No   WO No.
Work Type   Area
1     6343     PM        BOP
2     6344     PM        BOP
3     6345     PM        BOP
4     6346     PM        BOP
5     6347     PM        CH
6     6348     PM        CH
7     6349     PM        CH
8     6350     PM        ASH
9     6351     PM       UNIT 1
10   6352   PM   UNIT
11   6353   PM   UNIT 1
12   6354   PM   UNIT 1
13   6355   PM   UNIT 1
14   6356   PM   UNIT 1
15   6360   PM   UNIT 1
16   6361   PM   UNIT
17   6362   PM   UNIT 1
18   6363   PM   UNIT 1
19   6368   PM   UNIT 1
20   6369   PM   UNIT 1
21   6357   PM   UNIT 2
22   6358   PM   UNIT 2
23   6359   PM   UNIT 2
24   6364   PM   UNIT 2
25   6365   PM   UNIT 2
26   6366   PM   UNIT 2
27   6367   PM   UNIT 2
28   6370   PM   UNIT 2
29   6225   PM   UNIT 2
2    6424   CD   UNIT 2
3    6449   CD   UNIT 2
                             Job Description           Crew Size   Duration
Breafing Pagi                                             9          0.50
Sholat ashar                                              9          0.50
Fire Fighting Test                                        2          2.00
Kegiatan Budaya Kalbar 1                                  9          1.50
Aux Boiler Test                                           2          2.00
PM
PM ELECTRICAL 400/230V C.W. PC SECTION A                  2          2.50
PM ELECTRICAL MOTOR DOSING PUMP REVERSE OSMOSIS AREA      2          2.00
PM ELECTRICAL MOTOR DOSING PUMP WWTP AREA                 2          2.00
PM ELECTRICAL MOTOR DOSING PUMP UNIT AREA                 2          2.00
PM ELECTRICAL MCC AREA COAL TRANSFER TOWER 1              2          3.50
PM ELECTRICAL MCC COAL CRUSHING HOUSE MCC AREA TT2        2          3.50
PM ELECTRICAL SHIP UNLOADER 2                             3          3.50
PM ELECTRICAL ESP MCC SECTION                             2          2.00
PM ELECTRICAL EXCITING TR. UNIT 1                         2          1.00
PM ELECTRICAL CIRCULATING WATER TRAFO A-B                       2   1.00
PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER A-B UNIT 1            2   1.50
PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT 1                  2   1.50
PM ELECTRICAL MOTOR C3WP UNIT 1                                 2   1.50
PM ELECTRICAL MOTOR SWBP UNIT 1                                 2   1.50
PM ELECTRICAL MOTOR COAL FEEDER UNIT 1                          2   1.50
PM ELECTRICAL CCB MCC                                           2   2.00
PM ELECTRICAL MOV AREA FEED WATER, COOLING WATER, VACUUM DAN
                                                                2   4.50
CONDENSER UNIT 1
PM ELECTRICAL MOV AREA COAL FEEDER UNIT 1                       2   1.50
PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT 1             2   7.00
PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                     2   3.00
PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 2                      3   2.50
PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 2                      3   2.50
PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 2                        3   2.50
PM ELECTRICAL MOV AREA ECONOMIZER, STEAM, BLOW DOWN AND DRAWN
                                                                2   4.50
UNIT 2
PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 2                        2   1.50
PM ELECTRICAL MOTOR APH A-B UNIT 2                                           2   3.00
PM ELECTRICAL SOOT BLOWER UNIT 2                                             2   7.00
PM ELECTRICAL GT & UAT UNIT 2                                                2   2.00
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 2                             2   3.00
CORRECTIVE
UNIT 2 - MILL 2B, ABNORMAL SOUND ON MOTOR SIDE OF LUBE OIL PUMP A            2   3.00
UNIT 2 - Drum Boiler No 2, Emergency Drain Indication Fault Can't Open and
                                                                             2   3.00
Close
SPONSOR WORK
Supporting HM Inspection CWP1
                                       Total Man Hours
                                        Total Man Hour
                                Total Scheduled Utility M
                                   11              12              12              2
Clock Hour   Man Hour    Senin           Selasa          Rabu            Kamis
                        6-May-24        7-May-24        8-May-24        9-May-24
  0:30         4.5        4.50            4.50            4.50
  0:30         4.5        4.50            4.50            4.50
  2:00          4                                                         4.00
  1:30         13.5
  2:00          4         4.00
  2:30         5.00       5.00
  2:00         4.00       4.00
  2:00         4.00       4.00
  2:00         4.00       4.00
  3:30         7.00       7.00
  3:30         7.00       7.00
  3:30        10.50                       5.25            5.25
  2:00         4.00                                       4.00
  1:00         2.00                       2.00
1:00   2.00           2.00
1:30   3.00           3.00
1:30   3.00                  3.00
1:30   3.00                  3.00
1:30   3.00                  3.00
1:30   3.00           3.00
2:00   4.00           4.00
4:30   9.00           9.00
1:30   3.00           3.00
7:00   14.00                        7.00
3:00   6.00    1.20   1.20   1.20   1.20
2:30   7.50    7.50
2:30   7.50                  7.50
2:30   7.50                  7.50
4:30   9.00                  9.00
1:30   3.00    3.00
3:00   6.00           6.00
7:00   14.00   4.67   4.67   4.67
2:00   4.00           4.00
3:00   6.00                  6.00
3:00   6.00    6.00
3:00   6.00                  6.00
                                    66.37        56.12        69.12        12.20
      Total Man Hours Scheduled
                                     72           72           72           16
        Total Man Hours Available
Total Scheduled Utility Man Hours   92.18%       77.94%       96.00%       76.25%
                                             9            9            9            2
            2
  Jumat                      Remarks                 Status WO   Status Permit   PIC
10-May-24
                visual check, cleaning peralatan,
                                                    Close
                peralatan normal oprasi
                Visual check, cleaning peralatan,
                                                    Close
                Peralatan beroperasi normal
                Visual check, cleaning peralatan,
                                                    Close
                Peralatan normal oprasi
                Visual check, cleaning peralatan,
                                                    Close
                Normal oprasi
                Visual check, cleaning peralatan,
                                                    Close
                Normal oprasi
                Visual check, cleaning peralatan,
                                                    Close
                Normal oprasi
                Clean equipment, tighten
                equipment bolts and grease the      Close
                motor, normal operasi
                cleanig peralatan, normal operasi Close
                cleaning, normal operation          Close
       cleaning equipment n check
       temperature peralatan, normal       SPS signed   Close   Operator
       operasi
       Cleaning n greasing motor,
                                           Close
       normal operation
       Greasing side NDE (30g) and
                                           Close
       cleaning motor, Normal
       Greasing DE/NDE Bearing motor
       (20g/20g) & cleaning motor
                                        Close
       Normal ( condition bearing motor
       to DCS force)
       Greasing side NDE/DE bearing
       motor (20g/20g) and cleaning
       motor                               Close
       Normal ( Bearing motor to DCS
       condition Force)
       Clean equipment, tighten
                                           Close
       equipment bolts, normal operasi
       clean equipment and surrounding
                                       Close
       area, normal operasi
       clean equipment and surrounding
                                       Close
       area, normal operasi
       Clean equipment and tighten
                                           Close
       equipment bolts, normal operasi
       Cleaning peralatan, visual check,
7.00                                       Close
       normal oprasi
1.20   normal operasi                      SPS signed   Close   Operator
       Visual check, cleaning peralatan,
                                           Close
       greasing motor, Normal oprasi
       cleaning and greasing equipment,
                                        Close
       normal equipment operation
       cleaning and greasing motor,
                                           Close
       normal equipment operation
       cleaning peralatan, normal operasi SPS signed    Close   Operator
       Visual check, cleaning peralatan,
                                           Close
       Normal oprasi
Clean equipment and tighten
                                     Close
equipment bolts, normal operasi
cleaning, visual check, function
                                 Close
test, equipment Normal with note
Visual cek silica gel & Fan trafo,
                                     Close
Normal
The mcc room temperature is hot
and the hgopper 4 ash selector is
damaged, hot mcc equipment        Close
repairs have not been made,
normal equipment operation
UNIT 2 - MILL 2B, ABNORMAL
SOUND ON MOTOR SIDE OF LUBE
OIL PUMP A
there is dirt between the motor
                                Inprg           WDREVIEW   K3L
coupling and pump, cleaning and
no load test motor
no abnormal sound and normal
vibration
Indication Fault active, Alarm on
display mov ckd limit error, Reset
                                   SPS signed   Close      Operator
alarm and Recalibration Close
Normal condition poition close
 8.20
 16
51.25%
         2
                                                            WEEKLY MAINTENANCE SCHEDULE W
                                                            PEMELIHARAAN LISTRIK PLTU KALBA
No   WO No.   No Work Order   Work Type      No PM/SR        Division
1     6492    KB1-24-501695      PM       PM-KK-HLBP-0003      HL
2     6493    KB1-24-501696      PM       PM-KK-HLBP-0006      HL
3     6494    KB1-24-501697      PM       PM-KK-HLBP-0009      HL
4     6495    KB1-24-501698      PM       PM-KK-HLBP-0026      HL
5     6496    KB1-24-501699      PM       PM-KK-HLEP-0007      HL
6     6497    KB1-24-501700      PM       PM-KK-HLEP-0008      HL
7     6498    KB1-24-501701      PM       PM-KK-HLEP-0036      HL
8     6499    KB1-24-501702      PM       PM-KK-HLEP-0037      HL
9    6500   KB1-24-501703   PM   PM-KK-HLEP-0038   HL
10   6501   KB1-24-501704   PM   PM-KK-HLEP-0042   HL
11   6650   KB1-24-501808   PM   PM-KK-HLEP-0053   HL
12   6503   KB1-24-501706   PM   PM-KK-HLU-0021    HL
13   6504   KB1-24-501707   PM   PM-KK-HLU-0027    HL
14   6505   KB1-24-501708   PM   PM-KK-HLU-0029    HL
15   6506   KB1-24-501709   PM   PM-KK-HLU-0031    HL
16   6508   KB1-24-501711   PM   PM-KK-HLU-0041    HL
17   6509   KB1-24-501712   PM   PM-KK-HLU-0043    HL
18   6512   KB1-24-501715   PM   PM-KK-HLU-0054    HL
19   6513   KB1-24-501716   PM   PM-KK-HLU-0062    HL
20   6514   KB1-24-501717   PM   PM-KK-HLU-0096    HL
21   6515   KB1-24-501718   PM   PM-KK-HLU-0105    HL
22   6502   KB1-24-501705   PM   PM-KK-HLU-0002    HL
23   6507   KB1-24-501710   PM   PM-KK-HLU-0040   HL
24   6510   KB1-24-501713   PM   PM-KK-HLU-0049   HL
25   6511   KB1-24-501714   PM   PM-KK-HLU-0051   HL
26   6516   KB1-24-501719   PM   PM-KK-HLU-0107   HL
27   6517   KB1-24-501720   PM   PM-KK-HLU-0108   HL
28   6518   KB1-24-501721   PM   PM-KK-HLU-0109   HL
1    6292   KB1-24-000549   CD                    HL
2    6722   KB1-24-000604   CD                    HL
3
4
WEEKLY MAINTENANCE SCHEDULE WEEK 20 2024
PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
             Area                               Job Description                       Crew Size
                    Breafing Pagi                                                        9
                    Sholat ashar                                                         9
                    Fire Fighting Test                                                   2
                    Kegiatan Budaya Kalbar 1                                             9
                    PM
             BOP    PM ELECTRICAL MOTOR AREA REVERSE OSMOSIS                             2
             BOP    PM ELECTRICAL SUPPLY WATER & WATER TREATMENT TR. A-B                 2
             BOP    PM ELECTRICAL MOTOR AREA FUEL OIL PUMP HOUSE                         2
             BOP    PM ELECTRICAL INSULATION TEST BOP AREA                               2
              CH    PM ELECTRICAL MOTOR C5                                               2
              CH    PM ELECTRICAL MOTOR CRUSHER A-B                                      2
                    PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR FUEL OIL STORAGE
              CH                                                                         2
                    TANK
              CH    PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR STRE                  2
 CH      PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR SHIP UNLOADER   2
 CH      PM ELECTRICAL INSULATION TEST EP AREA                          2
 CH      PM ELECTRICAL 400/230V COAL HANDLING PC SECTION                2
UNIT 1   PM ELECTRICAL MOTOR EH DAN RECIR UNIT 1                        2
UNIT 1   PM ELECTRICAL MOTOR LTE PUMP UNIT 1                            2
UNIT 1   PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT 1                    2
UNIT 1   PM ELECTRICAL MOTOR BFP UNIT 1                                 2
UNIT 1   PM ELECTRICAL MOTOR FLAME DETECTOR COOLING AIR FAN UNIT 1      2
UNIT 1   PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 1                        2
UNIT 1   PM ELECTRICAL MOV AREA FLUE GAS AND AIR UNIT 1                 2
UNIT 1   PM ELECTRICAL MOTOR APH A-B UNIT 1                             2
UNIT 1   PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 1                        2
UNIT     PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                    2
UNIT 2   PM ELECTRICAL GENERATOR UNIT 2                                 2
UNIT 2   PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 2                          3
UNIT 2   PM ELECTRICAL BATTERY DC UNIT 2                                    3
         PM ELECTRICAL MOV MAIN STEAM, REHEAT STEAM, BYPASS, GLAND STEAM,
UNIT 2                                                                      2
         EXTRACTION STEAM DAN AUXILIARY STEAM UNIT 2
UNIT 2   PM ELECTRICAL 230/400V PC SECTION UNIT 2                           2
UNIT 2   PM ELECTRICAL 230/400V MCC TURBINE UNIT 2                          2
UNIT 2   PM ELECTRICAL 6.3KV UNIT SECTION UNIT 2                            2
         CORRECTIVE
 CH      Inspection the Magnetic Separator C3B - Indication Trip            2
 CH      Inspection the CCTV of Bunker Unit 2 Area - CCTV Indication Off    2
         SPONSOR WORK
         Replace the Current Transducer of Crusher 2B                       2
         Supporting HM Inspection CWP1                                      2
         Install the Traveling Motor for Hoist Crane in Boiler Area         3
Install the Electrical in Fuel Oil Pump House   2
                                                          Total
                                                           Tota
                                                    Total Schedu
                                               11               8               10
Duration   Clock Hour   Man Hour     Senin           Selasa           Rabu
                                   13-May-24        14-May-24       15-May-24
  0.50       0:30         4.5        4.50             4.50            4.50
  0.50       0:30         4.5        4.50             4.50            4.50
  2.00       2:00          4
  2.00       2:00          18
  2.00       2:00         4.00       4.00
  2.50       2:30         5.00                                        5.00
  2.00       2:00         4.00
  3.00       3:00         6.00       3.00             3.00
  2.00       2:00         4.00
  1.50       1:30         3.00                                        3.00
  1.00       1:00         2.00                                        2.00
  1.00       1:00         2.00                                        2.00
1.00   1:00   2.00          2.00
3.00   3:00   6.00   3.00   3.00
2.00   2:00   4.00
1.50   1:30   3.00
1.50   1:30   3.00
1.50   1:30   3.00
2.50   2:30   5.00
1.50   1:30   3.00                 3.00
1.50   1:30   3.00                 3.00
4.50   4:30   9.00                 4.50
3.00   3:00   6.00   6.00
1.50   1:30   3.00
3.00   3:00   6.00   1.20   1.20   1.20
2.50   2:30   5.00   5.00
2.50    2:30    7.50           7.50
2.00    2:00    6.00           6.00
4.50    4:30    9.00
2.00    2:00    4.00   4.00
2.00    2:00    4.00
2.00    2:00    4.00   4.00
4.00    4:00    8.00   8.00
4.00    4:00    8.00           8.00
3.00    3:00     6                    6.00
20.00   20:00   40     8.00    8.00   8.00
4.00    4:00    12     12.00
4.00        4:00           8
                                     67.20        47.70        46.70
       Total Man Hours Scheduled
                                      72           72           72
         Total Man Hours Available
 Total Scheduled Utility Man Hours   93.33%       66.25%       64.86%
                                              9            9            9
            10               6
  Kamis            Jumat                      Remarks                   Status WO   Status Permit
16-May-24        17-May-24
  4.50             4.50
  4.50             4.50
  4.00
                   18.00
                                 -Visual check, cleaning equipment
                                                                         CLOSE         CLOSE
                                 -Normal Operation
                                 -Cleaning Equipment, visual check
                                                                         CLOSE         CLOSE
                                 - Normal operation
                                 -cleaning, regreasing, visual check,
                                 grounding check, current and
  4.00                                                                   CLOSE         CLOSE
                                 themperature measurement
                                 - Normal Operation
                                 -Visual check
                                                                         CLOSE         CLOSE
                                 -Normal Operation
                                 -Cleaning, visual check, greasing,
  4.00                           check amper and grounding               CLOSE         CLOSE
                                 -Normal Operation
                                 -Cleaning Equipment, visual check,
                                 check grounding dan temperatur
                                                                         CLOSE         CLOSE
                                 motor
                                 -Normal Operation
                                 -check grounding resistance
                                                                         CLOSE         CLOSE
                                 -normal
                                 -check grounding resistance
                                                                         CLOSE         CLOSE
                                 -normal
              -grounding results are in good
              condition                               CLOSE      CLOSE
              -Result mark 0.016 Ohm
              - INSULATION TEST
                                                      CLOSE      CLOSE
              -Normal Operation
              -Cleaning Equipment, visual check
       4.00                                           CLOSE      CLOSE
              -Normal operation
              -Cleaning, visual check, greasing,
3.00          grounding check and temperatur          CLOSE      CLOSE
              -Normal
              -Cleaning, visual check, greasing,
              grounding check and temperatur
       3.00                                          LE signed   Close
              motor
              -Normal Operation
              -Cleaning, check grounding, visual
3.00          check                                   CLOSE      CLOSE
              -Normal
              -Cleaning, visual check
5.00                                                  CLOSE      CLOSE
              - Normal Operation
              -Cleaning, greasing, visual check,
              grounding check, temperatur
                                                      CLOSE      CLOSE
              check
              -Normal operation
              -Cleaning, regreasing, visual check,
              check grounding and temperatur          CLOSE      CLOSE
              -Normal operation
              -Cleaning, visual check, alrm check
4.50                                                  CLOSE      CLOSE
              -Normal operation
              -Visual check, cleaning equipment
                                                      CLOSE      CLOSE
              -Normal Operation
              -cleaning, regreasing, visual check,
              grounding check, current and
3.00                                                  CLOSE      CLOSE
              themperature measurement
              -Normal operation
              -INSULATION MEASUREMENT
1.20   1.20                                           CLOSE      CLOSE
              -MOTOR ON GOOD CONDITION
              -Cleaning, check karbon brush
                                                      CLOSE      CLOSE
              -Normal oprasi
              -Cleaning AND Greasing Motor
                                                   CLOSE      CLOSE
              -Normal operation
              - Cleaning, visual check,check
              battery voltage                      CLOSE      CLOSE
              -Normal Operation
              -Visual check, cleaning equipment
       9.00                                       LE signed   Close
              -Normal Operation
              -Visual check, cleaning equipment
                                                   CLOSE      CLOSE
              -Normal Operation
              -Visual check, cleaning equipment
       4.00                                        CLOSE      CLOSE
              -Normal Operation
              -Visual check, cleaning equipment
                                                   CLOSE      CLOSE
              -Normal Operation
              -Limit switch eror
              -repair contact switch               Comp       CLOSE
              -Normal
              -CCTV bunker 5,6,7,8 can’t
              monitor
              -Cable Conector FO converter
              disconnected                         Comp       CLOSE
              -Replace cable conector
              -Condition after replace cabel
              CCTV normal
8.00   8.00
 8.00
56.70        56.20
 72           63
78.75%       89.21%
         9            9
PIC
Eksekutor
Eksekutor
                                                            WEEKLY MAINTENANCE SCHEDULE W
                                                            PEMELIHARAAN LISTRIK PLTU KALBA
No   WO No.   No Work Order   Work Type      No PM/SR        Division
1     6635    KB1-24-501793      PM       PM-KK-HLBP-0001      HL
2     6636    KB1-24-501794      PM       PM-KK-HLBP-0004      HL
3     6637    KB1-24-501795      PM       PM-KK-HLBP-0005      HL
4     6638    KB1-24-501796      PM       PM-KK-HLBP-0015      HL
5     6639    KB1-24-501797      PM       PM-KK-HLBP-0016      HL
6     6640    KB1-24-501798      PM       PM-KK-HLBP-0023      HL
7    6642   KB1-24-501800   PM   PM-KK-HLEP-0003   HL
8    6643   KB1-24-501801   PM   PM-KK-HLEP-0004   HL
9    6644   KB1-24-501802   PM   PM-KK-HLEP-0005   HL
10   6645   KB1-24-501803   PM   PM-KK-HLEP-0006   HL
11   6646   KB1-24-501804   PM   PM-KK-HLEP-0012   HL
12   6647   KB1-24-501805   PM   PM-KK-HLEP-0039   HL
13   6648   KB1-24-501806   PM   PM-KK-HLEP-0040   HL
14   6649   KB1-24-501807   PM   PM-KK-HLEP-0041   HL
15   6656   KB1-24-501814   PM   PM-KK-HLU-0033    HL
16   6657   KB1-24-501815   PM   PM-KK-HLU-0035    HL
17   6658   KB1-24-501816   PM   PM-KK-HLU-0037    HL
18   6659   KB1-24-501817   PM   PM-KK-HLU-0039    HL
19   6661   KB1-24-501819   PM   PM-KK-HLU-0048   HL
20   6664   KB1-24-501822   PM   PM-KK-HLU-0058   HL
21   6665   KB1-24-501823   PM   PM-KK-HLU-0060   HL
22   6666   KB1-24-501824   PM   PM-KK-HLU-0064   HL
23   6668   KB1-24-501826   PM   PM-KK-HLU-0099   HL
24   6669   KB1-24-501827   PM   PM-KK-HLU-0105   HL
25   6651   KB1-24-501809   PM   PM-KK-HLU-0006   HL
26   6652   KB1-24-501810   PM   PM-KK-HLU-0013   HL
27   6653   KB1-24-501811   PM   PM-KK-HLU-0015   HL
28   6654   KB1-24-501812   PM   PM-KK-HLU-0018   HL
29   6655   KB1-24-501813   PM   PM-KK-HLU-0020   HL
30   6660   KB1-24-501818   PM   PM-KK-HLU-0046   HL
31   6662   KB1-24-501820   PM   PM-KK-HLU-0053   HL
32   6663   KB1-24-501821   PM   PM-KK-HLU-0057   HL
33   6667   KB1-24-501825   PM   PM-KK-HLU-0067   HL
1    3371   KB1-23-000586   CM
1
2
WEEKLY MAINTENANCE SCHEDULE WEEK 21 2024
PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
             Area                               Job Description        Crew Size
                    Breafing Pagi                                         9
                    Sholat ashar                                          9
                    Fire Fighting Test                                    2
                    Kegiatan Budaya Kalbar 1                              9
                    PM
             BOP    PM ELECTRICAL FIRE FIGHTING PUMP                      2
             BOP    PM ELECTRICAL MOTOR AREA DEMINERALIZE PLANT           2
             BOP    PM ELECTRICAL MOTOR AREA SEA WATER PRE TREATMENT      2
             BOP    PM ELECTRICAL AREA SANITARY SEWAGE                    2
             BOP    PM ELECTRICAL MOTOR WASTE WATER AREA                  2
             BOP    PM ELECTRICAL MOTOR AUX BOILER AREA                   2
 CH      PM ELECTRICAL MOTOR C1                                          2
 CH      PM ELECTRICAL MOTOR C2 A-B                                      2
 CH      PM ELECTRICAL MOTOR C3 A-B                                      2
 CH      PM ELECTRICAL MOTOR C4 A-B                                      2
 CH      PM ELECTRICAL STACKER RECLAIMER                                 3
 CH      PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR COAL SAMPLING    2
 CH      PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR TRANSFER TOWER   2
 CH      PM ELECTRICAL EARTH RESISTANCE MEASUREMENT FOR CHIMNEY          2
UNIT 1   PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 1                      3
UNIT 1   PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 1                      3
UNIT 1   PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 1                        3
UNIT 1   PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 1                       3
UNIT 1   PM ELECTRICAL BATTERY DC UNIT 1                                 3
         PM ELECTRICAL MOV AREA ECONOMIZER, STEAM, BLOW DOWN AND DRAWN
UNIT 1                                                                   2
         UNIT 1
UNIT 1   PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 1                        2
UNIT 1   PM ELECTRICAL SOOT BLOWER UNIT 1                                2
UNIT 1   PM ELECTRICAL GT, UAT & SST UNIT 1                              2
