Cooling Tower Inspection Checklist

This document is a cooling tower inspection checklist that contains sections to inspect the tower structure, water distribution system, heat transfer system, mechanical equipment, and other components. The checklist rates each component's condition as 1 (good), 2 (keep an eye on it), or 3 (needs immediate attention) and includes space for comments. It requests information on the tower location, owner, manufacturer, model, serial number, process served, design conditions, number of cells, and installation date to help identify the specific cooling tower being inspected.

Uploaded by

Touseef Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views2 pages

Cooling Tower Inspection Checklist

This document is a cooling tower inspection checklist that contains sections to inspect the tower structure, water distribution system, heat transfer system, mechanical equipment, and other components. The checklist rates each component's condition as 1 (good), 2 (keep an eye on it), or 3 (needs immediate attention) and includes space for comments. It requests information on the tower location, owner, manufacturer, model, serial number, process served, design conditions, number of cells, and installation date to help identify the specific cooling tower being inspected.

Uploaded by

Touseef Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Cooling Tower Inspection Checklist

Tower Location Date Inspected


Owner / Company Inspected by
Company Contact Inspector
Signature Signature
Owner's Tower Designation
Tower Manufacturer Model No. Serial No.
Process Served by Tower Operation: Continuous q Intermittent q Seasonal q
Design Conditions: GPM HW ºF CW ºF WB ºF
Cell No. Number of Fan Cells Tower Type: Crossflow q Counterflow q
Date Tower was Installed

This checklist is intended to be used as a guide only. This checklist may not cover all potential issues and should not be relied upon as a substitute for Au-
thorized Service Provider's professional judgment. Authorized Service Provider should report on all issues. Any issues that are identified for which a space
is not otherwise provided in the checklist, should be noted in the Other Component sections or in a supplementary document.

Condition: 1—Good 2—Keep an eye on it 3—Needs immediate attention

1 2 3 Comments

Structure
Casing Material
Structural Material
Fan Deck Material
Stairway q Material
Ladder q Material
Handrail q Material
Interior Walkway q Material
Cold Water Basin Material
Silt, Debris Buildup

Water Distribution System


Open Basin System
Distribution Basin Material
Inlet Pipe Material
Inlet Manifold Material
Flow Control Valves Size
Nozzles — Orifice Diameter Size
Silt, Algae, Debris
Spray Type System
Header Pipe Material
Branch Pipe Material
Nozzles — Orifice Diameter Size
Up spray q Down spray q

Heat Transfer System


Fill — Type and Material
Eliminators — Type and Material
Louvers — Type and Material
Biological Fouling

Use this space to list specific items needing attention:




92-1447D
Condition: 1—Good 2—Keep an eye on it 3—Needs immediate attention

1 2 3 Comments

Mechanical Equipment
Speed Reducer Type: Belt q Gear q Direct Drive q
Belt Drive Unit
Belt Designation
Fan Sheave Designation
Motor Sheave Designation
Gear Drive Unit
Manufacturer Model Ratio
Oil Level: Full q Add Immediately q Low, Check Again Soon q
Oil Condition: Good q Contains Water q Contains Metal q Contains Sludge q
Oil Type Used
Seals
Backlash
Fan Shaft Endplay
Unusual Noises? No q Yes q Action Required
Drive Shaft
Manufacturer Material
Fan
Fan Type: Propeller q Blower q
Manufacturer Fixed Pitch q Adjustable Pitch q
Diameter Number of Blades

Blade Material
Hub Material
Hub Cover Material
Blade Assembly Hardware
Tip Clearance " min " max
Vibration Level
Fan Cylinder Height
Mechanical Equipment Support
Oil Fill and Drain Line
Oil Level Sight Glass
Vibration Limit Switch
Motor
Manufacturer
Name Plate Data: HP RPM Phase Hz Volts
F L Amps Frame SF Special Info.
Last Lubrication — Date
Grease Used — Type
Unusual Noises? No q Yes q Action Required
Unusual Vibration? No q Yes q Action Required
Unusual Heat Build-up? No q Yes q Action Required

Make-up Valve
Other Component
Other Component