Site No.250-Prototype No.48-Al Mujahidin Departement Branch Completion Abha-Asir Zone WBS

This document outlines the work breakdown structure (WBS) and milestones for the completion of Site No. 250, the Al Mujahidin Department Branch prototype project No. 48 in the Asir zone of Saudi Arabia. Key milestones include engineering works from April 2015 to July 2015, shop drawing submittals from July 2015 to March 2016, procurement from May 2015 to June 2016, and construction from May 2015 to February 2017 with phases for the main building, barracks, electricity room, mosque, warehouse and main entrance. The project is scheduled for testing and commissioning in November-February 2017 and handover in December 2016-March 2017.

Uploaded by

Faheem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views33 pages

Site No.250-Prototype No.48-Al Mujahidin Departement Branch Completion Abha-Asir Zone WBS

This document outlines the work breakdown structure (WBS) and milestones for the completion of Site No. 250, the Al Mujahidin Department Branch prototype project No. 48 in the Asir zone of Saudi Arabia. Key milestones include engineering works from April 2015 to July 2015, shop drawing submittals from July 2015 to March 2016, procurement from May 2015 to June 2016, and construction from May 2015 to February 2017 with phases for the main building, barracks, electricity room, mosque, warehouse and main entrance. The project is scheduled for testing and commissioning in November-February 2017 and handover in December 2016-March 2017.

Uploaded by

Faheem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 33

Site no.250-Prototype no.

48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250 KAP5-Site No.250-(AL-MUJAHIDIN DEPARTMENT BRANCH


9-Apr-15 9-Apr-15
COMPLETION)-Prototype
29-Mar-17 no.48-ASIR Zone 29-Mar-17
250.1 Project Milestones 9-Apr-15 29-Mar-17 9-Apr-15 29-Mar-17
250.1.6 General Milestones 9-Apr-15 29-Mar-17 9-Apr-15 29-Mar-17
250.1.4 Engineering Works Milestones 9-Apr-15 11-Jul-15 9-Apr-15 11-Jul-15
250.1.1 Shop Drawings Milestones 12-Jul-15 2-Apr-16 12-Jul-15 2-Apr-16
250.1.1.1 Shop Drawings Submittal Milestones 12-Jul-15 16-Mar-16 12-Jul-15 16-Mar-16
250.1.1.2 Shop Drawings Approval Milestones 12-Jul-15 2-Apr-16 12-Jul-15 2-Apr-16
250.1.2 Procurement Milestones 26-May-15 23-Jun-16 26-May-15 23-Jun-16
250.1.3 Construction Milestones 9-May-15 12-Feb-17 9-May-15 12-Feb-17
250.1.3.1 Site Construction Milestones 9-May-15 12-Feb-17 9-May-15 12-Feb-17
250.1.3.2 Main Building Milestones 12-Jul-15 31-Jul-16 12-Jul-15 31-Jul-16
250.1.3.3 Barrack Milestones 27-Jul-15 31-Aug-16 27-Jul-15 31-Aug-16
250.1.3.4 Electricity room Milestones 5-Aug-15 17-Sep-16 5-Aug-15 17-Sep-16
250.1.3.5 Mosque Milestones 1-Aug-15 28-Sep-16 1-Aug-15 28-Sep-16
250.1.3.6 Ware house Milestones 16-Jul-15 31-Oct-16 16-Jul-15 31-Oct-16
250.1.3.9 Main Entrance Milestones 9-Aug-15 31-Oct-16 9-Aug-15 31-Oct-16
250.1.3.7 Kiosk Milestones 7-Aug-16 20-Sep-16 7-Aug-16 20-Sep-16
250.1.8 Testing & Commissioning Milestones 1-Nov-16 15-Feb-17 1-Nov-16 15-Feb-17
250.1.5 Handing Over & Project Close Out Milestones 26-Dec-16 29-Mar-17 26-Dec-16 29-Mar-17
250.2 Engineering Works 9-Apr-15 11-Jul-15 9-Apr-15 11-Jul-15
250.2.1 Design Work 9-Apr-15 11-Jul-15 9-Apr-15 11-Jul-15
250.2.1.1 Site Adaptation 9-Apr-15 8-May-15 9-Apr-15 8-May-15
250.2.1.2 Design Work 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.3 Main Building 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.3.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.3.2 Design Approval 19-May-15 11-Jul-15 19-May-15 11-Jul-15
250.2.1.2.1 Barracks 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.1.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.1.2 Design Approval 19-May-15 11-Jul-15 19-May-15 11-Jul-15

Page 1 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.2.1.2.2 Electricity room 9-May-15 9-Jul-15 9-May-15 9-Jul-15


250.2.1.2.2.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.2.2 Design Approval 19-May-15 9-Jul-15 19-May-15 9-Jul-15
250.2.1.2.4 Mosque 9-May-15 9-Jul-15 9-May-15 9-Jul-15
250.2.1.2.4.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.4.2 Design Approval 19-May-15 9-Jul-15 19-May-15 9-Jul-15
250.2.1.2.5 Ware house 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.5.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.5.2 Design Approval 19-May-15 11-Jul-15 19-May-15 11-Jul-15
250.2.1.2.8 Main Entrance 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.8.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.8.2 Design Approval 19-May-15 11-Jul-15 19-May-15 11-Jul-15
250.2.1.2.6 Kiosk 9-May-15 11-Jul-15 9-May-15 11-Jul-15
250.2.1.2.6.1 Design Submittal 9-May-15 29-Jun-15 9-May-15 29-Jun-15
250.2.1.2.6.2 Design Approval 19-May-15 11-Jul-15 19-May-15 11-Jul-15
250.20 Mobilization Works 9-May-15 7-Jul-15 9-May-15 7-Jul-15
250.20.1 Caravans 9-May-15 28-May-15 9-May-15 28-May-15
250.20.1.5 CONSTRUCTION OF CARAVANS 9-May-15 28-May-15 9-May-15 28-May-15
250.20.4 Intial Manpower and Equipment Mobilization 9-May-15 28-May-15 9-May-15 28-May-15
250.20.6 Outer Fence 29-May-15 17-Jun-15 29-May-15 17-Jun-15
250.20.6.5 CONSTRUCTION OF FENCE 29-May-15 17-Jun-15 29-May-15 17-Jun-15
250.20.2 Sign Board 18-Jun-15 7-Jul-15 18-Jun-15 7-Jul-15
250.20.2.5 CONSTRUCTION OF SIGN BOARD 18-Jun-15 7-Jul-15 18-Jun-15 7-Jul-15
250.20.3 Soil Investigation 9-May-15 16-May-15 9-May-15 16-May-15
250.3 Shop Drawings 12-Jul-15 2-Apr-16 12-Jul-15 2-Apr-16
250.3.4 Shop Drawings Submittal 12-Jul-15 16-Mar-16 12-Jul-15 16-Mar-16
250.3.4.6 Site Plan 27-Oct-15 30-Nov-15 27-Oct-15 30-Nov-15
250.3.4.6.2 SURVEY & SITE LEVELLING 27-Oct-15 2-Nov-15 27-Oct-15 2-Nov-15
250.3.4.6.3 INFRASTRUCTURES & NEWWORKS 3-Nov-15 9-Nov-15 3-Nov-15 9-Nov-15

Page 2 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.4.6.4 PAVEMENT & ROAD WORKS 10-Nov-15 16-Nov-15 10-Nov-15 16-Nov-15


250.3.4.6.5 BOUNDARY WALL 17-Nov-15 23-Nov-15 17-Nov-15 23-Nov-15
250.3.4.6.6 LANDSCAPE 24-Nov-15 30-Nov-15 24-Nov-15 30-Nov-15
250.3.4.7 Architectural 12-Jul-15 12-Mar-16 12-Jul-15 12-Mar-16
250.3.4.7.1 Main Building 12-Jul-15 26-Oct-15 12-Jul-15 26-Oct-15
250.3.4.7.1.2 Ground floor 12-Jul-15 18-Aug-15 12-Jul-15 18-Aug-15
250.3.4.7.1.3 First floor 19-Aug-15 22-Sep-15 19-Aug-15 22-Sep-15
250.3.4.7.1.5 Roof 24-Sep-15 12-Oct-15 24-Sep-15 12-Oct-15
250.3.4.7.1.4 Elevation 13-Oct-15 26-Oct-15 13-Oct-15 26-Oct-15
250.3.4.7.2 Barracks 27-Oct-15 6-Dec-15 27-Oct-15 6-Dec-15
250.3.4.7.2.2 Ground floor 27-Oct-15 24-Nov-15 27-Oct-15 24-Nov-15
250.3.4.7.2.7 Roof 25-Nov-15 30-Nov-15 25-Nov-15 30-Nov-15
250.3.4.7.2.4 Elevation 1-Dec-15 6-Dec-15 1-Dec-15 6-Dec-15
250.3.4.7.3 Electricity room 25-Jan-16 10-Feb-16 25-Jan-16 10-Feb-16
250.3.4.7.3.2 Ground floor 25-Jan-16 7-Feb-16 25-Jan-16 7-Feb-16
250.3.4.7.3.4 Elevation 8-Feb-16 10-Feb-16 8-Feb-16 10-Feb-16
250.3.4.7.4 Mosque 7-Dec-15 30-Dec-15 7-Dec-15 30-Dec-15
250.3.4.7.4.2 Ground floor 7-Dec-15 23-Dec-15 7-Dec-15 23-Dec-15
250.3.4.7.4.3 Roof 24-Dec-15 27-Dec-15 24-Dec-15 27-Dec-15
250.3.4.7.4.4 Elevation 28-Dec-15 30-Dec-15 28-Dec-15 30-Dec-15
250.3.4.7.5 Ware house 31-Dec-15 24-Jan-16 31-Dec-15 24-Jan-16
250.3.4.7.5.2 Ground floor 31-Dec-15 17-Jan-16 31-Dec-15 17-Jan-16
250.3.4.7.5.3 Roof 18-Jan-16 20-Jan-16 18-Jan-16 20-Jan-16
250.3.4.7.5.4 Elevation 21-Jan-16 24-Jan-16 21-Jan-16 24-Jan-16
250.3.4.7.8 Main Entrance 11-Feb-16 9-Mar-16 11-Feb-16 9-Mar-16
250.3.4.7.8.2 Ground floor 11-Feb-16 28-Feb-16 11-Feb-16 28-Feb-16
250.3.4.7.8.3 Roof 29-Feb-16 2-Mar-16 29-Feb-16 2-Mar-16
250.3.4.7.8.4 Elevation 3-Mar-16 9-Mar-16 3-Mar-16 9-Mar-16
250.3.4.7.6 Kiosk 10-Mar-16 12-Mar-16 10-Mar-16 12-Mar-16

Page 3 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.4.7.6.2 Ground floor 10-Mar-16 12-Mar-16 10-Mar-16 12-Mar-16


250.3.4.1 Structural 12-Jul-15 1-Sep-15 12-Jul-15 1-Sep-15
250.3.4.1.1 Main Building 12-Jul-15 1-Sep-15 12-Jul-15 1-Sep-15
250.3.4.1.1.1 Foundation 12-Jul-15 18-Jul-15 12-Jul-15 18-Jul-15
250.3.4.1.1.2 Ground floor 22-Jul-15 4-Aug-15 22-Jul-15 4-Aug-15
250.3.4.1.1.3 First floor 5-Aug-15 18-Aug-15 5-Aug-15 18-Aug-15
250.3.4.1.1.5 Roof 19-Aug-15 1-Sep-15 19-Aug-15 1-Sep-15
250.3.4.1.2 Barracks 22-Jul-15 8-Aug-15 22-Jul-15 8-Aug-15
250.3.4.1.2.1 Foundation 22-Jul-15 27-Jul-15 22-Jul-15 27-Jul-15
250.3.4.1.2.2 Ground floor 28-Jul-15 8-Aug-15 28-Jul-15 8-Aug-15
250.3.4.1.3 Electricity room 22-Jul-15 1-Aug-15 22-Jul-15 1-Aug-15
250.3.4.1.3.1 Foundation 22-Jul-15 25-Jul-15 22-Jul-15 25-Jul-15
250.3.4.1.3.2 Ground floor 26-Jul-15 1-Aug-15 26-Jul-15 1-Aug-15
250.3.4.1.4 Mosque 12-Jul-15 25-Jul-15 12-Jul-15 25-Jul-15
250.3.4.1.4.1 Foundation 12-Jul-15 14-Jul-15 12-Jul-15 14-Jul-15
250.3.4.1.4.2 Ground floor 15-Jul-15 25-Jul-15 15-Jul-15 25-Jul-15
250.3.4.1.5 Ware house 22-Jul-15 1-Aug-15 22-Jul-15 1-Aug-15
250.3.4.1.5.1 Foundation 22-Jul-15 25-Jul-15 22-Jul-15 25-Jul-15
250.3.4.1.5.2 Ground floor 26-Jul-15 1-Aug-15 26-Jul-15 1-Aug-15
250.3.4.1.8 Main Entrance 22-Jul-15 1-Aug-15 22-Jul-15 1-Aug-15
250.3.4.1.8.1 Foundation 22-Jul-15 25-Jul-15 22-Jul-15 25-Jul-15
250.3.4.1.8.2 Ground floor 26-Jul-15 1-Aug-15 26-Jul-15 1-Aug-15
250.3.4.1.6 Kiosk 2-Aug-15 8-Aug-15 2-Aug-15 8-Aug-15
250.3.4.1.6.1 Foundation 2-Aug-15 5-Aug-15 2-Aug-15 5-Aug-15
250.3.4.1.6.2 Ground floor 6-Aug-15 8-Aug-15 6-Aug-15 8-Aug-15
250.3.4.2 Electrical 2-Sep-15 14-Mar-16 2-Sep-15 14-Mar-16
250.3.4.2.1 Main Building 2-Sep-15 15-Sep-15 2-Sep-15 15-Sep-15
250.3.4.2.1.2 Ground floor 2-Sep-15 8-Sep-15 2-Sep-15 8-Sep-15
250.3.4.2.1.3 First floor 9-Sep-15 15-Sep-15 9-Sep-15 15-Sep-15

