COMMENTS ON PROTECTION SLD OF BARAPUKURIA 230/132Kv substation
General Comments:
Sl no.    Comments of PGCB                                                          Energypac Answers
1.        CT sizing calculations have to be submitted separately for approval       Agreed will be submitted
          of CT ratings will not be issued without the sizing calculation.          later.
2.        As per the SLD, it seems that both line differential relays are located   For each line 2Nos. Line
          at the same panel and CT Secondary wire be extended from the              differential relay 7SD87
          power plant end to the substation end. CT capability of handling the      as main-1 & main-2 to
          increased burden needs to be calculated in such situation. But it is      be installed at PGCB
          recommend to install line differential relay in separate ends             &BPDB end. Both relays
                                                                                    shall be communicated
                                                                                    with each other by fiber
                                                                                    optic cable.
3.        All relay setting calculation needs to be performed by simulation         Relay setting calculation
          software and have to be approved by PGCB.                                 shall be done manually.
4.        Tariff metering scheme should be approved by BPD                          Agreed
5.        Only one energy meter is shown for each feeder; the issue to be           2 Nos terrif meter shall
          decided by SSD & QC with reference to the contract.                       be installed at line.
6.        Necessary NLDC integration have to be performed by EPC                    As per contract.
          contractor.
7.        Bus bar Protection is not shown for 230kV Bus bar in the PSLD. As         Out of scope (No need at
          per the practice of PGCB, all 230kV substations should be equipped        this moment as
          with bus bar protection along with breaker failure protection. It is      discussed with PGCB
          recommended to take necessary steps for including BBP in the              Design & Protection
          mentioned substation.                                                     Department)
8.        Only one main protection relay is shown for each 230kV line. As per       As discussed with PGCB
          the practice of PGCB and Bangladesh Grid Code, all 230kV lines            for protection of 230KV
          should be equipped with Main-1 and Main-2 protection                      line, 2 Nos. line
          Relays. One more set of line differential relay has to be provided for    differential relay as
          each line. The relays may be Supplied from the store of PGCB as           Main-1 & Main-2 is
          required; necessary design, installation, testing and Commissioning       required. These 2 Nos.
          works have to be done by the contractor.                                  of relay will be supplied
                                                                                    by PGCB. Type of relay is
                                                                                    7SD87 of SIEMENS.
                                                                                    PGCB shall help
                                                                                    ENERGYPAC to co-
                                                                                    ordinate with BPDB for
                                                                                    installation of
                                                                                    differential relay at
                                                                                    230KV P/S end.
9.        All relays must be provided with necessary Test Terminal Blocks           Agreed
          (TTB) in the respective panel.
10.       No 33kV CB is shown between T-03 and associated earthing                  Out of scope (Omitted
          transformer. 33kV CB should be provided between the transformers          from SLD)
11.       CT of 0.415kV side is used in Transformer overall differential relay of   Out of scope (Omitted
          T-03; it is recommended To use CT for 33kV side of the earthing           from SLD)
          transformer instead
12.       REF protections have to be available for T-03 as well as its earting      Out of scope (Omitted
          transformer in the Main-1tramsformer differential relay. REF              from SLD)
          protection of earthing transformer will cover the 33kV side And its
          neutral part.
13.       Over-current and earth fault protection need to be provided for           N/A
          33kV side as well as 0.415kVSide of the earthing transformer.
`
14.   Synchrocheck functions have to be activated for both 230k V and          N/A as discussed with
      132kV side CB of the Transformer.                                        PGCB Design &
                                                                               Protection Department.
15.   No overall differential protection is provided for T02. It is            (Out of scope) PGCB will
      recommended to provided overall differential protection for the          supply 1 No. differential
      transformer covering the post CTs. The relay may supplied from the       relay type 7UT86 of
      store of PGCB as required; necessary design, installation, testing and   SIEMENS. ENERGYPAC
      commissioning works have to be done by the contractor.                   will do the installation
                                                                               works for T-02
                                                                               transformer.
`