CURRICULUM VITAE
CIVIL STATE
First name: BRAHMI
Name: Hamza
Date & place of birth : The 02/11/1981 at Dellys (Boumerdes).
Address: Base vie cité la SNTF BT 21/04 Rouiba Alger 16012
Tel: (+213) 662846886
Email: hamzaptg@gmail.com
Family Situation: single
Nationality : Algerian
Military service: engaged
FORMATIO N&STADIES
1
July-2001: Obtainment of Baccalaureate Branch sciences.
2001-2006: Engineer Diploma from the faculty of the Engineering
sciences University of Boumerdes ( EX, INGM):
Speciality : Mechanical Engineering. Option: Industrial
Maintenance
2009-2010: Specialist Engineer Diploma from Algerian Petroleum
Institute (IAP), Boumerdes:
Speciality : Mechanical Petroleum Specialist Engineer
WORKING EXPERIENCE
January 2016 –November 2016 Mechanical Engineer (Insulation
Supervisor)
Company: Algerian National Company of Petroleum Great Work
(ENGTP/sonatrach).
Project: In Aminas Compression Project (IACP –Tighountourin)
Client: JGC Corporation /JGC Algeria
October 2013-December 2015: Mechanical Engineer
(Painting&Insulation Supervisor)
Company: Algerian National Company of Petroleum Great Work
(ENGTP).
Project: Bir Sbaa Field Development :Bir Sbaa Crude Oil
Processing Facilities Project (CPF, Pipeline,Trunkline , Flowline ,
Wellhead).
Client: JGC Corporation /JGC Algeria.
December 2011-September 2013:Mechanical engineer
(Painting&Insulation Supervisor)
Company: Algerian National Company of Petroleum Great Work
(ENGTP).
Project: Gassi Touil Gas Processing Facilities Project (construction of
plant for natural gas treatment).
Client: JGC Corporation /JGC Algeria.
October 2010-November2011:Mechanical engineer (Static and
rotating equipment and steel structure engineer)
Company: Algerian National Company of Petroleum Great Work
(ENGTP).
Project: Gas and Oil separation facilities in the Rhourde Nouss field
(South Algeria).
Client: JGC Corporation /JGC Algeria.
May 2009-September 2010: Mechanical engineer
Company: Algerian National Company of Petroleum Great Work
(ENGTP).
ACTIVITIES (for painting and insulation supervisor)
Ensures that the activity carried by the Subcontractor are in line with
the Project Specifications and schedule..
Ensures that the activities are carried according the required HSE
standards.
Ensures that the complete set of Project documents have been handed
over to the Subcontractor.
Ensure that all the necessary testing equipment are available and fit
for purpose.
Ensure that all the piping and equipment are ready to be processed
(painted and insulated as the case may be in accordance with the
current schedule.
Prepares of the site daily activity log.
Participates to the coordination meetings between the areas of the
Plant for the sequence determination.
Monitors the progress of activities and ensures the continuous
assessment of the quantities installed.
Preparation of Planning and Schedule of painting and insulation works.
Ensures the Subcontractor Quality standard achieve the Project
requirements
Preparation of PV reports and RFI for final Inspection
Monitors the manpower level of the Subcontractor, through periodical
audits
Estimate and Control all Painting and Insulation Materials
Ensures that the storing and preservation of the paints for the various
painting cycles are as per vendors requirements (temperature,
humidity and expiry date).
DIVERS
Languages : Arabic (very good), French (good), English(good).
Software : Ms Office (world, Excel), AutoCAD .
Ready for work in south or displacement (international).
Driver license category B