100% found this document useful (2 votes)
7K views2 pages

Material Inspection Request (MIR) : Plot No. (4151)

This material inspection request form is from Alghanim International General Trading & Contracting Co. to their subcontractor Al-Kalah Al-Kuwaitiya General Trading & Contracting Co. regarding Block Work Package A of Al-Khiran Outlet Mall. It requests inspection of materials and includes notes on quantity, specifications, manufacturer, and area of use. The subcontractor's QA/QC will provide remarks and the project manager will take action.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
7K views2 pages

Material Inspection Request (MIR) : Plot No. (4151)

This material inspection request form is from Alghanim International General Trading & Contracting Co. to their subcontractor Al-Kalah Al-Kuwaitiya General Trading & Contracting Co. regarding Block Work Package A of Al-Khiran Outlet Mall. It requests inspection of materials and includes notes on quantity, specifications, manufacturer, and area of use. The subcontractor's QA/QC will provide remarks and the project manager will take action.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Material Inspection Request (MIR)

Contract Title: Block Work Package A of Al-Khiran Outlet Mall


Contract No.: Plot No. (4151)
Sub Contract No.:
Employer: Tamdeen Al-Khiran Co.
Supervision
SSH Engineering Consultant Group.
Consultant:
Contractor: Alghanim International General Trading & Contracting Co.
Sub Contractor: Al-Kalah Al-Kuwaitiya General Trading & Contracting Co.
Revision
Reference No.: MIR/KOM/AR/ 0 Date: XX-XX-XXXX
:

Note: Copies of all documents referenced below are to be attached with this Inspection Request.
Description of Material:
Material Approval No.:
Material Quantity:
Technical Submittal No.:
Specification or Contract Document
Reference:
Manufacturer (Name & Address):
Supplier and / or Local Agent:
Area / Location of Use:

Inspection by Sub Contractor’s QA/QC Remarks:

Signatur
Project Manager: Date: XX-XX-XXXX
e:

Action Code:
☐ A - Approved ☐ D – Additional Information Required
☐ B - Approved As Noted ☐ E – Information Required
☐ C – Rejected ☐ BR – Approved with Comments – Resubmit

Supervision Consultant Comments:

Supervision Consultant: ________________ Date: _______________

Distribution:
To Original Copy
Employer (optional) ☐ ☐
Supervision Consultant ☐ ☐

You might also like