Document Number                                                       Document Title                                                        Item                         Rev
Inspection Codes:         SC: Subcontractor                                 PEC: Petrofac                            C: Company/Client                   TP: Third Party
                          R: Document/Report Review                         S: Surveillance                          RR: Random Review
                          H: Hold Point (Notification Required & Presence is Mandatory)                              W: Witness Point (Notification Required but Presence is not Mandatory)
                                                                                                                                   Responsible       Verifying        Intervention Points
Item         Control Activity                Action to be verified             Reference Document          Acceptance Criteria
                                                                                                                                      Party          Document       SC     PEC     C     TP
                                     a. Review & verify validity of             Manufacturer’s data        Good mechanical
                                                                                                                                   PEC Site          Calibration
                                        calibration certificates,                sheet                       and electrical
        Control of Inspection Test                                                                                                 Supervisor        Certificate/
 1.0                                    Identification Number/Sticker           PEC-QU-GDE-X-               condition                                              R/S    R/S     S
        & Measuring Equipment                                                                                                      SC Electrical      IM&TE
                                     b. Verify condition of the test             11152                      Valid calibration
                                                                                                                                   QC Inspector       Register
                                        equipment                               Project Spec.               certificate
                                     a. Visual inspection to verify correct
                                        size & type, appearance etc.                                        No damage
                                                                                Purchase Order/                                   SC Material       Purchase
        Material Inspection          b. Ensure no damage to galvanization                                   Conform to
                                                                                 Delivery Note/Data                                Controller          Order/
        (subject to provisions of       and free from physical damages                                       specifications
 2.0                                                                             Sheet                                             SC/PEC             Delivery      R/S    R/S     S
        project Material Receiving   c. All accessories are of correct                                      Confirms to storage
                                                                                Project Material                                  Electrical QC     Note/Data
        procedure)                      type/material                                                        and preservation
                                                                                 Receiving Procedure                               Inspector           Sheet
                                                                                                             requirements
                                     d. Storage and preservation (e.g. long
                                        term outdoor storage at site)
                                     a. Review of applicable
                                                                                                            Complies with AFC
                                        drawings/documents and ensure
                                                                                List of latest revision     document register     PEC Site
                                        that latest revision is available at
                                                                                 of applicable              Complies with AFC     Supervisor S
        Drawings and Documents          site (e.g.: Cable routing layout,
 3.0                                                                             drawings                    drawings,             C/PEC                NIL         R       R      R
        status                          cable schedule, Review of work
                                                                                AFC drawings and            applicable            Electrical QC
                                        procedures, Method Statements,
                                                                                 Specifications              standards and         Inspector
                                        QC Procedures and other related
                                                                                                             Specifications
                                        documents etc.)
                                     a. Ensure fabrication is as per the
                                        drawing
                                                                                                            Correct routing
                                     b. Where applicable, verify cable tray                                 Adequate supports
                                        route is in accordance with layout                                   are provided
                                                                                                                                   PEC Site
                                        drawings                                Lay out drawings/          Support span is not
        Inspection of cable tray                                                                                                   Supervisor
                                     c. Ensure adequate supports are             installation details        greater than                           ITR-E-0201X     W       S      S
 4.0    support installation                                                                                                       SC E&I QC
                                        provided as per                         Project Spec.               straight section
                                                                                                                                   Inspector
                                        installation drawings                                                length or as
                                                                                                             recommended by
                                     d. Check dimensions, distance
                                                                                                             manufacturer
                                        between supports, fixing method
                                        etc.
              Document Number                                                          Document Title                                                       Item                         Rev
Inspection Codes:         SC: Subcontractor                                 PEC: Petrofac                              C: Company/Client                   TP: Third Party
                          R: Document/Report Review                         S: Surveillance                            RR: Random Review
                          H: Hold Point (Notification Required & Presence is Mandatory)                                W: Witness Point (Notification Required but Presence is not Mandatory)
                                                                                                                                     Responsible       Verifying        Intervention Points
Item         Control Activity                   Action to be verified              Reference Document       Acceptance Criteria
                                                                                                                                        Party          Document       SC     PEC     C     TP
                                       e. No cut or drill on structural
                                          members
                                       a. Check spacing between trays,
                                          elevation, size, clamps, connectors,
                                          bolts, nuts, washers, etc.
