Cabang Samarinda: Nama Bulan: Agustus NIS Jabatan Area Kerja: Cabang Samarinda Devisi: Service

This document contains a timesheet for an employee working at the Samarinda branch of the company in August. It lists the dates worked, day of the week, whether it was a work day or holiday, tasks completed each day, and time spent on each task. Over the month the employee spent a total of 58 hours working on tasks such as troubleshooting and repairs of construction equipment for clients, meetings, training, and working from home.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views2 pages

Cabang Samarinda: Nama Bulan: Agustus NIS Jabatan Area Kerja: Cabang Samarinda Devisi: Service

This document contains a timesheet for an employee working at the Samarinda branch of the company in August. It lists the dates worked, day of the week, whether it was a work day or holiday, tasks completed each day, and time spent on each task. Over the month the employee spent a total of 58 hours working on tasks such as troubleshooting and repairs of construction equipment for clients, meetings, training, and working from home.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CABANG SAMARINDA

NAMA Bulan : Agustus


NIS JABATAN
AREA KERJA : CABANG SAMARINDA DEVISI : SERVICE

JAM KERJA
TGL HARI KET URAIAN PEKERJAAN Total
DARI SMPAI
01 August 2020 Sabtu HL OFF - - -
02 August 2020 Minggu HL OFF - - -
03 August 2020 Senin HK T/S travel right can't steering PC400-8 (05) PT.NPI 7.42 18.22 1.5
04 August 2020 Selasa HK T/S travel right can't steering PC400-8 (05) PT.NPI 7.52 18.45 2
05 August 2020 Rabu HK PPM unit PC400-8 (05)LC PT.NPI 7:54 18:11 1
06 August 2020 Kamis HK Monitoring unit PC 400-8 LC (05) PT.NPI 7:47 18:20 1
07 August 2020 Jumat HK disconect & remove lift cylinder Blade D155-2 7:53 19:00 2
08 August 2020 Sabtu HL remove C frame & right equalizer bar D155-2 7:55 18:42 10.5
09 August 2020 Minggu HL OFF
10 August 2020 Senin HK remove trackframe & sprocket D155-2. 7:46 18:42 1.5
11 August 2020 Selasa HK remove case & remove bullgear D155-2 7:49 19:04 2
12 August 2020 Rabu HK cleaning komponen F/D D155-2 7:51 19:08 2
13 August 2020 Kamis HK cleaning & repair bullgearD155-2 7:48 17:14 -
14 August 2020 Jumat HK repair komponen F/D D155-2 7:52 18:41 1
15 August 2020 Sabtu HL Latihan upacara - - -
16 August 2020 Minggu HL OFF - - -
17 August 2020 Senin HK Upacara - - -
18 August 2020 Selasa HK reporting PC400-8 (05) PT.NPI 7:56 18:55 2
19 August 2020 Rabu HK PPM unit PC400-8 (09) PT.NPI 7:47 18:39 1.5
20 August 2020 Kamis HL OFF - - -
21 August 2020 Jumat HK T/S travel right low power unit PC400-8 (09)PT.NPI 7:40 19:16 2
22 August 2020 Sabtu HL T/S travel right low power unit PC400-8 (09)PT.NPI 7:57 18:24 10,5
23 August 2020 Minggu HL OFF - - -
24 August 2020 Senin HK ground test & monitoring PC400-8 (09)PT.NPI 7:51 19:00 0
25 August 2020 Selasa HK T/S over heat engine PC300 (NC 04) PT.NPI 7:32 18:19 0
26 August 2020 Rabu HK T/S over heat engine PC300 (NC 04) PT.NPI 7:53 19:03 2
27 August 2020 Kamis HK reporting PC400-8(09) & waiting part PC300(NC04) 7:59 19:24 2.5
28 August 2020 Jumat HK install thermostat PC300(NC 04) 7:51 19:01 2
29 August 2020 Sabtu HL monitoring & reporting PC300(NC 04) 7:54 19:01 11
30 August 2020 Minggu HL OFF - - -
31 August 2020 Senin HK WFH - - -
JUMLAH 58

DIBUAT OLEH DIPERIKSA OLEH DISETUJUI

BM/DEPT.HEAD/SPV BM/DEPT.HEAD/SPV

Ket:
HL : HARI LIBUR
HK : HARI KERJA
E

You might also like