HYDRAULIC PARAMETERS OF CANAL
DISCHARGE in cumec                                                    QC     0.1783
BED WIDTH OF CANAL in m                                             CBW        0.49
DEPTH OF WATER in m                                                   DC      0.495
CANAL BED LEVEL in m                                                CBL      151.23
FULL SUPPLY LEVEL in m                                               FSL    151.725
SIDE SLOPE OF CANAL                                                   SC         1
MANNING COEFFICIENT                                                    N      0.018
FREE BOARD                                                            FB       0.45
HYDRAULIC PARAMETERS OF NALLAH
FLOOD DISCHARGE in cumec                                             QN      179.98
HIGH FLOOD LEVEL in m                                               HFL      150.94
HIGH FLOOD DEPTH (M)                                                HFD       1.805
GEN. GROUND LEVEL in m                                               GL      151.33
DRAIN BED LEVEL in m                                                        149.135
DESIGN STEPS
A. HYDRAULIC DESIGN
1. DRAINAGE WATERWAY
LACEY'S REGI. PERIMET. in m                                             P    64.798              P=4.83*SQRT(QN)
Select suitable no. of spans and their width and add to them the width of piers
so that the overall waterway is nearly same as that of Lacey's regime perimeter.
NUMBER OF SPAN                                                       NS         7
WIDTH OF SPAN in m                                                   WS         8
WIDTH OF PIER in m                                                   PW       0.75
OVERALL WATERWAY in m                                                OW       60.5               OW=NS*WS+(NS-1)*PW
2. CANAL WATERWAY
REDUCED WIDTH OF CANAL ,m                                           RWC       1.00    The width of canal is suitably reduced and
                                                                                      splays are provided at d/s and u/s
CONTRACTION SPLAY                                                     CS        2
EXPANSION SPLAY                                                       ES        3
LEN. OF CONTR. TRANS. in m                                           LCT      -0.51              LCT=(CBW-RWC)*CS/2
LEN. OF EXP.TRANSITION in m                                          LET     -0.765              LET=(CBW-RWC)*ES/2
In the transition zone the side slope of the channel section will be warped from
1.5 :1 to vertical
3. HEAD LOSS AND BED LEVELS AT DIFFERENT SECTIONS
At section 4-4
AREA OF X-SECTION in sqm
(trepezoidal) D/S of barrel                         AT                           0.49               AT=(CBW+SC*DC)*DC
VELOCITY OF FLOW in m/sec                          VF1                           0.37               VF1=QC/AT
VELOCITY HEAD in m                                VH1                            0.01               VH1=VF12/(2*9.81)
R.L. OF WATER SUR. in m                            RL1                          151.73              RL1=CBL+DC
R.L. OF T.E.L. in m                                TL1                          151.73              TL1=RL1+VH1
At section 3-3
AREA OF X-SECTION in sqm
(rectangular)at barrel                              AR                            0.495            AR=RWC*DC
VELOCITY OF FLOW in m/sec                          VF2                             0.36            VF2=QC/AR
VELOCITY HEAD in m                                VH2                              0.01            VH2=VF22/(2*9.81)
LOSS OF HEAD IN EXPANS. m                         HLE                              0.00            HLE=0.3*(VF22-VF12)/(2*9.81)
R.L. OF T.E.L. in m                                TL2                           151.73            TL2=TL1+HLE
R.L. OF WATER SUR. in m                            RL2                          151.725            RL2=TL2-VH2
R.L. OF BED in m                                    RB                          151.230            RB=RL2-DC
HYDRAU. MEAN DEPTH in m                           HMD                             0.249            HMD=AR/(RWC+2*DC)
SLOPE                                                S                           0.0003   3721.336 S=VF22*N2/HMD4/3
HEAD LOSS IN TROUGH in m                           HLT                           0.0163            HLT=S*OW
At section 2-2
R.L. OF T.E.L. in m                                TL3                          151.748             TL3=TL2+HLT
R.L. OF WATER SUR. in m                            RL3                         151.7414             RL3=TL3-VH2
R.L. OF BED in m                                  RB1                          151.2464             RB1=RL3-DC
At section 1-1
LOSS OF HEAD IN CONT. in m                        HLC                            0.000              HLC=0.2*(VF22-VF12)/(2*9.81)
R.L. OF T.E.L. in m                                TL4                          151.748             TL4=TL3+HLC
R.L. OF WATER SUR. in m                            RL4                          151.741             RL4=TL4-VH1
R.L. OF BED in m                                  RB2                           151.246             RB2=RL4-DC
4. TRANSITIONS
A) Expansion Transition
The transition is worked out on the basis of Mitra formula.