Page 4 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.4.2.2 Barracks 16-Sep-15 21-Sep-15 16-Sep-15 21-Sep-15


250.3.4.2.2.2 Ground floor 16-Sep-15 21-Sep-15 16-Sep-15 21-Sep-15
250.3.4.2.3 Electricity room 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.2.3.2 Ground floor 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.2.4 Mosque 22-Sep-15 1-Oct-15 22-Sep-15 1-Oct-15
250.3.4.2.4.2 Ground floor 22-Sep-15 1-Oct-15 22-Sep-15 1-Oct-15
250.3.4.2.5 Ware house 3-Oct-15 6-Oct-15 3-Oct-15 6-Oct-15
250.3.4.2.5.2 Ground floor 3-Oct-15 6-Oct-15 3-Oct-15 6-Oct-15
250.3.4.2.8 Main Enrance 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.2.8.2 Ground floor 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.2.6 Kiosk 13-Mar-16 14-Mar-16 13-Mar-16 14-Mar-16
250.3.4.2.6.2 Ground floor 13-Mar-16 14-Mar-16 13-Mar-16 14-Mar-16
250.3.4.8 Mechanical 9-Sep-15 16-Mar-16 9-Sep-15 16-Mar-16
250.3.4.8.4 Plumbing 9-Sep-15 20-Oct-15 9-Sep-15 20-Oct-15
250.3.4.8.4.1 Main Building 9-Sep-15 22-Sep-15 9-Sep-15 22-Sep-15
250.3.4.8.4.1.2 Ground floor 9-Sep-15 15-Sep-15 9-Sep-15 15-Sep-15
250.3.4.8.4.1.3 First floor 16-Sep-15 22-Sep-15 16-Sep-15 22-Sep-15
250.3.4.8.4.2 Barracks 22-Sep-15 3-Oct-15 22-Sep-15 3-Oct-15
250.3.4.8.4.2.2 Ground floor 22-Sep-15 3-Oct-15 22-Sep-15 3-Oct-15
250.3.4.8.4.4 Mosque 3-Oct-15 6-Oct-15 3-Oct-15 6-Oct-15
250.3.4.8.4.4.2 Ground floor 3-Oct-15 6-Oct-15 3-Oct-15 6-Oct-15
250.3.4.8.4.5 Ware house 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.8.4.5.2 Ground floor 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.8.4.7 Main entrance 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.4.7.2 Ground floor 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.3 Fire fighting 16-Sep-15 25-Oct-15 16-Sep-15 25-Oct-15
250.3.4.8.3.1 Main Building 16-Sep-15 5-Oct-15 16-Sep-15 5-Oct-15
250.3.4.8.3.1.2 Ground floor 16-Sep-15 22-Sep-15 16-Sep-15 22-Sep-15
250.3.4.8.3.1.3 First floor 24-Sep-15 5-Oct-15 24-Sep-15 5-Oct-15

Page 5 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.4.8.3.2 Barracks 4-Oct-15 8-Oct-15 4-Oct-15 8-Oct-15


250.3.4.8.3.2.2 Ground floor 4-Oct-15 8-Oct-15 4-Oct-15 8-Oct-15
250.3.4.8.3.3 Electricity room 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.3.3.2 Ground floor 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.3.4 Mosque 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.8.3.4.2 Ground floor 7-Oct-15 11-Oct-15 7-Oct-15 11-Oct-15
250.3.4.8.3.5 Ware house 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.3.5.2 Ground floor 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.3.7 Main Entrance 21-Oct-15 25-Oct-15 21-Oct-15 25-Oct-15
250.3.4.8.3.7.2 Ground floor 21-Oct-15 25-Oct-15 21-Oct-15 25-Oct-15
250.3.4.8.5 HVAC 24-Sep-15 16-Mar-16 24-Sep-15 16-Mar-16
250.3.4.8.5.1 Main Building 24-Sep-15 12-Oct-15 24-Sep-15 12-Oct-15
250.3.4.8.5.1.2 Ground floor 24-Sep-15 5-Oct-15 24-Sep-15 5-Oct-15
250.3.4.8.5.1.3 First floor 6-Oct-15 12-Oct-15 6-Oct-15 12-Oct-15
250.3.4.8.5.2 Barracks 10-Oct-15 14-Oct-15 10-Oct-15 14-Oct-15
250.3.4.8.5.2.2 Ground floor 10-Oct-15 14-Oct-15 10-Oct-15 14-Oct-15
250.3.4.8.5.3 Electricity room 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.5.3.2 Ground floor 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.5.4 Mosque 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.5.4.2 Ground floor 12-Oct-15 15-Oct-15 12-Oct-15 15-Oct-15
250.3.4.8.5.5 Ware house 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.5.5.2 Ground floor 17-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15
250.3.4.8.5.8 Main Entrance 26-Oct-15 29-Oct-15 26-Oct-15 29-Oct-15
250.3.4.8.5.8.2 Ground floor 26-Oct-15 29-Oct-15 26-Oct-15 29-Oct-15
250.3.4.8.5.6 Kiosk 15-Mar-16 16-Mar-16 15-Mar-16 16-Mar-16
250.3.4.8.5.6.2 Ground floor 15-Mar-16 16-Mar-16 15-Mar-16 16-Mar-16
250.3.1 Shop Drawings Approval 15-Jul-15 2-Apr-16 15-Jul-15 2-Apr-16
250.3.1.6 Site Plan 3-Nov-15 16-Dec-15 3-Nov-15 16-Dec-15
250.3.1.6.2 SURVEY & SITE LEVELLING 3-Nov-15 18-Nov-15 3-Nov-15 18-Nov-15

Page 6 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.1.6.3 INFRASTRUCTURES & NEWWORKS 10-Nov-15 25-Nov-15 10-Nov-15 25-Nov-15


250.3.1.6.4 PAVEMENT & ROAD WORKS 17-Nov-15 2-Dec-15 17-Nov-15 2-Dec-15
250.3.1.6.5 BOUNDARY WALL 24-Nov-15 9-Dec-15 24-Nov-15 9-Dec-15
250.3.1.6.6 LANDSCAPE 1-Dec-15 16-Dec-15 1-Dec-15 16-Dec-15
250.3.1.7 Architectural 22-Jul-15 28-Mar-16 22-Jul-15 28-Mar-16
250.3.1.7.1 Main Building 22-Jul-15 11-Nov-15 22-Jul-15 11-Nov-15
250.3.1.7.1.2 Ground floor 22-Jul-15 3-Sep-15 22-Jul-15 3-Sep-15
250.3.1.7.1.3 First floor 26-Aug-15 14-Oct-15 26-Aug-15 14-Oct-15
250.3.1.7.1.5 Roof 6-Oct-15 28-Oct-15 6-Oct-15 28-Oct-15
250.3.1.7.1.4 Elevation 20-Oct-15 11-Nov-15 20-Oct-15 11-Nov-15
250.3.1.7.2 Barracks 2-Nov-15 22-Dec-15 2-Nov-15 22-Dec-15
250.3.1.7.2.2 Ground floor 2-Nov-15 10-Dec-15 2-Nov-15 10-Dec-15
250.3.1.7.2.7 Roof 1-Dec-15 16-Dec-15 1-Dec-15 16-Dec-15
250.3.1.7.2.4 Elevation 7-Dec-15 22-Dec-15 7-Dec-15 22-Dec-15
250.3.1.7.3 Electricity room 28-Jan-16 27-Feb-16 28-Jan-16 27-Feb-16
250.3.1.7.3.2 Ground floor 28-Jan-16 23-Feb-16 28-Jan-16 23-Feb-16
250.3.1.7.3.4 Elevation 11-Feb-16 27-Feb-16 11-Feb-16 27-Feb-16
250.3.1.7.4 Mosque 10-Dec-15 16-Jan-16 10-Dec-15 16-Jan-16
250.3.1.7.4.2 Ground floor 10-Dec-15 9-Jan-16 10-Dec-15 9-Jan-16
250.3.1.7.4.3 Roof 28-Dec-15 12-Jan-16 28-Dec-15 12-Jan-16
250.3.1.7.4.4 Elevation 31-Dec-15 16-Jan-16 31-Dec-15 16-Jan-16
250.3.1.7.5 Ware house 4-Jan-16 9-Feb-16 4-Jan-16 9-Feb-16
250.3.1.7.5.2 Ground floor 4-Jan-16 2-Feb-16 4-Jan-16 2-Feb-16
250.3.1.7.5.3 Roof 21-Jan-16 6-Feb-16 21-Jan-16 6-Feb-16
250.3.1.7.5.4 Elevation 25-Jan-16 9-Feb-16 25-Jan-16 9-Feb-16
250.3.1.7.8 Main Entrance 15-Feb-16 26-Mar-16 15-Feb-16 26-Mar-16
250.3.1.7.8.2 Ground floor 15-Feb-16 15-Mar-16 15-Feb-16 15-Mar-16
250.3.1.7.8.3 Roof 3-Mar-16 19-Mar-16 3-Mar-16 19-Mar-16
250.3.1.7.8.4 Elevation 7-Mar-16 26-Mar-16 7-Mar-16 26-Mar-16

Page 7 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.1.7.6 Kiosk 13-Mar-16 28-Mar-16 13-Mar-16 28-Mar-16


250.3.1.7.6.2 Ground floor 13-Mar-16 28-Mar-16 13-Mar-16 28-Mar-16
250.3.1.1 Structural 15-Jul-15 17-Sep-15 15-Jul-15 17-Sep-15
250.3.1.1.1 Main Building 22-Jul-15 17-Sep-15 22-Jul-15 17-Sep-15
250.3.1.1.1.1 Foundation 22-Jul-15 6-Aug-15 22-Jul-15 6-Aug-15
250.3.1.1.1.2 Ground floor 29-Jul-15 20-Aug-15 29-Jul-15 20-Aug-15
250.3.1.1.1.3 First floor 12-Aug-15 3-Sep-15 12-Aug-15 3-Sep-15
250.3.1.1.1.5 Roof 26-Aug-15 17-Sep-15 26-Aug-15 17-Sep-15
250.3.1.1.2 Barracks 28-Jul-15 24-Aug-15 28-Jul-15 24-Aug-15
250.3.1.1.2.1 Foundation 28-Jul-15 12-Aug-15 28-Jul-15 12-Aug-15
250.3.1.1.2.2 Ground floor 3-Aug-15 24-Aug-15 3-Aug-15 24-Aug-15
250.3.1.1.3 Electricity room 26-Jul-15 17-Aug-15 26-Jul-15 17-Aug-15
250.3.1.1.3.1 Foundation 26-Jul-15 10-Aug-15 26-Jul-15 10-Aug-15
250.3.1.1.3.2 Ground floor 29-Jul-15 17-Aug-15 29-Jul-15 17-Aug-15
250.3.1.1.4 Mosque 15-Jul-15 10-Aug-15 15-Jul-15 10-Aug-15
250.3.1.1.4.1 Foundation 15-Jul-15 3-Aug-15 15-Jul-15 3-Aug-15
250.3.1.1.4.2 Ground floor 22-Jul-15 10-Aug-15 22-Jul-15 10-Aug-15
250.3.1.1.5 Ware house 26-Jul-15 17-Aug-15 26-Jul-15 17-Aug-15
250.3.1.1.5.1 Foundation 26-Jul-15 10-Aug-15 26-Jul-15 10-Aug-15
250.3.1.1.5.2 Ground floor 29-Jul-15 17-Aug-15 29-Jul-15 17-Aug-15
250.3.1.1.8 Main Entrance 26-Jul-15 17-Aug-15 26-Jul-15 17-Aug-15
250.3.1.1.8.1 Foundation 26-Jul-15 10-Aug-15 26-Jul-15 10-Aug-15
250.3.1.1.8.2 Ground floor 29-Jul-15 17-Aug-15 29-Jul-15 17-Aug-15
250.3.1.1.6 Kiosk 4-Aug-15 24-Aug-15 4-Aug-15 24-Aug-15
250.3.1.1.6.1 Foundation 4-Aug-15 22-Aug-15 4-Aug-15 22-Aug-15
250.3.1.1.6.2 Ground floor 9-Aug-15 24-Aug-15 9-Aug-15 24-Aug-15
250.3.1.2 Electrical 9-Sep-15 30-Mar-16 9-Sep-15 30-Mar-16
250.3.1.2.1 Main Building 9-Sep-15 7-Oct-15 9-Sep-15 7-Oct-15
250.3.1.2.1.2 Ground floor 9-Sep-15 30-Sep-15 9-Sep-15 30-Sep-15

