Template #1
OPERATIONAL PROCEDURE
Equipment Type
Equipment Code
Location
Operation Procedure:
Template #2
HOUSEKEEPING SCHEDULE
Qualification Station/Bldg.
Area/Section
In-Charge
Schedule for the 2nd Semester, 2011
Responsible
ACTIVITIES Every Every
Person Daily other Weekly 15th Monthly Remarks
Day Day
1. Clean and check welding
equipment/ accessories
from dust and oil; dry and
properly laid-out/
secured/stable
2. Clean and free welding
booths and welding
positioners from
dust/rust /gums, used Mig
wire stubs and metal
scraps
3. Clean and arrange working
tables according to floor
plan/lay-out; check
stability
4. Clean and check floor,
walls, windows, ceilings
• graffiti/dust/rust
• cobwebs and
outdated/unnecessary
objects/items
• obstructions
• any used
materials/scraps (slugs,
stubs) spilled liquid
• open cracks (floor)
5. Clean and check work shop
ventilation and
illumination by dusting
lamps/bulbs, replacing
non-functional lamps and
keeping exhaust clean
6. Clean and check computer
set -monitor, CPU,
keyboards, mouse – free,
unnecessary markings,
dust; cables and plugs are
in order; well-arranged; all
items functional
7. Clean, inspect air
conditioning equipment:
• keep screen and filter
free from dust/rust
• Check selector knobs if
in normal positions and
are functional
• Check if drainage is OK
8. Clean, check and maintain
Tool Room
• Free of dust, not damp
• Tools in appropriate
positions/locations
• With visible
labels/signage
• Logbook and forms are
complete, in order and
updated
• Lights, ventilation – OK
9. Clean and check Rest Room
• Urinals, bowls, wash
basins, walls and
partitions are free from
stains, dirt, oils, graffiti
and unnecessary objects;
Template #3
GMAW WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Dispose segregated waste; clean garbage cans
Sweep floors; if wet, wipe dry
Wipe and clean whiteboards
Clean and arrange working tables
Clean and check mounting of machines/equipment
Before leaving, collect stubs and other welding wastes.
WEEKLY TASK YES NO
Clean posters, visual aids and update accomplishment/Progress Charts
Clean bulbs/lamps/ceilings/walls
Clean/Wash of windows/glasses/mirrors
Clean and check tools, machines, supplies, materials
Sanitize garbage receptacles
Empty water collector; clean body of Water Dispenser
MONTHLY TASK YES NO
Conduct inventory
Clean and arrange tool room
Inspect electrical system; clean cables, wires
Clean instructional materials & modules; arrange and put in order
Inspect and clean air-conditioning equipment filter; clean body
Template #4
WELDING EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
• •
Template #5
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE
EQUIPMENT CODE
LOCATION
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day
1. Check panel board, and
circuit breakers’
electrical connections,
cables and outlets
Clean and kept dry
Parts are well-
secured/attached
Properly labeled
2. Check Mig gun (nozzle,
contact tip, diffuser)
and ground cable:
Clean and kept dry
Parts are well-
secured/ attached
Inspect for damages
and replace parts if
necessary
3. Check adjustment
lever’s if functional
(amperages/speed); if
not, calibrate
4. Check Gas cylinder
outfit for any
abnormality
Gate valve
Co2 regulator
Gas hose Fittings
Fittings
5. Check/Clean wire
feeder (rollers, wire
speed/spool
adjustment); remove
used oil, dust; keep
dry.
6. Run the equipment for
5 minutes and observe
for unusual noise or
abnormal operation; if
repair is necessary,
send to technician.
Template #6
WORKSHOP INSPECTION CHECKLIST
Qualification
Area/Section In-Charge
YES NO INSPECTION ITEMS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Remarks:
Inspected by: Date:
Template #7
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type :
Property Code/Number :
Location :
YES NO INSPECTION ITEMS
Remarks:
Inspected by: Date:
Template # 8
WASTE SEGREGATION LIST
Qualification:
Area/Section :
In-charge:
WASTE SEGREGATION METHOD
GENERAL/ACCUMULATED WASTE
Recycle Compost Dispose