UNIT 1   PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                     2
UNIT 2   PM ELECTRICAL EXCITING TR. UNIT 2                               2
UNIT 2   PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER A-B UNIT 2            2
UNIT 2   PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT 2                  2
UNIT 2   PM ELECTRICAL MOTOR C3WP UNIT 2                                 2
UNIT 2   PM ELECTRICAL MOTOR SWBP UNIT 2                                 2
UNIT 2   PM ELECTRICAL MOTOR COAL FEEDER UNIT 2                         2
         PM ELECTRICAL MOV AREA FEED WATER, COOLING WATER, VACUUM DAN
UNIT 2                                                                  2
         CONDENSER UNIT 2
UNIT 2   PM ELECTRICAL MOV AREA COAL FEEDER UNIT 2                      2
UNIT 2   PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT 2            2
         CORRECTIVE
 CH      Coal, Electrical Loader A - Short                              2
         SPONSOR WORK
Supporting HM for Inspection CWP1      2
Supporting HM for Inspection Mill 1A   2
                                                 Total
                                                  Tota
                                           Total Schedu
                                               16               14               12               3
Duration   Clock Hour   Man Hour     Senin           Selasa            Rabu             Kamis
                                   20-May-24        21-May-24        22-May-24        23-May-24
  0.50       0:30         4.5        4.50             4.50             4.50
  0.50       0:30         4.5        4.50             4.50             4.50
  2.00       2:00          4                                                            4.00
  2.00       2:00          18
  3.00       3:00          6                                                            6.00
  2.00       2:00          4                          4.00
  2.00       2:00          4                          4.00
  2.00       2:00          4                                           4.00
  2.00       2:00          4                                           4.00
  2.00       2:00          4
2.00   2:00    4     4.00
2.00   2:00    4     4.00
2.00   2:00    4            4.00
1.50   1:30    3            3.00
3.50   3:30   10.5          10.50
1.00   1:00    2     2.00
1.00   1:00    2     2.00
1.00   1:00    2     2.00
2.50   2:30   7.5           7.50
2.50   2:30   7.5                   7.50
2.50   2:30   7.5                   7.50
2.50   2:30   7.5                   7.50
2.00   2:00   6                  6.00
4.50   4:30   9    9.00
1.50   1:30   3    3.00
7.00   7:00   14   4.67   4.67   4.67
2.00   2:00   4    4.00
3.00   3:00   6    1.20   1.20   1.20   1.20
1.00   1:00   2    2.00
1.50   1:30   3    3.00
1.50   1:30   3    3.00
1.50   1:30   3                  3.00
1.50   1:30   3                  3.00
1.50   1:30   3           3.00
4.50   4:30   9           9.00
1.50   1:30   3           3.00
7.00   7:00   14                        7.00
8.00   8:00   16   5.33   5.33   5.33
6.00        6:00          12          4.00         4.00          4.00
4.00        4:00           8          4.00         4.00
                                     66.20         76.20        66.70         18.20
       Total Man Hours Scheduled
                                      72            72           72            16
         Total Man Hours Available
 Total Scheduled Utility Man Hours   91.94%       105.83%       92.64%       113.75%
                                              9             9            9             2
            3
  Jumat                      Remarks                   Status WO   Status Permit   PIC
24-May-24
                -cleaning, regreasing, visual check,
                grounding check, current and
                                                         Close        Close
                themperature measurement
                -equipment in normal operation
                -Cleaning equipment, visual check,
                check grounding                          Close        Close
                -Normal Operation
                -Cleaning equipment, visual check,
                check grounding                          Close        Close
                -Normal Operation
                -Cleaning, visual check
                                                         Close        Close
                -Normal Operation
                -Cleaning, visual check, check
                grounding and temperature                Close        Close
                -Normal Operation
                -Dirty body electrical motor
                surface
  4.00          -Dust                                    Close        Close
                -Visual Check, Cleaning
                -Normal Condition
-Cleaning, visual check, check
grounding and temperature            Close   Close
-Normal Operation
-Cleaning, visual check, check
grounding and temperature            Close   Close
-Normal Operation
-Cleaning equipment, visual check,
greasing, check grounding and
                                     Close   Close
temperature
-Normal Operation
-Cleaning equipment, visual check,
greasing, check grounding and
                                     Close   Close
temperature
-Normal Operation
-Cleaning equipment, visual check
                                     Close   Close
-normal operation
-Check grounding resistance
                                     Close   Close
-normal operation
-Check grounding resistance
                                     Close   Close
-normal operation
-Check grounding resistance
                                     Close   Close
-normal operation
-Cleaning equipment, visual check,
greasing and temperature             Close   Close
-Normal operation
-Cleaning, visual check, greasing
and check temperature                Close   Close
-Normal Operation
-Cleaning, visual check, greasing
and check temperature                Close   Close
-Normal Operation
-Cleaning, visual check, greasing
and check temperature                Close   Close
-Normal Operation
       - Update battery corotion UNIT 1
       Group 1 :
       42,31,07,76,77,21,41,72,99,04
       (Total =10 Cell)
       Group 2 : 68,71,86,69,63,28,10,11
       (Total = 8 Cell)                     Close   Close
       -corrosion
       -Cleaning, visual check, check
       room temperature, add anti-
       corrosion
       -normal operation
       -Cleaning, visual check
                                            Close   Close
       -normal
       -Cleaning, visual check
                                            Close   Close
       -normal
       -Cleaning equipment, visual check
                                            Close   Close
       -normal
       -Cleaning equipment, visual check,
       check grounding, check
                                            Close   Close
       temperature and silica gel
       -normal operation
       Result insulation measurement
1.20                                        Close   Close
       Good
       -Cleaning equipment, visual check
                                            Close   Close
       -normal
       -Cleaning, visual check, greasing,
       check grounding and temperature      Close   Close
       -normal operation
       -Cleaning, visual check, check
       grounding                            Close   Close
       -normal operation
       -Cleaning, visual check, check
       temperature, grounding and
                                            Close   Close
       greasing
       -normal operation
       -Cleaning, visual check, check
       temperature, grounding and
                                            Close   Close
       greasing
       -normal operation
       -Cleaning equipment, visual check
                                             Close   Close
       -normal
       -Visual Check, cleaning, Tightening
                                             Close   Close
       -Condition and indication normal
       -Cleaning equipment, visual check
                                             Close   Close
       -normal
       -Abnormal AB1,CD1,CD3,Tiny 1,2
       &3
       -AB1 Test squence trip, CD1
       Selenoid Purging can't Open,CD3
       Ignitor Can't Insert,Tiny 1&3 Not
7.00   Flame, Tiny 2 Selenoid HSD Can't      Close   Close
       Open
       -PM and Fuction Test
       -AB2,AB3,AB4, CD2, CD4, & Tiny 4
       Test Squence Normal and
       condition Good
       -Fuse often cutoff and accu always
       drop
       -Cable control, cable power dc,
       socket switch melted and cable
       short
                                             Wdone   Close
       -Inspection cable, battery, and
       altenator, replace cable, and
       replace turn signal lamp switch
       -Electrical loader test normal, and
       fuction switch signal lamp normal
12.20
 14
87.14%
         2
                                                       WEEKLY MAINTENANCE SCHEDULE WEEK
                                                       PEMELIHARAAN LISTRIK PLTU KALBAR-1 B
No   WO No.   No Work Order   Work      No PM/SR        Division   Area
                              Type
1     6789    KB1-24-501904   PM     PM-KK-HLBP-0002       HL      BOP
2     6790    KB1-24-501905   PM     PM-KK-HLBP-0007       HL      BOP
3     6791    KB1-24-501906   PM     PM-KK-HLBP-0008       HL      BOP
4     6792    KB1-24-501907   PM     PM-KK-HLBP-0010       HL      BOP
5     6793    KB1-24-501908   PM     PM-KK-HLBP-0017       HL      BOP
6     6794    KB1-24-501909   PM     PM-KK-HLEP-0001       HL       CH
7     6795    KB1-24-501910   PM     PM-KK-HLEP-0002       HL       CH
8    6796   KB1-24-501911   PM   PM-KK-HLEP-0009   HL   ASH
9    6797   KB1-24-501912   PM   PM-KK-HLEP-0013   HL   CH
10   6798   KB1-24-501913   PM   PM-KK-HLEP-0024   HL   CH
11   6799   KB1-24-501914   PM   PM-KK-HLEP-0051   HL   ASH
12   6800   KB1-24-501915   PM   PM-KK-HLEP-0052   HL   UNIT
13   6801   KB1-24-501916   PM   PM-KK-HLU-0001    HL   UNIT
14   6802   KB1-24-501917   PM   PM-KK-HLU-0011    HL   UNIT
15   6803   KB1-24-501918   PM   PM-KK-HLU-0016    HL   UNIT
16   6810   KB1-24-501925   PM   PM-KK-HLU-0050    HL   UNIT
17   6813   KB1-24-501928   PM   PM-KK-HLU-0100    HL   UNIT
18   6814   KB1-24-501929   PM   PM-KK-HLU-0101    HL   UNIT
19   6815   KB1-24-501930   PM   PM-KK-HLU-0102    HL   UNIT
20   6816   KB1-24-501931   PM   PM-KK-HLU-0105    HL   UNIT
21   6670   KB1-24-501828   PM   PM-KK-HLEP-0054   HL   ASH
22   6804   KB1-24-501919   PM   PM-KK-HLU-0022    HL   UNIT
23   6805   KB1-24-501920   PM   PM-KK-HLU-0028   HL   UNIT
24   6806   KB1-24-501921   PM   PM-KK-HLU-0030   HL   UNIT
25   6807   KB1-24-501922   PM   PM-KK-HLU-0032   HL   UNIT
26   6808   KB1-24-501923   PM   PM-KK-HLU-0042   HL   UNIT
27   6809   KB1-24-501924   PM   PM-KK-HLU-0044   HL   UNIT
28   6811   KB1-24-501926   PM   PM-KK-HLU-0055   HL   UNIT
29   6812   KB1-24-501927   PM   PM-KK-HLU-0097   HL   UNIT
1    5824   KB1-24-000464   CM    SR-24-000363    HL   CH
2    6745   KB1-24-000627   CD    SR-24-000898    HL   UNIT
3    6877   KB1-24-000635   CM    SR-24-000991    HL   ASH
4    4151   KB1-24-000096   CM    SR-24-000112    HL   UNIT
5   6889   KB1-24-000647   CD   SR-24-001015   HL   BOP
1                                              HL   UNIT
                                                           Total
MAINTENANCE SCHEDULE WEEK 22 2024
 RAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                               Job Description                    Remarks
          Breafing Pagi
          Sholat ashar
          Fire Fighting Test
          Kegiatan Budaya Kalbar 1
          PM
                                                     /-cleaning,visual check, grounding
                                                     check, current, themperature
                                                     measurement, and chek
          PM ELECTRICAL AREA CHLORINE PLANT
                                                     parameter.
                                                     -Chlorine Plant A is not stanby,
                                                     some cell part is leak and broken
                                                     -Cleaning, visual check, check
          PM ELECTRICAL MOTOR AREA NETRALIZING
                                                     grounding
          PLANT
                                                     -Normal operation
                                                     -Cleaning, visual check, check
          PM ELECTRICAL MOTOR AREA COAL WASTE
                                                     grounding
          WATER PLANT
                                                     -normal operation
          PM ELECTRICAL MULTIPURPORSE PUMP HOUSE Cleaning, visual check, Normal
          MCC                                    operation
                                                     -Cleaning, visual check, check
          PM ELECTRICAL MOTOR AREA MULTI PURPOSE
                                                     grounding and temperatur
          PUMP AREA
                                                     -Normal Operation
                                                     -Cleaning, visual check, check
          PM ELECTRICAL MOTOR BC-2                   grounding
                                                     -Normal Operation
                                                     -Cleaning, visual check, check
          PM ELECTRICAL MOTOR BC-1                   grounding
                                                     -Normal operation
                                             -Cleaning, visual check, check
PM ELECTRICAL ELECTRIC SCREW AIR &
                                             grounding, greasing
CONVEYING AIR COMPRESSOR
                                             -Normal operation
                                             cleaning, visual check,Normal
PM ELECTRICAL SHIP UNLOADER 1
                                             operation
                                             cleaning, visual check,Normal
PM ELECTRICAL COAL-BUNKER BAY MCC
                                             operation
PM ELECTRICAL PAINTING MOTOR SCREW AIR & cleaning, visual check,Normal
CONVEYING AIR COMPRESSOR                 operation
                                             cleaning, visual check,Normal
PM ELECTRICAL 6.3KV & 230/400V PC SECTION
                                             operation
                                             cleaning, visual check,Normal
PM ELECTRICAL GENERATOR UNIT 1
                                             operation
                                             -cleaning, regreasing, visual check,
PM ELECTRICAL MOTOR CIRCULATING WATER        grounding check, current and
PUMP 1-5                                     themperature measurement
                                             -CWP1 inspection on progress
                                         -cleaning, regreasing, visual check,
                                         grounding check, current and
PM ELECTRICAL MOTOR CWP AREA (TBS, TRASH themperature measurement
RAKE, BACKWASH PUMP, SEA WATER PUMP)     -some of cover fan trash track si
                                         corrosion and need to replace the
                                         new one
PM ELECTRICAL MOV MAIN STEAM, REHEAT
                                             cleaning, visual check,Normal
STEAM, BYPASS, GLAND STEAM, EXTRACTION
                                             operation
STEAM AND AUXILIARY STEAM UNIT 1
                                             cleaning, visual check,Normal
PM ELECTRICAL 230/400V PC SECTION UNIT 1
                                             operation
                                             cleaning, visual check,Normal
PM ELECTRICAL 230/400V MCC TURBINE UNIT 1
                                             operation
                                             cleaning, visual check,Normal
PM ELECTRICAL 6.3KV UNIT SECTION UNIT 1
                                             operation
                                             -do the task of INSULATION TEST
PM ELECTRICAL INSULATION TEST OF MOTOR       motor
UNIT                                         -already done and motor on good
                                             condition
                                             -cleaning, tightening, visual check,
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER    check parameter
UNIT 1                                       -Unit Stop ( repair tube leakage in
                                             boiler)
                                             -Cleaning, visual check, greasing,
PM ELECTRICAL MOTOR EH DAN RECIR UNIT 2      check grounding and temperatur
                                             -normal operation
                                                   -Cleaning, visual check, greasing,
PM ELECTRICAL MOTOR LTE PUMP UNIT 2                check grounding and temperatur
                                                   -normal operation
                                          -Cleaning, visual check, check
PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT
                                          grounding
2
                                          -normal operation
                                                   cleaning, visual check,Normal
PM ELECTRICAL MOTOR BFP UNIT 2
                                                   operation
                                                   -Cleaning, visual check, check
PM ELECTRICAL MOTOR FLAME DETECTOR
                                                   grounding
COOLING AIR FAN UNIT 2
                                                   -normal operation
                                                   -Cleaning, visual check, greasing,
PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 2            check grounding
                                                   -normal operation
PM ELECTRICAL MOV AREA FLUE GAS AND AIR            cleaning, visual check,Normal
UNIT 2                                             operation
                                                   -Cleaning, visual check, check
PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 2            grounding
                                                   -normal operation
CORRECTIVE
                                                     -Winding Brake Burn (Short circuit)
Coal, STRE can't travellling, indication long travel -Varnish Winding Quality decrease
fault (Brake Motor Cable Reel 6.3kV Short)           -Rewinding / Repleacement Brake
                                                     -Reschedule
                                                   -any abnormal sound at Motor
                                                   side when test run
                                                   -shaf rotor banding and bearing
UNIT 1, Trafo Fan SST No 5 Abnormal Noise          broken
                                                   -replace full set motor fan
                                                   -equipment is in normal operating
                                                   condition
The Dry Ash Conveyor Unit 2 Damper Head            -MOV indication is Bad & cannot
Cannot Open&Close From DCS                         be operated remotely and locally
                                                   -Batrai MOV Low voltage
                                                   -Replacement Batrai and
                                                   Rekelibrasi MOV
                                                   -finish
BOP, MOV Outlet SRWP A fault (cannot be
                                                                                    Plant Ok
operated)
BOP - Lab, Coal Preparation Room Exhaust Fan       -Abnormal Noise
Abnormal Sound                                     -Blade Fan Break
                                                   -Repair Blade fan
                                                   -finish
SPONSOR WORK
Repair the Cover of Cable Duct in Boiler Unit 2
Area
                      Total Man Hours Scheduled
                       Total Man Hours Available
               Total Scheduled Utility Man Hours
No   WO No.   No Work Order                        Job Description             Crew Size
                                                                                       Duration
                              Breafing Pagi                                       8      0.5
                              Sholat ashar                                        8      0.5
                              Fire Fighting Test                                  2       2
                              Kegiatan Budaya Kalbar 1                            8      1.5
                              Aux Boiler Test                                     2       2
                              PM
1     6936    KB1-24-502008 PM ELECTRICAL 400/230V C.W. PC SECTION A              2      2.5
                              PM ELECTRICAL MOTOR DOSING PUMP REVERSE OSMOSIS
2     6937    KB1-24-502009                                                       2      2.0
                              AREA
3     6938    KB1-24-502010 PM ELECTRICAL MOTOR DOSING PUMP WWTP AREA             2      2.0
4     6939    KB1-24-502011 PM ELECTRICAL MOTOR DOSING PUMP UNIT AREA             2      2.0
5     6940    KB1-24-502012 PM ELECTRICAL MCC AREA COAL TRANSFER TOWER 1          2      3.5
                              PM ELECTRICAL MCC COAL CRUSHING HOUSE MCC AREA
6     6941    KB1-24-502013                                                       2      3.5
                              TT2
7     6942    KB1-24-502014 PM ELECTRICAL SHIP UNLOADER 2                         3      3.5
8     6943    KB1-24-502015 PM ELECTRICAL ESP MCC SECTION                         2      2.0
9     6944    KB1-24-502016 PM ELECTRICAL EXCITING TR. UNIT 1                     2      1.0
10    6945    KB1-24-502017 PM ELECTRICAL CIRCULATING WATER TRAFO A-B             2      1.0
                            PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER A-B
11   6946   KB1-24-502018                                                       2   1.5
                            UNIT 1
12   6947   KB1-24-502019 PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT 1        2   1.5
13   6948   KB1-24-502020 PM ELECTRICAL MOTOR C3WP UNIT 1                       2   1.5
14   6949   KB1-24-502021 PM ELECTRICAL MOTOR SWBP UNIT 1                       2   1.5
15   6953   KB1-24-502025 PM ELECTRICAL MOTOR COAL FEEDER UNIT 1                2   1.5
16   6954   KB1-24-502026 PM ELECTRICAL CCB MCC                                 2   2.0
                            PM ELECTRICAL MOV AREA FEED WATER, COOLING
17   6955   KB1-24-502027                                                       2   4.5
                            WATER, VACUUM DAN CONDENSER UNIT 1
18   6956   KB1-24-502028 PM ELECTRICAL MOV AREA COAL FEEDER UNIT 1             2   1.5
19   6961   KB1-24-502033 PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT 1   2   7.0
20   6962   KB1-24-502034 PM ELECTRICAL INSULATION TEST OF MOTOR UNIT           2   3.0
21   6950   KB1-24-502022 PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 2            3   2.5
22   6951   KB1-24-502023 PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 2         3   2.5
23   6952   KB1-24-502024 PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 2           3   2.5
                            PM ELECTRICAL MOV AREA ECONOMIZER, STEAM, BLOW
24   6957   KB1-24-502029                                                    2   4.5
                            DOWN AND DRAWN UNIT 2
25   6958   KB1-24-502030 PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 2           2   1.5
26   6959   KB1-24-502031 PM ELECTRICAL MOTOR APH A-B UNIT 2                 2   3.0
27   6960   KB1-24-502032 PM ELECTRICAL SOOT BLOWER UNIT 2                   2   7.0
28   6963   KB1-24-502035 PM ELECTRICAL GT & UAT UNIT 2                      2   2.0
29   6817   KB1-24-501932 PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 2   2   3.0
                            CORRECTIVE
1    5363   KB1-24-000376 Common, Valve MOV Spray TBS 4 Leak indication      2   3.0
2    7024   KB1-24-000662   Coal - Relay and kontaktor dozer 320A broken     2   4.0
3    7045   KB1-24-000683 UNIT 2 - BALL CLEANING SIDE B,                     2   4.0
4   4151   KB1-24-000096 BOP, MOV Outlet SRWP A fault (cannot be operated)              2    3.0
                           Coal, STRE can't travellling, indication long travel fault
5   7170   KB1-24-000687                                                                2    4.0
                           (Brake Motor Cable Reel 6.3kV Short)
                           Swap the Motor Traveling of Coal Waste Pond HYD to Coal
6   6147   KB1-24-000521                                                                3   12.00
                           Waste Water Pond
                           SPONSOR WORK
      Total Man Hours Sche
        Total Man Hours Ava
Total Scheduled Utility Man H
                              9        12          9           9           8
Clock HourMan Hour    Senin       Selasa    Rabu       Kamis       Jumat                    Remarks
                     3-Jun-24 4-Jun-24 5-Jun-24 6-Jun-24 7-Jun-24
  0:30       4        4.00        4.00      4.00       4.00        4.00
  0:30       4        4.00        4.00      4.00       4.00        4.00
  2:00       4                                         4.00
  1:30      12                                                     12.00
  2:00       4                              4.00
  2:30     5.00       5.00                                                     Cleaning, visual check
                                                                               Cleaning, visual check, check
  2:00     4.00       4.00
                                                                               grounding
                                                                               Cleaning, visual check, check
  2:00     4.00       4.00
                                                                               grounding
                                                                               Cleaning, visual check, check
  2:00     4.00       4.00
                                                                               grounding
  3:30     7.00       7.00                                                     Cleaning, visual check
  3:30     7.00       7.00                                                     Cleaning, visual check
  3:30     10.50                  5.25      5.25                               Cleaning, visual check
  2:00     4.00                             4.00                               Cleaning, visual check
  1:00     2.00                   2.00                                         Cleaning, visual check
                                                                               -Dusty and dirty
                                                                               -Cleaning panel, visual check and
  1:00     2.00                   2.00                                         parameter check
                                                                               -equipment on good and normal
                                                                               condition
                                                  -Body Motor Dirty
                                                  -CleaningLubrication (Greas 15 gr
1:30   3.00                                3.00
                                                  DE & NDE)
                                                  -Normal Operation
                                                  -ABNORMAL NOISE SIDE NDE
                                                  MOTOR