Page 8 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.1.2.1.3 First floor 16-Sep-15 7-Oct-15 16-Sep-15 7-Oct-15


250.3.1.2.2 Barracks 22-Sep-15 13-Oct-15 22-Sep-15 13-Oct-15
250.3.1.2.2.2 Ground floor 22-Sep-15 13-Oct-15 22-Sep-15 13-Oct-15
250.3.1.2.3 Electricity room 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.2.3.2 Ground floor 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.2.4 Mosque 3-Oct-15 18-Oct-15 3-Oct-15 18-Oct-15
250.3.1.2.4.2 Ground floor 3-Oct-15 18-Oct-15 3-Oct-15 18-Oct-15
250.3.1.2.5 Ware house 7-Oct-15 22-Oct-15 7-Oct-15 22-Oct-15
250.3.1.2.5.2 Ground floor 7-Oct-15 22-Oct-15 7-Oct-15 22-Oct-15
250.3.1.2.8 Main Entrance 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.2.8.2 Ground floor 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.2.6 Kiosk 15-Mar-16 30-Mar-16 15-Mar-16 30-Mar-16
250.3.1.2.6.2 Ground floor 15-Mar-16 30-Mar-16 15-Mar-16 30-Mar-16
250.3.1.8 Mechanical 16-Sep-15 2-Apr-16 16-Sep-15 2-Apr-16
250.3.1.8.4 Plumbing 16-Sep-15 5-Nov-15 16-Sep-15 5-Nov-15
250.3.1.8.4.1 Main Building 16-Sep-15 14-Oct-15 16-Sep-15 14-Oct-15
250.3.1.8.4.1.2 Ground floor 16-Sep-15 7-Oct-15 16-Sep-15 7-Oct-15
250.3.1.8.4.1.3 First floor 24-Sep-15 14-Oct-15 24-Sep-15 14-Oct-15
250.3.1.8.4.2 Barracks 4-Oct-15 19-Oct-15 4-Oct-15 19-Oct-15
250.3.1.8.4.2.2 Ground floor 4-Oct-15 19-Oct-15 4-Oct-15 19-Oct-15
250.3.1.8.4.4 Mosque 7-Oct-15 22-Oct-15 7-Oct-15 22-Oct-15
250.3.1.8.4.4.2 Ground floor 7-Oct-15 22-Oct-15 7-Oct-15 22-Oct-15
250.3.1.8.4.5 Ware house 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.8.4.5.2 Ground floor 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.8.4.7 Main Entrance 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.4.7.2 Ground floor 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.3 Fire fighting 24-Sep-15 10-Nov-15 24-Sep-15 10-Nov-15
250.3.1.8.3.1 Main Building 24-Sep-15 21-Oct-15 24-Sep-15 21-Oct-15
250.3.1.8.3.1.2 Ground floor 24-Sep-15 14-Oct-15 24-Sep-15 14-Oct-15

Page 9 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.3.1.8.3.1.3 First floor 6-Oct-15 21-Oct-15 6-Oct-15 21-Oct-15


250.3.1.8.3.2 Barracks 10-Oct-15 25-Oct-15 10-Oct-15 25-Oct-15
250.3.1.8.3.2.2 Ground floor 10-Oct-15 25-Oct-15 10-Oct-15 25-Oct-15
250.3.1.8.3.3 Electricity room 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.3.3.2 Ground floor 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.3.4 Mosque 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.8.3.4.2 Ground floor 12-Oct-15 27-Oct-15 12-Oct-15 27-Oct-15
250.3.1.8.3.5 Ware house 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.3.5.2 Ground floor 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.3.7 Main Entrance 26-Oct-15 10-Nov-15 26-Oct-15 10-Nov-15
250.3.1.8.3.7.2 Ground floor 26-Oct-15 10-Nov-15 26-Oct-15 10-Nov-15
250.3.1.8.5 HVAC 6-Oct-15 2-Apr-16 6-Oct-15 2-Apr-16
250.3.1.8.5.1 Main Building 6-Oct-15 28-Oct-15 6-Oct-15 28-Oct-15
250.3.1.8.5.1.2 Ground floor 6-Oct-15 21-Oct-15 6-Oct-15 21-Oct-15
250.3.1.8.5.1.3 First floor 13-Oct-15 28-Oct-15 13-Oct-15 28-Oct-15
250.3.1.8.5.2 Barracks 15-Oct-15 31-Oct-15 15-Oct-15 31-Oct-15
250.3.1.8.5.2.2 Ground floor 15-Oct-15 31-Oct-15 15-Oct-15 31-Oct-15
250.3.1.8.5.3 Electricity room 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.5.3.2 Ground floor 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.5.4 Mosque 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.5.4.2 Ground floor 17-Oct-15 1-Nov-15 17-Oct-15 1-Nov-15
250.3.1.8.5.5 Ware house 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.5.5.2 Ground floor 21-Oct-15 5-Nov-15 21-Oct-15 5-Nov-15
250.3.1.8.5.8 Main Entrance 31-Oct-15 15-Nov-15 31-Oct-15 15-Nov-15
250.3.1.8.5.8.2 Ground floor 31-Oct-15 15-Nov-15 31-Oct-15 15-Nov-15
250.3.1.8.5.6 Kiosk 17-Mar-16 2-Apr-16 17-Mar-16 2-Apr-16
250.3.1.8.5.6.2 Ground floor 17-Mar-16 2-Apr-16 17-Mar-16 2-Apr-16
250.4 Procurement 9-May-15 23-Jun-16 9-May-15 23-Jun-16
250.4.2 P.O. 9-May-15 3-Apr-16 9-May-15 3-Apr-16

Page 10 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.4.2.7 Site Plan Materials 26-May-15 3-Apr-16 26-May-15 3-Apr-16


250.4.2.7.10 EARTH MATERIALS 26-May-15 19-Mar-16 26-May-15 19-Mar-16
250.4.2.7.20 DRAINAGE SYSTEM MATERIALS 31-Aug-15 24-Feb-16 31-Aug-15 24-Feb-16
250.4.2.7.60 BOUNDARY WALL MATERIALS 15-Aug-15 30-Aug-15 15-Aug-15 30-Aug-15
250.4.2.7.30 ELECTRICAL MATERIALS 18-Jan-16 22-Mar-16 18-Jan-16 22-Mar-16
250.4.2.7.40 PORTABEL & IRRIGATION SYSTEM MATERIALS 20-Sep-15 31-Dec-15 20-Sep-15 31-Dec-15
250.4.2.7.50 FIRE FIGHTING SYSTEM MATERIALS 19-Dec-15 16-Feb-16 19-Dec-15 16-Feb-16
250.4.2.7.70 PAVEMENT & ROADS MATERIALS 20-Jan-16 22-Mar-16 20-Jan-16 22-Mar-16
250.4.2.7.80 LAND SCAPE MATERIALS 20-Jan-16 3-Apr-16 20-Jan-16 3-Apr-16
250.4.2.1 Buildings Materials 9-May-15 13-Feb-16 9-May-15 13-Feb-16
250.4.2.1.1 CONCRETE MATERIALS 9-May-15 4-Jun-15 9-May-15 4-Jun-15
250.4.2.1.7 Block Works 29-Jul-15 13-Aug-15 29-Jul-15 13-Aug-15
250.4.2.1.8 Metal Fabrications Works 10-Nov-15 9-Feb-16 10-Nov-15 9-Feb-16
250.4.2.1.9 Proofing and insulation Works 16-May-15 2-Jan-16 16-May-15 2-Jan-16
250.4.2.1.2 FINISH MATERIALS 18-Oct-15 13-Feb-16 18-Oct-15 13-Feb-16
250.4.2.1.3 ELECTRICAL MATERIALS 23-Jun-15 7-Jan-16 23-Jun-15 7-Jan-16
250.4.2.1.4 HVAC MATERIALS 18-Oct-15 7-Dec-15 18-Oct-15 7-Dec-15
250.4.2.1.5 PLUMBING MATERIALS 12-Oct-15 6-Dec-15 12-Oct-15 6-Dec-15
250.4.2.1.6 FIRE FIGHTING MATERIALS 27-Jul-15 12-Oct-15 27-Jul-15 12-Oct-15
250.4.3 Start of Delivery 25-May-15 23-Jun-16 25-May-15 23-Jun-16
250.4.3.7 Site Plan Materials 11-Jun-15 23-Jun-16 11-Jun-15 23-Jun-16
250.4.3.7.10 EARTH MATERIALS 11-Jun-15 30-Mar-16 11-Jun-15 30-Mar-16
250.4.3.7.20 DRAINAGE SYSTEM MATERIALS 31-Aug-15 30-Mar-16 31-Aug-15 30-Mar-16
250.4.3.7.60 BOUNDARY WALL MATERIALS 31-Aug-15 27-Oct-15 31-Aug-15 27-Oct-15
250.4.3.7.30 ELECTRICAL MATERIALS 3-Feb-16 31-May-16 3-Feb-16 31-May-16
250.4.3.7.40 PORTABEL & IRRIGATION SYSTEM MATERIALS 12-Oct-15 14-Apr-16 12-Oct-15 14-Apr-16
250.4.3.7.50 FIRE FIGHTING SYSTEM MATERIALS 4-Jan-16 17-Apr-16 4-Jan-16 17-Apr-16
250.4.3.7.70 PAVEMENT & ROADS MATERIALS 6-Feb-16 26-Apr-16 6-Feb-16 26-Apr-16
250.4.3.7.80 LAND SCAPE MATERIALS 6-Feb-16 23-Jun-16 6-Feb-16 23-Jun-16

Page 11 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.4.3.1 Buildings Materials 25-May-15 13-Apr-16 25-May-15 13-Apr-16


250.4.3.1.1 CONCRETE MATERIALS 25-May-15 16-Jun-15 25-May-15 16-Jun-15
250.4.3.1.7 Block Works 15-Aug-15 17-Sep-15 15-Aug-15 17-Sep-15
250.4.3.1.8 Metal Fabrications Works 26-Nov-15 2-Apr-16 26-Nov-15 2-Apr-16
250.4.3.1.9 Proofing and insulation Works 1-Jun-15 19-Jan-16 1-Jun-15 19-Jan-16
250.4.3.1.2 FINISH MATERIALS 3-Nov-15 13-Apr-16 3-Nov-15 13-Apr-16
250.4.3.1.3 ELECTRICAL MATERIALS 9-Jul-15 14-Mar-16 9-Jul-15 14-Mar-16
250.4.3.1.4 HVAC MATERIALS 28-Oct-15 13-Jan-16 28-Oct-15 13-Jan-16
250.4.3.1.5 PLUMBING MATERIALS 28-Oct-15 10-Feb-16 28-Oct-15 10-Feb-16
250.4.3.1.6 FIRE FIGHTING MATERIALS 12-Aug-15 3-Dec-15 12-Aug-15 3-Dec-15
250.5 Construction 9-May-15 12-Feb-17 9-May-15 12-Feb-17
250.5.02 Division2-Site Works 12-Jul-15 30-Aug-16 12-Jul-15 30-Aug-16
250.5.02.1 Main Building 12-Jul-15 10-Oct-15 12-Jul-15 10-Oct-15
250.5.02.5 Barracks 27-Jul-15 30-Sep-15 27-Jul-15 30-Sep-15
250.5.02.2 Electricity room 5-Aug-15 3-Oct-15 5-Aug-15 3-Oct-15
250.5.02.3 Mosque 1-Aug-15 3-Oct-15 1-Aug-15 3-Oct-15
250.5.02.4 Ware house 16-Jul-15 31-Oct-15 16-Jul-15 31-Oct-15
250.5.02.8 Main Entrance 9-Aug-15 7-Oct-15 9-Aug-15 7-Oct-15
250.5.02.6 Kiosk 7-Aug-16 30-Aug-16 7-Aug-16 30-Aug-16
250.5.03 Division3-Concrete 22-Jul-15 18-Sep-16 22-Jul-15 18-Sep-16
250.5.03.1 Main Building 22-Jul-15 14-Mar-16 22-Jul-15 14-Mar-16
250.5.03.1.3 Sub structure 22-Jul-15 18-Nov-15 22-Jul-15 18-Nov-15
250.5.03.1.3.1 Foundation 22-Jul-15 18-Nov-15 22-Jul-15 18-Nov-15
250.5.03.1.2 Super structure 19-Nov-15 14-Mar-16 19-Nov-15 14-Mar-16
250.5.03.1.2.1 Ground floor 19-Nov-15 14-Dec-15 19-Nov-15 14-Dec-15
250.5.03.1.2.2 First floor 15-Dec-15 24-Jan-16 15-Dec-15 24-Jan-16
250.5.03.1.2.3 Roof 25-Jan-16 14-Mar-16 25-Jan-16 14-Mar-16
250.5.03.5 Barracks 2-Aug-15 22-Jun-16 2-Aug-15 22-Jun-16
250.5.03.5.1 Sub structure 2-Aug-15 12-Oct-15 2-Aug-15 12-Oct-15

Page 12 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.03.5.1.1 Foundation 2-Aug-15 12-Oct-15 2-Aug-15 12-Oct-15


