ANJUMAN INSTITUTE OF TECHNOLOGY AND MANAGEMENT
(AFFILIATED TO VTU, BELAGAVI, RECOGONISED BY AICTE, NEW DELHI)
ANJUMANABAD BHATKAL – 581320
KARNATAKA
A PROJECT REPORT ON
"EXTENSIVE SURVEY VIVA-VOCE"
SUBMITTED IN PRACTICAL FULFILLMENT OF THE REQUIREMENTS FOR PROJECT WORK OF SIXTH
SEMESTERCIVIL ENGINEERING UNDER VISVESVARAYA TECHNOLOGICAL UNIVERSITY, BELAGAVI
BY
PROJECT ASSOCIATES
Under the guidance of:
Prof. CHIDANAND NIAK
DEPARTMENT OF CIVIL ENGINEERING
2018-2019
ANJUMANINSTITUTE OF TECHNOLOGY AND MANAGEMENT
(AFFILIATED TO VTU, BELAGAVI, RECOGONISED BY AICTE, NEW DELHI)
ANJUMANABAD BHATKAL – 581320
KARNATAKA
DEPARTMENT OF CIVIL ENGINEERING
CERTIFICATE
Certified that the project work entitled "EXTENSIVE SURVEY PROJECT" is a bonafide work carried out in a partial
fulfillment for the requirements of project work of 6th semester, CIVIL ENGINEERING course of the VISVESVARAYA
TECHNOLOGICAL UNIVERSITY, BELAGAVI during the year 2018-19.It is certified that all corrections/suggestions
indicated for internal assessment have been incorporated in the report deposited in the department library .The project
report has been approved as it satisfies the requirements in respect of project work prescribed for 6th semester Civil
engineering.
SIGNATURE OF PRINCIPAL SIGNATURE OF H.O.D SIGNATURE OF GUIDE
Name of student : SIGNATURE OF EXAMINERS WITH DATE
External Viva : 1………………………………….
University seat number: : 2…………………………………….
ACKNOWLEDGEMENT
We are thankful to our H.O.D, Prof. H.M.Phalachandra and Prof. CHIDANAND NAIK for
their constant encouragement and guidance during the process of this survey project work.
We take this opportunity to express our sincere and heartfelt gratitude to our beloved
Principal Dr.M.A.Bhavikatti for their all support.
Needless to say we have a vote of thanks to all the faculty members of the Civil Engineering
Department AITM Bhatkal, for their excellent support rendered in the course of our task.
We thank the almighty GOD without whose blessings this project would still remain a
dream. The joy and satisfaction that accompany the successful completion of any task would
incomplete without the mention of those who made it possible.
SNEHA NAIK
EXTENSIVE SURVEY PROJECT
PROJECT ASSOCIATES
SNEHA PANDU NAIK (2AB16CV032)
ABDUL BAQUEE MUNIR (2AB16CV001)
AHMED KAZI (2AB15C004)
MOHAMMED ARIB (2AB16CV015)
SWALEHA (2AB17CV404)
ABDUL WARIS (2AB16CV004)
MUBEEN T.P (2AB16CV021)
EXTENSIVE SURVEY PROJECT
SYNOPSIS
This project work involves the investigation, surveying, planning and design work.
The project works includes fly leveling and transferring of benchmark with respect to
MSL from the railway station Bhatkal to various points in the project area which includes water
supply and sanitary project, highway project, new tank project and old bund project.
The water supply and sanitary work includes the alignment and design of the water
supply pipes and sewers in the proposed residential colony at ANJUMANABAD. Survey works
are conducted to determine the different possible alignment of sewers. The map of the area
was prepared by plane table survey. Proposed project work includes the design of sewerage
system and also water supply system including the design of an overhead water tank. If this
project is implemented, it will help Bhatkal people to occupy this newly proposed residential
area and the sanitary condition of the area will also be improved.