1:30   3.00                                3.00
                                                  -CLEANING AND GREASING
                                                  -AFTER GREASING NOISE NORMAL
                                                  Cleaning, visual check, greasing,
1:30   3.00                         3.00
                                                  check grounding and temperatur
                                                  Cleaning, visual check, greasing,
1:30   3.00                         3.00
                                                  and check temperatur
                                                  -cleaning, visual check, grounding
                                                  check, current and themperature
1:30   3.00           3.00                        measurement
                                                  -The equipment is clean and
                                                  operating normally
                                                  cleaning,visual check, grounding
2:00   4.00           4.00
                                                  check
4:30   9.00                         9.00          Cleaning, visual check
                                                  cleaning, visual check,equipment
1:30   3.00           3.00
                                                  in good and normal operation
                                                  -Abnormal AB1, CD1, Tiny 1, Tiny 2
                                                  -AB 1 ( Selenoid Oil Valve
                                                  Demage), CD 1 (Not Pipe Air
                                                  Supply), Tiny1 (Indication Flame
                                                  Hunting),Tiny 2 (Flame Not
7:00   14.00                        7.00   7.00
                                                  Detected)
                                                  -PM Visual Check, Cleaning, Check
                                                  component and Fuction test
                                                  -AB2,AB3,AB4,CD2,CD3,CD4, Tiny
                                                  3, Tiny 4 Test Sequence Normal
3:00   6.00    1.20   1.20   1.20   1.20   1.20   ALL MOTOR IN GOOD CONDITION
                                                  Cleaning, visual check, greasing,
2:30   7.50                         7.50
                                                  and check temperatur
                                                  -DUSTY AND DIRTY
2:30   7.50                                7.50   -CLEANING AND GREASING
                                                  (NDE/DE BEARING MOTOR)
2:30   7.50                  7.50                 Cleaning, visual check, greasing
4:30   9.00           9.00                        Visual Check, Cleaning
1:30   3.00    3.00                               Cleaning, visual check
3:00   6.00                  6.00                 Cleaning, visual check
7:00   14.00   4.67   4.67   4.67                 Cleaning, visual check
                                                  Cleaning, visual check, check
2:00   4.00           4.00                        grounding, temperatur, dan silica
                                                  gel
                                                  Cleaning, visual check, pengentian
3:00   6.00                  6.00
                                                  silica gell
3:00   6.00                                6.00
4:00   8.00                         4.00   4.00
                                                  -Problem Actualy On MOV Ball
4:00   8.00                  4.00   4.00          Collector Can"t Operation and
                                                  feedback purple color
                                                  -Rotation Stuck Because Condition
                                                  Gear And Shaft corotion
                                                  -Cleaning,Lubrication, Inspection
                                                  And Calibration LImit Open/Close
                                                  -Fuction Test Open/CLose from
                                                  DCS And Indication Feedback
                                                  Normal
                                               -BOP, MOV Outlet SRWP A fault
3:00    6.00    6.00                           (cannot be operated)
                                               -power supply control modul is
                                               broken
                                               -replace new power supply
                                               control, recalibrate, change switch
                                               open indication, run test
                                               -Function test has been finished,
                                               MOV Normal operation
4:00    8.00    8.00                           -Coal, STRE can't travellling,
                                               indication long travel fault (Brake
                                               Motor Cable Reel 6.3kV Short)
                                               -Motor broke (Short)
                                               -replace and repair Motor breake,
                                               run test and function test
                                               -Motor has been normal operation
                                               - Motor Treveling Roller Drum
                                               Grab not exis
12:00   36.00          12.00   12.00   12.00
                                               - Install Motor traveling Roller
                                               drum grab and Fuction test
                                               - Test Up/Down, Trevel R/F
                                               Normal But Condition wirerope
                                               Stacked need Follow Up HM Team
                                               For stretch the wire
                                 47.87       60.12       62.62       62.70       63.70
    Total Man Hours Scheduled
                                  64          64          64          64          64
     Total Man Hours Available
tal Scheduled Utility Man Hours 74.79%       93.93%      97.84%      97.97%      99.53%
                                         8           8           8           8           8
Status WO   Status Permit   PIC
  close         close
  close         close
  close         close
  close         close
  close         close
  close         close
  close         close
  close         close
  close         close
  close         close
close   close
close   close
close   close
close   close
close   close
close   close
close   close
close   close
close   close
close   close
close   close
  close     close
  close     close
  close     close
  close     close
  close     close
  close     close
  close     close
  close     close
Plant Ok
Check Mat
  Comp      close
Comp   close
Comp   close
Comp   close
                                                        WEEKLY MAINTENANCE SCHEDULE WEEK 24 2024
                                                        PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No   WO No. No Work Order Work Type      No PM/SR        Division   Area
1     7094   KB1-24-502106   PM       PM-KK-HLBP-0003      HL        BOP
2     7095   KB1-24-502107   PM       PM-KK-HLBP-0006      HL        BOP
3     7096   KB1-24-502108   PM       PM-KK-HLBP-0009      HL        BOP
4     7097   KB1-24-502109   PM       PM-KK-HLBP-0026      HL        BOP
5     7098   KB1-24-502110   PM       PM-KK-HLEP-0007      HL        CH
6     7099   KB1-24-502111   PM       PM-KK-HLEP-0008      HL        CH
7     7100   KB1-24-502112   PM       PM-KK-HLEP-0042      HL        CH
8     7249   KB1-24-502213   PM       PM-KK-HLEP-0053      HL        CH
9     7102   KB1-24-502114   PM       PM-KK-HLU-0021       HL       UNIT 1
10    7103   KB1-24-502115   PM       PM-KK-HLU-0027       HL       UNIT 1
11    7104   KB1-24-502116   PM       PM-KK-HLU-0029       HL       UNIT 1
12    7105   KB1-24-502117   PM       PM-KK-HLU-0031       HL       UNIT 1
13   7107   KB1-24-502119   PM   PM-KK-HLU-0041   HL   UNIT 1
14   7108   KB1-24-502120   PM   PM-KK-HLU-0043   HL   UNIT 1
15   7111   KB1-24-502123   PM   PM-KK-HLU-0054   HL   UNIT 1
16   7112   KB1-24-502124   PM   PM-KK-HLU-0062   HL   UNIT 1
17   7113   KB1-24-502125   PM   PM-KK-HLU-0096   HL   UNIT 1
18   7114   KB1-24-502126   PM   PM-KK-HLU-0105   HL   UNIT 1
19   7101   KB1-24-502113   PM   PM-KK-HLU-0002   HL   UNIT 1
20   7106   KB1-24-502118   PM   PM-KK-HLU-0040   HL   UNIT 1
21   7109   KB1-24-502121   PM   PM-KK-HLU-0049   HL   UNIT 2
22   7110   KB1-24-502122   PM   PM-KK-HLU-0051   HL   UNIT 2
23   7115   KB1-24-502127   PM   PM-KK-HLU-0107   HL   UNIT 2
24   7116   KB1-24-502128   PM   PM-KK-HLU-0108   HL   UNIT 2
25   7117   KB1-24-502129   PM   PM-KK-HLU-0109   HL   UNIT 2
1    7035   KB1-24-000673   CD    SR-24-001186    HL    BOP
2    7027   KB1-24-000665   CM    SR-24-001143    HL    CH
3   7323   KB1-24-000710   CM                  HL   BOP
4   5363   KB1-24-000376   CM   SR-24-000451   HL   UNIT
5   7024   KB1-24-000662   CD   SR-24-001080   HL   UNIT
MAINTENANCE SCHEDULE WEEK 24 2024
ARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                               Job Description              Crew Size Duration Clock Hour Man Hour
          Breafing Pagi                                        8       0.50      0:30        4
          Sholat ashar                                         8       0.50      0:30        4
          Fire Fighting Test                                   2       2.00      2:00        4
          Kegiatan Budaya Kalbar 1                             8       1.50      1:30       12
          Training                                             1       4.00      4:00        4
          PM
          PM ELECTRICAL MOTOR AREA REVERSE OSMOSIS             2       2.00      2:00      4.00
          PM ELECTRICAL SUPPLY WATER & WATER TREATMENT
                                                               2       2.50      2:30      5.00
          TR. A-B
          PM ELECTRICAL MOTOR AREA FUEL OIL PUMP HOUSE         2       2.00      2:00      4.00
          PM ELECTRICAL INSULATION TEST BOP AREA               2       3.00      3:00      6.00
          PM ELECTRICAL MOTOR C5                               2       2.00      2:00      4.00
          PM ELECTRICAL MOTOR CRUSHER A-B                      2       1.50      1:30      3.00
          PM ELECTRICAL INSULATION TEST EP AREA                2       3.00      3:00      6.00
          PM ELECTRICAL 400/230V COAL HANDLING PC SECTION      2       2.00      2:00      4.00
          PM ELECTRICAL MOTOR EH DAN RECIR UNIT 1              2       1.50      1:30      3.00
          PM ELECTRICAL MOTOR LTE PUMP UNIT 1                  2       1.50      1:30      3.00
          PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT 1          2       1.50      1:30      3.00
          PM ELECTRICAL MOTOR BFP UNIT 1                       2       2.50      2:30      5.00
PM ELECTRICAL MOTOR FLAME DETECTOR COOLING AIR
                                                 2   1.50   1:30   3.00
FAN UNIT 1
PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 1          2   1.50   1:30   3.00
PM ELECTRICAL MOV AREA FLUE GAS AND AIR UNIT 1   2   4.50   4:30   9.00
PM ELECTRICAL MOTOR APH A-B UNIT 1               2   3.00   3:00   6.00
PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 1          2   1.50   1:30   3.00
PM ELECTRICAL INSULATION TEST OF MOTOR UNIT      2   3.00   3:00   6.00
PM ELECTRICAL GENERATOR UNIT 2                   2   2.50   2:30   5.00
PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 2        3   2.50   2:30   7.50
PM ELECTRICAL BATTERY DC UNIT 2                  3   2.00   2:00   6.00
PM ELECTRICAL MOV MAIN STEAM, REHEAT STEAM,
BYPASS, GLAND STEAM, EXTRACTION STEAM DAN        2   4.50   4:30   9.00
AUXILIARY STEAM UNIT 2
PM ELECTRICAL 230/400V PC SECTION UNIT 2         2   2.00   2:00   4.00
PM ELECTRICAL 230/400V MCC TURBINE UNIT 2        2   2.00   2:00   4.00
PM ELECTRICAL 6.3KV UNIT SECTION UNIT 2          2   2.00   2:00   4.00
CORRECTIVE
Abnormal Sound On Jockey Pump B                  2   6.00   6:00   12.00
Coal - motor break C3B short, leak out oil       2   8.00   8:00   16.00
Replace the Control Transformer of the Coal Waste Water
                                                          2     4.00         4:00        8.00
Crane - No Output Voltage
Common, Valve MOV Spray TBS 4 Leak indication             2     6.0          6:00       12.00
Coal - Relay and kontaktor dozer 320A broken              2     6.0          6:00       12.00
SPONSOR WORK
                                                                       Total Man Hours Scheduled
                                                                        Total Man Hours Available
                                                              Total Scheduled Utility Man Hours
   10        8         8          8         6
                                                                 Remarks                Status WO
 Senin     Selasa     Rabu      Kamis     Jumat
10-Jun-24 11-Jun-24 12-Jun-24 13-Jun-24 14-Jun-24
  4.00      4.00      4.00      4.00      4.00
  4.00      4.00      4.00      4.00      4.00
                                4.00
                                          12.00
                                4.00      4.00
                                                    Cleaning, visual check, check
  4.00                                                                                    Close
                                                    parameter
                      5.00                          Cleaning, visual check                Close
                                                    -Cleaning, visual check, check
                                                    grounding and greasing
            4.00                                    -pupm A not stanby (repair pump),     Close
                                                    pump B abnormal Noise at NDE
                                                    motor
  3.00      3.00                                    equipment in normal condition         Close
                                                    Cleaning, visual check, check
                                4.00                                                      Close
                                                    grounding
                                                    -Cleaning, visual check, check
                                                    grounding, greasing
                      3.00                                                                Close
                                                    -Normal oprasi, replace new
                                                    grounding cable for motot crusher
  3.00      3.00                                    equipmet in good condition            Close
                                          4.00      Cleaning, visual check                Close
                                                    Cleaning, visual check, check
                                3.00                grounding, temperatur and check       Close
                                                    ampere
                                                    Cleaning, visual check, check
                                          3.00                                            Close
                                                    grounding
                                                    Cleaning, visual check, check
                                3.00                                                      Close
                                                    grounding
                                                    Cleaning, visual check, normal
                                5.00                                                      Close
                                                    operation
                                   -Cleaning, visual check, check
                                   grounding
              3.00                                                       Close
                                   -Normal oprasi, cover of cooling
                                   fan motorvisual
                                   Cleaning,   need check,
                                                     to repainting
                                                            greasing,
              3.00                 check grounding                       Close
                                   -Normal operasi
                                   -cleaning, visual check, grounding
              9.00                 check                                 Close
                                   -equipment normal operation
                                   Cleaning, visual check, check
6.00                               grounding, check temperature          Close
                                   -Normal oprasi
                                   -cleaning, visual check, check
                     3.00          grounding                             Close
                                   -Normal oprasi
                                   result test of Motor Exhaust MOT
1.20   1.20   1.20   1.20   1.20   B is bad condition, need to check     Close
                                   overall condition of motor
                                   Cleaning, visual check,Normal
5.00                                                                     Close
                                   oprasi
                                   Cleaning, visual check, check
       7.50                        grounding and greasing, Normal        Close
                                   -Cleaning,
                                   oprasi      visual check
                                   -Normal with note : Battry yg
       6.00                        corosi unit 2                         Close
                                      Grub 2 ( 26,27,44)
                                      Grub 1 (52,21,70,)
                            9.00   Normal oprasi                         Close
                                   Cleaning, visual check, chek
4.00                                                                     Close
                                   parameter, Normal oprasi
                                   Cleaning, visual check, normal
                            4.00                                         Close
                                   operation
                                   Cleaning, visual check, chek
4.00                                                                     Close
                                   parameter, Normal oprasi
                                   -Abnormal Sound On Jockey Pump
                                   B
                                   -Bearing NDE side is broken
                                   -Replace new bearing NDE side of
                                   motor Jokey pump B
                     6.00   6.00   -has finish (No load and load test-   Comp
                                   >OK)
8.00   8.00                                                              Inprg
                                              -Power Lose 1 Phase On Cabinet
                                              control Crane
 8.00                                         -Lose power on Rel Busbar             Comp
                                              because rel not good and not
                                              conect from juction box to control
                                              panel
                                              -Change supply power from Rel
                                              busbar to use cable direct from
                                              juction box to control panel
                                              -Voltage Normal and Test fuction
                                              Normal
                                              -Common, Valve MOV Spray TBS 4
                                              Can't Operate
                                              -modul power control broken
          6.00     6.00                       -replace new power module,            Comp
                                              recalibrate, function test
                                              -cover MOV broken, need to
                                              change new cover
                                              -Relay and Contactors dozzer 320A
                                              broken
                                              -Short Circuit
                                              -Replacement of Relay and
                   6.00     6.00                                                    Comp
                                              Contactor
                                              -the test will be carried out after
                                              the fuel pump is installed by a
                                              mechanic
54.20    46.70    44.20    47.20     51.20
 64       64       56       56        49
84.69%   72.97%   78.93%   84.29%   104.49%
  8        8        7        7         7
Status Permit   PIC
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
Wstart
Close
Close
Close
                                                       WEEKLY MAINTENANCE SCHEDULE WEEK 25 202
                                                       PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGK
No   WO No.   No Work Order   Work      No PM/SR        Division    Area
                              Type
1     7236    KB1-24-502200   PM     PM-KK-HLBP-0001      HL        BOP
2     7237    KB1-24-502201   PM     PM-KK-HLBP-0004      HL        BOP
3     7238    KB1-24-502202   PM     PM-KK-HLBP-0005      HL        BOP
4     7239    KB1-24-502203   PM     PM-KK-HLBP-0015      HL        BOP
5     7240    KB1-24-502204   PM     PM-KK-HLBP-0016      HL        BOP
6     7241    KB1-24-502205   PM     PM-KK-HLBP-0023      HL        BOP
7     7244    KB1-24-502208   PM     PM-KK-HLEP-0003      HL         CH
8    7245   KB1-24-502209   PM   PM-KK-HLEP-0004   HL    CH
9    7246   KB1-24-502210   PM   PM-KK-HLEP-0005   HL    CH
10   7247   KB1-24-502211   PM   PM-KK-HLEP-0006   HL    CH
11   7248   KB1-24-502212   PM   PM-KK-HLEP-0012   HL    CH
12   7255   KB1-24-502219   PM   PM-KK-HLU-0033    HL    CH
13   7256   KB1-24-502220   PM   PM-KK-HLU-0035    HL    CH
14   7257   KB1-24-502221   PM   PM-KK-HLU-0037    HL    CH
15   7258   KB1-24-502222   PM   PM-KK-HLU-0039    HL   UNIT 1
16   7260   KB1-24-502224   PM   PM-KK-HLU-0048    HL   UNIT 1
17   7263   KB1-24-502227   PM   PM-KK-HLU-0058   HL   UNIT 1
18   7264   KB1-24-502228   PM   PM-KK-HLU-0060   HL   UNIT 1
19   7265   KB1-24-502229   PM   PM-KK-HLU-0064   HL   UNIT 1
20                          PM   PM-KK-HLU-0098   HL   UNIT 1
21   7267   KB1-24-502231   PM   PM-KK-HLU-0099   HL   UNIT 1
22   7268   KB1-24-502232   PM   PM-KK-HLU-0105   HL   UNIT 1
23   7250   KB1-24-502214   PM   PM-KK-HLU-0006   HL   UNIT 1
24   7251   KB1-24-502215   PM   PM-KK-HLU-0013   HL   UNIT 2
25   7252   KB1-24-502216   PM   PM-KK-HLU-0015   HL   UNIT 2
26   7253   KB1-24-502217   PM   PM-KK-HLU-0018   HL   UNIT 2
27   7254   KB1-24-502218   PM   PM-KK-HLU-0020   HL   UNIT 2
28   7259   KB1-24-502223   PM   PM-KK-HLU-0046   HL   UNIT 2
29   7261   KB1-24-502225   PM   PM-KK-HLU-0053   HL   UNIT 2
30   7262   KB1-24-502226   PM   PM-KK-HLU-0057   HL   UNIT 2
31   7266   KB1-24-502230   PM   PM-KK-HLU-0067   HL   UNIT 2
1   2390   KB1-23-000314   CM   SR-23-000417   HL   BOP
2
NTENANCE SCHEDULE WEEK 25 2024
AN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                                                                    4            4          8
                          Job Description       Crew Durati Clock   Man     Senin       Selasa       Rabu
                                                Size  on    Hour    Hour
                                                                           17-Jun-24 18-Jun-24 19-Jun-24
          Breafing Pagi                          8    0.50   0:30    4                               4.00
          Sholat ashar                           8    0.50   0:30    4                               4.00
          Fire Fighting Test                     2    2.00   2:00    4
          Kegiatan Budaya Kalbar 1               8    1.50   1:30   12
          Performance Test                       2    2.00   2:00    4                               4.00
          PM
          PM ELECTRICAL FIRE FIGHTING PUMP       2    3.00   3:00    6
          PM ELECTRICAL MOTOR AREA
                                                 2    2.00   2:00    4
          DEMINERALIZE PLANT
          PM ELECTRICAL MOTOR AREA SEA WATER
                                                 2    2.00   2:00    4
          PRE TREATMENT
          PM ELECTRICAL AREA SANITARY SEWAGE     2    2.00   2:00    4
          PM ELECTRICAL MOTOR WASTE WATER
                                                 2    2.00   2:00    4
          AREA
          PM ELECTRICAL MOTOR AUX BOILER AREA    2    2.00   2:00    4                  4.00
          PM ELECTRICAL MOTOR C1                 2    2.00   2:00    4
PM ELECTRICAL MOTOR C2 A-B               2   2.00   2:00    4
PM ELECTRICAL MOTOR C3 A-B               2   2.00   2:00    4
PM ELECTRICAL MOTOR C4 A-B               2   1.50   1:30    3
PM ELECTRICAL STACKER RECLAIMER          3   3.50   3:30   10.5   5.25
PM ELECTRICAL MEDIUM SPEED MILL A-D
                                         3   2.50   2:30   7.5
UNIT 1
PM ELECTRICAL INDUCED DRAFT FAN A-B
                                         3   2.50   2:30   7.5    7.50
UNIT 1
PM ELECTRICAL PRIMARY AIR FAN A-B UNIT
                                         3   2.50   2:30   7.5    7.50
1
PM ELECTRICAL FORCED DRAFT FAN A-B
                                         3   2.50   2:30   7.5    7.50
UNIT 1
PM ELECTRICAL BATTERY DC UNIT 1          3   2.00   2:00    6
PM ELECTRICAL MOV AREA ECONOMIZER,
                                           2   4.50   4:30   9
STEAM, BLOW DOWN AND DRAWN UNIT 1
PM ELECTRICAL MOV AREA SOOTBLOWER
                                           2   1.50   1:30   3    3.00
UNIT 1
PM ELECTRICAL SOOT BLOWER UNIT 1           2   7.00   7:00   14   4.67   4.67   4.67
PM ELECTRICAL PAINTING MOTOR INTAKE
AREA (TBS, TRASH RAKE, BACKWASH PUMP,      2   3.00   3:00   6
SEA WATER PUMP)
PM ELECTRICAL GT, UAT & SST UNIT 1         2   2.00   2:00   4                  1.33
PM ELECTRICAL INSULATION TEST OF
                                           2   3.00   3:00   6    1.20   1.20   1.20
MOTOR UNIT
PM ELECTRICAL EXCITING TR. UNIT 2          2   1.00   1:00   2
PM ELECTRICAL MOTOR VACUUM PUMP
                                           2   1.50   1:30   3
CONDENSER A-B UNIT 2
PM ELECTRICAL MOTOR CONDENSATE
                                           2   1.50   1:30   3
PUMP A-B UNIT 2
PM ELECTRICAL MOTOR C3WP UNIT 2            2   1.50   1:30   3
PM ELECTRICAL MOTOR SWBP UNIT 2            2   1.50   1:30   3
PM ELECTRICAL MOTOR COAL FEEDER UNIT
                                           2   1.50   1:30   3
2
PM ELECTRICAL MOV AREA FEED WATER,
COOLING WATER, VACUUM DAN                  2   4.50   4:30   9
CONDENSER UNIT 2
PM ELECTRICAL MOV AREA COAL FEEDER
                                           2   1.50   1:30   3
UNIT 2
PM ELECTRICAL FUNCTION TEST - TINY & OIL
                                           2   7.00   7:00   14
GUN UNIT 2
CORRECTIVE
BOP, Neraca Digital 220 gr, Can't turn on.