                                       b. Ladder/tray are internally smooth
                                          with the fastening bolts installed
                                                                                                             Installation is
                                          with the head inside and the                                        complete in
                                          nut/washer outside                                                  accordance with
                                       c. Splice plates, (e.g.: straight, offset    Layout drawings                                 PEC Site
        Inspection of installation                                                                            applicable
                                                                                    Manufacturer’s                                  Supervisor
 5.0    Cable trays /racks (straight      and adjustable etc.) are of correct                                 drawings                                ITR-E-0201X     W       S      S
                                                                                     instructions                                    SC E&I QC
        Length)                           type suitable for the location                                     No more than one
                                                                                    Project Spec.                                   Inspector
                                       d. Ensure no sharp edges                                               splice plate is
                                                                                                              located between
                                       e. Check for any additional support
                                                                                                              supports
                                          requirement
                                       f. Verify location of expansion guide
                                          and support for the same
                                       g. Ensure touch up paint for cut edges
                                          and drilled holes
                                       a. Verify fittings and connectors are of
                                          correct size, type suitable for the
                                          location
                                       b. Visual inspection against                 Installation details                            PEC Site
        Clamps, fittings,
                                          applicable drawing                        Manufacturer’s          Complies with          Supervisor
 6.0    connectors, hanger                                                                                                                            ITR-E-0201X     W       S      S
                                       c. Satisfactory bending radius                instructions             Installation details   SC E&I QC
        clamps
                                       d. Check supports at bends and route         Project Spec.                                   Inspector
                                          changes
                                       e. Each joints are properly tightened
                                          with the fastening bolts installed
              Document Number                                                         Document Title                                                      Item                         Rev
Inspection Codes:          SC: Subcontractor                                 PEC: Petrofac                           C: Company/Client                   TP: Third Party
                           R: Document/Report Review                         S: Surveillance                         RR: Random Review
                           H: Hold Point (Notification Required & Presence is Mandatory)                             W: Witness Point (Notification Required but Presence is not Mandatory)
                                                                                                                                   Responsible       Verifying        Intervention Points
Item         Control Activity                  Action to be verified             Reference Document       Acceptance Criteria
                                                                                                                                      Party          Document       SC     PEC     C     TP
                                         with the head inside and the
                                         nut/washer outside
                                       a. Verify Expansion guides are fitted
                                          at specified intervals
                                       b. Verify gap setting is correct
        Installation of Expansion      c. Verify nut/bolt/washers are suitable    Installation                                    PEC Site
        Splice Plates (Thermal
                                          for the purpose                          details/Layout          Complies with          Supervisor
 7.0    expansion and contraction                                                                                                                   ITR-E-0201X     W       S      S
                                       d. Check clamping method                    drawing                  installation detail    SC E&I QC
        of cable tray at long
                                       e. Ensure no restriction for proper        Project Spec.                                   Inspector
        straight run)
                                          movement
                                       f. Verify installation of supports at
                                          both sides of expansion guide
                                       a. Inspect cable route and ensure all                               All works
                                          areas are free of debris, sharp                                   completed,             PEC Site
                                          edges etc. which may damage             Layout drawing           adequately             Supervisor
 8.0    Release for cable laying                                                  Project Spec.                                                    ITR-E-0201X     W       W      S
                                          cables during installation                                        supported, route       SC E&I QC
                                       b. Tray should never be used as a                                    clean and no           Inspector
                                                                                                            debris
                                          walk way
                                       a. Ensure to maintain electrical
                                          continuity of cable tray system
                                       b. Verify bonding jumpers are
                                                                                                           Complies with          PEC Site
        Cable tray system bonding         provided at specified locations         Installation details
                                                                                                            installation details   Supervisor
 9.0    and connection to the             (e.g.: Expansion splice plates,         Layout drawings                                                  ITR-E-0203X     W       S      S
                                                                                                            and layout             SC E&I QC
        main earthing system              adjustable splice plates,               Project Spec.
                                                                                                            drawings               Inspector
                                          discontinuous routes etc.)
                                       c. Verify connection to main grid at
                                          specified locations
        Cable tray system                                                         Layout drawing          Cable dressing,
                                       a. Verify cable dressing/segregation                                                        SC/PEC E&I
10.0    released for installation of                                              Cable Schedule           segregation and                        ITR-E-0203X      W       W      S
                                       b. Verify, Tagging, clamping etc.                                                           QC Inspector
        covers                                                                    Project Spec.            testing completed
              Document Number                                                          Document Title                                                      Item                         Rev
Inspection Codes:          SC: Subcontractor                                 PEC: Petrofac                            C: Company/Client                   TP: Third Party
                           R: Document/Report Review                         S: Surveillance                          RR: Random Review
                           H: Hold Point (Notification Required & Presence is Mandatory)                              W: Witness Point (Notification Required but Presence is not Mandatory)
                                                                                                                                    Responsible       Verifying        Intervention Points
Item         Control Activity                  Action to be verified              Reference Document       Acceptance Criteria
                                                                                                                                       Party          Document       SC     PEC     C     TP
        (if applicable)- Post          c. Ensure all required tests are
        cabling inspection                performed and acceptable
                                       a. Check clamps are of correct type,
                                          size and material as per installation
                                          details
                                                                                                            Complies with          PEC Site
        Cable tray covers installed    b. Check proper fixing of the covers        Installation details
                                                                                                             installation details   Supervisor
11.0    as per requirement             c. Check distance between clamps            Layout drawing                                                   ITR-E-0204X     W       W      S
                                                                                                             and layout             SC E&I QC
                                       d. Check clamps are suitable for the        Project Spec.