NO. OF COMPARTMENTS                                                      NC         1
THICKNESS OF INTERMEDIATE WALL                                          TIW       0.00
THICKNESS OF OUTER WALL in m   TOW       0.27
WIDTH OF COMPART. in m          WC       1.00       WC=(RWC-(NC-1)*TIW)/NC
LENGTH OF TROUGH in m            LB      1.54       LB=RWC+2*TOW
FREE BOARD                       FB      0.45   m
Canal
0.49
                                                             1
                    Section1-1   Section 2-2                          Section 3-3
0.495
1.54
                                 Trough Compartments
STRUCTURAL DESIGN
A) DESIGN OF VERTICAL WALLS
UNIT WEIGHT OF WATER                                 W 9800          N/m3
HEIGHT OF WATER                                      H 0.495         m
BENDING MOMENT AT THE BOTTOM OF
VERTICAL WALLS                                    BMV1 1378.38409    Nm
CONCRETE GRADE                                         M20
FOR THIS GRADE scbc                                    7             N/mm2    REFER TABLE 1 ON SHEET 2
m                                                      13
sst                                                    150           N/mm2
factor k                                               0.37759336
j                                                      0.87413555
R                                                      1.15523723
effective depth required                               34.5421637    mm
The walls are also to be designed as girder
having a span                                                8.00    M
minimum thickness required                                 266.67    mm
                                                   SAY     270.00    mm
COVER                                                       50.00    mm
keeping a cover of 50 mm effective depth                   220.00    mm
adopt effective depth                                        220     mm
STEEL REQUIRED Ast                                      47.783453    mm2
STEEL PROVIDED Ast                                      810          mm2
dia of bars                                             12           mm
Area of one bar                                         113.04       mm2
spacing S                                               139.555556   mm
provide 10 mm dia bars at spacing                       130          mm
area of distribution steel                              666.666667   mm2
                                                    say 670          mm2
area on each face                                       335          mm2
dia of bar for distribution steel                       8            mm
area of 8 mm bar                                        50.24        mm2
using 8 mm dia bars spacing required                    140          mm
                                            8 mm f @      F.B.=
                                          140 mm           450
8 mm dia bars @ 140 mm c/c                                     945
                                           12 mm f @                          M-20 Conc.
                                          130 mm
                                                1000
                                           10 mm f @   400
                                                       mm c/c
                                                                                   150 mm
                             16 mm f .
                              4 no.                10 mm f @         200
                                    8 mm f @                         mm c/c
                                        200 mm c/c
-1)*PW
reduced and
d u/s
)*CS/2
)*ES/2
C)*DC
F12)/(2*9.81)
2*DC)
F12)/(2*9.81)
on transitrion
 canal
a distance X
ion transitrion
 canal
a distance X
)*TIW)/NC
                  0.49
Section 4-4
pansion
ansition
ON SHEET 2
                     TABLE 1
PERMISSIBLE STRESSES IN CONCRETE
          (IS-456-1978)
            PERMISSIBLE         BOND
              STRESS IN         STRESS
GRADE OF   COMPRESSION          tbd
CONCRETE       (N/mm2)          N/mm2
         BENDING DIRECT
         scbc       scc
M10            3.00      2.50         0
M15            5.00      4.00       0.6
M20            7.00      5.00       0.8
M25            8.50      6.00       0.9
M30          10.50       8.00         1
M35           11.00      9.00       1.1
M40          13.00      10.00       1.2
                       TABLE 2
PERMISSIBLE SHEAR STRESS IN CONCRETE
            (IS 456-1978)
 100*As/bd     M15        M20    M25      M30
       0.25       0.22      0.22   0.23      0.23
        0.5       0.29       0.3   0.31      0.31
       0.75       0.34      0.35   0.36      0.37
          1       0.37      0.39    0.4      0.41
       1.25        0.4      0.42   0.44      0.45
        1.5       0.42      0.45   0.46      0.48
       1.75       0.44      0.47   0.49       0.5
          2       0.44      0.49   0.51      0.53
       2.25       0.44      0.51   0.53      0.55
        2.5       0.44      0.51   0.55      0.57
       2.75       0.44      0.51   0.56      0.58
3 & ABOVE         0.44      0.51   0.57       0.6
                     TABLE 3
MAXIMUM SHEAR STRESS IN CONCRETE
          (IS 456-1978)