                                                   2       3.00    3:00    6
Tried using another adapter
SPONSOR WORK
Start Up #1                                        2       5.00    5:00    10
Supporting Repair Boiler Tube #1                   1       20.00 20:00     20       20           20           20
                                                                                   28.87        29.87        66.95
                                                   Total Man Hours Scheduled
                                                                                    8            8            56
                                                       Total Man Hours Available
                                             Total Scheduled Utility Man Hours 360.83%         373.33%      119.55%
                                                                                           1            1            7
         9           8
 Kamis       Jumat       Sabtu   Minggu                                          Status WO
                                          Remarks
20-Jun-24 21-Jun-24 22-Jun-24 23-Jun-24
  4.00       4.00
  4.00       4.00
  4.00
  4.00
                                          -Cleaning, visual check, check
  6.00                                    grounding and greasing                   Close
                                          -Normal operation
                                          -cleaning, regreasing, visual check,
                                          grounding check, current and
                                                                                   Close
                                          themperature measurement
                                          -equipment normal operation
                                          -Cleaning, visual check, check
                                          grounding,check amper motor and
  4.00                                                                             Close
                                          greasing
                                          -normal operation
              -Cleaning, visual check, check
              grounding, greasing, check
4.00                                                 Close
              temperatur
              -normal operation
              -Cleaning, visual check, check
       4.00   grounding, greasing motor              Close
              -Normal operation
              -Cleaning, visual check, check
       3.00   grounding, greasing motor              Close
              -Normal operation
              -Cleaning, visual check, check
              grounding, tightening electrical
5.25                                                 Close
              part,
              -some part need to repair and test
              -Cleaning, visual chek, grounding
              check
       7.50                                          Close
              -Equipment in Standby condition
              (unit Stop)
              -cleaning, visual check, grounding
              check, current and themperature
                                                     Close
              measurement
              -normal operation
              -cleaning, regreasing, visual check,
              grounding check, current and
                                                     Close
              themperature measurement
              -Motor standby
              -cleaning, regreasing, visual check,
              grounding check, current and
                                                     Close
              themperature measurement
              -Motor standby
              -Cleaning, visual check, chek and
              measurement parameter,
              - • - Update battery corotion
              UNIT 1
              Group 1 :
6.00                                                 Close
              42,31,07,76,77,21,41,72,99,04
              (Total =10 Cell)
              Group 2 : 68,71,86,69,63,28,10,11
              (Total = 10 Cell) 77 & 78 (battery
              jebol)posisi battery di jumper
                                                                Inprg
                                                                Inprg
                            -Cleaning, visual check, check
                            grounding and check silica gel
                                                                Close
                            -Normal operation with note ( UAT
                            tranducer OTI broke)
1.20   1.20                 all motor in good condition         Inprg
              2.00                                              Inprg
              3.00                                              Inprg
              3.00                                              Inprg
                     3.00                                       Inprg
                     3.00                                       Inprg
                            -Cleaning, visual check, check
       3.00                 grounding                           Close
                            -normal operation
                            -Cleaning, visual check
       3.00                                                     Inprg
                            -Normal operation
                            -AB 1, CD1, CD3, TINY 1
                            -AB1 (NO FLAME), CD1 (SELENOID
                            PURGE BROKEN&HOSE LEAK), CD3
7.00   7.00                                                     Close
                            (NOT INSERT), TINY 1 (NO FLAME)
                            -NEED REPAIR
                            -REPIAR OG
                                                   -BOP, Neraca Digital 220 gr, Can't
                                                   turn on. Tried using another
                                                   adapter
 6.00                                                                                   Inprg
                                                   -PCB broken
                                                   -Replace PCB new
                                                   -Test and normal
             10.00
  20
 75.45       46.70         8.00        6.00
  56          49            7           7
134.73%      95.31%       114.29%     85.71%
         7            7           1            1
Status Permit
                PIC
   Close
   Close
   Close
Close
Close
Close
Close
Close
Close
Close
Close
Close
  Hreview        HSE
  Hreview        HSE
   Close
HSELWDreview     HSE
  Hreview        HSE
  Hreview        HSE
  Hreview        HSE
   Wstart      executor
   Wstart      executor
   Close
HSEWDreview      HSE
   Close
HSELWDreview   HSE
                                                     WEEKLY MAINTENANCE SCHEDULE WEEK 26 2024
                                                     PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAY
No   WO     No Work Order   Work      No PM/SR        Division   Area
     No.                    Type
1    7392   KB1-24-502308   PM     PM-KK-HLBP-0002      HL       BOP
2    7393   KB1-24-502309   PM     PM-KK-HLBP-0007      HL       BOP
3    7394   KB1-24-502310   PM     PM-KK-HLBP-0008      HL       BOP
4    7395   KB1-24-502311   PM     PM-KK-HLBP-0010      HL       BOP
5    7396   KB1-24-502312   PM     PM-KK-HLBP-0017      HL       BOP
6    7399   KB1-24-502315   PM     PM-KK-HLEP-0001      HL       CH
7    7400   KB1-24-502316   PM   PM-KK-HLEP-0002   HL    CH
8    7401   KB1-24-502317   PM   PM-KK-HLEP-0009   HL    ASH
9    7402   KB1-24-502318   PM   PM-KK-HLEP-0013   HL    CH
10   7403   KB1-24-502319   PM   PM-KK-HLEP-0024   HL    CH
11   7404   KB1-24-502320   PM   PM-KK-HLEP-0052   HL   UNIT
12   7405   KB1-24-502321   PM   PM-KK-HLU-0001    HL   UNIT
13   7406   KB1-24-502322   PM   PM-KK-HLU-0011    HL   UNIT
14   7407   KB1-24-502323   PM   PM-KK-HLU-0016    HL   UNIT
15   7414   KB1-24-502330   PM   PM-KK-HLU-0050    HL   UNIT
16   7417   KB1-24-502333   PM   PM-KK-HLU-0100    HL   UNIT 1
17   7418   KB1-24-502334   PM   PM-KK-HLU-0101    HL   UNIT 1
18   7419   KB1-24-502335   PM   PM-KK-HLU-0102    HL   UNIT 1
19   7420   KB1-24-502336   PM   PM-KK-HLU-0105    HL   UNIT
20   7269   KB1-24-502233   PM   PM-KK-HLEP-0054   HL   UNIT 1
21   7408   KB1-24-502324   PM   PM-KK-HLU-0022    HL   UNIT 2
22   7409   KB1-24-502325   PM   PM-KK-HLU-0028    HL   UNIT 2
23   7410   KB1-24-502326   PM   PM-KK-HLU-0030    HL   UNIT 2
24   7411   KB1-24-502327   PM   PM-KK-HLU-0032    HL   UNIT 2
25   7412   KB1-24-502328   PM   PM-KK-HLU-0042    HL   UNIT 2
26   7413   KB1-24-502329   PM   PM-KK-HLU-0044    HL   UNIT 2
27   7415   KB1-24-502331   PM   PM-KK-HLU-0055    HL   UNIT 2
28   7416   KB1-24-502332   PM   PM-KK-HLU-0097    HL   UNIT 2
1    7347   KB1-24-000734
2    7337   KB1-24-000724
3    7338   KB1-24-000725
4           SR-24-001562
5           SR-24-001549
6    7350   KB1-24-000737
40   7485   KB1-24-000754
41   7627   KB1-24-000783
42   7502   KB1-24-000771
43   7498   KB1-24-000767
44
45
MAINTENANCE SCHEDULE WEEK 26 2024
ARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                              Job Description         Crew Size   Duration   Clock Hour
         Breafing Pagi                                   8          0.5        0:30
         Sholat ashar                                    8          0.5        0:30
         Fire Fighting Test                              2           2         2:00
         Kegiatan Budaya Kalbar 1                        8          1.5        1:30
         Performance Test #1                             1           2         2:00
         PM
         PM ELECTRICAL AREA CHLORINE PLANT               2           4         4:00
         PM ELECTRICAL MOTOR AREA NETRALIZING PLANT      2           2         2:00
         PM ELECTRICAL MOTOR AREA COAL WASTE
                                                         2           2         2:00
         WATER PLANT
         PM ELECTRICAL MULTIPURPORSE PUMP HOUSE
                                                         2          2.5        2:30
         MCC
         PM ELECTRICAL MOTOR AREA MULTI PURPOSE
                                                         2           2         2:00
         PUMP AREA
         PM ELECTRICAL MOTOR BC-2                        3          2.5        2:30
PM ELECTRICAL MOTOR BC-1                    2   2     2:00
PM ELECTRICAL ELECTRIC SCREW AIR &
                                            2   2     2:00
CONVEYING AIR COMPRESSOR
PM ELECTRICAL SHIP UNLOADER 1               3   3.5   3:30
PM ELECTRICAL COAL-BUNKER BAY MCC           2   2     2:00
PM ELECTRICAL 6.3KV & 230/400V PC SECTION   2   2     2:00
PM ELECTRICAL GENERATOR UNIT 1              2   2.5   2:30
PM ELECTRICAL MOTOR CIRCULATING WATER
                                            2   2.5   2:30
PUMP 1-5
PM ELECTRICAL MOTOR CWP AREA (TBS, TRASH
                                            2   1.5   1:30
RAKE, BACKWASH PUMP, SEA WATER PUMP)
PM ELECTRICAL MOV MAIN STEAM, REHEAT
STEAM, BYPASS, GLAND STEAM, EXTRACTION      2   4.5   4:30
STEAM DAN AUXILIARY STEAM UNIT 1
PM ELECTRICAL 230/400V PC SECTION UNIT 1    2   2     2:00
PM ELECTRICAL 230/400V MCC TURBINE UNIT 1   2   2     2:00
PM ELECTRICAL 6.3KV UNIT SECTION UNIT 1     2   2     2:00
PM ELECTRICAL INSULATION TEST OF MOTOR
                                            2   3     3:00
UNIT
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER
                                                      2   3     3:00
UNIT 1
PM ELECTRICAL MOTOR EH DAN RECIR UNIT 2               2   1.5   1:30
PM ELECTRICAL MOTOR LTE PUMP UNIT 2                   2   1.5   1:30
PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT
                                                      2   1.5   1:30
2
PM ELECTRICAL MOTOR BFP UNIT 2                        2   2.5   2:30
PM ELECTRICAL MOTOR FLAME DETECTOR
                                                      2   1.5   1:30
COOLING AIR FAN UNIT 2
PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 2               2   1.5   1:30
PM ELECTRICAL MOV AREA FLUE GAS AND AIR
                                                      2   4.5   4:30
UNIT 2
PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 2               2   1.5   1:30
CORRECTIVE
Coal - the fuse for the 320B lamp is short, causing
                                                      2   6     6:00
the battery to drop quickly
Unit 2 - Ball Cleaning Pump 2A High Vibration    2   8   8:00
Unit 2 - Ball cleaning pump 2B High vibration    2   8   8:00
Unit 2,The exhaust fan MOT 2B insulation test
                                                 2   4   4:00
results were not good
Ash - bucket eleavtor A unit 1 broken            2   4   4:00
Common, MOV Backwash TBS no. 5 cannot open
                                                 2   4   4:00
and close
Dismantle the Motor Hydraulic of Center Gate
                                                 3   4   4:00
Hopper STRE - Need Rewinding
Inspection the Slewing Motor Brake - Oil Leaks   2   4   4:00
Inspection the MOV of Inlet Mill 2A - Indication
                                                    2   4       4:00
Fault in DCS
Inspection the Exhaust Fan of MOT 2B - Insulation
                                                    2   4       4:00
Resistant Value Not Good
                                                               Err:507
                                                               Err:507
SPONSOR WORK
                                                                  Total Man Hours Scheduled
                                                                    Total Man Hours Available
                                                            Total Scheduled Utility Man Hours
                    9            12          11           10           7
Man Hour    Senin       Selasa        Rabu        Kamis        Jumat                    Remarks
           24-Jun-24 25-Jun-24 26-Jun-24 27-Jun-24 28-Jun-24
   4         4.00       4.00          4.00        4.00         4.00
   4         4.00       4.00          4.00        4.00         4.00
   4                                              4.00
   12                                                          12.00
   2                                              2.00
                                                                           - Cleaning, visual checl, parameter
  8.00                                                         8.00        check
                                                                           - Plant B not stanby
                                                                           - Cleaning, visual check, check
  4.00                                4.00                                 grounding
                                                                           - normal
                                                                           - Cleaning, visual check, check
  4.00                                            4.00                     grounding
                                                                           - Normal
                                                                           - Cleaning, tightening, visual &
  5.00                  5.00                                               parameter check
                                                                           - Normal condition
                                                                           - Cleanig, grounding check,
                                                                           regreasing, visual check,
                                                                           themperature & parameter check
  4.00                  4.00
                                                                           - NOrmal with note, some motor
                                                                           corrotion and need to repainting
                                                                           or replace new one
                                                                           - Cleaning, visual check, check
  7.50                  7.50                                               grounding
                                                                           - Motor stanby
                                            - Cleaning, visual check, check
                                            grounding, greasing and check
4.00    4.00
                                            temperatur
                                            - Normal operation
                                            - Cleaning, visual check, greasing
4.00            4.00                        motor, check grounding
                                            - Normal
                                            - Cleaning, visual check, check
                                            grounding and greasing motor
10.50   10.50
                                            - Normal with note (2pcs electrical
                                            room lamp is broken)
                                            - Cleaning, visual check
4.00                          4.00
                                            - Normal operation
                                            - Cleaning, visual check
4.00    4.00
                                            - Normal operation
                                            - Cleaning, visual check, check
                                            carbon brush
5.00    5.00
                                            - Normal (Carbon brush -b4
                                            replacement)
                                            - cleaning, regreasing, visual
                                            check, grounding check, current
5.00                                 5.00   and themperature measurement
                                            - CWP4 not standby (progress
                                            inspection)
                                            - cleaning, regreasing, visual
                                            check, grounding check, current
3.00                                 3.00   and themperature measurement
                                            - cover fan trash track A/B korosi
                                            (need replace new one)
                                            - Cleaning, visual check
9.00                   9.00
                                            - Normal
                                            - Cleaning, visual check
4.00    4.00
                                            - Normal
                                            - Cleaning, visual check
4.00                   4.00
                                            - Normal
                                            - Cleaning, visual check
4.00    4.00
                                            - Normal
6.00    1.20    1.20   1.20   1.20   1.20   Motor in good condition
                                    - Cleaning, visual check, check
6.00                         6.00   grounding, check silica gell
                                    - Normal operation
                                    - Cleaning, visual check, greasing,
3.00           3.00                 check grounding and temperatur
                                    - Normal
                                    - Cleaning, visual check, greasing
                                    motor, check grounding and
3.00                  3.00
                                    temperatur
                                    - Normal opration
                                    - Cleaning, visual check, check
3.00           3.00                 grounding
                                    - Normal
                                    - Cleaning, visual check, check
5.00                  5.00          grounding
                                    - Normal operation
                                    - Cleaning, visual check, check
3.00                         3.00   grounding, check temperatur
                                    - Normal
                                    - Cleaning, visual check, regreasing
                                    motor, check grounding, check
3.00                         3.00
                                    temperatur
                                    - Normal operation
                                    - Cleanig, visual check
9.00                         9.00
                                    - Normal Operation
                                    - Cleaning, visual check, check
3.00           3.00                 grounding
                                    - Normal
                                    - Fuse side lamp putus and the
12.00   6.00   6.00                 light contact is on
                                    - replacing the lamp side fuse
                                    - Normal oprasi
                                            - High Vibration Motor Side
                                            - From the PDM Analysis there is a
16.00   8.00   8.00                         bearing damege spectrum on the
                                            DE and NDE sides
                                            - Uncouple Motor ro Pump,
                                            Pullout Coupling Motor side, No
                                            Load Test Motor, Inspection
                                            bearing condition, Next Need
                                            Replace Bearing DE and NDE
                                            - WMATL (Waiting Material) Need
                                            replece Bearing DE and NDE
                                            (Bearing type 6309-2RZ/C3Z2)
16.00                  8.00   8.00
8.00                   8.00
8.00                                 8.00
                                            - Can’t Operation local and remote
8.00                                 8.00   - 3 phase module control demege
                                            - Replace 3 phase module control,
                                            calibration open/close and
                                            function test from local and
                                            remote
                                            - Fuction normal, and indication
                                            on dcs normal
12.00          12.00
                                            - COAL - STRE slewing motor brake
                                            oil is leaking
8.00           4.00    4.00                 - seal for STRE slewing motor
                                            brake oil is broke
                                            - topup oil, replace new motor
                                            break, run test, fungtion test
                                            - Replacement of new motor,
                                            motor is operating normally
                                                                                                  - Can't Operation from local and
                                                                                                  DCS
                                                                                                  - Ready alarm fault Undefined On
                8.00                                     4.00          4.00                       display
                                                                                                  - Check alarm fault on dislay, Try
                                                                                                  operation by handweel,
                                                                                                  Calibration Open, pullout part
                                                                                                  module mov, uninstall MOV
                                                                                                  komponen and check board on
                                                                                                  MOV
                                                                                                  - WMATL module Positioner
                                                                                                  (encode) demage, need replace
                                                                                                  - The exhaust fan MOT 2B
                                                                                                  insulation test results were not
                                                                                                  good
                                                                                                  - The motor winding is damp and
                                                                                                  has oil inside.