                                                                                                             drawings               Inspector
                                          location (indoor/outdoor)
                                       e. Correct type of nut/bolt/washers
                                          used and properly tightened
                                       a. Check trench depth, sand bedding                                  Complies with          PEC Site
                                                                                   Layout Drawing and
        Inspect trench for             b. Verify route is as per layout                                      installation details   Supervisor
12.0                                                                                installation details                                             ITR-E-0202X     W       S      S
        underground conduit               drawing                                                            and layout             SC E&I QC
                                                                                   Project Spec.
                                       c. Ensure no obstructions                                             drawings               Inspector
        Check installation of
                                       a. Check conduit routing is correct as
        conduit, fittings,                                                                                  Complies with          PEC Site
                                          per drawing, cut edges are               Layout Drawing and
        identification labels if                                                                             installation details   Supervisor
13.0                                      deburred, correct size, correct           installation details                                             ITR-E-0202X     W       S      S
        required, before backfilling                                                                         and layout             SC E&I QC
                                          bending radius, soft sand filling,       Project Spec.
        and compaction                                                                                       drawings               Inspector
                                          warning tape, identification, etc.
        (Underground)
        Check preparation of                                                       Layout Drawing and      Draw rope              PEC Site
                                       a. Check for no obstructions, draw
14.0    conduit prior to cable                                                      installation details     provided and NO        Supervisor       ITR-E-0202X      S      S      S
                                          ropes installed
        pulling (Underground)                                                      Project Spec.            obstructions           SC E&I QC
                                                                                                                                    Inspector
                                                                                                            Complies with
                                                                                   Layout Drawing and
        Check sealing after            a. Check material used for sealing                                    installation details
15.0                                                                                installation details                            PEC Site         ITR-E-0202X      S      S      S
        installation(Underground)         and sealed properly                                                and layout
                                                                                   Project Spec.                                   Supervisor
                                                                                                             drawings
              Document Number                                                          Document Title                                                      Item                         Rev
Inspection Codes:         SC: Subcontractor                                 PEC: Petrofac                             C: Company/Client                   TP: Third Party
                          R: Document/Report Review                         S: Surveillance                           RR: Random Review
                          H: Hold Point (Notification Required & Presence is Mandatory)                               W: Witness Point (Notification Required but Presence is not Mandatory)
                                                                                                                                    Responsible       Verifying        Intervention Points
Item         Control Activity                  Action to be verified              Reference Document       Acceptance Criteria
                                                                                                                                       Party          Document       SC     PEC     C     TP
                                                                                                                                    SC E&I QC
                                                                                                                                    Inspector
                                      a. Verify location, routing, no
                                         obstructions, cut edges are
                                         deburred, correct bending radius,
        Check installation of            expansion joints fitted (if required),
                                                                                                            Complies with          PEC Site
        conduit and fittings,            workmanship, and identification           Layout Drawing and
                                                                                                             installation details   Supervisor
16.0    Junction boxes, pull boxes,   b. Ensure to avoid unnecessary                installation details                                             ITR-E-0202X     W       S      S
                                                                                                             and layout             SC E&I QC
        identification labels if         bends                                     Project Spec.
                                                                                                             drawings               Inspector
        required (Above ground)       c. Verify Junction boxes/pull boxes
                                         are accessible and not obstructed
                                         by conduit, cable tray, duct or any
                                         other utilities
                                                                                                            Adequate supports
                                                                                                             provided               PEC Site
                                      a. Ensure adequate supports                  Layout Drawing and
        Conduit supports structure                                                                          Complies with          Supervisor
17.0                                     provided at specified intervals            installation details                                             ITR-E-0202X     W       S      S
        secure (Above ground)                                                                                installation details   SC E&I QC
                                      b. Correct fasteners and hangers             Project Spec.
                                                                                                             and layout             Inspector
                                                                                                             drawings
                                      a. Ensure to maintain electrical
        Conduit system bonding                                                                              Complies with          PEC Site
                                         continuity steel conduit                  Layout Drawing and
        and connection to the main                                                                           installation details   Supervisor
18.0                                  b. Check bonding jumpers are                  installation details                                             ITR-E-0203X     W       S      S
        earthing system                                                                                      and layout             SC E&I QC
                                         provided and connection to main           Project Spec.
                                                                                                             drawings               Inspector
                                         grid at specified locations
                                      a. Verify tags are provided as per
                                                                                                            Complies with
                                         project requirement                       Layout Drawing and
        Post cabling inspection of                                                                           installation details   SC/PEC E&I
19.0                                  b. Verify sealing of conduits with            installation details                                             ITR-E-0203X     W       W      S
        conduits                                                                                             and layout             QC Inspector
                                         approved material                         Project Spec.
                                                                                                             drawings
                                      c. Verify clamps and fixing is secure