Doc. No.
:
              Nasa Multiplex                 Rev. No. : 0
                                             Date         :
       Sump Pump – Plant Performance Test
                                                                      M&E Division
    Client                         Project                Design Consultant           MEP Consultants
EMAAR Properties         Burj Dubai – The Residences        Woods Bagot              Roberts & Partners
1.     Pump Consisting of                             :
2.     Pump Details :
         MAKE             MODEL         DUTY          SERIAL No.      MOTOR CAPACITY
3.
                        Current Drawn by Motor
       Make                                               Overload Setting           Fuse Rating
                  Rated Value        Observed Value
4. Level switches operation
       a. Pump-1 Start                                        :
       b. Pump-2 Start                                        :
       c. All pump stop                                       :
       d. High level indication                               :
5. Dry run protection                                         :
6.      Flashing / Alarm during high level                    :
  7.      Operation of chclic change over          :
  8.      ECMS Controls                            :
REMARKS
NAME
SIGNATURE
DATE
               TESTED & CERTIFIED BY        WITNESSED BY   WITNESSED BY
                                               (NMX)       CONSULTANT
                                           Doc. No. :
            Nasa Multiplex                 Rev. No. : 0
                                           Date     :
          Test Certificate for Sump Pump
                                                                 M&E Division
    Client                      Project              Design Consultant           MEP Consultants
EMAAR Properties      Burj Dubai – The Residences      Woods Bagot              Roberts & Partners
 Location / Area :
 S. No.              Activities / Items to be Inspected
          Obtain pump manufacturers test curve prior to
   1.
          commencement
          Check Electrical connections properly made
   2.     (Terminal covers fitted, level switches connected
          properly)
          Check overload setting correct and record setting on
   3.
          test sheets.
          Check fuse rating correct and record setting on test
   4.
          sheets.
   5.     Check direction and speed of rotation are correct.
          Check and record pump and motor name plate details
   6.
          on test sheets.
   7.     Check motor current on all phases and record result.
          Check valves and non return valves are fitted and area
   8.
          fully open.
   9.     Record pump flow and head.
          Check auto change over to stand-by pump (if
   10.
          applicable).
   Location / Area :
   S. No.              Activities / Items to be Inspected
             Check float switches located at correct location
       11.
             proper start-stop-high level indication.
             Check pumps can be removed and refixed without
       12.
             problem.
             Check guide bar, lifting chains are fixed properly and
       13.
             secured.
       14.   Check for dry run protection.
       15.   Check for proper operation of pumps.
REMARKS
NAME
SIGNATURE
DATE
              TESTED & CERTIFIED BY             WITNESSED BY          WITNESSED BY
                                                   (NMX)              CONSULTANT
                               PUMP SCHEDULE
SL.
        Description          Model / Make         Capacity       Location
No.
                                                                Podium
      Sump Pump set for             AP           3 L/s @ 15
 1                                                              Basement
      Surface water       10.50.12.3/GRUNDFOS     Mtr head
                                                                Level
                                                                Podium
      Sump Pump set for             AP           3 L/s @ 15
 2                                                              Basement
      Sewage              51.65.22.3/GRUNDFOS     Mtr head
                                                                Level
      Sump Pump for                                             Podium
                                    AP           1L/s @ 7 Mtr
 3    Chilled Water                                             Basement
                          12.40.04.A1/GRUNDFOS       head
      Trench                                                    Level