0% found this document useful (0 votes)
206 views10 pages

Maintain Training Facilities

Maintain training facilities by following house

Uploaded by

lei melendrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views10 pages

Maintain Training Facilities

Maintain training facilities by following house

Uploaded by

lei melendrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 10

Maintain

Training
Facilities
Template #1
OPERATIONAL PROCEDURE
Equipment Type
Equipment Code
Location
Operation Procedure:
Template #2
HOUSEKEEPING SCHEDULE
Qualification Station/Bldg.

Area/Section

In-Charge

Schedule for the 2nd Semester, 2011


Responsible
ACTIVITIES Every Every
Person Daily other Weekly 15th Monthly Remarks
Day Day
1. Clean and check welding
equipment/ accessories
from dust and oil; dry and
properly laid-out/
secured/stable
2. Clean and free welding
booths and welding
positioners from
dust/rust /gums, used Mig
wire stubs and metal
scraps
3. Clean and arrange working
tables according to floor
plan/lay-out; check
stability
4. Clean and check floor,
walls, windows, ceilings
• graffiti/dust/rust
• cobwebs and
outdated/unnecessary
objects/items
• obstructions
• any used
materials/scraps (slugs,
stubs) spilled liquid
• open cracks (floor)
5. Clean and check work shop
ventilation and
illumination by dusting
lamps/bulbs, replacing
non-functional lamps and
keeping exhaust clean
6. Clean and check computer
set -monitor, CPU,
keyboards, mouse – free,
unnecessary markings,
dust; cables and plugs are
in order; well-arranged; all
items functional
7. Clean, inspect air
conditioning equipment:
• keep screen and filter
free from dust/rust
• Check selector knobs if
in normal positions and
are functional
• Check if drainage is OK
8. Clean, check and maintain
Tool Room
• Free of dust, not damp
• Tools in appropriate
positions/locations
• With visible
labels/signage
• Logbook and forms are
complete, in order and
updated
• Lights, ventilation – OK
9. Clean and check Rest Room
• Urinals, bowls, wash
basins, walls and
partitions are free from
stains, dirt, oils, graffiti
and unnecessary objects;
Template #3
GMAW WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Dispose segregated waste; clean garbage cans

Sweep floors; if wet, wipe dry

Wipe and clean whiteboards

Clean and arrange working tables

Clean and check mounting of machines/equipment

Before leaving, collect stubs and other welding wastes.

WEEKLY TASK YES NO


Clean posters, visual aids and update accomplishment/Progress Charts

Clean bulbs/lamps/ceilings/walls

Clean/Wash of windows/glasses/mirrors

Clean and check tools, machines, supplies, materials

Sanitize garbage receptacles

Empty water collector; clean body of Water Dispenser

MONTHLY TASK YES NO


Conduct inventory

Clean and arrange tool room

Inspect electrical system; clean cables, wires

Clean instructional materials & modules; arrange and put in order

Inspect and clean air-conditioning equipment filter; clean body


Template #4
WELDING EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
•  •

Template #5
EQUIPMENT MAINTENANCE SCHEDULE
EQUIPMENT TYPE
EQUIPMENT CODE
LOCATION
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day

1. Check panel board, and


circuit breakers’
electrical connections,
cables and outlets
 Clean and kept dry
 Parts are well-
secured/attached
 Properly labeled
2. Check Mig gun (nozzle,
contact tip, diffuser)
and ground cable:
 Clean and kept dry
 Parts are well-
secured/ attached
 Inspect for damages
and replace parts if
necessary
3. Check adjustment
lever’s if functional
(amperages/speed); if
not, calibrate

4. Check Gas cylinder


outfit for any
abnormality
 Gate valve
 Co2 regulator
 Gas hose Fittings
 Fittings
5. Check/Clean wire
feeder (rollers, wire
speed/spool
adjustment); remove
used oil, dust; keep
dry.

6. Run the equipment for


5 minutes and observe
for unusual noise or
abnormal operation; if
repair is necessary,
send to technician.
Template #6

WORKSHOP INSPECTION CHECKLIST

Qualification

Area/Section In-Charge

YES NO INSPECTION ITEMS

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Remarks:

Inspected by: Date:

Template #7
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type :
Property Code/Number :
Location :
YES NO INSPECTION ITEMS

Remarks:

Inspected by: Date:

Template # 8
WASTE SEGREGATION LIST
Qualification:
Area/Section :
In-charge:
WASTE SEGREGATION METHOD
GENERAL/ACCUMULATED WASTE
Recycle Compost Dispose

You might also like