250.5.03.5.2 Super structure 2-Apr-16 22-Jun-16 2-Apr-16 22-Jun-16
250.5.03.5.2.1 Ground floor 2-Apr-16 18-Apr-16 2-Apr-16 18-Apr-16
250.5.03.5.2.2 Roof 18-Jun-16 22-Jun-16 18-Jun-16 22-Jun-16
250.5.03.2 Electricity room 10-Aug-15 23-Jul-16 10-Aug-15 23-Jul-16
250.5.03.2.1 Sub structure 10-Aug-15 13-Oct-15 10-Aug-15 13-Oct-15
250.5.03.2.1.1 Foundation 10-Aug-15 13-Oct-15 10-Aug-15 13-Oct-15
250.5.03.2.2 Super structure 7-Jun-16 23-Jul-16 7-Jun-16 23-Jul-16
250.5.03.2.2.1 Ground floor 7-Jun-16 19-Jun-16 7-Jun-16 19-Jun-16
250.5.03.2.2.2 Roof 18-Jul-16 23-Jul-16 18-Jul-16 23-Jul-16
250.5.03.3 Mosque 6-Aug-15 23-Jul-16 6-Aug-15 23-Jul-16
250.5.03.3.1 Sub structure 6-Aug-15 12-Oct-15 6-Aug-15 12-Oct-15
250.5.03.3.1.1 Foundation 6-Aug-15 12-Oct-15 6-Aug-15 12-Oct-15
250.5.03.3.2 Super structure 5-May-16 23-Jul-16 5-May-16 23-Jul-16
250.5.03.3.2.1 Ground floor 5-May-16 21-May-16 5-May-16 21-May-16
250.5.03.3.2.2 Roof 18-Jul-16 23-Jul-16 18-Jul-16 23-Jul-16
250.5.03.4 Ware house 29-Jul-15 22-Jun-16 29-Jul-15 22-Jun-16
250.5.03.4.1 Sub structure 29-Jul-15 18-Nov-15 29-Jul-15 18-Nov-15
250.5.03.4.1.1 Foundation 29-Jul-15 18-Nov-15 29-Jul-15 18-Nov-15
250.5.03.4.2 Super structure 24-Feb-16 22-Jun-16 24-Feb-16 22-Jun-16
250.5.03.4.2.1 Ground floor 24-Feb-16 31-Mar-16 24-Feb-16 31-Mar-16
250.5.03.4.2.2 Roof 18-Jun-16 22-Jun-16 18-Jun-16 22-Jun-16
250.5.03.8 Main Entrance 13-Aug-15 18-Sep-16 13-Aug-15 18-Sep-16
250.5.03.8.1 Sub structure 13-Aug-15 15-Oct-15 13-Aug-15 15-Oct-15
250.5.03.8.1.1 Foundation 13-Aug-15 15-Oct-15 13-Aug-15 15-Oct-15
250.5.03.8.2 Super structure 6-Jul-16 18-Sep-16 6-Jul-16 18-Sep-16
250.5.03.8.2.1 Ground floor 6-Jul-16 18-Jul-16 6-Jul-16 18-Jul-16
250.5.03.8.2.2 Roof 13-Sep-16 18-Sep-16 13-Sep-16 18-Sep-16
250.5.03.6 Kiosk 10-Aug-16 7-Sep-16 10-Aug-16 7-Sep-16

Page 13 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.03.6.1 Sub structure 10-Aug-16 21-Aug-16 10-Aug-16 21-Aug-16


250.5.03.6.1.1 Foundation 10-Aug-16 21-Aug-16 10-Aug-16 21-Aug-16
250.5.03.6.2 Super structure 1-Sep-16 7-Sep-16 1-Sep-16 7-Sep-16
250.5.03.6.2.1 Ground floor 1-Sep-16 7-Sep-16 1-Sep-16 7-Sep-16
250.5.04 Division4-Masonry 9-Jan-16 12-Sep-16 9-Jan-16 12-Sep-16
250.5.04.1 Main Building 9-Jan-16 8-Mar-16 9-Jan-16 8-Mar-16
250.5.04.1.2 Super structure 9-Jan-16 8-Mar-16 9-Jan-16 8-Mar-16
250.5.04.1.2.1 Ground floor 9-Jan-16 17-Jan-16 9-Jan-16 17-Jan-16
250.5.04.1.2.2 First floor 18-Feb-16 27-Feb-16 18-Feb-16 27-Feb-16
250.5.04.1.2.3 Roof 3-Mar-16 8-Mar-16 3-Mar-16 8-Mar-16
250.5.04.5 Barracks 14-May-16 16-Jun-16 14-May-16 16-Jun-16
250.5.04.5.2 Super structure 14-May-16 16-Jun-16 14-May-16 16-Jun-16
250.5.04.5.2.1 Ground floor 14-May-16 19-May-16 14-May-16 19-May-16
250.5.04.5.2.2 Roof 14-Jun-16 16-Jun-16 14-Jun-16 16-Jun-16
250.5.04.2 Electricity room 14-Jul-16 17-Jul-16 14-Jul-16 17-Jul-16
250.5.04.2.2 Super structure 14-Jul-16 17-Jul-16 14-Jul-16 17-Jul-16
250.5.04.2.2.1 Ground floor 14-Jul-16 17-Jul-16 14-Jul-16 17-Jul-16
250.5.04.3 Mosque 15-Jun-16 17-Jul-16 15-Jun-16 17-Jul-16
250.5.04.3.2 Super structure 15-Jun-16 17-Jul-16 15-Jun-16 17-Jul-16
250.5.04.3.2.1 Ground floor 15-Jun-16 19-Jun-16 15-Jun-16 19-Jun-16
250.5.04.3.2.2 Roof 14-Jul-16 17-Jul-16 14-Jul-16 17-Jul-16
250.5.04.4 Ware house 26-Apr-16 16-Jun-16 26-Apr-16 16-Jun-16
250.5.04.4.2 Super structure 26-Apr-16 16-Jun-16 26-Apr-16 16-Jun-16
250.5.04.4.2.1 Ground floor 26-Apr-16 16-May-16 26-Apr-16 16-May-16
250.5.04.4.2.2 Roof 11-Jun-16 16-Jun-16 11-Jun-16 16-Jun-16
250.5.04.7 Main Entrance 13-Aug-16 12-Sep-16 13-Aug-16 12-Sep-16
250.5.04.7.2 Super structure 13-Aug-16 12-Sep-16 13-Aug-16 12-Sep-16
250.5.04.7.2.1 Ground floor 13-Aug-16 16-Aug-16 13-Aug-16 16-Aug-16
250.5.04.7.2.2 Roof 11-Sep-16 12-Sep-16 11-Sep-16 12-Sep-16

Page 14 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.05 Division5-Metals 10-Mar-16 5-Oct-16 10-Mar-16 5-Oct-16


250.5.05.1 Main Building 10-Mar-16 15-May-16 10-Mar-16 15-May-16
250.5.05.1.2 Super structure 10-Mar-16 15-May-16 10-Mar-16 15-May-16
250.5.05.1.2.1 Ground floor 10-Mar-16 3-Apr-16 10-Mar-16 3-Apr-16
250.5.05.1.2.2 First floor 20-Apr-16 15-May-16 20-Apr-16 15-May-16
250.5.05.1.2.3 Roof 16-Apr-16 18-Apr-16 16-Apr-16 18-Apr-16
250.5.05.5 Barracks 3-Jul-16 27-Jul-16 3-Jul-16 27-Jul-16
250.5.05.5.2 Super structure 3-Jul-16 27-Jul-16 3-Jul-16 27-Jul-16
250.5.05.5.2.1 Ground floor 3-Jul-16 21-Jul-16 3-Jul-16 21-Jul-16
250.5.05.5.2.2 Roof 25-Jul-16 27-Jul-16 25-Jul-16 27-Jul-16
250.5.05.2 Electricity room 20-Aug-16 24-Aug-16 20-Aug-16 24-Aug-16
250.5.05.2.2 Super structure 20-Aug-16 24-Aug-16 20-Aug-16 24-Aug-16
250.5.05.2.2.1 Ground Floor 20-Aug-16 24-Aug-16 20-Aug-16 24-Aug-16
250.5.05.3 Mosque 27-Jul-16 9-Aug-16 27-Jul-16 9-Aug-16
250.5.05.3.2 Super structure 27-Jul-16 9-Aug-16 27-Jul-16 9-Aug-16
250.5.05.3.2.1 Ground floor 27-Jul-16 9-Aug-16 27-Jul-16 9-Aug-16
250.5.05.3.2.2 Roof 7-Aug-16 9-Aug-16 7-Aug-16 9-Aug-16
250.5.05.4 Ware house 31-Jul-16 10-Sep-16 31-Jul-16 10-Sep-16
250.5.05.4.2 Super structure 31-Jul-16 10-Sep-16 31-Jul-16 10-Sep-16
250.5.05.4.2.1 Ground floor 4-Sep-16 10-Sep-16 4-Sep-16 10-Sep-16
250.5.05.4.2.2 Roof 31-Jul-16 2-Aug-16 31-Jul-16 2-Aug-16
250.5.05.7 Main Entrance 7-Sep-16 5-Oct-16 7-Sep-16 5-Oct-16
250.5.05.7.2 Super structure 7-Sep-16 5-Oct-16 7-Sep-16 5-Oct-16
250.5.05.7.2.1 Ground floor 7-Sep-16 8-Sep-16 7-Sep-16 8-Sep-16
250.5.05.7.2.2 Roof 3-Oct-16 5-Oct-16 3-Oct-16 5-Oct-16
250.5.07 Division7-Thermal & Moisture Protection 20-Aug-15 2-Oct-16 20-Aug-15 2-Oct-16
250.5.07.1 Main Building 20-Aug-15 11-Apr-16 20-Aug-15 11-Apr-16
250.5.07.1.3 Sub structure 20-Aug-15 14-Oct-15 20-Aug-15 14-Oct-15
250.5.07.1.3.1 Foundation 20-Aug-15 14-Oct-15 20-Aug-15 14-Oct-15

Page 15 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.07.1.2 Super structure 12-Jan-16 11-Apr-16 12-Jan-16 11-Apr-16


250.5.07.1.2.1 Ground floor 12-Jan-16 24-Feb-16 12-Jan-16 24-Feb-16
250.5.07.1.2.2 First floor 22-Feb-16 5-Apr-16 22-Feb-16 5-Apr-16
250.5.07.1.2.3 Roof 15-Mar-16 11-Apr-16 15-Mar-16 11-Apr-16
250.5.07.5 Barracks 25-Aug-15 20-Jul-16 25-Aug-15 20-Jul-16
250.5.07.5.1 Sub structure 25-Aug-15 3-Oct-15 25-Aug-15 3-Oct-15
250.5.07.5.1.1 Foundation 25-Aug-15 3-Oct-15 25-Aug-15 3-Oct-15
250.5.07.5.2 Super structure 19-May-16 20-Jul-16 19-May-16 20-Jul-16
250.5.07.5.2.1 Ground floor 19-May-16 16-Jun-16 19-May-16 16-Jun-16
250.5.07.5.2.2 Roof 23-Jun-16 20-Jul-16 23-Jun-16 20-Jul-16
250.5.07.2 Electricity room 3-Sep-15 7-Aug-16 3-Sep-15 7-Aug-16
250.5.07.2.1 Sub structure 3-Sep-15 5-Oct-15 3-Sep-15 5-Oct-15
250.5.07.2.1.1 Foundation 3-Sep-15 5-Oct-15 3-Sep-15 5-Oct-15
250.5.07.2.2 Super structure 18-Jul-16 7-Aug-16 18-Jul-16 7-Aug-16
250.5.07.2.2.1 Ground floor 18-Jul-16 7-Aug-16 18-Jul-16 7-Aug-16
250.5.07.2.2.2 Roof 24-Jul-16 6-Aug-16 24-Jul-16 6-Aug-16
250.5.07.3 Mosque 31-Aug-15 6-Aug-16 31-Aug-15 6-Aug-16
250.5.07.3.1 Sub structure 31-Aug-15 5-Oct-15 31-Aug-15 5-Oct-15
250.5.07.3.1.1 Foundation 31-Aug-15 5-Oct-15 31-Aug-15 5-Oct-15
250.5.07.3.2 Super structure 18-Jun-16 6-Aug-16 18-Jun-16 6-Aug-16
250.5.07.3.2.1 Ground floor 18-Jun-16 20-Jun-16 18-Jun-16 20-Jun-16
250.5.07.3.2.2 Roof 24-Jul-16 6-Aug-16 24-Jul-16 6-Aug-16
250.5.07.4 Ware house 2-Sep-15 30-Jul-16 2-Sep-15 30-Jul-16
250.5.07.4.1 Sub structure 2-Sep-15 4-Nov-15 2-Sep-15 4-Nov-15
250.5.07.4.1.1 Foundation 2-Sep-15 4-Nov-15 2-Sep-15 4-Nov-15
250.5.07.4.2 Super structure 30-Apr-16 30-Jul-16 30-Apr-16 30-Jul-16
250.5.07.4.2.1 Ground floor 30-Apr-16 29-Jun-16 30-Apr-16 29-Jun-16
250.5.07.4.2.2 Roof 23-Jun-16 30-Jul-16 23-Jun-16 30-Jul-16
250.5.07.8 Main Entrance 7-Sep-15 2-Oct-16 7-Sep-15 2-Oct-16