The highway project includes the suitable and economical alignment of the road. Design
of various elements along the road such horizontal curves, thickness of pavements etc are
considered. Proposed alignment is ANJUMANBAD road to SAGAR road.
The new tank project work deals with alignment of centre line of the proposed weir,
capacity surveys and canal alignments. Proposed new tank project will help in irrigating more
fields, which in turn will improve the living conditions of the village.
The old bund project site is located in Gulmi and it proposed to upgrade the existing
bund over there.
CONTENTS
INTRODUCTION
PART-1 : WATER SUPPLY AND SANITARY PROJECT 1
CHAPTER-1: INTRODUCTION
IMPORTANCE AND NECESSITY OF WATER SUPPLY SCHEME
SCOPE AND AIM
CHAPTER-2: WATER SUPPLY SYSTEM
QUANTITY OF WATER
PER-CAPITA DEMAND
DESIGN PERIOD
POPULATION FORECASTING
CHAPTER-3: DESIGN OF PIPE LINES
PIPE LINES FROM THE GROUND STORAGE TANK
SUB MAINS
CHAPTER-4: DESIGN OF OVERHEAD TANK
CAPACITY DESIGN
CHAPTER-5: SEVERAGE SYSTEM
INTRODUCTION
SEWERAGE SYSTEM
SYSTEM OF SEWERAGE
CHAPTER-6: DESIGN OF SEWER PIPES
DESIGN OF MAIN SEWER
DESIGN OF SUB MAIN
CHAPTER-7: DESIGN OF MANHOLES
INTRODUCTION
PART –2: HIGHWAY PROJECT 40
CHAPTER- 1: INTRODUCTION
SCOPE OF THE PROJECT
CHATER 2: HIGHWAY PLANNING
INTRODUCTION
OBJECTIVES OF HIGHWAY PLANNING
PLANNING SURVEY
PREPARATION OF MASTER PLAN
CHAPTER 3: HIGHWAY ALIGNMENT
INTRODUCTION
FACTORS CONTROLLING ALIGNMENT
ENGINEERING SURVEYS FOR HIGHWAY LOCATION
LOCATION
DETAILED SURVEY
Chapter 4: HIGHWAY GEOMETRIC DESIGN
HIGHWAY CROSS SECTION ELEMENTS
SIGHT DISTANCE
DESIGN SPEED
HORIZONTAL CURVES
VERTICAL CURVES
CHAPTER 5: DESIGN ROAD ELEMENTS
DESIGN OF CAMBER
DESIGN OF HORIZONTAL CURVES
DESIGN OF VERTICAL CURVES
DESIGN OF PAVEMENT
PART-3: NEW TANK PROJECT 81
CHAPTER-1:
INTRODUCTION
GENERAL
CLIMATE
RAINFALL
CATCHMENT AREA
SURVEY DETAILS
CROP PATTERN
CHAPTER 2:
ANALYSIS OF RAINFALL TABLE
STANGER’S TABLE FOR YIELD CALCULATION
VOLUME CALCULATION
CHAPETR 3: COMPUTATION OF YIELD
DESIGN OF LEFT BANK CANAL AND RIGHT BANK CANAL
DESIGN OF OUTLETS
DESIGN OF DAM FILTER
CAPACITY CURVE
PART –4: OLD TANK PROJECT 108
CHAPTER 1 :
INTRODUCTION
GENERAL
RAINFALL
CATCHMENT AREA
SURVEY DETAILS
CROP PATTERN
CHAPTER 2
ANALYSIS OF RAINFALL TABLE
STRAINGER’S TABLE FOR YEILD CALCULATION
VOLUME CALCULATION
CHAPTER 3 :
COMPUTATION OF YEILD
COMPUTATION OF STORAGE
ESTIMATION OF DISCHARGE
PRACTICAL PROFILE OF THE BUND
CONCLUSION 125
BIBLOGRAPHY 126