,400.00 cu.m 2,800.00
-10mmØ def. bar 11 153.00 lgth 1,683.00
- tie Wire 1 67.00 kgs 67.00

Material Cost: 152,366.50


labor cost: 68,564.93
Total ₱220,931.43

Masonry Works
A. Exterior and Interior Wall
-4" thick Concrete Hollowblocks 3850 14.00 pcs. 53,900.00
-Cement 16 243.00 bags 3,888.00
-Sand 1.3 1,400.00 cu.m 1,820.00
-10mmØ def. bar 261 153.00 lgth 39,933.00
- tie Wire 14 67.00 kgs 938.00

Material Cost: 100,479.00


labor cost: 45,215.55
Total ₱145,694.55

Cement Plastering
A. Exterior and Interior Walling
-Cement 159 243.00 bags 38,637.00
-Sand 13.2 1,400.00 cu.m 18,480.00
-Sahara 30 30.00 packs 900.00

Material Cost: 58,017.00


labor cost: 29,008.50
Total ₱87,025.50

Page 2 of 5
Steel Trusses
-1 1/2"x3/16" Angle Bars 20 465.00 length 9,300.00
-2"x3/16" Angle Bars 18 430.00 length 7,740.00
-2"x3"x1.2mm C-Purlins 30 635.00 length 19,050.00
-1"x3/16" Angle Bars 18 418.00 bags 7,524.00
-10mmØ def. bar 10 153.00 lgth 1,530.00
-Welding Rod(Electrode) 15 2,860.00 box 42,900.00
-Cut off Blade 2 190.00 cu.m 380.00
-Assorted Paint Brush 3 28.00 cu.m 84.00
-Red Oxide with Catalyst 3 716.00 lgth 2,148.00
- Lacquer Thinner 2 374.00 kgs 748.00
Material Cost: 91,404.00
labor cost: 45,702.00
Total: ₱137,106.00

Pre-fabricated Color Roofing


-Long Span Colored Roof & Accessories 1 50,000.00 lot 50,000.00
Labor & Materials
Total: ₱50,000.00

Ceiling
-PVC Ceiling 10 467.00 length 4,670.00
-PVC Wall Angle 12 31.00 pcs. 372.00
-Hardiflex board(4'x8'x1/4") 50 485.00 shts 24,250.00
-Wall Angle (10' long) 35 59.00 length 2,065.00
-Double Furring (10' long) 50 117.00 length 5,850.00
-C-channel (10' long) 50 99.00 piece 4,950.00
-Double Furring Clip 1000 6.00 piece 6,000.00
-Concrete Nails #1 6 79.00 kg. 474.00
-Blind Revits 3 273.00 box 819.00
-Hardiflex Screw 2000 1.00 piece 2,000.00
Material Cost: 51,450.00
labor cost: 23,152.50
Total ₱74,602.50

Carpentry Works
A. Doors with Jamb and Hardwares
-Wooden Panel Door 5 4,560.00 set 22,800.00
-Wooden Door Jamb 5 1,923.00 set 9,615.00
-PVC Door 3 2,600.00 set 7,800.00
-Door Hinges 16 550.00 set 8,800.00
-Door Knob 8 800.00 set 6,400.00
-Assorted Common Nails 10 56.00 kg. 560.00

Material Cost: 55,975.00


labor cost: 25,188.75
Total ₱81,163.75

Sliding Glass Door and Windows (One-Sky Frame)-Refer to the drawing


(Lumpsum incuding materials & installation)
-Frame, Glass and Accessories 1 50,000.00 lot 50,000.00

Total ₱50,000.00

Tile Works
-Bedrooms
-60x60cm Ceramic Tiles 145 200.00 piece 29,000.00
-Stairs
-60x60cm Ceramic Tiles 30 200.00 piece 6,000.00
-Dining, Kitchen and Living Area
-60x60cm Ceramic Tiles 125 200.00 piece 25,000.00
-Balcony
-40x40cm Ceramic Tiles 90 100.00 piece 9,000.00
-Toilet and Bath and Public CR
-.30x.30mts. Cer. Tiles (flooring) 95 50.00 piece 4,750.00
-0.60x0.30mts. Cer. Tiles (walling) 140 200.00 piece 28,000.00
-Tile Grout 77 72.00 packs 5,544.00

Page 3 of 5
-Tile Trimmer (for T&B walling) 8 45.00 pcs. 360.00
-Stair Nosing 5 550.00 length 2,750.00
-Cement 40 243.00 bags 9,720.00
-Tile Adhesive 20 282.00 bags 5,640.00
-Sand 3 1,400.00 cu.m. 4,200.00

Material Cost: 94,964.00


labor cost: 47,482.00
Total ₱142,446.00

Painting Works
A. Masonry Painting Works
-Boysen Plexibond 3 770.00 gal. 2,310.00
for Water Proofing (Fire Wall)
-Skimcoat 13 420.00 bag 5,460.00
-Acrytex Primer White 13 752.00 gal. 9,776.00
-Masonry Putty 13 287.00 gal. 3,731.00
-Body Filler 13 535.00 gal. 6,955.00
-Boysen Semi-Gloss Latex 13 800.00 gal. 10,400.00
- Assorted Roller Paint 5 69.00 pc. 345.00
-Assorted Paint Brush 5 45.00 pc. 225.00
-Sand Paper #80 50 18.00 sht. 900.00
-Sand Paper #150 50 18.00 sht. 900.00
- Masking Tape #2 10 39.00 roll 390.00

B. Ceiling Painting Works


-Flat Wall Latex Primer 8 850.00 gal. 6,800.00
-Flat Latex White 8 505.00 gal. 4,040.00
-Paint Reducer 8 378.00 gal. 3,024.00
-Paint Thinner 8 650.00 gal. 5,200.00
-Skimcoat 8 420.00 bag 3,360.00
-Non-sag Epoxy (Girder) 2 2,440.00 gal. 4,880.00
- Assorted Roller Paint 5 69.00 pc. 345.00
-Assorted Paint Brush 5 45.00 pc. 225.00
- Assorted Sand Paper 100 18.00 sht. 1,800.00
- Masking Tape #2 10 39.00 roll 390.00
- Joint Tape #2 5 120.00 roll 600.00
- Pain Tray 3 28.00 piece 84.00

Total Cost: ₱72,140.00


labor cost: 36,070.00
Total ₱108,210.00

Electrical Works
-Electrical Wirings and Accessories 1 50,000.00 lot 50,000.00
-Electrical Fixtures- Ceiling Lamp 21 500.00 set 10,500.00
with bulbs
-Labor Cost 1 50,000.00 lot 50,000.00
Total ₱110,500.00

Plumbing Works
Plumbing
- water closet 3 8,000.00 set (LP) 24,000.00
- lavatory 3 5,000.00 set (LP) 15,000.00
- faucet for lavatory 3 1,000.00 set (LP) 3,000.00
- shower fixtures 3 5,000.00 set (LP) 15,000.00
- floor drain 3 100.00 set 300.00
-exhaust fan 3 3,000.00 set (LP) 9,000.00
-piping & acc. (PPR Pipes for water line and Atlanta Pipes for San. Line) 50,000.00
Total Cost: ₱116,300.00

Building ₱1,725,645.68

Summary:
Total Amount:
Site Works 88,000.00
Form Works 189,841.25
Building 1,725,645.68

Page 4 of 5
Total Cost: ₱ 2,003,486.93

Conforme:

SPS. RODOLFO AND CONCORDIA ACAR


Owner

Prepared by:
NICYLL H. COSMOD
Architect