                                                                                                  - Cleaning, revarnish, heating,
                8.00                                     2.67          2.67          2.67
                                                                                                  sealent all connector side,
                                                                                                  insulation test, install, run test
                                                                                                  - sources of oil seepage on site still
                                                                                                  appear, operator need check
                                                                                                  everyday for clean it
               Err:507
               Err:507
                              54.70        68.70         60.87         58.87         55.87
 Total Man Hours Scheduled
                               52           52            52            52            52
  Total Man Hours Available
Scheduled Utility Man Hours 105.19%       132.12%       117.05%       113.21%       107.44%
                                      8             8             8             8             8
Status WO   Status Permit
                              PIC
  Inprg        Close        Operator
Finished
Finished
  Inprg        Close        Operator
  Inprg        Close        Operator
Finished
 Finished
 Finished
 Finished
 Finished
 Finished
 Finished
SPS signed   Close   Operator
SPS signed   Close   Operator
 Finished
 Finished
 Finished
 Finished
 Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Wdone      Close
Wdone      Close
Plant Ok
 Inprg     Close    Operator
 Inprg     Wstart   Executor
Wdone      Close
Wdone   Close
Inprg   Close   Operator
                                                   WEEKLY MAINTENANCE SCHEDULE WEEK 27 2024
                                                   PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No   WO No Work Order     Work      No PM/SR        Division   Area
     No.                  Type
1    7551 KB1-24-502407   PM     PM-KK-HLBP-0013      HL        BOP
2    7552 KB1-24-502408   PM     PM-KK-HLBP-0018      HL        BOP
3    7553 KB1-24-502409   PM     PM-KK-HLBP-0019      HL        BOP
4    7554 KB1-24-502410   PM     PM-KK-HLBP-0020      HL        BOP
5    7555 KB1-24-502411   PM     PM-KK-HLBP-0028      HL        BOP
6    7556 KB1-24-502412   PM     PM-KK-HLBP-0038      HL        BOP
7    7557 KB1-24-502413   PM     PM-KK-HLEP-0010      HL        CH
8    7558 KB1-24-502414   PM     PM-KK-HLEP-0011      HL        CH
9    7559 KB1-24-502415   PM     PM-KK-HLEP-0014      HL        CH
10 7560 KB1-24-502416     PM     PM-KK-HLEP-0023      HL        ASH
11 7561 KB1-24-502417     PM     PM-KK-HLU-0005       HL       UNIT 1
12 7562 KB1-24-502418     PM     PM-KK-HLU-0010       HL       UNIT 1
13 7563 KB1-24-502419     PM     PM-KK-HLU-0012       HL       UNIT 1
14 7564 KB1-24-502420     PM     PM-KK-HLU-0014       HL       UNIT 1
15 7565 KB1-24-502421   PM   PM-KK-HLU-0017    HL   UNIT 1
16 7566 KB1-24-502422   PM   PM-KK-HLU-0019    HL   UNIT 1
17 7570 KB1-24-502426   PM   PM-KK-HLU-0045    HL   UNIT 1
18 7571 KB1-24-502427   PM   PM-KK-HLU-0047    HL   UNIT
19 7572 KB1-24-502428   PM   PM-KK-HLU-0052    HL   UNIT 1
20 7573 KB1-24-502429   PM   PM-KK-HLU-0056    HL   UNIT 1
21 7578 KB1-24-502434   PM   PM-KK-HLU-0066    HL   UNIT 1
22 7579 KB1-24-502435   PM   PM-KK-HLU-0105    HL   UNIT
23 7567 KB1-24-502423   PM   PM-KK-HLU-0034    HL   UNIT 2
24 7568 KB1-24-502424   PM   PM-KK-HLU-0036    HL   UNIT 2
25 7569 KB1-24-502425   PM   PM-KK-HLU-0038    HL   UNIT 2
26 7574 KB1-24-502430   PM   PM-KK-HLU-0059    HL   UNIT 2
27 7575 KB1-24-502431   PM   PM-KK-HLU-0061    HL   UNIT 2
28 7576 KB1-24-502432   PM   PM-KK-HLU-0063    HL   UNIT 2
29 7577 KB1-24-502433   PM   PM-KK-HLU-0065    HL   UNIT 2
30 7580 KB1-24-502436   PM   PM-KK-HLU-0106    HL   UNIT 2
31 7421 KB1-24-502337   PM   PM-KK-HLEP-0055   HL   UNIT 2
1   7507 KB1-24-000776   CD   SR-24-001584   HL   UNIT 1
2   7336 KB1-24-000723   CD   SR-24-001335   HL   UNIT 1
5   7477 KB1-24-000746   CD   SR-24-001551   HL    BOP
6   7485 KB1-24-000754   CM                  HL    CH
MAINTENANCE SCHEDULE WEEK 27 2024
 RAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                                                                        11     12   11
                         Job Description              Crew Durat   Clock   Man      Senin Selasa Rabu
                                                      Size ion     Hour    Hour
                                                                                   1-Jul-24 2-Jul-24 3-Jul-24
          PM
          PM ELECTRICAL 400/230V C.W. PC SECTION A     2    2.5    2:30    5.00     5.00
          PM ELECTRICAL MOTOR DOSING PUMP REVERSE
                                                       2    2.0    2:00    4.00     4.00
          OSMOSIS AREA
          PM ELECTRICAL MOTOR DOSING PUMP WWTP
                                                       2    2.0    2:00    4.00     4.00
          AREA
          PM ELECTRICAL MOTOR DOSING PUMP UNIT
                                                       2    2.0    2:00    4.00     4.00
          AREA
          PM ELECTRICAL PAINTING MOTOR AREA
                                                       2    3.0    3:00    6.00
          CHLORINE PLANT
          PM ELECTRICAL PAINTING MOTOR MOTOR CWP
                                                       2    3.0    3:00    6.00
          AREA
          PM ELECTRICAL MCC AREA COAL TRANSFER
                                                       2    3.5    3:30    7.00     7.00
          TOWER 1
          PM ELECTRICAL MCC COAL CRUSHING HOUSE
                                                       2    3.5    3:30    7.00     7.00
          MCC AREA TT2
          PM ELECTRICAL SHIP UNLOADER 2                3    3.5    3:30    10.50             5.25     5.25
          PM ELECTRICAL ESP MCC SECTION                2    2.0    2:00    4.00                       4.00
          PM ELECTRICAL EXCITING TR. UNIT 1            2    1.0    1:00    2.00              2.00
          PM ELECTRICAL CIRCULATING WATER TRAFO A-B    2    1.0    1:00    2.00              2.00
          PM ELECTRICAL MOTOR VACUUM PUMP
                                                       2    1.5    1:30    3.00
          CONDENSER A-B UNIT 1
          PM ELECTRICAL MOTOR CONDENSATE PUMP A-B
                                                       2    1.5    1:30    3.00
          UNIT 1
PM ELECTRICAL MOTOR C3WP UNIT 1              2   1.5   1:30   3.00
PM ELECTRICAL MOTOR SWBP UNIT 1              2   1.5   1:30   3.00
PM ELECTRICAL MOTOR COAL FEEDER UNIT 1       2   1.5   1:30   3.00           3.00
PM ELECTRICAL CCB MCC                        2   2.0   2:00   4.00           4.00
PM ELECTRICAL MOV AREA FEED WATER,
COOLING WATER, VACUUM DAN CONDENSER          2   4.5   4:30   9.00
UNIT 1
PM ELECTRICAL MOV AREA COAL FEEDER UNIT 1    2   1.5   1:30   3.00           3.00
PM ELECTRICAL FUNCTION TEST - TINY & OIL
                                             2   7.0   7:00   14.00
GUN UNIT 1
PM ELECTRICAL INSULATION TEST OF MOTOR
                                             2   3.0   3:00   6.00    1.20   1.20   1.20
UNIT
PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 2   3   2.5   2:30   7.50
PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 2   3   2.5   2:30   7.50
PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 2     3   2.5   2:30   7.50                  7.50
PM ELECTRICAL MOV AREA ECONOMIZER,
                                             2   4.5   4:30   9.00           9.00
STEAM, BLOW DOWN AND DRAWN UNIT 2
PM ELECTRICAL MOV AREA SOOTBLOWER UNIT
                                             2   1.5   1:30   3.00    3.00
2
PM ELECTRICAL MOTOR APH A-B UNIT 2           2   3.0   3:00   6.00                  6.00
PM ELECTRICAL SOOT BLOWER UNIT 2             2   7.0   7:00   14.00   4.67   4.67   4.67
PM ELECTRICAL GT & UAT UNIT 2                2   2.0   2:00   4.00           4.00
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER
                                             2   3.0   3:00   6.00                  6.00
UNIT 2
CORRECTIVE
Unit 1 - MOV venting economizer hanger tubes
                                                  2     4.0    4:00      8.00      8.00
outlet header Coupling Local Broken
COMMON - CWP 1 High Vibration                     3    20.0   20:00     60.00      12.00   12.00   12.00
Centrifugal oil pump C High Vibration             2     8.0    8:00     16.00              8.00    8.00
Install the Motor Hydraulic of Center Gate
                                                  2    8.00    8:00     16.00                      16.00
Hopper STRE - After Rewinding
SPONSOR WORK
                                                                                   67.87   66.12   84.62
                                                      Total Man Hours Scheduled
                                                                                    64      64      64
                                                       Total Man Hours Available
                                               Total Scheduled Utility Man Hours 106.04% 103.31% 132.21%
8   8   8
         9           8
 Kamis       Jumat                          Remarks                    Status WO   Status Permit
                                                                                                     PIC
4-Jul-24 5-Jul-24
                         -Cleaning, visual check, NORMAL                FINISH
                         Cleaning, visual check, check grounding,
                                                                        FINISH
                         NORMAL
                         -Cleaning, visual check, check grounding
                         -Normal with note, '- cover fan dosing pump    FINISH
                         Korosi
                         -Cleaning, visual check, check grounding
                         -Normal with note, '- cover fan dosing pump    FINISH
                         Korosi
                         -painting motor
 6.00                    -Motor in normal condition no neet to           Close        Close
                         repainting
             6.00        -Cleaning, visual check, NORMAL               LE signed      Close        EXECUTOR
                         -cleaning,visual check, grounding check,
                         current and parameter measurement               Close        Close
                         -Normal operation
                         -cleaning, visual check, grounding check,
                         current and parameter measurement               Close        Close
                         -Normal operation
                         Cleaning, visual check, greasing motor
                                                                        FINISH
                         -NORMAL
                         -Cleaning, visual check, NORMAL                FINISH
                         Cleaning, visual check, check temperatur
                                                                        FINISH
                         -NORMAL
                         -Cleaning, visual check, NORMAL                FINISH
                         Cleaning, visual check, check grounding,
             3.00                                                      LE signed      Close        EXECUTOR
                         NORMAL
                         Cleaning, visual check, check grounding,
             3.00                                                      LE signed      Close        EXECUTOR
                         NORMAL
              Cleaning, visual check, check amper and
3.00          grounding                                       FINISH
              -NORMAL
              Cleaning, visual check, check grounding,
3.00                                                          FINISH
              NORMAL
              Cleaning, visual check, check grounding,
                                                              FINISH
              NORMAL
              -Cleaning, visual check, NORMAL                 FINISH
              -cleaning, visual check
9.00                                                         LE signed   Close    EXECUTOR
              - Normal operation
              -Cleaning, visual check, NORMAL                 FINISH
7.00   7.00                                                   Inprg      Wstart   EXECUTOR
1.20   1.20   all motor in normal condition                   Close      Close
              Cleaning, visual check, greasing, check
7.50          temperatur and grounding                        FINISH
              -NORMAL
              Cleaning, visual check, check grounding and
       7.50                                                  LE signed   Close    EXECUTOR
              greasing
              Cleaning, visual check, check grounding and
              greasing                                        FINISH
              -NORMAL
              -Cleaning, visual check, NORMAL                 FINISH
              Cleaning, visual check, check alrm pada MOV     FINISH
              -Cleaning, visual check, check grounding
                                                              FINISH
              -Normal oprasi
              -Cleaning, visual check, NORMAL                 FINISH
              -Cleaning, visual check, check grounding and
              silica gel                                      FINISH
              -NORMAL
              -Cleaning, visual check, check grounding and
              silica gel                                      FINISH
              -NORMAL
                  -Unit 1 - MOV venting economizer hanger
                  tubes outlet header Coupling Local Broken
                  -Clutch of coupling can't released
                  -inspect gearbox and drive bus of MOV,          Inprg   WDREVIEW   EXECUTOR
                  function test (OPEN & CLOSE MOV)
                  -MOV has been repaired and normal to
                  operated
 12.00   12.00                                                    Inprg    Wstart    EXECUTOR
                  -COAL - CENTER GATE HOPPER STRE                 COMP      Close
                  HYDRAULIC OIL MOTOR COVER IS DAMAGED
                  -Motor short, bearing damage
                  -rewinding Motor, replace new bearing, no
                  load test, function dan run test on site (OK)
                  -Motor running normaly
 68.70   67.70
  64      64
107.34% 105.78%
8   8
Column1
sched start 25-27 Juni 2024
target finish 3 Juli 2024
                                                    WEEKLY MAINTENANCE SCHEDULE WEEK 28 2024
                                                    PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No   WO    No Work Order   Work      No PM/SR       Divisi   Area
     No.                   Type                      on
1    7686 KB1-24-502496    PM     PM-KK-HLBP-0003    HL       BOP
2    7687 KB1-24-502497    PM     PM-KK-HLBP-0006    HL       BOP
3    7688 KB1-24-502498    PM     PM-KK-HLBP-0009    HL       BOP
4    7689 KB1-24-502499    PM     PM-KK-HLBP-0026    HL       BOP
5    7690 KB1-24-502500    PM     PM-KK-HLBP-0029    HL       BOP
6    7691 KB1-24-502501    PM     PM-KK-HLEP-0007    HL       CH
7    7692 KB1-24-502502    PM     PM-KK-HLEP-0008    HL       CH
8    7693 KB1-24-502503    PM     PM-KK-HLEP-0042    HL       CH
9    7848 KB1-24-502607    PM     PM-KK-HLEP-0053    HL       CH
10   7695 KB1-24-502505    PM     PM-KK-HLU-0021     HL      UNIT 1
11   7696 KB1-24-502506    PM     PM-KK-HLU-0027     HL      UNIT 1
12   7697 KB1-24-502507    PM     PM-KK-HLU-0029     HL      UNIT 1
13   7698 KB1-24-502508    PM     PM-KK-HLU-0031     HL      UNIT 1
14   7700 KB1-24-502510   PM   PM-KK-HLU-0041   HL   UNIT 1
15   7701 KB1-24-502511   PM   PM-KK-HLU-0043   HL   UNIT 1
16   7704 KB1-24-502514   PM   PM-KK-HLU-0054   HL   UNIT 1
17   7705 KB1-24-502515   PM   PM-KK-HLU-0062   HL   UNIT 1
18   7706 KB1-24-502516   PM   PM-KK-HLU-0096   HL   UNIT 1
19   7707 KB1-24-502517   PM   PM-KK-HLU-0103   HL   UNIT 1
20   7708 KB1-24-502518   PM   PM-KK-HLU-0104   HL   UNIT 1
21   7709 KB1-24-502519   PM   PM-KK-HLU-0105   HL   UNIT 1
22   7694 KB1-24-502504   PM   PM-KK-HLU-0002   HL   UNIT 2
23   7699 KB1-24-502509   PM   PM-KK-HLU-0040   HL   UNIT 2
24   7702 KB1-24-502512   PM   PM-KK-HLU-0049   HL   UNIT 2
25   7703 KB1-24-502513   PM   PM-KK-HLU-0051   HL   UNIT 2
26   7710 KB1-24-502520   PM   PM-KK-HLU-0107   HL   UNIT 2
27   7711 KB1-24-502521   PM   PM-KK-HLU-0108   HL   UNIT 2
28   7712 KB1-24-502522   PM   PM-KK-HLU-0109   HL   UNIT 2
1    7503 KB1-24-000772   CM    SR-24-001549    HL    ASH
2    7501 KB1-24-000770   CM    SR-24-001617    HL    ASH
3   7766 KB1-24-000805   RTF   SR-24-001768   HL    BOP
4   7336 KB1-24-000723   CD    SR-24-001335   HL   UNIT 1
5   7348 KB1-24-000735   CD    SR-24-001531   HL    CH
6   7633 KB1-24-000789   CM    SR-24-001632   HL    BOP
7   8064 KB1-24-000853   CM                   HL   UNIT 2
                                                                  Total Man Hours Scheduled
                                                                    Total Man Hours Available
                                                            Total Scheduled Utility Man Hours
EKLY MAINTENANCE SCHEDULE WEEK 28 2024
MELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                        Job Description                                        Remarks
          Breafing Pagi
          Sholat ashar
          Fire Fighting Test
          Kegiatan Budaya Kalbar 1
          Aux Boiler Test
          PM
          PM ELECTRICAL MOTOR AREA REVERSE          -Cleaning, visual check, check grounding
          OSMOSIS                                   -Normal
          PM ELECTRICAL SUPPLY WATER & WATER        Cleaning, visual check
          TREATMENT TR. A-B                         -NORMAL
          PM ELECTRICAL MOTOR AREA FUEL OIL         Cleaning, visual check
          PUMP HOUSE                                -NORMAL
                                                    Cleaning, visual check
          PM ELECTRICAL INSULATION TEST BOP AREA
                                                    -NORMAL
                                                    -corrosion area
          PM ELECTRICAL PAINTING MOTOR MOTOR
                                                    -repainting
          AREA SEA WATER PRE TREATMENT
                                                    -the motorbike is still good
                                                    -Cleaning, visual check, check grounding
          PM ELECTRICAL MOTOR C5
                                                    -Normal
                                                    -Cleaning, greasing, visual check, check grounding and
          PM ELECTRICAL MOTOR CRUSHER A-B           temperatur
                                                    -Normal
                                                    Cleaning, visual check
          PM ELECTRICAL INSULATION TEST EP AREA
                                                    -NORMAL
          PM ELECTRICAL 400/230V COAL HANDLING      -Cleaning, visual check, check grounding
          PC SECTION                                -normal operation
          PM ELECTRICAL MOTOR EH DAN RECIR UNIT -Cleaning, visual check, check grounding and greasing
          1                                     - normal
                                                    -cleaning, regreasing, visual check, grounding check, current
          PM ELECTRICAL MOTOR LTE PUMP UNIT 1       and themperature measurement
                                                    -normal operation
          PM ELECTRICAL MOTOR JACKING OIL PUMP      -Cleaning, visual check, check grounding
          UNIT 1                                    -Normal
                                                    -Cleaning, visual check, check grounding
          PM ELECTRICAL MOTOR BFP UNIT 1
                                                    -normal
PM ELECTRICAL MOTOR FLAME DETECTOR               -Cleaning, visual check, check grounding and temperatur
COOLING AIR FAN UNIT 1                           -normal
                                        -Cleaning, visual check, check grounding, greasing and check
PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 1 temperatur
                                        -normal
PM ELECTRICAL MOV AREA FLUE GAS AND     Cleaning, visual check
AIR UNIT 1                              -NORMAL
                                                 Cleaning, visual check
PM ELECTRICAL MOTOR APH A-B UNIT 1
                                                 -NORMAL
PM ELECTRICAL MOTOR LUBE OIL MOT UNIT -Cleaning, visual check, check grounding
1                                     -normal
PM ELECTRICAL PAINTING OF MOTOR                  -Painting is done on the motorbike
TURBINE AREA UNIT 1                              -normal
PM ELECTRICAL PAINTING OF MOTOR BOILER -Motorcycle painting whose paint has peeled off
AREA UNIT 1                            -normal
PM ELECTRICAL INSULATION TEST OF MOTOR
                                       all motro in good condition
UNIT
                                                 Cleaning, visual check
PM ELECTRICAL GENERATOR UNIT 2
                                                 -NORMAL
                                        -VISUAL CEK,CLEANING,GREASING (25g NDE, 25g DE side
PM ELECTRICAL FORCED DRAFT FAN A-B UNIT
                                        bearing motor )
2
                                        -NOISE AND MOTOR OPERATION GOOD
                                                 Cleaning, visual check
PM ELECTRICAL BATTERY DC UNIT 2
                                                 -NORMAL
PM ELECTRICAL MOV MAIN STEAM, REHEAT
                                       Cleaning, visual check
STEAM, BYPASS, GLAND STEAM, EXTRACTION
                                       -NORMAL
STEAM DAN AUXILIARY STEAM UNIT 2
                                                 Cleaning, visual check
PM ELECTRICAL 230/400V PC SECTION UNIT 2
                                                 -NORMAL
                                                 -cleaning, visual check, grounding check, current and
PM ELECTRICAL 230/400V MCC TURBINE
                                                 themperature measurement
UNIT 2
                                                 -normal condition
                                                 Cleaning, visual check
PM ELECTRICAL 6.3KV UNIT SECTION UNIT 2
                                                 -NORMAL
CORRECTIVE
Ash - bucket eleavtor A unit 1 broken            -Ash - bucket eleavtor A unit 1 broken
                                                 -cable of break system broken
                                                 -Waiting for the material, need to replace new break system
                                                 -cable is too short and aligned with the hole in the case break
Ash, Motor fan bag filter bottom ash silo unit
1 abnormal sound and vibration
ODR-Pre Treatment Control Panel Box            -ODR-Pre Treatment Control Panel Box Settling Basin Area
Settling Basin Area Handle loose & fan cant    Handle loose & fan cant rotate
rotate                                         -Can't oprate
                                               -new fan replacement
                                               -is operating normally
                                               -COMMON - CWP 1 High Vibration
                                               -oil leak into the winding area, oil contaminan, not sealing
COMMON - CWP 1 High Vibration                  cover at NDE side
                                               -inspect all bearing, replace NDE bearing, resetting spring of
                                               trush pad, regreasing, replace new oil, replace new Vseal and
                                               oil seal than run test
                                               -vibrations are decreased and normal operation
                                             -It was found that the small fire truck could not be operated
It was found that the small fire truck could because the battery was low
not be operated because the battery was low -Battery was low
                                             -New battery replacement
                                             -Small fire truck is operating normally
