Checklist for Masonry Work
Client Inspection Report No
Consultant Date
Vendor
Package Civil Finishes
Description of Work Masonry work
Wing Dwg.Ref.No Rev Inspection Request
Floor By Time
Details :
Location
Sl. No Description YES NO NA Remarks
MEP CLEARANCES
Have all the electrical conduit drops cleared or marked in the
1
beams and GI wires placed in conduits .
Vendor CBRE CLIENT
Signature Signature Signature
Name Name Name
Date Date Date
During Block work YES NO NA
Is the latest updated "Good For Construction" drawing
1
available?
2 Method statement submitted
3 Is the work area clear of loose mortar, concrete debris, etc.?
4 Check for suitability & safety of scaffolding. Is it acceptable?
5 Mixing of cement mortar is being done on G.I sheet
Check for pre-moistening & cleanliness of concrete blocks/clay
6
bricks before placing
7 Check for the cement mortar mix proportion
Check for dimensions, right angles, diagonals of base line single
8
layer
9 Check for the cement mortar Joint thickness
10 Check for staggering of vertical joints
11 Check the size of Openings for Doors and Windows
12 Check the block sizes and wall thickness
Check for dimensions, plumb, levels & right angles(with respect
13
to base line marking)
14 Check for the provision of RCC band at every 1 mt. height
15 Has the raking been provided in the block / brickwork ?
16 Check the bond between old and new masonry. Is it acceptable?
17 Check for brick on edge
After Block work
1 Check for Cleaning & Raking of Joints
2 Provision for sufficient curing of walls
3 Check if the debris have been removed
4 Completion of rectification work, if any
Observations if any :
Above Observations have been attended & completed YES NO NA
Contractor CBRE
Contractor Civil Contractor Safety CBRE Safety Client Representative
Quality Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-015/Rev01/Oct2013
CBRE South Asia Pvt. Ltd. CBRE South Asia Pvt. Ltd. 1 of 1