CONCRETE GRADE          M15  M20          M25       M30   M35   M40
MAX. SHEAR STRESS       1.6  1.8          1.9       2.2   2.3   2.5
                    TABLE 4
         AQUEDUCT AT BINJOR MINOR RD 81-82
A        Hydraulic Parameters of Canal : --
     1   Discharge                    0.1783     cumec
     2   Bed width of canal             0.490    m.
     3   Full Supply Depth              0.495    m.
     4   Canal bed level            151.230      m.
     5   Full supply level          151.725      m.
     6   Side slope                         1    :1
     7   Free board                     0.450    m.
     8   Manning,s coeff.               0.018
                                                                                                                Abut.bed
                                                                                                                146.500
                                                                                                      Pier bed= 144.940
                                                                              151.080
                               H.F.L.=   150.940                              150.880
                                         Top RL = 152.175
                                             F.S.L.= 151.725
                                            C.B.L.= 151.230
                                                                                150.880
                                                          2.290
                           1
         Slope       12
ACCEPTED
4 Design of pier
  The Pier should be checked at two levels          At bed level                149.135
                                                    At foundation level         144.940
Iyy = 1/12*db^3+2(0.11*(0.5d)^4+(0.5*22/28*0.5d^2)(0.5b+4d/(3*22/7))
Iyy = 0.898
13 The pier is having semi circular shape in both faces along drain having dia 0.75 mt.at top and
   1.23 mt.at RL 148.00
14 No dimension shall be directly measured from the drawing.
15 SBC of soil has been assumed as 25.00 t/sqm. And silt factor as 1.25 . Soil tests are to be
   carried out at pier locations and ensure the assumed parameters otherwise design is to be
   modified accordingly.
16 The deepest nallah level has to be avoided while locating piers.
17 Suitable u/s & d/s transitions joining canal & trough are to be provided as per site.
Abut.bed
DESIGN OF AQUADUCT                            Design of Aqueduct on Kukund River at Baretha Main canal No. 2
                                                                 (HYDRAULIC)
HYDRAULIC PARAMETERS OF CANAL
DISCHARGE in cumec                                                         QC       1.013
BED WIDTH OF CANAL in m                                                  CBW          2.5
DEPTH OF WATER in m                                                        DC        0.75
CANAL BED LEVEL in m                                                     CBL       201.65
FULL SUPPLY LEVEL in m                                                    FSL      201.82
SIDE SLOPE OF CANAL                                                        SC          1
MANNING COEFFICIENT                                                         N       0.018
FREE BOARD                                                                 FB         0.5
HYDRAULIC PARAMETERS OF NALLAH
FLOOD DISCHARGE in cumec                                                  QN       788.44
HIGH FLOOD LEVEL in m                                                    HFL       200.08
HIGH FLOOD DEPTH (M)                                                     HFD        3.39
GEN. GROUND LEVEL in m                                                    GL       200.61
DRAIN BED LEVEL in m                                                               196.69
DESIGN STEPS
A. HYDRAULIC DESIGN
1. DRAINAGE WATERWAY
LACEY'S REGI. PERIMET. in m                                                 P      64.798
Select suitable no. of spans and their width and add to them the width of piers
so that the overall waterway is nearly same as that of Lacey's regime perimeter.
