Quotation of SUZUKI:: .: 01.18: .: 01/01/2018: Siem Reap: 01: .

This document is a quotation for construction work at a project site in Siem Reap, Cambodia. It includes 7 items (A through G) with descriptions and costs. Item A includes wall work like smart boards and painting. Item B includes wall and door glass. Item C includes ceiling work and painting. Item D includes logos. Item E includes an MEP plan. Item F includes 30% labor costs. The total amount is $2,574. Payment will be made in 3 stages - 30% initially, 60% after design completion, and 10% after further completion. The design period is 2 weeks.

Uploaded by

lavy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views2 pages

Quotation of SUZUKI:: .: 01.18: .: 01/01/2018: Siem Reap: 01: .

This document is a quotation for construction work at a project site in Siem Reap, Cambodia. It includes 7 items (A through G) with descriptions and costs. Item A includes wall work like smart boards and painting. Item B includes wall and door glass. Item C includes ceiling work and painting. Item D includes logos. Item E includes an MEP plan. Item F includes 30% labor costs. The total amount is $2,574. Payment will be made in 3 stages - 30% initially, 60% after design completion, and 10% after further completion. The design period is 2 weeks.

Uploaded by

lavy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Phenar Chey Village, Svay Dangkum Commune,

Siem Reap City, Siem Reap, Cambodia.


Tel: (+855)70 39 04 08 / 17 32 66 04
ail: rithsarorn396@gmail.com

roject : …………………. : 01.18


Client :…………………. : 01/01/2018
dress : Siem Reap : 01
Tel :…………………..
Quotation of SUZUKI
No Description Unit Q.T.Y Unit Price Total cost

A Wall Work
Smart Board inside and Outside ea 25 $ 13.00 $ 325.00
Steel Rectangular 30x30 ea 7 $ 8.00 $ 56.00
Painting m2 24 $ 3.00 $ 72.00
B Wall Clare Glass,10.th.k m2 28 $ 35.00 $ 980.00
Door Clear Glass ea 1 $ 300.00 $ 300.00
C Celling m2 32 $ 6.00 $ 192.00
Painting m 2
32 $ 3.00 $ 96.00
Steel Rectangular 30x30 ea 15 $ 8.00 $ 120.00
Logo (Z SUZUKI and MARINGE) from
D m2 3.5 $ 38.00 $ 133.00
Alucabornd
E MEP Plan One Set ea 1 $ 300.00 $ 300.00
F Labor 30% L/S 1 $ 772.20 $ 772.20

G TOTAL AMOUNT $ 2,574.00


Term of Payment:
. - First payment 30%, after contract sign $ 772.20
. - 60% after design complete 60% ` $ 1,544.40
. - 10% after design complete $ 257.40
Design period :2 Weeks

Siem Reap,………./………./……….. Siem Reap,.09./ 12/ 2018


Client

Rith Sarorn
Executive Design Manager

Design Construction Service: Architectural Plan and 3D Design, Structural Design, Building Renovation and
Consultancy
Swimming Pool, Steam, Sauna and Spa, Water treatment and Filtration system
`

30%
60%
10%

Design Construction Service: Architectural Plan and 3D Design, Structural Design, Building Renovation and
Consultancy
Swimming Pool, Steam, Sauna and Spa, Water treatment and Filtration system

You might also like