0% found this document useful (0 votes)
7K views1 page

Labour Rate PDF

This document provides a list of itemized labour rates for various construction tasks including earthwork, concrete work, masonry work, plastering, flooring, and other finishes. There are 19 line items with the unit of measurement and rate provided for each task such as excavation at Rs. 13/cuft, backfilling at Rs. 8/cuft, and RCC slab work at Rs. 90/sqft. Remarks are also included for some items such as RCC specifying it is for a 90 PLY slab.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7K views1 page

Labour Rate PDF

This document provides a list of itemized labour rates for various construction tasks including earthwork, concrete work, masonry work, plastering, flooring, and other finishes. There are 19 line items with the unit of measurement and rate provided for each task such as excavation at Rs. 13/cuft, backfilling at Rs. 8/cuft, and RCC slab work at Rs. 90/sqft. Remarks are also included for some items such as RCC specifying it is for a 90 PLY slab.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Option I

Labour rate (item wise)

S.No. Item Unit Rate Remarks


1 Earthwork in Excavation Cuft. 13
2 Earthwork in Backfilling Cuft. 8
3 Soling/ Ramming Sqft. 5
4 PCC Sqft. 35
5 RCC Sqft. 90 PLY
6 RCC (FOUNDATION) Cuft. 90 Footing
8 Wall 9"/4" Sqft. 40
9 Plaster Inside Sqft. 15
10 Plaster Outside Sqft. 23
11 Screeding/ punning Sqft. 35
12 Chipping Sqft. 5
13 Tile Sqft. 40
14 Marble Sqft. 70
15 Marble moulding (Single) rft. 35
16 Marble moulding (Double) rft. 65
17 Pani patti rft. 40
18 Skirting rft. 25