MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD
SUBCONTRACT SERVICES DEPARTMENT, SUPPLY CHAIN MANAGEMENT
WORK DONE REPORT (ORIGINAL SCOPE)
Project Name : LNG BW PAVILION VANDA Work Discipline : Machinery
Job No : Type Of Costing : Estimate (MMHE)
SubCon Name : TGS Maritime Technology Sdn. Bhd. Final (Subcontractor)
SO No : WCR&JN No : 109.19 / JN116.19
Job Start : 23.08.2019 Job Finish : 29.08.2019
Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)
MAIN ENGINE TURBOCHARGER (MODEL: NA357)
1 Carried out ash blasting the trubocharger rotorturbine wheel &
5 units
hydrojetting cleaning the blower impeller.
2 Carried out dynamic balancing the turbocharger rotor. 5 units
3 Carried out ash blasting the cone. (Item A) 5 nos.
4 Carried out ash blasting the side entry casing. (Item B) 5 nos.
5 Carried out ash blasting the diffuser. (Item C) 5 nos.
6 Carried out ash blasting the seal plate. (Item D) 5 nos.
7 Carried out ash blasting the seal plate. (Item E) 5 nos.
8 Carried out ultrasonic cleaning the main casing. (Item F) 5 nos.
9 Carried out ultrasonic cleaning the bearing housing T/E. (Item G) 5 nos.
10 Carried out ultrasonic cleaning the bearing housing C/E. (Item H) 5 nos.
11 Carried out ash blasting the compressor outlet casing. (Item J) 5 nos.
TOTAL, RM -
MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date
Prepared by, QA / QC …………………………………………………………..
…………………. TL (Discipline) ………………………………………………………….
Subcontractor
Date :
HOD (Discipline) …………………………………………………………..
P.S. …………………………………………………………..
Approved by (MMHE),
Project /Product Manager …………………………………………………………..
MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD
SUBCONTRACT SERVICES DEPARTMENT, SUPPLY CHAIN MANAGEMENT
WORK DONE REPORT (ADDITIONAL SCOPE)
Project Name : LNG BW PAVILION VANDA Work Discipline : Machinery
Job No : Type Of Costing : Estimate (MMHE)
SubCon Name : TGS Maritime Technology Sdn. Bhd. Final (Subcontractor)
SO No : WCR&JN No : 110.19 / JN116.19
Job Start : 23.08.2019 Job Finish : 29.08.2019
Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)
MAIN ENGINE TURBOCHARGER (MODEL: NA357)
1 Provided measuring equipment & assist specialist taken
measurements for 5 nos. of the rotor shaft, 5 nos. of the turbine 1 job.
blade & 3 nos. of compressor wheel.
2 Carried out repaired thread by hand tapping for main casing
120 holes
bolt hole.
3 Carried out repaired thread by hand tapping for compressor
120 holes
outlet casing bolt hole.
4 Make hole by drilling for nameplate. 3 holes
5 Carried out ash blasting the elbow pipe. 3 nos.
6 Carried out ash blasting the nozzle clamping plate. 5 nos.
7 Provided manpower including tools & equipment to assist
specialist on disassembling & assembling work for 5 units
turbocharger rotor.
TOTAL, RM -
MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date
Prepared by, QA / QC …………………………………………………………..
…………………. TL (Discipline) ………………………………………………………….
Subcontractor
Date :
HOD (Discipline) …………………………………………………………..
P.S. …………………………………………………………..
Approved by (MMHE),
Project /Product Manager …………………………………………………………..