NUMBER OF SPAN                                                            NS          6
WIDTH OF SPAN in m                                                        WS          5
WIDTH OF PIER in m                                                        PW         1.5
OVERALL WATERWAY in m                                                     OW        60.5
2. CANAL WATERWAY
REDUCED WIDTH OF CANAL ,m                                                RWC        1.5     The width of canal is suitably re
                                                                                            splays are provided at d/s and u
CONTRACTION SPLAY                                                          CS         2
EXPANSION SPLAY                                                            ES         3
LEN. OF CONTR. TRANS. in m                                                LCT       -0.51
LEN. OF EXP.TRANSITION in m                                               LET      -0.765
In the transition zone the side slope of the channel section will be warped from
1.5 :1 to vertical
4. TRANSITIONS
A) Expansion Transition
The transition is worked out on the basis of Mitra formula.
Nallah
 Canal
                                 0.49
                                                                                               1
                                           Section1-1       Section 2-2
-0.51 60.5
0.495
1.54
Trough Compartments
STRUCTURAL DESIGN
A) DESIGN OF VERTICAL WALLS
WEIGHT OF WATER                                                      W 9800
HEIGHT OF WATER                                                      H 0.495                   m
BENDING MOMENT AT THE BOTTOM OF
VERTICAL WALLS                                                    BMV1 2144.4562125
CONCRETE GRADE                                                         M20
FOR THIS GRADE scbc                                                    7            REFER TABLE 1 ON SHEET 2
m                                                                      13
sst                                                                    150
factor k                                              0.377593361
j                                                     0.8741355463
R                                                     1.1552372262
effective depth required                              43.084693114 mm
The walls are also to be designed as girder
having a span                                               8.00    M
minimum thickness required                                266.67    mm
                                                  SAY     270.00    mm
COVER                                                      50.00    mm
keeping a cover of 50 mm effective depth                  220.00    mm
adopt effective depth                                  220          mm
STEEL REQUIRED Ast                                     810          mm2
dia of bars                                            16           mm
Area of one bar                                        200.96       mm2
spacing S                                              248.09876543 mm
provide 10 mm dia bars at spacing                      240          mm
area of distribution steel                             666.66666667 mm2
                                                   say 670          mm2
area on each face                                      335          mm2
dia of bar for distribution steel                      8            mm
area of 8 mm bar                                       50.24        mm2
using 8 mm dia bars spacing required                   140          mm
                                                270.00                                   270.00
                                       2-12 mm f
                                                   f.b. = 60.00
                                                          mm
                                            8   mm f @
                                          140   mm
8 mm f 2 legged stirrups                                       1.10
                                           16   mm f @        metre
                                          240   mm
                                            12 mm f @    880
                                                         mm c/c
                                                                      200.00
                           20 mm f .
                            3 no.           12 mm f @    440
                                                         mm c/c
Main canal No. 2
P=4.83*SQRT(QN)
OW=NS*WS+(NS-1)*PW
            LCT=(CBW-RWC)*CS/2
            LET=(CBW-RWC)*ES/2
            AT=(CBW+SC*DC)*DC
            VF1=QC/AT
            VH1=VF12/(2*9.81)
            RL1=CBL+DC
            TL1=RL1+VH1
            AR=RWC*DC
            VF2=QC/AR
            VH2=VF22/(2*9.81)
            HLE=0.3*(VF22-VF12)/(2*9.81)
            TL2=TL1+HLE
            RL2=TL2-VH2
            RB=RL2-DC
            HMD=AR/(RWC+2*DC)
            S=VF22*N2/HMD4/3
            HLT=S*OW
            TL3=TL2+HLT
            RL3=TL3-VH2
            RB1=RL3-DC
            HLC=0.2*(VF22-VF12)/(2*9.81)
            TL4=TL3+HLC
            RL4=TL4-VH1
            RB2=RL4-DC
            -0.77
            0.49
            -0.51
            0.49
            WC=(RWC-(NC-1)*TIW)/NC
            LB=RWC+2*TOW
0.49
-0.765
                          Expansion
                          Transition
ah Intersection
0.27
         16 mm f .
          4 no.                                     10 mm f @      200                                                                                       146.8
                           8 mm f @                                mm c/c                                        Found. C.C. 1:3:6                           146.5
                                  200 mm c/c                                                                                             3560
                                                                                                                                  4560
                                                                                                                                  Abut.bed
                                                                                                                                  146.500
                                                                                                                        Pier bed= 144.940