Page 16 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.07.8.1 Sub structure 7-Sep-15 8-Oct-15 7-Sep-15 8-Oct-15


250.5.07.8.1.1 Foundation 7-Sep-15 8-Oct-15 7-Sep-15 8-Oct-15
250.5.07.8.2 Super structure 17-Aug-16 2-Oct-16 17-Aug-16 2-Oct-16
250.5.07.8.2.1 Ground floor 17-Aug-16 31-Aug-16 17-Aug-16 31-Aug-16
250.5.07.8.2.2 Roof 19-Sep-16 2-Oct-16 19-Sep-16 2-Oct-16
250.5.07.6 Kiosk 24-Aug-16 31-Aug-16 24-Aug-16 31-Aug-16
250.5.07.6.1 Substructure 24-Aug-16 31-Aug-16 24-Aug-16 31-Aug-16
250.5.07.6.1.1 Foundation 24-Aug-16 31-Aug-16 24-Aug-16 31-Aug-16
250.5.08 Division8-Doors & Windows 16-Jan-16 26-Sep-16 16-Jan-16 26-Sep-16
250.5.08.1 Main Building 16-Jan-16 26-Jun-16 16-Jan-16 26-Jun-16
250.5.08.1.2 Super structure 16-Jan-16 26-Jun-16 16-Jan-16 26-Jun-16
250.5.08.1.2.1 Ground floor 16-Jan-16 16-Jun-16 16-Jan-16 16-Jun-16
250.5.08.1.2.2 First floor 25-Feb-16 26-Jun-16 25-Feb-16 26-Jun-16
250.5.08.5 Barracks 21-May-16 25-Jul-16 21-May-16 25-Jul-16
250.5.08.5.2 Super structure 21-May-16 25-Jul-16 21-May-16 25-Jul-16
250.5.08.5.2.1 Ground floor 21-May-16 25-Jul-16 21-May-16 25-Jul-16
250.5.08.2 Electricity room 18-Jul-16 30-Aug-16 18-Jul-16 30-Aug-16
250.5.08.2.2 Super structure 18-Jul-16 30-Aug-16 18-Jul-16 30-Aug-16
250.5.08.2.2.1 Ground floor 18-Jul-16 30-Aug-16 18-Jul-16 30-Aug-16
250.5.08.3 Mosque 20-Jun-16 13-Aug-16 20-Jun-16 13-Aug-16
250.5.08.3.2 Super structure 20-Jun-16 13-Aug-16 20-Jun-16 13-Aug-16
250.5.08.3.2.1 Ground floor 20-Jun-16 13-Aug-16 20-Jun-16 13-Aug-16
250.5.08.4 Ware house 12-May-16 26-Sep-16 12-May-16 26-Sep-16
250.5.08.4.2 Super structure 12-May-16 26-Sep-16 12-May-16 26-Sep-16
250.5.08.4.2.1 Ground floor 12-May-16 26-Sep-16 12-May-16 26-Sep-16
250.5.08.7 Main Entrance 17-Aug-16 18-Sep-16 17-Aug-16 18-Sep-16
250.5.08.7.2 Super structure 17-Aug-16 18-Sep-16 17-Aug-16 18-Sep-16
250.5.08.7.2.1 Ground floor 17-Aug-16 18-Sep-16 17-Aug-16 18-Sep-16
250.5.09 Division9-Finishes 1-Feb-16 24-Oct-16 1-Feb-16 24-Oct-16

Page 17 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.09.1 Main Building 1-Feb-16 21-Jun-16 1-Feb-16 21-Jun-16


250.5.09.1.2 Super structure 1-Feb-16 21-Jun-16 1-Feb-16 21-Jun-16
250.5.09.1.2.1 Ground floor 1-Feb-16 26-May-16 1-Feb-16 26-May-16
250.5.09.1.2.2 First floor 13-Mar-16 7-Jun-16 13-Mar-16 7-Jun-16
250.5.09.1.2.3 Roof 19-Apr-16 24-Apr-16 19-Apr-16 24-Apr-16
250.5.09.1.2.4 Elevation 25-Apr-16 21-Jun-16 25-Apr-16 21-Jun-16
250.5.09.5 Barracks 1-Jun-16 20-Aug-16 1-Jun-16 20-Aug-16
250.5.09.5.2 Super structure 1-Jun-16 20-Aug-16 1-Jun-16 20-Aug-16
250.5.09.5.2.1 Ground floor 1-Jun-16 4-Aug-16 1-Jun-16 4-Aug-16
250.5.09.5.2.4 Elevation 28-Jul-16 20-Aug-16 28-Jul-16 20-Aug-16
250.5.09.2 Electricity room 30-Jul-16 17-Sep-16 30-Jul-16 17-Sep-16
250.5.09.2.2 Super structure 30-Jul-16 17-Sep-16 30-Jul-16 17-Sep-16
250.5.09.2.2.1 Ground floor 30-Jul-16 17-Sep-16 30-Jul-16 17-Sep-16
250.5.09.2.2.3 Roof 10-Aug-16 11-Aug-16 10-Aug-16 11-Aug-16
250.5.09.2.2.4 Elevation 13-Aug-16 31-Aug-16 13-Aug-16 31-Aug-16
250.5.09.3 Mosque 27-Jun-16 20-Sep-16 27-Jun-16 20-Sep-16
250.5.09.3.2 Super structure 27-Jun-16 20-Sep-16 27-Jun-16 20-Sep-16
250.5.09.3.2.1 Ground floor 27-Jun-16 16-Aug-16 27-Jun-16 16-Aug-16
250.5.09.3.2.3 Roof 10-Aug-16 10-Aug-16 10-Aug-16 10-Aug-16
250.5.09.3.2.4 Elevation 11-Aug-16 20-Sep-16 11-Aug-16 20-Sep-16
250.5.09.4 Ware house 31-May-16 8-Oct-16 31-May-16 8-Oct-16
250.5.09.4.2 Super structure 31-May-16 8-Oct-16 31-May-16 8-Oct-16
250.5.09.4.2.1 Ground floor 31-May-16 8-Oct-16 31-May-16 8-Oct-16
250.5.09.4.2.3 Roof 3-Aug-16 8-Aug-16 3-Aug-16 8-Aug-16
250.5.09.4.2.4 Elevation 9-Aug-16 25-Sep-16 9-Aug-16 25-Sep-16
250.5.09.8 Main Entrance 24-Aug-16 24-Oct-16 24-Aug-16 24-Oct-16
250.5.09.8.2 Super structure 24-Aug-16 24-Oct-16 24-Aug-16 24-Oct-16
250.5.09.8.2.1 Ground floor 24-Aug-16 24-Sep-16 24-Aug-16 24-Sep-16
250.5.09.8.2.3 Roof 6-Oct-16 8-Oct-16 6-Oct-16 8-Oct-16

Page 18 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.09.8.2.4 Elevation 9-Oct-16 24-Oct-16 9-Oct-16 24-Oct-16


250.5.09.6 Kiosk 20-Sep-16 20-Sep-16 20-Sep-16 20-Sep-16
250.5.09.6.2 Super structure 20-Sep-16 20-Sep-16 20-Sep-16 20-Sep-16
250.5.09.6.2.3 Roof 20-Sep-16 20-Sep-16 20-Sep-16 20-Sep-16
250.5.10 Division10-Specialties 8-Jun-16 19-Oct-16 8-Jun-16 19-Oct-16
250.5.10.1 Main Building 8-Jun-16 21-Jun-16 8-Jun-16 21-Jun-16
250.5.10.1.2 Super structure 8-Jun-16 21-Jun-16 8-Jun-16 21-Jun-16
250.5.10.1.2.1 Ground floor 8-Jun-16 14-Jun-16 8-Jun-16 14-Jun-16
250.5.10.1.2.2 First floor 15-Jun-16 21-Jun-16 15-Jun-16 21-Jun-16
250.5.10.3 Barracks 10-Aug-16 18-Aug-16 10-Aug-16 18-Aug-16
250.5.10.3.2 Super structure 10-Aug-16 18-Aug-16 10-Aug-16 18-Aug-16
250.5.10.3.2.1 Ground floor 10-Aug-16 18-Aug-16 10-Aug-16 18-Aug-16
250.5.10.2 Ware house 13-Oct-16 19-Oct-16 13-Oct-16 19-Oct-16
250.5.10.2.2 Super structure 13-Oct-16 19-Oct-16 13-Oct-16 19-Oct-16
250.5.10.2.2.1 Ground floor 13-Oct-16 19-Oct-16 13-Oct-16 19-Oct-16
250.5.10.6 Main Entrance 28-Sep-16 2-Oct-16 28-Sep-16 2-Oct-16
250.5.10.6.2 Super structure 28-Sep-16 2-Oct-16 28-Sep-16 2-Oct-16
250.5.10.6.2.1 Ground floor 28-Sep-16 2-Oct-16 28-Sep-16 2-Oct-16
250.5.11 Division11-Equipment 8-Jun-16 1-Oct-16 8-Jun-16 1-Oct-16
250.5.11.1 Main Building 8-Jun-16 26-Jun-16 8-Jun-16 26-Jun-16
250.5.11.1.2 Super structure 8-Jun-16 26-Jun-16 8-Jun-16 26-Jun-16
250.5.11.1.2.1 Ground floor 8-Jun-16 16-Jun-16 8-Jun-16 16-Jun-16
250.5.11.1.2.2 First floor 18-Jun-16 26-Jun-16 18-Jun-16 26-Jun-16
250.5.11.5 Barracks 6-Aug-16 16-Aug-16 6-Aug-16 16-Aug-16
250.5.11.5.2 Super structure 6-Aug-16 16-Aug-16 6-Aug-16 16-Aug-16
250.5.11.5.2.1 Ground floor 6-Aug-16 16-Aug-16 6-Aug-16 16-Aug-16
250.5.11.6 Main Entrance 25-Sep-16 1-Oct-16 25-Sep-16 1-Oct-16
250.5.11.6.2 Super structure 25-Sep-16 1-Oct-16 25-Sep-16 1-Oct-16
250.5.11.6.2.1 Ground floor 25-Sep-16 1-Oct-16 25-Sep-16 1-Oct-16

Page 19 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.1 Division12-Furniture 27-Jun-16 31-Oct-16 27-Jun-16 31-Oct-16


250.5.1.1 Main Building 27-Jun-16 31-Jul-16 27-Jun-16 31-Jul-16
250.5.1.1.2 Super structure 27-Jun-16 31-Jul-16 27-Jun-16 31-Jul-16
250.5.1.1.2.1 Ground floor 27-Jun-16 7-Jul-16 27-Jun-16 7-Jul-16
250.5.1.1.2.2 First floor 20-Jul-16 31-Jul-16 20-Jul-16 31-Jul-16
250.5.1.5 Barracks 21-Aug-16 31-Aug-16 21-Aug-16 31-Aug-16
250.5.1.5.2 Super structure 21-Aug-16 31-Aug-16 21-Aug-16 31-Aug-16
250.5.1.5.2.1 Ground floor 21-Aug-16 31-Aug-16 21-Aug-16 31-Aug-16
250.5.1.3 Mosque 21-Sep-16 27-Sep-16 21-Sep-16 27-Sep-16
250.5.1.3.2 Super structure 21-Sep-16 27-Sep-16 21-Sep-16 27-Sep-16
250.5.1.3.2.1 Ground floor 21-Sep-16 27-Sep-16 21-Sep-16 27-Sep-16
250.5.1.4 Ware house 20-Oct-16 31-Oct-16 20-Oct-16 31-Oct-16
250.5.1.4.2 Super structure 20-Oct-16 31-Oct-16 20-Oct-16 31-Oct-16
250.5.1.4.2.1 Ground floor 20-Oct-16 31-Oct-16 20-Oct-16 31-Oct-16
250.5.1.6 Main Entrance 25-Oct-16 31-Oct-16 25-Oct-16 31-Oct-16
250.5.1.6.2 Super structure 25-Oct-16 31-Oct-16 25-Oct-16 31-Oct-16
250.5.1.6.2.1 Ground floor 25-Oct-16 31-Oct-16 25-Oct-16 31-Oct-16
250.5.15 Division15-External Works and Landscaping 9-May-15 12-Feb-17 9-May-15 12-Feb-17
250.5.15.1 Survey & Site Levelling 9-May-15 24-Dec-15 9-May-15 24-Dec-15
250.5.15.2 Infrastructure & Networks 26-Dec-15 12-Feb-17 26-Dec-15 12-Feb-17
250.5.15.2.1 Drainage Networks 6-Jun-16 26-Jul-16 6-Jun-16 26-Jul-16
250.5.15.2.2 Water Supply Networks 6-Jun-16 3-Jul-16 6-Jun-16 3-Jul-16
250.5.15.2.3 Water Wells 26-Dec-15 17-Jan-16 26-Dec-15 17-Jan-16
250.5.15.2.4 Drainage Tank 26-Dec-15 10-Feb-16 26-Dec-15 10-Feb-16
250.5.15.2.5 Water Tank 11-Feb-16 3-Apr-16 11-Feb-16 3-Apr-16
250.5.15.2.8 Water Supply Pumps 27-Jul-16 10-Aug-16 27-Jul-16 10-Aug-16
250.5.15.2.9 RO 4-Apr-16 5-Jun-16 4-Apr-16 5-Jun-16
250.5.15.2.10 Fire Fighting Networks 6-Jun-16 19-Jul-16 6-Jun-16 19-Jul-16
250.5.15.2.10.11 Fire pumps (Electrical) 4-Jul-16 19-Jul-16 4-Jul-16 19-Jul-16