                                             -It was found that the small fire truck could not be operated
                                             because the battery was low
                                               -flushing pump #B start to stop it self in DCS, at the moment
BOP - Coalwaste : Flushing pump #B miss        ON breaker, but local is not running
electrical failure - General                   -BREAKER 400V not coming in at the moment rack in
                                               -rack out breaker and next rack in braker
                                               -test motor and result good
                                             -Unit 2 - MSV Sootblower Has Indications of a Steam Leak in
Unit 2 - MSV Sootblower Has Indications of a the Pipe (Leak Throug)
Steam Leak in the Pipe (Leak Throug)         -valve don't full close yet
                                             -closing by manual handwheel and recalibrate MOV
                                             -operator need to check in actual condition and take the
                                             action first
SPONSOR WORK
START UP UNIT 1
                  Total Man Hours Scheduled
                   Total Man Hours Available
           Total Scheduled Utility Man Hours
Status WO   Status Permit     PIC
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
LE signed      CLOSE        Executor
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
 CLOSE         CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
Inprg   HSELWDreview     HSE
CLOSE      CLOSE
Inprg   HSELWDreview     HSE
Inprg   HSELWDreview     HSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
CLOSE      CLOSE
Inprg    WDREVIEW      Executor
Appr
Inprg   HSELWDreview     HSE
Wdone      CLOSE
Wdone      CLOSE
Wdone      CLOSE
Inprg    WDREVIEW      Executor
                                                     WEEKLY MAINTENANCE SCHEDULE WEEK 29 2024
                                                     PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No WO No. No Work OrderWork Type      No PM/SR       Division   Area
1   7834   KB1-24-502593   PM      PM-KK-HLBP-0001     HL       BOP
2   7835   KB1-24-502594   PM      PM-KK-HLBP-0004     HL       BOP
3   7836   KB1-24-502595   PM      PM-KK-HLBP-0005     HL       BOP
4   7398   KB1-24-502314   PM      PM-KK-HLBP-0015     HL       BOP
5   7838   KB1-24-502597   PM      PM-KK-HLBP-0016     HL       BOP
6   7839   KB1-24-502598   PM      PM-KK-HLBP-0023     HL       BOP
7   7840   KB1-24-502599   PM      PM-KK-HLBP-0031     HL       BOP
8   7841   KB1-24-502600   PM      PM-KK-HLBP-0034     HL       BOP
9   7842   KB1-24-502601   PM      PM-KK-HLBP-0035     HL       BOP
10 7843    KB1-24-502602   PM      PM-KK-HLEP-0003     HL       CH
11 7844    KB1-24-502603   PM      PM-KK-HLEP-0004     HL       CH
12 7845    KB1-24-502604   PM      PM-KK-HLEP-0005     HL       CH
13 7846    KB1-24-502605   PM      PM-KK-HLEP-0006     HL       CH
14 7847    KB1-24-502606   PM      PM-KK-HLEP-0012     HL       CH
15 7854   KB1-24-502613   PM   PM-KK-HLU-0033   HL    CH
16 7855   KB1-24-502614   PM   PM-KK-HLU-0035   HL    CH
17 7856   KB1-24-502615   PM   PM-KK-HLU-0037   HL    CH
18 7857   KB1-24-502616   PM   PM-KK-HLU-0039   HL   UNIT 1
19 7859   KB1-24-502618   PM   PM-KK-HLU-0048   HL   UNIT 1
20 7862   KB1-24-502621   PM   PM-KK-HLU-0058   HL   UNIT 1
21 7863   KB1-24-502622   PM   PM-KK-HLU-0060   HL   UNIT 1
22 7864   KB1-24-502623   PM   PM-KK-HLU-0064   HL   UNIT 1
23 7866   KB1-24-502625   PM   PM-KK-HLU-0099   HL   UNIT 1
24 7867   KB1-24-502626   PM   PM-KK-HLU-0105   HL   UNIT 1
25 7849   KB1-24-502608   PM   PM-KK-HLU-0006   HL   UNIT 2
26 7850   KB1-24-502609   PM   PM-KK-HLU-0013   HL   UNIT 2
27 7851   KB1-24-502610   PM   PM-KK-HLU-0015   HL   UNIT 2
28 7852   KB1-24-502611   PM   PM-KK-HLU-0018   HL   UNIT 2
29 7853   KB1-24-502612   PM   PM-KK-HLU-0020   HL   UNIT 2
30 7858   KB1-24-502617   PM   PM-KK-HLU-0046   HL   UNIT 2
31 7860   KB1-24-502619   PM   PM-KK-HLU-0053   HL   UNIT 2
32 7861   KB1-24-502620   PM   PM-KK-HLU-0057   HL   UNIT 2
33 7865   KB1-24-502624   PM   PM-KK-HLU-0067   HL   UNIT 2
1   7782   KB1-24-000821   CD   SR-24-001787   HL   UNIT 1
2   7778   KB1-24-000817   CD   SR-24-001791   HL   UNIT 2
3   7925   KB1-24-000831   CD   SR-24-001797   HL    BOP
4   7501   KB1-24-000770   CM   SR-24-001617   HL    ASH
5   7499   KB1-24-000768   CD   SR-24-001550   HL    BOP
LY MAINTENANCE SCHEDULE WEEK 29 2024
LIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                                                                          11         11
                          Job Description            Crew DuratioClock Hour
                                                                         Man Hour Senin        Selasa
                                                     Size   n
                                                                                 15-Jul-24 16-Jul-24
          Breafing Pagi                               9    0.50   0:30    4.5      4.50        4.50
          Sholat ashar                                9    0.50   0:30    4.5      4.50        4.50
          Fire Fighting Test                          2    2.00   2:00     4
          Kegiatan Budaya Kalbar 1                    9    1.50   1:30    13.5
          PM
          PM ELECTRICAL FIRE FIGHTING PUMP            2    3.00   3:00    6.00
          PM ELECTRICAL MOTOR AREA DEMINERALIZE
                                                      2    2.00   2:00    4.00                 4.00
          PLANT
          PM ELECTRICAL MOTOR AREA SEA WATER PRE
                                                      2    2.00   2:00    4.00                 4.00
          TREATMENT
          PM ELECTRICAL AREA SANITARY SEWAGE          2    2.00   2:00    4.00
          PM ELECTRICAL MOTOR WASTE WATER AREA        2    2.00   2:00    4.00
          PM ELECTRICAL MOTOR AUX BOILER AREA         2    2.00   2:00    4.00
          PM ELECTRICAL PAINTING MOTOR MOTOR AREA
                                                      2    3.00   3:00    6.00
          COAL WASTE WATER PLANT
          PM ELECTRICAL PAINTING MOTOR MOTOR WASTE
                                                      2    3.00   3:00    6.00
          WATER AREA
          PM ELECTRICAL PAINTING MOTOR MOTOR AREA
                                                      2    3.00   3:00    6.00     6.00
          MULTI PURPOSE PUMP AREA
          PM ELECTRICAL MOTOR C1                      2    2.00   2:00    4.00     4.00
          PM ELECTRICAL MOTOR C2 A-B                  2    2.00   2:00    4.00     4.00
          PM ELECTRICAL MOTOR C3 A-B                  2    2.00   2:00    4.00                 4.00
          PM ELECTRICAL MOTOR C4 A-B                  2    1.50   1:30    3.00                 3.00
          PM ELECTRICAL STACKER RECLAIMER             3    3.50   3:30   10.50                 10.50
PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 1     3   2.50   2:30   7.50
PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 1     3   2.50   2:30   7.50
PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 1       3   2.50   2:30   7.50
PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 1      3   2.50   2:30   7.50
PM ELECTRICAL BATTERY DC UNIT 1                3   2.00   2:00   6.00
PM ELECTRICAL MOV AREA ECONOMIZER, STEAM,
                                               2   4.50   4:30   9.00    9.00
BLOW DOWN AND DRAWN UNIT 1
PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 1       2   1.50   1:30   3.00    3.00
PM ELECTRICAL SOOT BLOWER UNIT 1               2   7.00   7:00   14.00   4.67   4.67
PM ELECTRICAL GT, UAT & SST UNIT 1             2   2.00   2:00   4.00    4.00
PM ELECTRICAL INSULATION TEST OF MOTOR
                                               2   3.00   3:00   6.00    1.20   1.20
UNIT
PM ELECTRICAL EXCITING TR. UNIT 2              2   1.00   1:00   2.00    2.00
PM ELECTRICAL MOTOR VACUUM PUMP
                                               2   1.50   1:30   3.00
CONDENSER A-B UNIT 2
PM ELECTRICAL MOTOR CONDENSATE PUMP A-B
                                               2   1.50   1:30   3.00
UNIT 2
PM ELECTRICAL MOTOR C3WP UNIT 2                2   1.50   1:30   3.00
PM ELECTRICAL MOTOR SWBP UNIT 2                2   1.50   1:30   3.00
PM ELECTRICAL MOTOR COAL FEEDER UNIT 2         2   1.50   1:30   3.00           3.00
PM ELECTRICAL MOV AREA FEED WATER,
COOLING WATER, VACUUM DAN CONDENSER            2   4.50   4:30   9.00
UNIT 2
PM ELECTRICAL MOV AREA COAL FEEDER UNIT 2      2   1.50   1:30   3.00           3.00
PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN
                                               2   7.00   7:00   14.00
UNIT 2
CORRECTIVE
Unit 1 - DC Motor Earth/Isolation fault            3   6.00    6:00    18.00    9.00   9.00
Unit 2 DC Motor isolation fault                    3   6.00    6:00    18.00
BOP - Sodium Hypochlorite, Dilution Air Blower B
                                                   2   6.00    6:00    12.00    6.00   6.00
has a Abnormal Sound
Ash, Motor fan bag filter bottom ash silo unit 1
                                                   2   8.00   Err:507 Err:507
abnormal sound and vibration
BOP - Motor Centrifugal Feed Pump B Indication
                                                   2   8.0     8:00    16.00
Bearing Demage
SPONSOR WORK
      Total Man Hours Scheduled     61.87        61.37
                                     72           72
        Total Man Hours Available
Total Scheduled Utility Man Hours   85.93%       85.23%
                                             9            9
         9        12           7
 Rabu        Kamis     Jumat                    Remarks              Status WO   Status Permit
17-Jul-24 18-Jul-24 19-Jul-24
  4.50       4.50      4.50
  4.50       4.50      4.50
             4.00
                       13.50
                                   Cleaning, visual check, check
             6.00                                                      Close        Close
                                   grounding
                                   -Cleaning, visual check, check
                                   grounding                           Close        Close
                                   -Normal oprasi
                                   Cleaning, visual check, check
                                                                       Close        Close
                                   grounding
             4.00                  Cleaning, visual check              Close        Close
                                   Cleaning, visual check, check
             4.00                                                      Close        Close
                                   grounding
  4.00                             Cleaning, visual check              Close        Close
             6.00                  Cleaning, visual check              Close        Close
             6.00                  Cleaning, visual check              Close        Close
                                   Cleaning, visual check              Close        Close
                                   Cleaning, visual check, check
                                                                       Close        Close
                                   grounding and greasing
                                   Cleaning, visual check, check
                                                                       Close        Close
                                   grounding and greasing
                                   Cleaning, visual check, check
                                   grounding, check temperatur and     Close        Close
                                   greasing motor
                                   Cleaning, visual check, check
                                   grounding, check temperatur and     Close        Close
                                   greasing
                                   Cleaning, visual check, check
                                                                       Close        Close
                                   grounding
                     Cleaning, visual check, check
7.50                 grounding, check temperatur and    Close      Close
                     greasing
                     Cleaning, visual check, check
              7.50   grounding, check temperatur and   LE signed   Close
                     greasing
                     Cleaning, visual check, check
7.50                                                    Close      Close
                     grounding and greasing
                     Cleaning, visual check, check
7.50                                                    Close      Close
                     grounding and greasing
6.00                 Cleaning, visual check             Close      Close
                     Cleaning, visual check             Close      Close
                     Cleaning, visual check             Close      Close
4.67                 Cleaning, visual check             Close      Close
                     Cleaning, visual check, check
                                                        Close      Close
                     grounding
1.20   1.20   1.20   Visual check                      LE signed   Close
                     Cleaning, visual check             Close      Close
                     Cleaning, visual check, check
              3.00                                     LE signed   Close
                     grounding
                     Cleaning, visual check, check
              3.00   grounding, check temperatur and   LE signed   Close
                     greasing
                     Cleaning, visual check, check
       3.00          grounding, check temperatur and    Close      Close
                     greasing
                     Cleaning, visual check, check
       3.00          grounding, check temperatur and    Close      Close
                     greasing
                     Cleaning, visual check, check
                                                        Close      Close
                     grounding
              9.00   Cleaning, visual check            LE signed   Close
                     Cleaning, visual check             Close      Close
       7.00   7.00   Testing was carried out           LE signed   Close
                          -Result mager of DC motor low
                          resistance 1 mega ohm                  Inprg       WDREVIEW
                          -motorbike in damp condition
                          -Heating is done on the motor
                          -normal
                          -Insulation resistance of DC motor
                          low
9.00    9.00              -motorbike in damp condition           Inprg       WDREVIEW
                          -Heating is done on the motor
                          -normal
                          -Dilution Air Blower B Sodium
                          Hypochlorite sounds rough when
                          operating so if it is not addressed    Inprg      HSELWDreview
                          it will result in unproductive
                          operation of the chlorine plant
                          -Abnormal sound
                          -Normal motorbike, no abnormal
                          sound
                          -normal
                         -Motor fan bag filter bottom ash
                         silo unit 1 abnormal sound and
                         vibration
       Err:507   Err:507 -There are many piles of coal           Inprg      HSELWDreview
                         -Cleaning and visual checks are
                         carried out
                         -normal
                          -Abnormal sound and high
                          vibration
8.00    8.00              -Bearing demege sisi DE&NDE           LE signed      Close
                          -Check clearance bearing and
                          housing, Replace bearing DE &
                          NDE, Realignment motor to pump,
                          Top up greas
                          -Result no load and load test
                          Good, vibration and Sound
                          Normal, Now running continue
64.37        Err:507       Err:507
 72            72            63
89.40%       Err:507       Err:507
         9             9             9
PIC   Column1
Executor
Executor
Executor
Executor
Executor
Executor
Executor
Executor
  HSE
  HSE
Executor
                                                      WEEKLY MAINTENANCE SCHEDULE WEEK 30 2024
                                                      PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No WO No. No Work Order Work Type      No PM/SR       Division   Area
1    7988   KB1-24-502699   PM      PM-KK-HLBP-0002     HL        BOP
2    7989   KB1-24-502700   PM      PM-KK-HLBP-0007     HL        BOP
3    7990   KB1-24-502701   PM      PM-KK-HLBP-0008     HL        BOP
4    7991   KB1-24-502702   PM      PM-KK-HLBP-0010     HL        BOP
5    7992   KB1-24-502703   PM      PM-KK-HLBP-0017     HL        BOP
6    7993   KB1-24-502704   PM      PM-KK-HLEP-0001     HL        CH
7    7994   KB1-24-502705   PM      PM-KK-HLEP-0002     HL        CH
8    7995   KB1-24-502706   PM      PM-KK-HLEP-0009     HL        ASH
9    7996   KB1-24-502707   PM      PM-KK-HLEP-0013     HL        CH
10   7997   KB1-24-502708   PM      PM-KK-HLEP-0024     HL        CH
11   7998   KB1-24-502709   PM      PM-KK-HLEP-0052     HL       UNIT
12   7999   KB1-24-502710   PM      PM-KK-HLU-0001      HL       UNIT
13   8000   KB1-24-502711   PM      PM-KK-HLU-0011      HL       UNIT
14   8001   KB1-24-502712   PM      PM-KK-HLU-0016      HL       UNIT
15   8008   KB1-24-502719   PM      PM-KK-HLU-0050      HL       UNIT
16   8011   KB1-24-502722   PM      PM-KK-HLU-0100      HL       UNIT 1
17   8012   KB1-24-502723   PM   PM-KK-HLU-0101    HL   UNIT 1
18   8013   KB1-24-502724   PM   PM-KK-HLU-0102    HL   UNIT 1
19   8014   KB1-24-502725   PM   PM-KK-HLU-0105    HL   UNIT
20   7868   KB1-24-502627   PM   PM-KK-HLEP-0054   HL   UNIT 1
21   8002   KB1-24-502713   PM   PM-KK-HLU-0022    HL   UNIT 2
22   8003   KB1-24-502714   PM   PM-KK-HLU-0028    HL   UNIT 2
23   8004   KB1-24-502715   PM   PM-KK-HLU-0030    HL   UNIT 2
24   8005   KB1-24-502716   PM   PM-KK-HLU-0032    HL   UNIT 2
25   8006   KB1-24-502717   PM   PM-KK-HLU-0042    HL   UNIT 2
26   8007   KB1-24-502718   PM   PM-KK-HLU-0044    HL   UNIT 2
27   8009   KB1-24-502720   PM   PM-KK-HLU-0055    HL   UNIT 2
28   8010   KB1-24-502721   PM   PM-KK-HLU-0097    HL   UNIT 2
1    6887   KB1-24-000645                          HL    BOP
2    7763   KB1-24-000802                          HL   UNIT 2
3    7932   KB1-24-000838                          HL   UNIT 2
4   8235   KB1-24-000905   HL   UNIT 2
5   7345   KB1-24-000732   HL   UNIT 2
6   8236   KB1-24-000906   HL   UNIT 2
                                                Total Man Hour
                                                 Total Man Hou
                                         Total Scheduled Utility
LY MAINTENANCE SCHEDULE WEEK 30 2024
LIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                           Job Description
                                                                                Remarks
         PM
                                                            -Cleaning, visual check, check grounding
         PM ELECTRICAL AREA CHLORINE PLANT
                                                            -NORMAL, plant A not stanby
                                                            -Cleaning, visual check, check grounding
         PM ELECTRICAL MOTOR AREA NETRALIZING PLANT
                                                            -finish
         PM ELECTRICAL MOTOR AREA COAL WASTE WATER          -Cleaning, visual check, check grounding
         PLANT                                              -finish
         PM ELECTRICAL MULTIPURPORSE PUMP HOUSE MCC         Cleaning, visual check
         PM ELECTRICAL MOTOR AREA MULTI PURPOSE PUMP        -Cleaning, visual check, check grounding
         AREA                                               -finish
                                                            -Cleaning, visual check, check grounding
         PM ELECTRICAL MOTOR BC-2
                                                            -finish
                                                            -Cleaning, visual check, check grounding
         PM ELECTRICAL MOTOR BC-1
                                                            -finish
         PM ELECTRICAL ELECTRIC SCREW AIR & CONVEYING AIR   Cleaning, visual check, check grounding and
         COMPRESSOR                                         greasing, normal
                                                            Cleaning, visual check, check grounding and
         PM ELECTRICAL SHIP UNLOADER 1
                                                            greasing, Normal
         PM ELECTRICAL COAL-BUNKER BAY MCC                  NORMAL
                                                            -Cleaning, visual check
         PM ELECTRICAL 6.3KV & 230/400V PC SECTION
                                                            -Normal operation
                                                            -Cleaning, visual check
         PM ELECTRICAL GENERATOR UNIT 1
                                                            -Normal operation
                                                            -Cleaning, visual check, check grounding
         PM ELECTRICAL MOTOR CIRCULATING WATER PUMP 1-5
                                                            -finish
         PM ELECTRICAL MOTOR CWP AREA (TBS, TRASH RAKE,     -Cleaning, visual check, check grounding
         BACKWASH PUMP, SEA WATER PUMP)                     -finish
         PM ELECTRICAL MOV MAIN STEAM, REHEAT STEAM,
                                                            -Cleaning, visual check
         BYPASS, GLAND STEAM, EXTRACTION STEAM DAN
                                                            -Normal operation
         AUXILIARY STEAM UNIT 1
                                                            -Cleaning, visual check
         PM ELECTRICAL 230/400V PC SECTION UNIT 1
                                                            -Normal operation
                                                       -Cleaning, visual check
PM ELECTRICAL 230/400V MCC TURBINE UNIT 1
                                                       -Normal operation
                                                       -Cleaning, visual check
PM ELECTRICAL 6.3KV UNIT SECTION UNIT 1
                                                       -Normal operation
PM ELECTRICAL INSULATION TEST OF MOTOR UNIT            INSULATION TEST OF MOTOR
                                                       -Cleaning, visual check, check grounding,CHECK
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 1       SILICAGEL
                                                       -normal
                                                       -Cleaning, visual check, check grounding
PM ELECTRICAL MOTOR EH DAN RECIR UNIT 2
                                                       -finish
PM ELECTRICAL MOTOR LTE PUMP UNIT 2
                                                       Cleaning, visual check, check grounding and
PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT 2
                                                       greasing, Normal
                                                       -Cleaning, visual check
PM ELECTRICAL MOTOR BFP UNIT 2
                                                       -Motor standby
PM ELECTRICAL MOTOR FLAME DETECTOR COOLING AIR -Cleaning, visual check, check grounding
FAN UNIT 2                                     -finish
                                                       -Cleaning, visual check, check grounding
PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 2
                                                       -finish
                                                       -Cleaning, visual check, check grounding
PM ELECTRICAL MOV AREA FLUE GAS AND AIR UNIT 2
                                                       -finish
                                                       -Cleaning, visual check, check grounding
PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 2
                                                       -finish
CORRECTIVE
                                                       -MCB trip when start submercible pump B
