Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment For Location:
Contractor: Chipping work By Manually
Proba
ual
Sl Basic Job Potential Consequence Current control measures Init Addition
Resid
Risk rating Ri
Proba
bility
bility
risk
N Steps Hazard ial al sk
o. Ris control ra
k measure ti
P E A R P
n E A R
All the scafold should be checked g
before installation
At the time of erecting and
removal of scaffolding,the area
Slip of man/Fall muat be barricaded and restricted
Get Injury/Fatality for any other operation 2 0 0 1 2 4
of materials
All the scaffolds vertical should
be installed on a firm base
Use full body harness with double
Making of Safe lanyard and anchord it above the
1
Access head height
The working platform (at every
2.1m)should have double
railings,toeguard and a ladder as
access.
Working at
Get Injury/Fatality 2 0 0 1 4
height Take' WAH'permit before starting
the working at height activity
Enlist the name of work men at
daily attachment sheet befor
starting the activity
Dust Effects in lungs Use of good quality nose Mask 1 0 0 0 2 2
Use of good quality hand
gloves,safety shoes
Use of Chipping goggles
Deployment skill labour only
Chipping work Chipping activity to be carried on
2 sitting inside the jhola which is to
by manually Flying of
Get injury be hanged with reject silo 1 0 0 0 2 2
materials
wall.While changing the position
of work place.People shall go
carefully from jhola sitting on the
beam/girder with anchoring
safety harness.Anchoring facility
shall be made to anchor the
harness
Prepared By Approved By Reviwed By
Contractor Contractor
Date Date Date
1of1