Page 20 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.15.2.14 NOVEC System 6-Jun-16 3-Jul-16 6-Jun-16 3-Jul-16


250.5.15.2.16 Diesel Fuel Tank 4-Apr-16 18-Apr-16 4-Apr-16 18-Apr-16
250.5.15.2.17 GAS-Fuel Sytem 7-Apr-16 23-Apr-16 7-Apr-16 23-Apr-16
250.5.15.2.18 Electrical 16-Jul-16 21-Nov-16 16-Jul-16 21-Nov-16
250.5.15.2.18.2 Power Layout 16-Jul-16 19-Nov-16 16-Jul-16 19-Nov-16
250.5.15.2.18.6 Distribution Board 6-Aug-16 19-Nov-16 6-Aug-16 19-Nov-16
250.5.15.2.18.3 Earthing Layout 6-Aug-16 28-Aug-16 6-Aug-16 28-Aug-16
250.5.15.2.18.5 Lighting Layout 30-Jul-16 21-Nov-16 30-Jul-16 21-Nov-16
250.5.15.2.18.1 Data & Telephone / CCTV / NIC / IPTV,Fire Alarm) 30-Jul-16 19-Nov-16 30-Jul-16 19-Nov-16
250.5.15.2.11 Firing of Electric Current 12-Feb-17 12-Feb-17 12-Feb-17 12-Feb-17
250.5.15.3 Boundary Works 1-Aug-16 31-Dec-16 1-Aug-16 31-Dec-16
250.5.15.3.1 Precast Fence 1-Aug-16 31-Dec-16 1-Aug-16 31-Dec-16
250.5.15.4 Pavement & Road Works 29-Aug-16 1-Jan-17 29-Aug-16 1-Jan-17
250.5.15.5 Landscape Works 15-Oct-16 11-Feb-17 15-Oct-16 11-Feb-17
250.5.16 Division16-Mechanical 30-Jul-15 16-Oct-16 30-Jul-15 16-Oct-16
250.5.16.1 Main Building 30-Jul-15 14-Jun-16 30-Jul-15 14-Jun-16
250.5.16.1.1 Sub Structure 30-Jul-15 4-Aug-15 30-Jul-15 4-Aug-15
250.5.16.1.1.1 Drainage 30-Jul-15 4-Aug-15 30-Jul-15 4-Aug-15
250.5.16.1.7 Super Structure 9-Jan-16 14-Jun-16 9-Jan-16 14-Jun-16
250.5.16.1.7.1 Ground Floor 18-Jan-16 2-Jun-16 18-Jan-16 2-Jun-16
250.5.16.1.7.1.1 Plumbing 18-Jan-16 2-Jun-16 18-Jan-16 2-Jun-16
250.5.16.1.7.1.1.1 Drainage 18-Jan-16 2-Jun-16 18-Jan-16 2-Jun-16
250.5.16.1.7.1.1.2 Water Supply 18-Jan-16 2-Jun-16 18-Jan-16 2-Jun-16
250.5.16.1.7.1.3 HVAC 18-Jan-16 1-Jun-16 18-Jan-16 1-Jun-16
250.5.16.1.7.1.3.1 Concealed A/C Unit 18-Jan-16 1-Jun-16 18-Jan-16 1-Jun-16
250.5.16.1.7.1.3.2 Split Unit 18-Jan-16 31-May-16 18-Jan-16 31-May-16
250.5.16.1.7.1.3.3 Precision Type Unit 18-Jan-16 1-Jun-16 18-Jan-16 1-Jun-16
250.5.16.1.7.1.3.4 Ventlization System 18-Jan-16 17-Apr-16 18-Jan-16 17-Apr-16
250.5.16.1.7.1.2 Fire Fighting 18-Jan-16 6-Apr-16 18-Jan-16 6-Apr-16

Page 21 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.16.1.7.1.2.1 Fire Fighting System 18-Jan-16 6-Apr-16 18-Jan-16 6-Apr-16


250.5.16.1.7.1.2.2 NOVEC System 18-Jan-16 6-Apr-16 18-Jan-16 6-Apr-16
250.5.16.1.7.2 First Floor 28-Feb-16 14-Jun-16 28-Feb-16 14-Jun-16
250.5.16.1.7.2.1 Plumbing 28-Feb-16 14-Jun-16 28-Feb-16 14-Jun-16
250.5.16.1.7.2.1.1 Drainage 28-Feb-16 14-Jun-16 28-Feb-16 14-Jun-16
250.5.16.1.7.2.1.2 Water Supply 28-Feb-16 14-Jun-16 28-Feb-16 14-Jun-16
250.5.16.1.7.2.3 HVAC 28-Feb-16 13-Jun-16 28-Feb-16 13-Jun-16
250.5.16.1.7.2.3.1 Concealed A/C Unit 28-Feb-16 13-Jun-16 28-Feb-16 13-Jun-16
250.5.16.1.7.2.3.2 Split Unit 28-Feb-16 12-Jun-16 28-Feb-16 12-Jun-16
250.5.16.1.7.2.3.3 Precision Type Unit 28-Feb-16 13-Jun-16 28-Feb-16 13-Jun-16
250.5.16.1.7.2.3.4 Ventlization System 28-Feb-16 29-May-16 28-Feb-16 29-May-16
250.5.16.1.7.2.2 Fire Fighting 28-Feb-16 18-May-16 28-Feb-16 18-May-16
250.5.16.1.7.2.2.1 Fire Fighting System 28-Feb-16 18-May-16 28-Feb-16 18-May-16
250.5.16.1.7.2.2.2 NOVEC System 28-Feb-16 18-May-16 28-Feb-16 18-May-16
250.5.16.1.7.3 Roof 9-Jan-16 22-May-16 9-Jan-16 22-May-16
250.5.16.1.7.3.1 Drainage 9-Jan-16 14-Apr-16 9-Jan-16 14-Apr-16
250.5.16.1.7.3.2 HVAC Eqip 22-Mar-16 22-May-16 22-Mar-16 22-May-16
250.5.16.5 Barracks 11-Aug-15 9-Aug-16 11-Aug-15 9-Aug-16
250.5.16.5.1 Sub Structure 11-Aug-15 13-Aug-15 11-Aug-15 13-Aug-15
250.5.16.5.1.1 Drainage 11-Aug-15 13-Aug-15 11-Aug-15 13-Aug-15
250.5.16.5.2 Super structure 7-Apr-16 9-Aug-16 7-Apr-16 9-Aug-16
250.5.16.5.2.1 Ground floor 19-May-16 9-Aug-16 19-May-16 9-Aug-16
250.5.16.5.2.1.1 Plumbing 19-May-16 9-Aug-16 19-May-16 9-Aug-16
250.5.16.5.2.1.1.1 Drainage 19-May-16 9-Aug-16 19-May-16 9-Aug-16
250.5.16.5.2.1.1.2 Water Supply 19-May-16 9-Aug-16 19-May-16 9-Aug-16
250.5.16.5.2.1.3 HVAC 24-May-16 9-Aug-16 24-May-16 9-Aug-16
250.5.16.5.2.1.3.1 Concealed A/C Unit 24-May-16 9-Aug-16 24-May-16 9-Aug-16
250.5.16.5.2.1.3.4 Ventlization System 24-May-16 31-Jul-16 24-May-16 31-Jul-16
250.5.16.5.2.1.2 Fire Fighting 21-May-16 23-Jul-16 21-May-16 23-Jul-16

Page 22 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.16.5.2.1.2.1 Fire Fighting System 21-May-16 23-Jul-16 21-May-16 23-Jul-16


250.5.16.5.2.2 Roof 7-Apr-16 7-Aug-16 7-Apr-16 7-Aug-16
250.5.16.5.2.2.1 Drainage 7-Apr-16 24-Jul-16 7-Apr-16 24-Jul-16
250.5.16.5.2.2.2 HVAC Eqip 30-Jun-16 7-Aug-16 30-Jun-16 7-Aug-16
250.5.16.2 Electricity room 12-Jun-16 11-Sep-16 12-Jun-16 11-Sep-16
250.5.16.2.2 Super structure 12-Jun-16 11-Sep-16 12-Jun-16 11-Sep-16
250.5.16.2.2.1 Ground floor 18-Jul-16 11-Sep-16 18-Jul-16 11-Sep-16
250.5.16.2.2.1.3 Fire Fighting 18-Jul-16 3-Sep-16 18-Jul-16 3-Sep-16
250.5.16.2.2.1.3.1 Fire Fighting System 18-Jul-16 3-Sep-16 18-Jul-16 3-Sep-16
250.5.16.2.2.1.3.2 NOVEC System 18-Jul-16 3-Sep-16 18-Jul-16 3-Sep-16
250.5.16.2.2.1.2 HVAC 18-Jul-16 11-Sep-16 18-Jul-16 11-Sep-16
250.5.16.2.2.1.2.2 Split Unit 18-Jul-16 31-Aug-16 18-Jul-16 31-Aug-16
250.5.16.2.2.1.2.4 Ventlization System 18-Jul-16 11-Sep-16 18-Jul-16 11-Sep-16
250.5.16.2.2.2 Roof 12-Jun-16 22-Aug-16 12-Jun-16 22-Aug-16
250.5.16.2.2.2.1 Drainage 12-Jun-16 9-Aug-16 12-Jun-16 9-Aug-16
250.5.16.2.2.2.2 HVAC Eqip 27-Jul-16 22-Aug-16 27-Jul-16 22-Aug-16
250.5.16.3 Mosque 17-Aug-15 30-Aug-16 17-Aug-15 30-Aug-16
250.5.16.3.1 Sub Structure 17-Aug-15 18-Aug-15 17-Aug-15 18-Aug-15
250.5.16.3.1.1 Drainage 17-Aug-15 18-Aug-15 17-Aug-15 18-Aug-15
250.5.16.3.2 Super structure 11-May-16 30-Aug-16 11-May-16 30-Aug-16
250.5.16.3.2.1 Ground floor 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.16.3.2.1.1 Plumbing 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.16.3.2.1.1.1 Drainage 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.16.3.2.1.3 HVAC 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.16.3.2.1.3.2 Split Unit 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.16.3.2.1.2 Fire Fighting 20-Jun-16 8-Aug-16 20-Jun-16 8-Aug-16
250.5.16.3.2.1.2.1 Fire Fighting System 20-Jun-16 8-Aug-16 20-Jun-16 8-Aug-16
250.5.16.3.2.2 Roof 11-May-16 30-Aug-16 11-May-16 30-Aug-16
250.5.16.3.2.2.1 Drainage 11-May-16 30-Aug-16 11-May-16 30-Aug-16

Page 23 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.16.4 Ware house 9-Aug-15 13-Oct-16 9-Aug-15 13-Oct-16


250.5.16.4.1 Sub Structure 9-Aug-15 10-Aug-15 9-Aug-15 10-Aug-15
250.5.16.4.1.1 Drainage 9-Aug-15 10-Aug-15 9-Aug-15 10-Aug-15
250.5.16.4.2 Super structure 5-Mar-16 13-Oct-16 5-Mar-16 13-Oct-16
250.5.16.4.2.1 Ground floor 30-Apr-16 13-Oct-16 30-Apr-16 13-Oct-16
250.5.16.4.2.1.1 Plumbing 30-Apr-16 12-Oct-16 30-Apr-16 12-Oct-16
250.5.16.4.2.1.1.1 Drainage 30-Apr-16 12-Oct-16 30-Apr-16 12-Oct-16
250.5.16.4.2.1.1.2 Water Supply 17-May-16 12-Oct-16 17-May-16 12-Oct-16
250.5.16.4.2.1.3 HVAC 17-May-16 13-Oct-16 17-May-16 13-Oct-16
250.5.16.4.2.1.3.2 Split Unit 17-May-16 13-Oct-16 17-May-16 13-Oct-16
250.5.16.4.2.1.3.4 Ventlization System 17-May-16 21-Sep-16 17-May-16 21-Sep-16
250.5.16.4.2.1.2 Fire Fighting 17-May-16 10-Sep-16 17-May-16 10-Sep-16
250.5.16.4.2.1.2.1 Fire Fighting System 17-May-16 10-Sep-16 17-May-16 10-Sep-16
250.5.16.4.2.2 Roof 5-Mar-16 25-Aug-16 5-Mar-16 25-Aug-16
250.5.16.4.2.2.1 Drainage 5-Mar-16 25-Aug-16 5-Mar-16 25-Aug-16
250.5.16.8 Main Entrance 27-Aug-15 16-Oct-16 27-Aug-15 16-Oct-16
250.5.16.8.1 Sub Structure 27-Aug-15 29-Aug-15 27-Aug-15 29-Aug-15
250.5.16.8.1.1 Drainage 27-Aug-15 29-Aug-15 27-Aug-15 29-Aug-15
250.5.16.8.2 Super structure 19-Jul-16 16-Oct-16 19-Jul-16 16-Oct-16
250.5.16.8.2.1 Ground floor 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.1 Plumbing 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.1.1 Drainage 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.1.2 Water Supply 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.3 HVAC 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.3.2 Split Unit 17-Aug-16 27-Sep-16 17-Aug-16 27-Sep-16
250.5.16.8.2.1.2 Fire Fighting 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.16.8.2.1.2.1 Fire Fighting System 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.16.8.2.2 Roof 19-Jul-16 16-Oct-16 19-Jul-16 16-Oct-16
250.5.16.8.2.2.1 Drainage 19-Jul-16 16-Oct-16 19-Jul-16 16-Oct-16