                                                       -Samp pump short
BOP - sanitary sewage submercible pump B MCB trip
                                                       -Replacement of new samp pump
                                                       -normal
Install the Encoder Module for MOV Inlet Mill 2A -
Indication Fault
                                                       -UNIT 2, Fan Trafo GT Group 2 Indikasi
                                                       Abnormal Mode Auto
Inspection the Temperature Sensor of Oil Temperature   -WTI GT damaged, cable on sensor broken
Main Transformers - Fan Group 2 Abnormal Indication    -WTI set replacement, sensor verification and
when Auto                                              calibration, function test
                                                       -The cause of auto error mode is abnormal
                                                       sensor reading, WTI has been replaced
                                                     -Unit 2 - Drum emergency drain MOV no 2
                                                     Can`t open by DCS and Lokal
Unit 2 - Drum emergency drain MOV no 2 Can`t open by -gear reducer for encoder broken
DCS and Lokal                                        -WTMATL, need to repalce new gear
                                                     -MOV can't move by control because encoder
                                                     can't read actual positioning of valve
                                                             -Unit 2 - Mill 2B hydraulic pump B High
                                                             Vibration
                                                             -Mill 2B NDE Motor hydraulic pump B high
Unit 2 - Mill 2B hydraulic pump B High Vibration
                                                             vibration value : 17.06mm/s ( Danger )
                                                             -no load test, load test
                                                             -Normal condition
                                                             -Unit 2 - line greasing Mill 2B blockage
                                                             -line grease is blocked by old grease that has
                                                             hardened
Unit 2 - line greasing Mill 2B blockage
                                                             -replace new grease line
                                                             -the grease path can already put new grease
                                                             into the bearing well
SPONSOR WORK
Start Up Unit 2
                               Total Man Hours Scheduled
                                 Total Man Hours Available
                        Total Scheduled Utility Man Hours
Status WO   Status Permit   PIC
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close        Close
  Close      Close
  Close      Close
  Close      Close
  Close      Close
  Close      Close
  Inprg      Wstart   Executor
  Close      Close
  Close      Close
  Close      Close
  Close      Close
  Close      Close
  Close      Close
SPS signed   Close    Operator
  Inprg      Wstart   Executor
LE signed    Close    Executor
 Inprg      HSELWDreview     HSE
LE signed      Close       Executor
LE signed      Close       Executor
                                                            WEEKLY MAINTENANCE SCHEDULE WEE
                                                            PEMELIHARAAN LISTRIK PLTU KALBAR-
No   WO No.   No Work Order   Work Type      No PM/SR        Division   Area
1     8141    KB1-24-502798      PM       PM-KK-HLBP-0013      HL        BOP
2     8142    KB1-24-502799      PM       PM-KK-HLBP-0018      HL        BOP
3     8143    KB1-24-502800      PM       PM-KK-HLBP-0019      HL        BOP
4     8144    KB1-24-502801      PM       PM-KK-HLBP-0020      HL        BOP
5     8145    KB1-24-502802      PM       PM-KK-HLEP-0010      HL        CH
6     8146    KB1-24-502803      PM       PM-KK-HLEP-0011      HL        CH
7     8147    KB1-24-502804      PM       PM-KK-HLEP-0014      HL        CH
8     8148    KB1-24-502805      PM       PM-KK-HLEP-0023      HL        ASH
9     8149    KB1-24-502806      PM       PM-KK-HLU-0005       HL       UNIT 1
10    8150    KB1-24-502807      PM       PM-KK-HLU-0010       HL       UNIT 2
11    8151    KB1-24-502808      PM       PM-KK-HLU-0012       HL       UNIT 1
12   8152   KB1-24-502809   PM    PM-KK-HLU-0014    HL   UNIT 1
13   8153   KB1-24-502810   PM    PM-KK-HLU-0017    HL   UNIT 1
14   8154   KB1-24-502811   PM    PM-KK-HLU-0019    HL   UNIT 1
15   8158   KB1-24-502815   PM    PM-KK-HLU-0045    HL   UNIT 1
16   8159   KB1-24-502816   PM    PM-KK-HLU-0047    HL   UNIT 2
17   8160   KB1-24-502817   PM    PM-KK-HLU-0052    HL   UNIT 3
18   8161   KB1-24-502818   PM    PM-KK-HLU-0056    HL   UNIT 4
19   8166   KB1-24-502823   PM    PM-KK-HLU-0066    HL   UNIT 5
20   8167   KB1-24-502824   PM    PM-KK-HLU-0105    HL   UNIT 6
21   8155   KB1-24-502812   PM    PM-KK-HLU-0034    HL   UNIT 2
22   8156   KB1-24-502813   PM    PM-KK-HLU-0036    HL   UNIT 2
23   8157   KB1-24-502814   PM    PM-KK-HLU-0038    HL   UNIT 2
24   8162   KB1-24-502819   PM    PM-KK-HLU-0059    HL   UNIT 2
25   8163   KB1-24-502820   PM    PM-KK-HLU-0061    HL   UNIT 2
26   8164   KB1-24-502821   PM    PM-KK-HLU-0063    HL   UNIT 2
27   8165   KB1-24-502822   PM    PM-KK-HLU-0065    HL   UNIT 2
28   8168   KB1-24-502825   PM    PM-KK-HLU-0106    HL   UNIT 2
29   8015   KB1-24-502726   PM    PM-KK-HLEP-0055   HL   UNIT 2
1    8376   KB1-24-000932   RTF    SR-24-001943     HL   UNIT 2
2    5077   KB1-24-000322   CD     SR-24-000370     HL    BOP
3   HL   UNIT 2
AINTENANCE SCHEDULE WEEK 31 2024
 AAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                               Job Description           Crew Size   Duration   Clock Hour
          Breafing Pagi                                     9          0.5        0:30
          Sholat ashar                                      9          0.5        0:30
          Fire Fighting Test                                2           2         2:00
          Kegiatan Budaya Kalbar 1                          9          1.5        1:30
          Performance Test Unit 2                           2           2         2:00
          PM
          PM ELECTRICAL 400/230V C.W. PC SECTION A          2          2.5        2:30
          PM ELECTRICAL MOTOR DOSING PUMP REVERSE
                                                            2          2.0        2:00
          OSMOSIS AREA
          PM ELECTRICAL MOTOR DOSING PUMP WWTP AREA         2          2.0        2:00
          PM ELECTRICAL MOTOR DOSING PUMP UNIT AREA         2          2.0        2:00
          PM ELECTRICAL MCC AREA COAL TRANSFER TOWER 1      2          3.5        3:30
          PM ELECTRICAL MCC COAL CRUSHING HOUSE MCC
                                                            2          3.5        3:30
          AREA TT2
          PM ELECTRICAL SHIP UNLOADER 2                     3          3.5        3:30
          PM ELECTRICAL ESP MCC SECTION                     2          2.0        2:00
          PM ELECTRICAL EXCITING TR. UNIT 1                 2          1.0        1:00
          PM ELECTRICAL CIRCULATING WATER TRAFO A-B         2          1.0        1:00
          PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER
                                                            2          1.5        1:30
          A-B UNIT 1
PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT
                                                           2   1.5   1:30
1
PM ELECTRICAL MOTOR C3WP UNIT 1                            2   1.5   1:30
PM ELECTRICAL MOTOR SWBP UNIT 1                            2   1.5   1:30
PM ELECTRICAL MOTOR COAL FEEDER UNIT 1                     2   1.5   1:30
PM ELECTRICAL CCB MCC                                      2   2.0   2:00
PM ELECTRICAL MOV AREA FEED WATER, COOLING
                                                           2   4.5   4:30
WATER, VACUUM DAN CONDENSER UNIT 1
PM ELECTRICAL MOV AREA COAL FEEDER UNIT 1                  2   1.5   1:30
PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT
                                                           2   7.0   7:00
1
PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                2   3.0   3:00
PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 2                 3   2.5   2:30
PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 2                 3   2.5   2:30
PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 2                   3   2.5   2:30
PM ELECTRICAL MOV AREA ECONOMIZER, STEAM,
                                                           2   4.5   4:30
BLOW DOWN AND DRAWN UNIT 2
PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 2                   2   1.5   1:30
PM ELECTRICAL MOTOR APH A-B UNIT 2                         2   3.0   3:00
PM ELECTRICAL SOOT BLOWER UNIT 2                           2   7.0   7:00
PM ELECTRICAL GT & UAT UNIT 2                              2   2.0   2:00
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 2           2   3.0   3:00
CORRECTIVE
UNIT 2 - MOV Spray Reheat indicates Fault on DCS right
                                                           2   4.0   4:00
side and Local Over limit on left side
BOP, electrolyzer chlorination plant B no.06,08, 09 & 10
                                                           3   20    20:00
leak from the bolt behind the frame
Inspection the Motor of CWP 4   3   20         20:00
SPONSOR WORK
                                               Total Man Hours Scheduled
                                                 Total Man Hours Available
                                         Total Scheduled Utility Man Hours
                       9               12               9              9              6
Man Hour    Senin           Selasa            Rabu           Kamis          Jumat
           29-Jul-24       30-Jul-24        31-Jul-24       1-Aug-24       2-Aug-24
  4.5        4.50            4.50             4.50            4.50           4.50
  4.5        4.50            4.50             4.50            4.50           4.50
   4                                                          4.00
  13.5                                                                      13.50
   4                                          4.00
  5.00       5.00
  4.00       4.00
  4.00       4.00
  4.00       4.00
  7.00       7.00
  7.00                                                        7.00
 10.50                       5.25             5.25
  4.00                                        4.00
  2.00                       2.00
  2.00                       2.00
  3.00                                                                       3.00
3.00                                   3.00
3.00                            3.00
3.00                            3.00
3.00            3.00
4.00            4.00
9.00                            9.00
3.00            3.00
14.00                           7.00   7.00
6.00    1.20    1.20    1.20    1.20   1.20
7.50                            7.50
7.50                                   7.50
7.50                    7.50
9.00            9.00
3.00    3.00
6.00                    6.00
14.00   4.67    4.67    4.67
4.00            4.00
6.00                    6.00
8.00                            8.00
60.00   12.00   12.00   12.00
                60.00                       15.00         15.00         15.00        15.00
                              53.87         74.12         74.62         73.70        59.20
 Total Man Hours Scheduled
                               72            72            72            72           72
  Total Man Hours Available
Scheduled Utility Man Hours   74.81%       102.94%       103.63%       102.36%       82.22%
                                       9             9             9             9            9
                                                     WEEKLY MAINTENANCE SCHEDULE WEEK 32 2024
                                                     PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
No   WO     No Work Order   Work      No PM/SR        Division   Area
     No.                    Type
1    8291   KB1-24-502892   PM     PM-KK-HLBP-0003      HL        BOP
2                           PM     PM-KK-HLBP-0006      HL        BOP
3    8293   KB1-24-502894   PM     PM-KK-HLBP-0009      HL        BOP
4    8294   KB1-24-502895   PM     PM-KK-HLBP-0026      HL        BOP
5    8295   KB1-24-502896   PM     PM-KK-HLEP-0007      HL        CH
6    8296   KB1-24-502897   PM     PM-KK-HLEP-0008      HL        CH
7    8297   KB1-24-502898   PM     PM-KK-HLEP-0042      HL        CH
8                           PM     PM-KK-HLEP-0053      HL        CH
9    8299   KB1-24-502900   PM     PM-KK-HLU-0021       HL       UNIT 1
10   8300   KB1-24-502901   PM     PM-KK-HLU-0027       HL       UNIT 1
11   8301   KB1-24-502902   PM     PM-KK-HLU-0029       HL       UNIT 1
12   8302   KB1-24-502903   PM     PM-KK-HLU-0031       HL       UNIT 1
13   8304   KB1-24-502905   PM     PM-KK-HLU-0041       HL       UNIT 1
14   8305   KB1-24-502906   PM     PM-KK-HLU-0043       HL       UNIT 1
15   8308   KB1-24-502909   PM     PM-KK-HLU-0054       HL       UNIT 1
16   8309   KB1-24-502910   PM     PM-KK-HLU-0062       HL       UNIT 1
17   8310   KB1-24-502911   PM    PM-KK-HLU-0096   HL   UNIT 1
18   8311   KB1-24-502912   PM    PM-KK-HLU-0105   HL   UNIT 1
19   8298   KB1-24-502899   PM    PM-KK-HLU-0002   HL   UNIT 2
20   8303   KB1-24-502904   PM    PM-KK-HLU-0040   HL   UNIT 2
21   8306   KB1-24-502907   PM    PM-KK-HLU-0049   HL   UNIT 2
22   8307   KB1-24-502908   PM    PM-KK-HLU-0051   HL   UNIT 2
23   8312   KB1-24-502913   PM    PM-KK-HLU-0107   HL   UNIT 2
24   8313   KB1-24-502914   PM    PM-KK-HLU-0108   HL   UNIT 2
25   8314   KB1-24-502915   PM    PM-KK-HLU-0109   HL   UNIT 2
1    8086   KB1-24-000875   CM     SR-24-001854    HL   UNIT 1
2    7760   KB1-24-000799   RTF    SR-24-001702    HL    CH
3                           CD                     HL   UNIT 2
4    7943   KB1-24-000849   CM     SR-24-001832    HL    ASH
MAINTENANCE SCHEDULE WEEK 32 2024
ARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                                                                                   10
                    Job Description           Crew Size   Duration   Clock Hour   Man Hour    Senin
                                                                                             5-Aug-24
         PM
         PM ELECTRICAL MOTOR AREA REVERSE
                                                 2          2.00       2:00          4         4.00
         OSMOSIS
         PM ELECTRICAL SUPPLY WATER &
                                                 2          2.50       2:30          5
         WATER TREATMENT TR. A-B
         PM ELECTRICAL MOTOR AREA FUEL OIL
                                                 2          2.00       2:00          4
         PUMP HOUSE
         PM ELECTRICAL INSULATION TEST BOP
                                                 2          3.00       3:00          6         3.00
         AREA
         PM ELECTRICAL MOTOR C5                  2          2.00       2:00          4
         PM ELECTRICAL MOTOR CRUSHER A-B         2          1.50       1:30          3
         PM ELECTRICAL INSULATION TEST EP
                                                 2          3.00       3:00          6         3.00
         AREA
         PM ELECTRICAL 400/230V COAL
                                                 2          2.00       2:00          4
         HANDLING PC SECTION
         PM ELECTRICAL MOTOR EH DAN RECIR
                                                 2          1.50       1:30          3
         UNIT 1
         PM ELECTRICAL MOTOR LTE PUMP UNIT
                                                 2          1.50       1:30          3
         1
         PM ELECTRICAL MOTOR JACKING OIL
                                                 2          1.50       1:30          3
         PUMP UNIT 1
         PM ELECTRICAL MOTOR BFP UNIT 1          2          2.50       2:30          5
         PM ELECTRICAL MOTOR FLAME
                                                 2          1.50       1:30          3
         DETECTOR COOLING AIR FAN UNIT 1
         PM ELECTRICAL MOTOR SEAL AIR FAN
                                                 2          1.50       1:30          3
         UNIT 1
         PM ELECTRICAL MOV AREA FLUE GAS
                                                 2          4.50       4:30          9
         AND AIR UNIT 1
         PM ELECTRICAL MOTOR APH A-B UNIT 1      2          3.00       3:00          6         6.00
PM ELECTRICAL MOTOR LUBE OIL MOT
                                         2   1.50   1:30    3
UNIT 1
PM ELECTRICAL INSULATION TEST OF
                                         2   3.00   3:00    6     1.20
MOTOR UNIT
PM ELECTRICAL GENERATOR UNIT 2           2   2.50   2:30    5     5.00
PM ELECTRICAL FORCED DRAFT FAN A-B
                                         3   2.50   2:30    7.5
UNIT 2
PM ELECTRICAL BATTERY DC UNIT 2          3   2.00   2:00    6
PM ELECTRICAL MOV MAIN STEAM,
REHEAT STEAM, BYPASS, GLAND STEAM,
                                         2   4.50   4:30    9
EXTRACTION STEAM DAN AUXILIARY
STEAM UNIT 2
PM ELECTRICAL 230/400V PC SECTION
                                         2   2.00   2:00    4     4.00
UNIT 2
PM ELECTRICAL 230/400V MCC TURBINE
                                         2   2.00   2:00    4
UNIT 2
PM ELECTRICAL 6.3KV UNIT SECTION
                                         2   2.00   2:00    4     4.00
UNIT 2
CORRECTIVE
UNIT 1 - MOV Screen Ball Cleaning 1B,
                                         2   8.0    8:00    16    8.00
Can't Operation From DCS & Local
ODR - abnormal sound of feeder motor
                                         2   4.0    4:00    8
coal sampling BC2 no. 2
Inspection the Motor of CWP 4            3   20     20:00   60    12.00
Unit 1, Vibrator bottom ash silo short   2   8.0    8:00    16
SPONSOR WORK
                                    58.20
      Total Man Hours Scheduled
                                     64
        Total Man Hours Available
Total Scheduled Utility Man Hours   90.94%
                                             8
          8          9           9           6
 Selasa       Rabu       Kamis       Jumat
6-Aug-24 7-Aug-24 8-Aug-24 9-Aug-24
              5.00
                         4.00
  3.00
                         4.00
              3.00
  3.00
                                     4.00
                         3.00
                                     3.00
                         3.00
                         5.00
              3.00
              3.00
              4.50       4.50
                3.00
1.20    1.20    1.20    1.20
7.50
6.00
                        9.00
                        4.00
8.00
        8.00
12.00   12.00   12.00   12.00
8.00    8.00
56.70        55.70        51.70        53.20
 64           64           64           56
88.59%       87.03%       80.78%       95.00%
         8            8            8            8
      Eko Junianto
               52 WEEKS PLANNING DAN SCHEDULING 2024 -
                 PEMELIHARAAN KONTROL & INSTRUMEN
                                                                                   5-11
NO.                                                  PM DESCRIPTION         UNIT   W32
 1    MAJUN                                                           KG           5.20
 2    WYPALL                                                          ROLL         0.13
 3    KUAS 2 INCH                                                     PCS          2.50
 4    KUAS 4 INCH                                                     PCS          2.50
 5    WD 40                                                           CAN          1.80
 6    SARUNG TANGAN KAIN                                              PAIRS        2.50
 7    ISOLASI SCOTCH 35                                               ROLL         2.00
 8    Contact cleaner                                                 CAN
 9    GREASE LITHIUM 3                                                KG           0.15
10    GREASE LITHIUM 2                                                KG           0.25
11    GREASE S3 T100 2                                                KG           0.20
12    BATTERY TERMINAL PROTECTOR                                      CAN          0.50
13    SABUN ; SABUN TANGAN ISI3.7 LITER (Permatex)                    Gallon
14    Masker 3M N95                                                   Pcs          30.00
                                                                                           31.2
15    THREEBOND 5211 SILICONE SEALENT                                 Tube
16    CAT JOTUN ORANGE
17    CAT JOTUN BIRU
18    CAT JOTUN ABU-ABU
                                                          WEEKLY MAINTENANCE SCHEDULE WEEK
                                                          PEMELIHARAAN LISTRIK PLTU KALBAR-1
No   WO No.   No Work Order Work Type      No PM/SR        Division    Area
 1                             PM       PM-KK-HLBP-0001      HL        BOP
 2                             PM       PM-KK-HLBP-0004      HL        BOP
 3                             PM       PM-KK-HLBP-0005      HL        BOP
 4                             PM       PM-KK-HLBP-0015      HL        BOP
 5                             PM       PM-KK-HLBP-0016      HL        BOP
 6                             PM       PM-KK-HLBP-0023      HL        BOP
 7                             PM       PM-KK-HLEP-0003      HL         CH
 8                             PM       PM-KK-HLEP-0004      HL         CH
 9                             PM       PM-KK-HLEP-0005      HL         CH
10                             PM       PM-KK-HLEP-0006      HL         CH
11                             PM       PM-KK-HLEP-0012      HL         CH
12                             PM       PM-KK-HLU-0033       HL         CH
13                             PM       PM-KK-HLU-0035       HL         CH
14                             PM       PM-KK-HLU-0037       HL         CH
15                             PM       PM-KK-HLU-0039       HL       UNIT 1
16                             PM       PM-KK-HLU-0048       HL       UNIT 1
17                             PM       PM-KK-HLU-0058       HL       UNIT 1
18                             PM       PM-KK-HLU-0060       HL       UNIT 1
19                             PM       PM-KK-HLU-0064       HL       UNIT 1
20                             PM       PM-KK-HLU-0099       HL       UNIT 1
21                             PM       PM-KK-HLU-0105       HL       UNIT 1
22                             PM       PM-KK-HLU-0006       HL       UNIT 1
23                             PM       PM-KK-HLU-0013       HL       UNIT 2
24                             PM       PM-KK-HLU-0015       HL       UNIT 2
25                             PM       PM-KK-HLU-0018       HL       UNIT 2
26                             PM       PM-KK-HLU-0020       HL       UNIT 2
27                             PM       PM-KK-HLU-0046       HL       UNIT 2
28                             PM       PM-KK-HLU-0053       HL       UNIT 2
29                             PM       PM-KK-HLU-0057       HL       UNIT 2
30   PM   PM-KK-HLU-0067   HL   UNIT 2
NTENANCE SCHEDULE WEEK 33 2024
AN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                      Job Description                     Crew Size   Duration
          Breafing Pagi                                                      9          0.50
          Sholat ashar                                                       9          0.50
          Fire Fighting Test                                                 2          2.00
          Kegiatan Budaya Kalbar 1                                           9          2.00
          PM
          PM ELECTRICAL FIRE FIGHTING PUMP                                   2          3.00
          PM ELECTRICAL MOTOR AREA DEMINERALIZE PLANT                        2          2.00
          PM ELECTRICAL MOTOR AREA SEA WATER PRE TREATMENT                   2          2.00
          PM ELECTRICAL AREA SANITARY SEWAGE                                 2          2.00
          PM ELECTRICAL MOTOR WASTE WATER AREA                               2          2.00
          PM ELECTRICAL MOTOR AUX BOILER AREA                                2          2.00
          PM ELECTRICAL MOTOR C1                                             2          2.00
          PM ELECTRICAL MOTOR C2 A-B                                         2          2.00
