Work Done Report: (Original Scope)

1. TGS Maritime Technology Sdn. Bhd was subcontracted by Malaysia Marine and Heavy Engineering to perform cleaning and repair work on 5 main engine turbochargers. 2. The original scope of work included ash blasting and ultrasonic cleaning of various turbocharger components. 3. Additional work included taking measurements, repairing bolt holes, drilling holes, and providing assistance with disassembly and assembly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views2 pages

Work Done Report: (Original Scope)

1. TGS Maritime Technology Sdn. Bhd was subcontracted by Malaysia Marine and Heavy Engineering to perform cleaning and repair work on 5 main engine turbochargers. 2. The original scope of work included ash blasting and ultrasonic cleaning of various turbocharger components. 3. Additional work included taking measurements, repairing bolt holes, drilling holes, and providing assistance with disassembly and assembly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD

SUBCONTRACT SERVICES DEPARTMENT, SUPPLY CHAIN MANAGEMENT

WORK DONE REPORT (ORIGINAL SCOPE)

Project Name : LNG BW PAVILION VANDA Work Discipline : Machinery


Job No : Type Of Costing : Estimate (MMHE)
SubCon Name : TGS Maritime Technology Sdn. Bhd. Final (Subcontractor)
SO No : WCR&JN No : 109.19 / JN116.19
Job Start : 23.08.2019 Job Finish : 29.08.2019

Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)

MAIN ENGINE TURBOCHARGER (MODEL: NA357)

1 Carried out ash blasting the trubocharger rotorturbine wheel &


5 units
hydrojetting cleaning the blower impeller.

2 Carried out dynamic balancing the turbocharger rotor. 5 units

3 Carried out ash blasting the cone. (Item A) 5 nos.

4 Carried out ash blasting the side entry casing. (Item B) 5 nos.

5 Carried out ash blasting the diffuser. (Item C) 5 nos.

6 Carried out ash blasting the seal plate. (Item D) 5 nos.

7 Carried out ash blasting the seal plate. (Item E) 5 nos.

8 Carried out ultrasonic cleaning the main casing. (Item F) 5 nos.

9 Carried out ultrasonic cleaning the bearing housing T/E. (Item G) 5 nos.

10 Carried out ultrasonic cleaning the bearing housing C/E. (Item H) 5 nos.

11 Carried out ash blasting the compressor outlet casing. (Item J) 5 nos.

TOTAL, RM -

MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date

Prepared by, QA / QC …………………………………………………………..

…………………. TL (Discipline) ………………………………………………………….


Subcontractor
Date :
HOD (Discipline) …………………………………………………………..

P.S. …………………………………………………………..

Approved by (MMHE),

Project /Product Manager …………………………………………………………..


MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD
SUBCONTRACT SERVICES DEPARTMENT, SUPPLY CHAIN MANAGEMENT

WORK DONE REPORT (ADDITIONAL SCOPE)

Project Name : LNG BW PAVILION VANDA Work Discipline : Machinery


Job No : Type Of Costing : Estimate (MMHE)
SubCon Name : TGS Maritime Technology Sdn. Bhd. Final (Subcontractor)
SO No : WCR&JN No : 110.19 / JN116.19
Job Start : 23.08.2019 Job Finish : 29.08.2019

Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)

MAIN ENGINE TURBOCHARGER (MODEL: NA357)

1 Provided measuring equipment & assist specialist taken


measurements for 5 nos. of the rotor shaft, 5 nos. of the turbine 1 job.
blade & 3 nos. of compressor wheel.

2 Carried out repaired thread by hand tapping for main casing


120 holes
bolt hole.

3 Carried out repaired thread by hand tapping for compressor


120 holes
outlet casing bolt hole.

4 Make hole by drilling for nameplate. 3 holes

5 Carried out ash blasting the elbow pipe. 3 nos.

6 Carried out ash blasting the nozzle clamping plate. 5 nos.

7 Provided manpower including tools & equipment to assist


specialist on disassembling & assembling work for 5 units
turbocharger rotor.

TOTAL, RM -

MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date

Prepared by, QA / QC …………………………………………………………..

…………………. TL (Discipline) ………………………………………………………….


Subcontractor
Date :
HOD (Discipline) …………………………………………………………..

P.S. …………………………………………………………..

Approved by (MMHE),

Project /Product Manager …………………………………………………………..