0% found this document useful (0 votes)
234 views5 pages

ODME Operation Instr

This document provides procedures for oil discharge and testing the GAN-TRIUMPH "ODME" system. The oil discharge procedure involves preparations on the main deck, at the fire control station, and at the CCR. Valves must be opened and closed in the proper sequence. The test procedure selects manual flow and speed values, runs a self test of all sensors and commands, and simulates a discharge to trigger an alarm when the PPM reaches a threshold.

Uploaded by

Celal Bozdogan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
234 views5 pages

ODME Operation Instr

This document provides procedures for oil discharge and testing the GAN-TRIUMPH "ODME" system. The oil discharge procedure involves preparations on the main deck, at the fire control station, and at the CCR. Valves must be opened and closed in the proper sequence. The test procedure selects manual flow and speed values, runs a self test of all sensors and commands, and simulates a discharge to trigger an alarm when the PPM reaches a threshold.

Uploaded by

Celal Bozdogan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

GAN-TRIUMPH “ODME” OPERATION & TEST PROCEDURE

CAUTION : System must be always on. Do not turn the system off. It can cause memory loss.

OIL DISCHARGE PROCEDURE

A) Preparations on Main Deck


1-Be sure that ; ``A1`` ( Fresh water drain) , ``C1`` ( Sample inlet drain) , ``D1 & D2``( Sample outlet
drain) , ``E`` ( Sampling pump Drain) valves are closed.

2- Open ``A`` (Fresh water inlet), ``C`` (Sample Inlet), ``D`` (Sample outlet-return to slop) valves.

3- Open the doors on the side of VPC panel

1/5
GAN-TRIUMPH “ODME” OPERATION & TEST PROCEDURE

B) Preparations at Fire Control Station.

1- Open ``B`` (Air supply of VPC panel) valve.

2- Be sure that the switch at pump control panel is at ``1`` position & Flowmeter panel power supply
is on.

2/5
GAN-TRIUMPH “ODME” OPERATION & TEST PROCEDURE
C ) Preparations at CCR

1- Push enter button for Oil Discharge option and select oil type

2- Reset Oil disch. Acc.

3- Set Total oil disch alarm limit (This limit must be max. 1/30,000 of the last cargo)

4- Select Start oil discharge option. When you push enter button system will start flushing and
calibration. This process takes 3 minutes. At the last 1.5 minutes start Slop P pump with 50 bars at
the end of the flushing process overboard will open and return to slop valve will be closed

5- When decanting completed. Push enter button twice Overboard valve will close and return valve
will open.
3/5
GAN-TRIUMPH “ODME” OPERATION & TEST PROCEDURE

TEST PROCEDURE

Before testing same procedure must be followed like decanting on deck. Only Sampling Valve (C)
and Sample outlet valve (D) to be kept closed.

1- From General settings menu Choose flowmeter 1 as manual (Manual Value is 500 cbm/hr)

2- General settings menu Choose Speed as manual (Manual Value is 10 kts)

3- At the bottom of General settings menu save the changes.

4/5
GAN-TRIUMPH “ODME” OPERATION & TEST PROCEDURE

4- Choose System Test option under Service Menu and Self Test

5- Select self test. System will test all sensors commands itself and result will be displayed.

6- Select simulation mode. When you select simulation mode overboard valve will open and return to
slop valve will close.

7- Push up button to increase PPM manually. When you reach 30L/mile System will give PPM Alarm
and overboard valve will close and Return to slop will open.