Page 24 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.16.6 Kiosk 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16


250.5.16.6.2 Super structure 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.16.6.2.1 Ground floor 8-Sep-16 17-Sep-16 8-Sep-16 17-Sep-16
250.5.16.6.2.1.1 HVAC 8-Sep-16 17-Sep-16 8-Sep-16 17-Sep-16
250.5.16.6.2.1.1.2 Split Unit 8-Sep-16 17-Sep-16 8-Sep-16 17-Sep-16
250.5.16.6.2.2 Roof 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.16.6.2.2.1 Drainage 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.17 Division17-Electrical 10-Aug-15 15-Oct-16 10-Aug-15 15-Oct-16
250.5.17.1 Main Building 10-Aug-15 14-Jun-16 10-Aug-15 14-Jun-16
250.5.17.1.2 Super structure 10-Aug-15 14-Jun-16 10-Aug-15 14-Jun-16
250.5.17.1.2.1 Ground floor 10-Aug-15 5-Jun-16 10-Aug-15 5-Jun-16
250.5.17.1.2.1.2 Power Layout 29-Nov-15 6-Apr-16 29-Nov-15 6-Apr-16
250.5.17.1.2.1.6 Distribution Board 24-Jan-16 2-Jun-16 24-Jan-16 2-Jun-16
250.5.17.1.2.1.4 Lightining Layout 10-Aug-15 24-Feb-16 10-Aug-15 24-Feb-16
250.5.17.1.2.1.3 Earthing Layout 10-Aug-15 24-Feb-16 10-Aug-15 24-Feb-16
250.5.17.1.2.1.5 Lighting Layout 29-Nov-15 5-Jun-16 29-Nov-15 5-Jun-16
250.5.17.1.2.1.1 Data & Telephone / CCTV / NIC / IPTV,Fire Alarm,Security
18-Jan-16
Doors) 2-Jun-16 18-Jan-16 2-Jun-16
250.5.17.1.2.2 First floor 29-Nov-15 14-Jun-16 29-Nov-15 14-Jun-16
250.5.17.1.2.2.2 Power Layout 9-Jan-16 18-May-16 9-Jan-16 18-May-16
250.5.17.1.2.2.6 Distribution Board 5-Mar-16 14-Jun-16 5-Mar-16 14-Jun-16
250.5.17.1.2.2.4 Lightining Layout 29-Nov-15 19-Apr-16 29-Nov-15 19-Apr-16
250.5.17.1.2.2.3 Earthing Layout 29-Nov-15 19-Apr-16 29-Nov-15 19-Apr-16
250.5.17.1.2.2.5 Lighting Layout 9-Jan-16 14-Jun-16 9-Jan-16 14-Jun-16
250.5.17.1.2.2.1 Data & Telephone / CCTV / NIC / IPTV,Fire Alarm,Security
28-Feb-16
Doors) 14-Jun-16 28-Feb-16 14-Jun-16
250.5.17.5 Barracks 17-Aug-15 9-Aug-16 17-Aug-15 9-Aug-16
250.5.17.5.2 Super structure 17-Aug-15 9-Aug-16 17-Aug-15 9-Aug-16
250.5.17.5.2.1 Ground floor 17-Aug-15 9-Aug-16 17-Aug-15 9-Aug-16
250.5.17.5.2.1.2 Power Layout 7-Apr-16 21-Jul-16 7-Apr-16 21-Jul-16
250.5.17.5.2.1.6 Distribution Board 25-May-16 27-Jul-16 25-May-16 27-Jul-16

Page 25 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.17.5.2.1.4 Lightining Layout 17-Aug-15 26-Jun-16 17-Aug-15 26-Jun-16


250.5.17.5.2.1.3 Earthing Layout 17-Aug-15 26-Jun-16 17-Aug-15 26-Jun-16
250.5.17.5.2.1.5 Lighting Layout 7-Apr-16 9-Aug-16 7-Apr-16 9-Aug-16
250.5.17.5.2.1.1 Data & Telephone / CCTV / NIC / IPTV,Fire Alarm) 21-May-16 9-Aug-16 21-May-16 9-Aug-16
250.5.17.2 Electricity room 26-Aug-15 13-Sep-16 26-Aug-15 13-Sep-16
250.5.17.2.2 Super structure 26-Aug-15 13-Sep-16 26-Aug-15 13-Sep-16
250.5.17.2.2.1 Ground floor 26-Aug-15 13-Sep-16 26-Aug-15 13-Sep-16
250.5.17.2.2.1.2 Power Layout 12-Jun-16 3-Sep-16 12-Jun-16 3-Sep-16
250.5.17.2.2.1.6 Distribution Board 25-Jul-16 10-Sep-16 25-Jul-16 10-Sep-16
250.5.17.2.2.1.4 Lightining Layout 26-Aug-15 15-Aug-16 26-Aug-15 15-Aug-16
250.5.17.2.2.1.3 Earthing Layout 26-Aug-15 15-Aug-16 26-Aug-15 15-Aug-16
250.5.17.2.2.1.7 Lighting Layout 12-Jun-16 1-Sep-16 12-Jun-16 1-Sep-16
250.5.17.2.2.1.1 Data & Telephone / CCTV /Fire Alarm) 18-Jul-16 13-Sep-16 18-Jul-16 13-Sep-16
250.5.17.2.2.1.5 Eqipment( Generators) 18-Jul-16 29-Aug-16 18-Jul-16 29-Aug-16
250.5.17.3 Mosque 23-Aug-15 20-Aug-16 23-Aug-15 20-Aug-16
250.5.17.3.2 Super structure 23-Aug-15 20-Aug-16 23-Aug-15 20-Aug-16
250.5.17.3.2.1 Ground floor 23-Aug-15 20-Aug-16 23-Aug-15 20-Aug-16
250.5.17.3.2.1.2 Power Layout 11-May-16 9-Aug-16 11-May-16 9-Aug-16
250.5.17.3.2.1.6 Distribution Board 25-Jun-16 13-Aug-16 25-Jun-16 13-Aug-16
250.5.17.3.2.1.3 Earthing Layout 23-Aug-15 10-Jul-16 23-Aug-15 10-Jul-16
250.5.17.3.2.1.5 Lighting Layout 11-May-16 20-Aug-16 11-May-16 20-Aug-16
250.5.17.3.2.1.1 Data & Telephone / CCTV /Fire Alarm) 20-Jun-16 20-Aug-16 20-Jun-16 20-Aug-16
250.5.17.4 Ware house 22-Aug-15 15-Oct-16 22-Aug-15 15-Oct-16
250.5.17.4.2 Super structure 22-Aug-15 15-Oct-16 22-Aug-15 15-Oct-16
250.5.17.4.2.1 Ground floor 22-Aug-15 15-Oct-16 22-Aug-15 15-Oct-16
250.5.17.4.2.1.2 Power Layout 5-Mar-16 10-Sep-16 5-Mar-16 10-Sep-16
250.5.17.4.2.1.6 Distribution Board 23-May-16 17-Sep-16 23-May-16 17-Sep-16
250.5.17.4.2.1.4 Lightining Layout 22-Aug-15 13-Jul-16 22-Aug-15 13-Jul-16
250.5.17.4.2.1.3 Earthing Layout 22-Aug-15 13-Jul-16 22-Aug-15 13-Jul-16

Page 26 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.5.17.4.2.1.5 Lighting Layout 5-Mar-16 15-Oct-16 5-Mar-16 15-Oct-16


250.5.17.4.2.1.1 Data & Telephone / CCTV /Fire Alarm) 17-May-16 15-Oct-16 17-May-16 15-Oct-16
250.5.17.8 Main Entrance 30-Aug-15 29-Sep-16 30-Aug-15 29-Sep-16
250.5.17.8.2 Super structure 30-Aug-15 29-Sep-16 30-Aug-15 29-Sep-16
250.5.17.8.2.1 Ground floor 30-Aug-15 29-Sep-16 30-Aug-15 29-Sep-16
250.5.17.8.2.1.2 Power Layout 11-Jul-16 20-Sep-16 11-Jul-16 20-Sep-16
250.5.17.8.2.1.6 Distribution Board 22-Aug-16 25-Sep-16 22-Aug-16 25-Sep-16
250.5.17.8.2.1.4 Lightining Layout 30-Aug-15 5-Sep-16 30-Aug-15 5-Sep-16
250.5.17.8.2.1.3 Earthing Layout 30-Aug-15 5-Sep-16 30-Aug-15 5-Sep-16
250.5.17.8.2.1.5 Lighting Layout 11-Jul-16 27-Sep-16 11-Jul-16 27-Sep-16
250.5.17.8.2.1.1 Data & Telephone / CCTV /Fire Alarm) 17-Aug-16 29-Sep-16 17-Aug-16 29-Sep-16
250.5.17.6 Kiosk 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.17.6.2 Super structure 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.17.6.2.1 Ground floor 17-Aug-16 19-Sep-16 17-Aug-16 19-Sep-16
250.5.17.6.2.1.2 Power Layout 1-Sep-16 14-Sep-16 1-Sep-16 14-Sep-16
250.5.17.6.2.1.6 Distribution Board 11-Sep-16 17-Sep-16 11-Sep-16 17-Sep-16
250.5.17.6.2.1.3 Earthing Layout 17-Aug-16 23-Aug-16 17-Aug-16 23-Aug-16
250.5.17.6.2.1.5 Lighting Layout 1-Sep-16 19-Sep-16 1-Sep-16 19-Sep-16
250.5.17.6.2.1.1 ( Telephone System) 8-Sep-16 14-Sep-16 8-Sep-16 14-Sep-16
250.6 Testing & Commissioning 25-Feb-16 15-Feb-17 25-Feb-16 15-Feb-17
250.6.1 Main Building 25-Feb-16 25-Dec-16 25-Feb-16 25-Dec-16
250.6.1.2 Water Supply 8-Mar-16 7-Nov-16 8-Mar-16 7-Nov-16
250.6.1.3 Drainage 8-Mar-16 9-Nov-16 8-Mar-16 9-Nov-16
250.6.1.4 Fire Protection 25-Feb-16 23-Nov-16 25-Feb-16 23-Nov-16
250.6.1.7 Electrical 10-Mar-16 13-Dec-16 10-Mar-16 13-Dec-16
250.6.1.10 HVAC 18-Apr-16 25-Dec-16 18-Apr-16 25-Dec-16
250.6.11 Barracks 26-Dec-16 11-Jan-17 26-Dec-16 11-Jan-17
250.6.11.2 Water Supply 26-Dec-16 28-Dec-16 26-Dec-16 28-Dec-16
250.6.11.3 Drainage 29-Dec-16 1-Jan-17 29-Dec-16 1-Jan-17

Page 27 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.6.11.4 Fire Protection 2-Jan-17 4-Jan-17 2-Jan-17 4-Jan-17


250.6.11.7 Electrical 5-Jan-17 8-Jan-17 5-Jan-17 8-Jan-17
250.6.11.10 HVAC 9-Jan-17 11-Jan-17 9-Jan-17 11-Jan-17
250.6.2 Electricity room 26-Dec-16 8-Jan-17 26-Dec-16 8-Jan-17
250.6.2.4 Fire Protection 5-Jan-17 8-Jan-17 5-Jan-17 8-Jan-17
250.6.2.7 LPG 2-Jan-17 4-Jan-17 2-Jan-17 4-Jan-17
250.6.2.1 Electrical 26-Dec-16 28-Dec-16 26-Dec-16 28-Dec-16
250.6.2.10 HVAC 29-Dec-16 1-Jan-17 29-Dec-16 1-Jan-17
250.6.3 Mosque 26-Dec-16 11-Jan-17 26-Dec-16 11-Jan-17
250.6.3.2 Water Supply 26-Dec-16 28-Dec-16 26-Dec-16 28-Dec-16
250.6.3.3 Drainage 29-Dec-16 1-Jan-17 29-Dec-16 1-Jan-17
250.6.3.4 Fire Protection 2-Jan-17 4-Jan-17 2-Jan-17 4-Jan-17
250.6.3.7 Electrical 5-Jan-17 8-Jan-17 5-Jan-17 8-Jan-17
250.6.3.10 HVAC 9-Jan-17 11-Jan-17 9-Jan-17 11-Jan-17
250.6.4 Ware house 12-Jan-17 4-Feb-17 12-Jan-17 4-Feb-17
250.6.4.2 Water Supply 12-Jan-17 16-Jan-17 12-Jan-17 16-Jan-17
250.6.4.3 Drainage 17-Jan-17 21-Jan-17 17-Jan-17 21-Jan-17
250.6.4.4 Fire Protection 22-Jan-17 25-Jan-17 22-Jan-17 25-Jan-17
250.6.4.7 Electrical 26-Jan-17 30-Jan-17 26-Jan-17 30-Jan-17
250.6.4.10 HVAC 31-Jan-17 4-Feb-17 31-Jan-17 4-Feb-17
250.6.7 Main Entrance 12-Jan-17 29-Jan-17 12-Jan-17 29-Jan-17
250.6.7.2 Water Supply 12-Jan-17 15-Jan-17 12-Jan-17 15-Jan-17
250.6.7.3 Drainage 16-Jan-17 18-Jan-17 16-Jan-17 18-Jan-17
250.6.7.4 Fire Protection 19-Jan-17 22-Jan-17 19-Jan-17 22-Jan-17
250.6.7.7 Electrical 23-Jan-17 25-Jan-17 23-Jan-17 25-Jan-17
250.6.7.10 HVAC 26-Jan-17 29-Jan-17 26-Jan-17 29-Jan-17
250.6.5 Kiosk 26-Jan-17 30-Jan-17 26-Jan-17 30-Jan-17
250.6.5.7 Electrical 26-Jan-17 28-Jan-17 26-Jan-17 28-Jan-17
250.6.5.10 HVAC 29-Jan-17 30-Jan-17 29-Jan-17 30-Jan-17

