100% found this document useful (2 votes)
2K views2 pages

Daily Piling Report and Checklist-Bored Piles

This daily piling report checklist documents information for bored piles installed on a construction project. It includes the date, weather, machine type used, pile sizes and positions installed. It also notes design specifications, concrete volumes poured, reinforcement details, pile locations and any non-conformance issues. A daily drilling sheet is also included which tracks anchor installation details like type, inclination, lengths, hole sizes and drillers sign-offs.

Uploaded by

KOMAL JOSHI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views2 pages

Daily Piling Report and Checklist-Bored Piles

This daily piling report checklist documents information for bored piles installed on a construction project. It includes the date, weather, machine type used, pile sizes and positions installed. It also notes design specifications, concrete volumes poured, reinforcement details, pile locations and any non-conformance issues. A daily drilling sheet is also included which tracks anchor installation details like type, inclination, lengths, hole sizes and drillers sign-offs.

Uploaded by

KOMAL JOSHI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Daily Piling Report and Checklist- Bored Piles

Date: Concrete Strength: Specific Tolerances: Project Name: MHPL


Weather: Pile Size: Position: Project No: 0002
Machine Type: Cover: Rake:

Design Information Pile Information Pile R.L.S Linear R.L.S As Installed NCR Comments
Concrete Reinforcement
Drilled Shaft Position Vertificaly over
SN Pile No. Rake Pile Dia. Depth Length Socket Length Volume Toe Cutoff Toe Cutoff (Y/N)
Slump
Theory Actual N.S E.W N.S E.W

Piling Report and Checklist


Daily Drill Sheet- Anchoring

Date: Project Name: MHPL


Weather: Project No: 0002
Drillers Sign Off
Acceptance (Green
SN Anchor Ref No. Anchor Type Inclination Bond Free Length Total Length Hole Dimater Drill Date Clean Out Spray next to anchor
hole=ok)

Daily Drill Sheet