PLN Letter No          :                                                                             Dated :
Contractor Letter No   :                                 Dated :                                     Received date:
                                                                                                                                             CCR OUT
                                       REVIEW FOR APPROVAL DRAWING/ DOCUMENT
                                   DRAWING/ DOCUMENT NUMBER
                                                                                                               DRAWING/ DOCUMENT TITLE
 No
                       PLN             REV.            CONTRACTOR                    REV.   STATUS
  .
  1.          11029B-00-E-60-AZ-         0       9714-PCWBS-FWBS-STD-001              0       C                         EDG GA DRAWING
  No.                                   PLN COMMENTS                                          No.                 CONTRACTOR RESPONSES
   1      Please provide PLN document number
          Please provide the following item :
          - weight of panel
          - material of enclosure
          - material of name plate, the material of nameplate shall be engrave stainless
   2      steel.
          - Index protection enclosure and control panel
          - capacity of fuel tank
          - detail of anchor bolt
          - name of each equipment part
          Please clarify the contractor document number is same with document "9714-
   3      PCWBS-FWBS-STD-001 GA DRAWING FOR EMERGENCY DIESEL GENERATOR
          CONTROL PANEL (GCP EDG)", which one is true
   4      Clarify Rev "N" on document cover.
                                                                       Page 1 of 4
                                                                                                            PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
                                                                                                                                            MPP NIAS(25 MW)
PLN Letter No          :                            Dated :
Contractor Letter No   :   Dated :                  Received date:
                                                   Reviewed by:                           Checked by:
                                     Page 2 of 4
                                                           PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
                                                                                           MPP NIAS(25 MW)