Page 28 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.6.8 Site Plan 12-Feb-17 15-Feb-17 12-Feb-17 15-Feb-17


250.6.8.5 Irrigation 12-Feb-17 13-Feb-17 12-Feb-17 13-Feb-17
250.6.8.6 Fuel Supply 14-Feb-17 15-Feb-17 14-Feb-17 15-Feb-17
250.7 Handing Over & Project Close Out 26-Dec-16 29-Mar-17 26-Dec-16 29-Mar-17
250.7.1 As Built 26-Dec-16 29-Mar-17 26-Dec-16 29-Mar-17
250.7.1.6 Site Plan 16-Feb-17 6-Mar-17 16-Feb-17 6-Mar-17
250.7.1.6.2 SURVEY & SITE LEVELLING 16-Feb-17 18-Feb-17 16-Feb-17 18-Feb-17
250.7.1.6.3 INFRASTRUCTURES & NEWWORKS 19-Feb-17 27-Feb-17 19-Feb-17 27-Feb-17
250.7.1.6.4 PAVEMENT & ROAD WORKS 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.6.5 BOUNDARY WALL 2-Mar-17 4-Mar-17 2-Mar-17 4-Mar-17
250.7.1.6.6 LANDSCAPE 5-Mar-17 6-Mar-17 5-Mar-17 6-Mar-17
250.7.1.1 Structural 26-Dec-16 6-Feb-17 26-Dec-16 6-Feb-17
250.7.1.1.1 Main Building 26-Dec-16 1-Jan-17 26-Dec-16 1-Jan-17
250.7.1.1.1.1 Foundation 26-Dec-16 28-Dec-16 26-Dec-16 28-Dec-16
250.7.1.1.1.2 Ground floor 26-Dec-16 28-Dec-16 26-Dec-16 28-Dec-16
250.7.1.1.1.3 First floor 26-Dec-16 1-Jan-17 26-Dec-16 1-Jan-17
250.7.1.1.1.5 Roof 29-Dec-16 1-Jan-17 29-Dec-16 1-Jan-17
250.7.1.1.2 Barracks 12-Jan-17 15-Jan-17 12-Jan-17 15-Jan-17
250.7.1.1.2.1 Foundation 12-Jan-17 15-Jan-17 12-Jan-17 15-Jan-17
250.7.1.1.2.2 Ground floor 12-Jan-17 15-Jan-17 12-Jan-17 15-Jan-17
250.7.1.1.3 Electricity rooms 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.3.1 Foundation 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.3.2 Ground floor 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.4 Mosque 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.4.1 Foundation 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.4.2 Ground floor 12-Jan-17 14-Jan-17 12-Jan-17 14-Jan-17
250.7.1.1.5 Ware house 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.1.5.1 Foundation 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.1.5.2 Ground floor 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17

Page 29 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.7.1.1.8 Main Entrance 30-Jan-17 31-Jan-17 30-Jan-17 31-Jan-17


250.7.1.1.8.1 Foundation 30-Jan-17 31-Jan-17 30-Jan-17 31-Jan-17
250.7.1.1.8.2 Ground floor 30-Jan-17 31-Jan-17 30-Jan-17 31-Jan-17
250.7.1.1.6 Kiosk 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.1.6.1 Foundation 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.1.6.2 Ground floor 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.7 Architectural 2-Jan-17 2-Mar-17 2-Jan-17 2-Mar-17
250.7.1.7.1 Main Building 2-Jan-17 20-Feb-17 2-Jan-17 20-Feb-17
250.7.1.7.1.2 Ground floor 2-Jan-17 18-Jan-17 2-Jan-17 18-Jan-17
250.7.1.7.1.3 First floor 19-Jan-17 5-Feb-17 19-Jan-17 5-Feb-17
250.7.1.7.1.5 Roof 6-Feb-17 12-Feb-17 6-Feb-17 12-Feb-17
250.7.1.7.1.4 Elevation 13-Feb-17 20-Feb-17 13-Feb-17 20-Feb-17
250.7.1.7.2 Barracks 16-Jan-17 24-Jan-17 16-Jan-17 24-Jan-17
250.7.1.7.2.2 Ground floor 16-Jan-17 22-Jan-17 16-Jan-17 22-Jan-17
250.7.1.7.2.7 Roof 23-Jan-17 24-Jan-17 23-Jan-17 24-Jan-17
250.7.1.7.2.4 Elevation 23-Jan-17 24-Jan-17 23-Jan-17 24-Jan-17
250.7.1.7.3 Electricity room 15-Jan-17 1-Feb-17 15-Jan-17 1-Feb-17
250.7.1.7.3.2 Ground floor 15-Jan-17 25-Jan-17 15-Jan-17 25-Jan-17
250.7.1.7.3.3 Roof 26-Jan-17 30-Jan-17 26-Jan-17 30-Jan-17
250.7.1.7.3.4 Elevation 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.7.4 Mosque 15-Jan-17 30-Jan-17 15-Jan-17 30-Jan-17
250.7.1.7.4.2 Ground floor 15-Jan-17 25-Jan-17 15-Jan-17 25-Jan-17
250.7.1.7.4.3 Roof 26-Jan-17 30-Jan-17 26-Jan-17 30-Jan-17
250.7.1.7.4.4 Elevation 29-Jan-17 30-Jan-17 29-Jan-17 30-Jan-17
250.7.1.7.5 Ware house 7-Feb-17 2-Mar-17 7-Feb-17 2-Mar-17
250.7.1.7.5.2 Ground floor 7-Feb-17 21-Feb-17 7-Feb-17 21-Feb-17
250.7.1.7.5.3 Roof 22-Feb-17 26-Feb-17 22-Feb-17 26-Feb-17
250.7.1.7.5.4 Elevation 27-Feb-17 2-Mar-17 27-Feb-17 2-Mar-17
250.7.1.7.8 Main Entrance 1-Feb-17 25-Feb-17 1-Feb-17 25-Feb-17

Page 30 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.7.1.7.8.2 Ground floor 1-Feb-17 15-Feb-17 1-Feb-17 15-Feb-17


250.7.1.7.8.3 Roof 16-Feb-17 20-Feb-17 16-Feb-17 20-Feb-17
250.7.1.7.8.4 Elevation 21-Feb-17 25-Feb-17 21-Feb-17 25-Feb-17
250.7.1.7.6 Kiosk 2-Feb-17 6-Feb-17 2-Feb-17 6-Feb-17
250.7.1.7.6.2 Ground floor 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.7.6.3 Roof 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.2 Electrical 25-Jan-17 5-Mar-17 25-Jan-17 5-Mar-17
250.7.1.2.1 Main Building 21-Feb-17 1-Mar-17 21-Feb-17 1-Mar-17
250.7.1.2.1.2 Ground floor 21-Feb-17 25-Feb-17 21-Feb-17 25-Feb-17
250.7.1.2.1.3 First floor 26-Feb-17 1-Mar-17 26-Feb-17 1-Mar-17
250.7.1.2.2 Barracks 25-Jan-17 26-Jan-17 25-Jan-17 26-Jan-17
250.7.1.2.2.2 Ground floor 25-Jan-17 26-Jan-17 25-Jan-17 26-Jan-17
250.7.1.2.3 Electricity room 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.2.3.2 Ground floor 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.2.4 Mosque 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.2.4.2 Ground floor 31-Jan-17 1-Feb-17 31-Jan-17 1-Feb-17
250.7.1.2.5 Ware house 4-Mar-17 5-Mar-17 4-Mar-17 5-Mar-17
250.7.1.2.5.2 Ground floor 4-Mar-17 5-Mar-17 4-Mar-17 5-Mar-17
250.7.1.2.8 Main Entrance 26-Feb-17 27-Feb-17 26-Feb-17 27-Feb-17
250.7.1.2.8.2 Ground floor 26-Feb-17 27-Feb-17 26-Feb-17 27-Feb-17
250.7.1.2.6 Kiosk 7-Feb-17 8-Feb-17 7-Feb-17 8-Feb-17
250.7.1.2.6.2 Ground floor 7-Feb-17 8-Feb-17 7-Feb-17 8-Feb-17
250.7.1.8 Mechanical 28-Jan-17 29-Mar-17 28-Jan-17 29-Mar-17
250.7.1.8.4 Plumbing 28-Jan-17 11-Mar-17 28-Jan-17 11-Mar-17
250.7.1.8.4.1 Main Building 2-Mar-17 11-Mar-17 2-Mar-17 11-Mar-17
250.7.1.8.4.1.2 Ground floor 2-Mar-17 6-Mar-17 2-Mar-17 6-Mar-17
250.7.1.8.4.1.3 First floor 7-Mar-17 11-Mar-17 7-Mar-17 11-Mar-17
250.7.1.8.4.2 Barracks 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17
250.7.1.8.4.2.2 Ground floor 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17

Page 31 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.7.1.8.4.3 Electricity room 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17


250.7.1.8.4.3.2 Ground floor 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.8.4.4 Mosque 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.4.4.2 Ground floor 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.4.5 Ware house 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.4.5.2 Ground floor 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.4.7 Main Entrance 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.4.7.2 Ground floor 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.3 Fire fighting 28-Jan-17 20-Mar-17 28-Jan-17 20-Mar-17
250.7.1.8.3.1 Main Building 12-Mar-17 20-Mar-17 12-Mar-17 20-Mar-17
250.7.1.8.3.1.2 Ground floor 12-Mar-17 15-Mar-17 12-Mar-17 15-Mar-17
250.7.1.8.3.1.3 First floor 16-Mar-17 20-Mar-17 16-Mar-17 20-Mar-17
250.7.1.8.3.2 Barracks 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17
250.7.1.8.3.2.2 Ground floor 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17
250.7.1.8.3.3 Electricity room 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.8.3.3.2 Ground floor 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17
250.7.1.8.3.4 Mosque 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.3.4.2 Ground floor 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.3.5 Ware house 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.3.5.2 Ground floor 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.3.7 Main Entrance 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.3.7.2 Ground floor 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.5 HVAC 28-Jan-17 29-Mar-17 28-Jan-17 29-Mar-17
250.7.1.8.5.1 Main Building 21-Mar-17 29-Mar-17 21-Mar-17 29-Mar-17
250.7.1.8.5.1.2 Ground floor 21-Mar-17 25-Mar-17 21-Mar-17 25-Mar-17
250.7.1.8.5.1.3 First floor 26-Mar-17 29-Mar-17 26-Mar-17 29-Mar-17
250.7.1.8.5.2 Barracks 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17
250.7.1.8.5.2.2 Ground floor 28-Jan-17 29-Jan-17 28-Jan-17 29-Jan-17
250.7.1.8.5.3 Electricity room 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17

Page 32 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary
Site no.250-Prototype no.48-Al Mujahidin Departement Branch Completion

ABHA-ASIR Zone

WBS

WBS Code WBS Name Start Finish 2014 2015 2016 2017 2018 2019 2020

250.7.1.8.5.3.2 Ground floor 5-Feb-17 6-Feb-17 5-Feb-17 6-Feb-17


250.7.1.8.5.4 Mosque 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.5.4.2 Ground floor 2-Feb-17 4-Feb-17 2-Feb-17 4-Feb-17
250.7.1.8.5.5 Ware house 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.5.5.2 Ground floor 6-Mar-17 9-Mar-17 6-Mar-17 9-Mar-17
250.7.1.8.5.8 Main Entrance 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.5.8.2 Ground floor 28-Feb-17 1-Mar-17 28-Feb-17 1-Mar-17
250.7.1.8.5.6 Kiosk 9-Feb-17 11-Feb-17 9-Feb-17 11-Feb-17
250.7.1.8.5.6.2 Ground floor 9-Feb-17 11-Feb-17 9-Feb-17 11-Feb-17
250.7.2 Operation & Manual Maintenance 16-Feb-17 7-Mar-17 16-Feb-17 7-Mar-17
250.7.3 Demobilization 8-Mar-17 27-Mar-17 8-Mar-17 27-Mar-17

Page 33 of 33 Date Revision Checked Approved


All Projects
12-Jul-15 Site no.250 (Rev00) A.Hashem M.Reda
WBS Elements below Project
Summary