S.
no               Discration          Nos     Length    With     Depath     Qty
       Brick work 4.5" thick            2      12.00     0.75      8.50      204.00
                                        4       4.00     0.75      8.50      136.00
       deduction
       Door                             -3      2.75     5.75      5.75      -47.44
                                                                             292.56          292.56
       PLASTING work 4.5" thick         4      12.00     0.75      8.50      408.00
                                        8       4.00     0.75      8.50      272.00
       deduction
       Door                             -3      2.75     5.75      5.75      -47.44
                                                                             632.56          632.56
       Brick work 4.5" thick METRIAL
       Brick                             5     332.56  1662.8        6       9976.8
       sand                            0.043    292.56    12.6      65     817.7122
       cement                          0.01     292.56      2.9    350     1023.969
                                                                           11818.48   11818.4809375
       Plasting work 4.5" thick
       sand                            0.05     632.56    31.63     85     2688.391
       cement                          0.01     632.56     6.33    350     2213.969
                                                                           4902.359     4902.359375
       labour
mason                 7       800                   5600
M.l                   7       500                   3500
F.l                   7       400                   2800
sand                                                1000
brick                                               1000
                                                   13900      13900
wash psaing                                          850
                                                    2500
                                                    3350        3350
                                                            34895.97
Brick work 9" thick   3    32.00    0.75   9.50    684.00
                      4    17.00    0.75   9.50    484.50
deduction
Door                  -6   3.00     0.75   6.00    -81.00
Window                -6   2.75     0.75   3.00    -37.13
                                                  1050.38    1050.38
Plaster 12mmm thick   6    32.00    0.75   9.50   1824.00
                      8    17.00    0.75   9.50   1292.00
deduction
Door                  -6   3.00     0.75   6.00   -108.00
Window                -6   2.75     0.75   3.00    -49.50
                                                  2958.50    2958.50
Flooring
room1                 3    9.91             10      297.3
room2                 3    9.91            5.75   170.948
                                                    468.248       468.25
Meterial                 Qty
Brick work             1050.38   0.028    29.4105
PLASting               2958.50   0.092    272.182
Floring                 468.25   0.092   43.07877
Brick Work
Brick           550    29.4105     6     97054.65 16175.78
Sand             0.2   29.4105   1350    7940.835   5.8821
Cement          1.92   29.4105    350    19763.86 56.46816
                                         124759.3             124759.341
Labour
mason            7       2       800      11200
F.l              7       1       400       2800
M.l              7       1       500       3500
sand liftin                                1500
brick lifting                              2500
                                          21500                   21500
Plasting
sand             4.6    272.18   1350    1690250 1252.037
cement          1.06   272.182    350    100979.5 288.5129
Labour
mason           12       2       800      19200
F.l             12       1       400       4800
M.l             12       1       500       6000
sand liftin                                2000
                                              32000          32000
Flooring
10mm chicps           0.4   187.299   45     8428.455
sand                  0.2   93.6495   62     5806.269
cement                1.5   19.6664   350    6883.238
                                             21117.96   21117.96225
Labour
mason                  2      2       800     3200
F.l                    2      3       400     2400
M.l                    2      1       500     1000
sand liftin                                   1500
10mm metal                                    1000
                                              9100            9100
kitchen plat foorm     3              4500    13500          13500
Pumbing                                       12000          12000
Election                                      10000          10000
Door                   6     5000             30000          30000
window                 6     3000             18000          18000
toilet door            3     1500             4500            4500
toilet door            3     2500             7500            7500
shetes rakulu 3'X8'   144    800
pipe 32                18              60
                                              2000
shead labour              20000         20000
                                     328454.43
                                  363350.39
no painting
no eletical
no site cleance charge
no shead rakulu metrial
no pipe charges metrial