          PM ELECTRICAL MOTOR C3 A-B                                         2          2.00
          PM ELECTRICAL MOTOR C4 A-B                                         2          1.50
          PM ELECTRICAL STACKER RECLAIMER                                    3          3.50
          PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 1                         3          2.50
          PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 1                         3          2.50
          PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 1                           3          2.50
          PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 1                          3          2.50
          PM ELECTRICAL BATTERY DC UNIT 1                                    3          2.00
          PM ELECTRICAL MOV AREA ECONOMIZER, STEAM, BLOW DOWN AND DRAWN
                                                                             2          4.50
          UNIT 1
          PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 1                           2          1.50
          PM ELECTRICAL SOOT BLOWER UNIT 1                                   2          7.00
          PM ELECTRICAL GT, UAT & SST UNIT 1                                 2          2.00
          PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                        2          3.00
          PM ELECTRICAL EXCITING TR. UNIT 2                                  2          1.00
          PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER A-B UNIT 2               2          1.50
          PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT 2                     2          1.50
          PM ELECTRICAL MOTOR C3WP UNIT 2                                    2          1.50
          PM ELECTRICAL MOTOR SWBP UNIT 2                                    2          1.50
          PM ELECTRICAL MOTOR COAL FEEDER UNIT 2                             2          1.50
          PM ELECTRICAL MOV AREA FEED WATER, COOLING WATER, VACUUM DAN
                                                                             2          4.50
          CONDENSER UNIT 2
          PM ELECTRICAL MOV AREA COAL FEEDER UNIT 2                          2          1.50
PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT 2   2      7.00
CORRECTIVE
SPONSOR WORK
                                                                 Total Man Hours Schedu
                                                                  Total Man Hours Availa
                                                          Total Scheduled Utility Man Ho
                           10         11       10        3         3
Clock Hour Man Hour Senin      Selasa    Rabu      Kamis     Jumat
                   12-Aug-24 13-Aug-24 14-Aug-24 15-Aug-24 16-Aug-24
   0:30      4.5      4.50      4.50      4.50      4.50      4.50
   0:30      4.5      4.50      4.50      4.50      4.50      4.50
   2:00       4                                     4.00
   2:00      18                                              18.00
  3:00       6                                     6.00
  2:00       4                 4.00
  2:00       4                 4.00
  2:00       4                           4.00
  2:00       4                           4.00
  2:00       4                                               4.00
  2:00       4       4.00
  2:00       4       4.00
  2:00       4                  4.00
  1:30       3                  3.00
  3:30      10.5               10.50
  2:30      7.5                 7.50
  2:30      7.5                          7.50
  2:30      7.5                          7.50
  2:30      7.5                          7.50
  2:00       6                           6.00
  4:30       9       9.00
  1:30      3         3.00
  7:00      14     4.6666667 4.6666667 4.6666667
  2:00      4         4.00
  3:00      6         1.20      1.20      1.20     1.20      1.20
  1:00      2         2.00
  1:30      3         3.00
  1:30      3         3.00
  1:30      3                             3.00
  1:30      3                             3.00
  1:30      3                   3.00
  4:30       9                 9.00
  1:30       3                 3.00
               7:00        14                                               7            7
      Total Man Hours Scheduled     46.87        62.87        57.37        27.20        39.20
       Total Man Hours Available     72           72           72           72           63
otal Scheduled Utility Man Hours   65.09%       87.31%       79.68%       37.78%       62.22%
                                            9            9            9            9            9
                                                            WEEKLY MAINTENANCE SCHEDULE W
                                                            PEMELIHARAAN LISTRIK PLTU KALBA
No   WO No.   No Work Order   Work Type      No PM/SR        Division
1                                PM       PM-KK-HLBP-0002      HL
2                                PM       PM-KK-HLBP-0007      HL
3                                PM       PM-KK-HLBP-0008      HL
4                                PM       PM-KK-HLBP-0010      HL
5                                PM       PM-KK-HLBP-0017      HL
6                                PM       PM-KK-HLBP-0030      HL
7                                PM       PM-KK-HLBP-0039      HL
8                                PM       PM-KK-HLBP-0040      HL
9                                PM       PM-KK-HLEP-0001      HL
10                               PM       PM-KK-HLEP-0002      HL
11                               PM       PM-KK-HLEP-0009      HL
12   PM   PM-KK-HLEP-0013   HL
13   PM   PM-KK-HLEP-0024   HL
14   PM   PM-KK-HLEP-0052   HL
15   PM   PM-KK-HLU-0001    HL
16   PM   PM-KK-HLU-0011    HL
17   PM   PM-KK-HLU-0016    HL
18   PM   PM-KK-HLU-0050    HL
19   PM   PM-KK-HLU-0100    HL
20   PM   PM-KK-HLU-0101    HL
21   PM   PM-KK-HLU-0102    HL
22   PM   PM-KK-HLU-0105    HL
23   PM   PM-KK-HLEP-0054   HL
24   PM   PM-KK-HLU-0022    HL
25   PM   PM-KK-HLU-0028    HL
26   PM   PM-KK-HLU-0030    HL
27   PM   PM-KK-HLU-0032    HL
28   PM   PM-KK-HLU-0042    HL
29   PM   PM-KK-HLU-0044    HL
30   PM   PM-KK-HLU-0055    HL
31   PM   PM-KK-HLU-0097    HL
32
WEEKLY MAINTENANCE SCHEDULE WEEK 34 2024
PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGKAYANG
             Area                               Job Description                   Crew Size
                    Breafing Pagi                                                    9
                    Sholat ashar                                                     9
                    Fire Fighting Test                                               2
                    Kegiatan Budaya Kalbar 1                                         9
                    PM
             BOP    PM ELECTRICAL AREA CHLORINE PLANT                                2
             BOP    PM ELECTRICAL MOTOR AREA NETRALIZING PLANT                       2
             BOP    PM ELECTRICAL MOTOR AREA COAL WASTE WATER PLANT                  2
             BOP    PM ELECTRICAL MULTIPURPORSE PUMP HOUSE MCC                       2
             BOP    PM ELECTRICAL MOTOR AREA MULTI PURPOSE PUMP AREA                 2
             BOP    PM ELECTRICAL PAINTING MOTOR MOTOR AREA NETRALIZING PLANT        2
             BOP    PM ELECTRICAL PAINTING MOTOR MOTOR AUX BOILER AREA               2
             BOP    PM ELECTRICAL PAINTING MOTOR MOTOR AREA REVERSE OSMOSIS          2
              CH    PM ELECTRICAL MOTOR BC-2                                         3
              CH    PM ELECTRICAL MOTOR BC-1                                         2
             ASH    PM ELECTRICAL ELECTRIC SCREW AIR & CONVEYING AIR COMPRESSOR      2
 CH      PM ELECTRICAL SHIP UNLOADER 1                                       3
 CH      PM ELECTRICAL COAL-BUNKER BAY MCC                                   2
UNIT     PM ELECTRICAL 6.3KV & 230/400V PC SECTION                           2
UNIT     PM ELECTRICAL GENERATOR UNIT 1                                      2
UNIT     PM ELECTRICAL MOTOR CIRCULATING WATER PUMP 1-5                      2
         PM ELECTRICAL MOTOR CWP AREA (TBS, TRASH RAKE, BACKWASH PUMP, SEA
UNIT                                                                         2
         WATER PUMP)
         PM ELECTRICAL MOV MAIN STEAM, REHEAT STEAM, BYPASS, GLAND STEAM,
UNIT                                                                         2
         EXTRACTION STEAM DAN AUXILIARY STEAM UNIT 1
UNIT 1   PM ELECTRICAL 230/400V PC SECTION UNIT 1                            2
UNIT 1   PM ELECTRICAL 230/400V MCC TURBINE UNIT 1                           2
UNIT 1   PM ELECTRICAL 6.3KV UNIT SECTION UNIT 1                             2
UNIT     PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                         2
UNIT 1   PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 1                    2
UNIT 2   PM ELECTRICAL MOTOR EH DAN RECIR UNIT 2                             2
UNIT 2   PM ELECTRICAL MOTOR LTE PUMP UNIT 2                                 2
UNIT 2   PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT 2                         2
UNIT 2   PM ELECTRICAL MOTOR BFP UNIT 2                                      2
UNIT 2   PM ELECTRICAL MOTOR FLAME DETECTOR COOLING AIR FAN UNIT 2           2
UNIT 2   PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 2                             2
UNIT 2   PM ELECTRICAL MOV AREA FLUE GAS AND AIR UNIT 2                      2
UNIT 2   PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 2                             2
                                                                             0
CORRECTIVE
SPONSOR WORK
                     Total
                      Tota
               Total Schedu
                                               7               8               6
Duration   Clock Hour   Man Hour     Senin          Selasa           Rabu
                                   19-Aug-24       20-Aug-24       21-Aug-24
  0.5        0:30         4.5        4.50            4.50            4.50
  0.5        0:30         4.5        4.50            4.50            4.50
   2         2:00          4
  1.5        1:30         13.5
   4         4:00         8.00
   2         2:00         4.00                                       4.00
   2         2:00         4.00
  2.5        2:30         5.00                       5.00
   2         2:00         4.00                       4.00
   3         3:00         6.00
   3         3:00         6.00
   3         3:00         6.00
  2.5        2:30         7.50                       7.50
   2         2:00         4.00       4.00
   2         2:00         4.00                       4.00
3.5   3:30   10.50   10.50
2     2:00   4.00
2     2:00   4.00    4.00
2.5   2:30   5.00    5.00
2.5   2:30   5.00
1.5   1:30   3.00
4.5   4:30   9.00                   9.00
2     2:00   4.00    4.00
2     2:00   4.00                   4.00
2     2:00   4.00    4.00
3     3:00   6.00    1.20    1.20   1.20
3     3:00   6.00
1.5   1:30   3.00            3.00
1.5   1:30   3.00                   3.00
1.5   1:30   3.00            3.00
2.5   2:30   5.00                   5.00
1.5   1:30   3.00
1.5   1:30   3.00
4.5   4:30   9.00
1.5   1:30   3.00            3.00
0     0:00   0.00
                                    41.70        39.70        35.20
      Total Man Hours Scheduled
                                     58.5         58.5         58.5
        Total Man Hours Available
Total Scheduled Utility Man Hours   71.28%       67.86%       60.17%
                                             9            9            9
            7               4
 Kamis           Jumat
22-Aug-24       23-Aug-24
  4.50            4.50
  4.50            4.50
  4.00
                  13.50
                  8.00
  4.00
4.00
       5.00
       3.00
1.20   1.20
6.00
3.00
3.00
9.00
43.20        39.70
 58.5         58.5
73.85%       67.86%
         9            9
                                                            WEEKLY MAINTENANCE SCHEDULE WEEK 35 20
                                                            PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGK
No   WO No.   No Work Order   Work Type      No PM/SR        Division    Area
1                                PM       PM-KK-HLBP-0013      HL        BOP
2                                PM       PM-KK-HLBP-0018      HL        BOP
3                                PM       PM-KK-HLBP-0019      HL        BOP
4                                PM       PM-KK-HLBP-0020      HL        BOP
5                                         PM-KK-HLBP-0027
6                                PM       PM-KK-HLEP-0010      HL         CH
7                                PM       PM-KK-HLEP-0011      HL         CH
 8                               PM       PM-KK-HLEP-0014      HL        CH
 9                               PM       PM-KK-HLEP-0023      HL        ASH
10                               PM       PM-KK-HLU-0005       HL       UNIT 1
11                               PM       PM-KK-HLU-0010       HL       UNIT 2
12                               PM       PM-KK-HLU-0012       HL       UNIT 1
13                               PM       PM-KK-HLU-0014       HL       UNIT 1
14                               PM       PM-KK-HLU-0017       HL       UNIT 1
15                               PM       PM-KK-HLU-0019       HL       UNIT 1
16                               PM       PM-KK-HLU-0045       HL       UNIT 1
17                               PM       PM-KK-HLU-0047       HL       UNIT 2
18                               PM       PM-KK-HLU-0052       HL       UNIT 3
19                               PM       PM-KK-HLU-0056       HL       UNIT 4
20                               PM       PM-KK-HLU-0066       HL       UNIT 5
21                               PM       PM-KK-HLU-0105       HL       UNIT 6
22                               PM       PM-KK-HLU-0034       HL       UNIT 2
23                               PM       PM-KK-HLU-0036       HL       UNIT 2
24                               PM       PM-KK-HLU-0038       HL       UNIT 2
25   PM   PM-KK-HLU-0059    HL   UNIT 2
26   PM   PM-KK-HLU-0061    HL   UNIT 2
27   PM   PM-KK-HLU-0063    HL   UNIT 2
28   PM   PM-KK-HLU-0065    HL   UNIT 2
29   PM   PM-KK-HLU-0106    HL   UNIT 2
30        PM-KK-HLU-0110
31   PM   PM-KK-HLEP-0055   HL   UNIT 2
NTENANCE SCHEDULE WEEK 35 2024
AN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                                                                                           9
                               Job Description                  Crew Size
                                                                       Duration
                                                                             Clock Hour
                                                                                    Man Hour     Senin
                                                                                               26-Aug-24
          Breafing Pagi                                            9     0.5   0:30   4.5         4.50
          Sholat ashar                                             9     0.5   0:30   4.5         4.50
          Fire Fighting Test                                       2      2    2:00    4
          Kegiatan Budaya Kalbar 1                                 9     1.5   1:30   13.5
          PM
          PM ELECTRICAL 400/230V C.W. PC SECTION A                 2     2.5   2:30   5.00       5.00
          PM ELECTRICAL MOTOR DOSING PUMP REVERSE OSMOSIS
                                                                   2     2.0   2:00   4.00       4.00
          AREA
          PM ELECTRICAL MOTOR DOSING PUMP WWTP AREA                2     2.0   2:00   4.00       4.00
          PM ELECTRICAL MOTOR DOSING PUMP UNIT AREA                2     2.0   2:00   4.00       4.00
          PM ELECTRICAL PAINTING MOTOR FIRE FIGHTING PUMP          2     3.0   3:00   6.00
          PM ELECTRICAL MCC AREA COAL TRANSFER TOWER 1             2     3.5   3:30   7.00       7.00
          PM ELECTRICAL MCC COAL CRUSHING HOUSE MCC AREA TT2       2     3.5   3:30   7.00       7.00
          PM ELECTRICAL SHIP UNLOADER 2                            3     3.5   3:30 10.50
          PM ELECTRICAL ESP MCC SECTION                            2     2.0   2:00 4.00
          PM ELECTRICAL EXCITING TR. UNIT 1                        2     1.0   1:00 2.00
          PM ELECTRICAL CIRCULATING WATER TRAFO A-B                2     1.0   1:00 2.00
          PM ELECTRICAL MOTOR VACUUM PUMP CONDENSER A-B
                                                                   2     1.5   1:30   3.00
          UNIT 1
          PM ELECTRICAL MOTOR CONDENSATE PUMP A-B UNIT 1           2     1.5   1:30   3.00
          PM ELECTRICAL MOTOR C3WP UNIT 1                          2     1.5   1:30   3.00
          PM ELECTRICAL MOTOR SWBP UNIT 1                          2     1.5   1:30   3.00
          PM ELECTRICAL MOTOR COAL FEEDER UNIT 1                   2     1.5   1:30   3.00
          PM ELECTRICAL CCB MCC                                    2     2.0   2:00   4.00
          PM ELECTRICAL MOV AREA FEED WATER, COOLING WATER,
                                                                   2     4.5   4:30   9.00
          VACUUM DAN CONDENSER UNIT 1
          PM ELECTRICAL MOV AREA COAL FEEDER UNIT 1                2     1.5   1:30   3.00
          PM ELECTRICAL FUNCTION TEST - TINY & OIL GUN UNIT 1      2     7.0   7:00 14.00
          PM ELECTRICAL INSULATION TEST OF MOTOR UNIT              2     3.0   3:00   6.00       1.20
          PM ELECTRICAL MEDIUM SPEED MILL A-D UNIT 2               3     2.5   2:30   7.50
          PM ELECTRICAL INDUCED DRAFT FAN A-B UNIT 2               3     2.5   2:30   7.50
          PM ELECTRICAL PRIMARY AIR FAN A-B UNIT 2                 3     2.5   2:30   7.50
PM ELECTRICAL MOV AREA ECONOMIZER, STEAM, BLOW
                                                        2    4.5    4:30   9.00
DOWN AND DRAWN UNIT 2
PM ELECTRICAL MOV AREA SOOTBLOWER UNIT 2                2    1.5    1:30 3.00       3.00
PM ELECTRICAL MOTOR APH A-B UNIT 2                      2    3.0    3:00 6.00
PM ELECTRICAL SOOT BLOWER UNIT 2                        2    7.0    7:00 14.00      4.67
PM ELECTRICAL GT & UAT UNIT 2                           2    2.0    2:00 4.00
PM ELECTRICAL PAINTING OF MOTOR TURBINE AREA UNIT 2     2    3.0    3:00   6.00
PM ELECTRICAL ESP TRANSFORMER - RECTIFIER UNIT 2        2    3.0    3:00   6.00
CORRECTIVE
SPONSOR WORK
                                                      Total Man Hours Scheduled     48.87
                                                       Total Man Hours Available     72
                                               Total Scheduled Utility Man Hours   67.87%
                                                                                            9
         10        7         6          5
  Selasa    Rabu      Kamis     Jumat
27-Aug-24 28-Aug-24 29-Aug-24 30-Aug-24
   4.50      4.50      4.50      4.50
   4.50      4.50      4.50      4.50
                       4.00
                                13.50
  5.25      5.25
            4.00
  2.00
  2.00
                                  3.00
                                  3.00
                       3.00
                       3.00
  3.00
  4.00
                       9.00
  3.00
                       7.00       7.00
  1.20      1.20       1.20       1.20
                       7.50
                                  7.50
            7.50
 9.00
              6.00
 4.67         4.67
 4.00
              6.00
 47.12        43.62        43.70        44.20
  72           72           72           72
65.44%       60.58%       60.69%       61.39%
         9            9            9            9
                                                            WEEKLY MAINTENANCE SCHEDULE WEEK 36 202
                                                            PEMELIHARAAN LISTRIK PLTU KALBAR-1 BENGK
No   WO No.   No Work Order   Work Type      No PM/SR        Division    Area
 1                               PM       PM-KK-HLBP-0003      HL        BOP
 2                               PM       PM-KK-HLBP-0006      HL        BOP
 3                               PM       PM-KK-HLBP-0009      HL        BOP
 4                               PM       PM-KK-HLBP-0026      HL        BOP
 5                               PM       PM-KK-HLEP-0007      HL         CH
 6                               PM       PM-KK-HLEP-0008      HL         CH
 7                               PM       PM-KK-HLEP-0042      HL         CH
 8                               PM       PM-KK-HLEP-0053      HL         CH
 9                               PM       PM-KK-HLU-0021       HL       UNIT 1
10                               PM       PM-KK-HLU-0027       HL       UNIT 1
11                               PM       PM-KK-HLU-0029       HL       UNIT 1
12                               PM       PM-KK-HLU-0031       HL       UNIT 1
13                               PM       PM-KK-HLU-0041       HL       UNIT 1
14                               PM       PM-KK-HLU-0043       HL       UNIT 1
15                               PM       PM-KK-HLU-0054       HL       UNIT 1
16                               PM       PM-KK-HLU-0062       HL       UNIT 1
17                               PM       PM-KK-HLU-0096       HL       UNIT 1
18                               PM       PM-KK-HLU-0105       HL       UNIT 1
19                               PM       PM-KK-HLU-0002       HL       UNIT 1
20                               PM       PM-KK-HLU-0040       HL       UNIT 1
21                               PM       PM-KK-HLU-0049       HL       UNIT 2
22                               PM       PM-KK-HLU-0051       HL       UNIT 2
23                               PM       PM-KK-HLU-0107       HL       UNIT 2
24                               PM       PM-KK-HLU-0108       HL       UNIT 2
25                               PM       PM-KK-HLU-0109       HL       UNIT 2
26                               PM       PM-KK-HLU-0111       HL       UNIT 2
NTENANCE SCHEDULE WEEK 36 2024
AN LISTRIK PLTU KALBAR-1 BENGKAYANG
                                      Job Description                        Crew Size   Duration
          Breafing Pagi                                                         9          0.50
          Sholat ashar                                                          9          0.50
          Fire Fighting Test                                                    2          2.00
          Kegiatan Budaya Kalbar 1                                              9          1.50
          PM
          PM ELECTRICAL MOTOR AREA REVERSE OSMOSIS                              2          2.00
          PM ELECTRICAL SUPPLY WATER & WATER TREATMENT TR. A-B                  2          2.50
          PM ELECTRICAL MOTOR AREA FUEL OIL PUMP HOUSE                          2          2.00
          PM ELECTRICAL INSULATION TEST BOP AREA                                2          3.00
          PM ELECTRICAL MOTOR C5                                                2          2.00
          PM ELECTRICAL MOTOR CRUSHER A-B                                       2          1.50
          PM ELECTRICAL INSULATION TEST EP AREA                                 2          3.00
          PM ELECTRICAL 400/230V COAL HANDLING PC SECTION                       2          2.00
          PM ELECTRICAL MOTOR EH DAN RECIR UNIT 1                               2          1.50
          PM ELECTRICAL MOTOR LTE PUMP UNIT 1                                   2          1.50
          PM ELECTRICAL MOTOR JACKING OIL PUMP UNIT 1                           2          1.50
          PM ELECTRICAL MOTOR BFP UNIT 1                                        2          2.50
          PM ELECTRICAL MOTOR FLAME DETECTOR COOLING AIR FAN UNIT 1             2          1.50
          PM ELECTRICAL MOTOR SEAL AIR FAN UNIT 1                               2          1.50
          PM ELECTRICAL MOV AREA FLUE GAS AND AIR UNIT 1                        2          4.50
          PM ELECTRICAL MOTOR APH A-B UNIT 1                                    2          3.00
          PM ELECTRICAL MOTOR LUBE OIL MOT UNIT 1                               2          1.50
          PM ELECTRICAL INSULATION TEST OF MOTOR UNIT                           2          3.00
          PM ELECTRICAL GENERATOR UNIT 2                                        2          2.50
          PM ELECTRICAL FORCED DRAFT FAN A-B UNIT 2                             3          2.50
          PM ELECTRICAL BATTERY DC UNIT 2                                       3          2.00
          PM ELECTRICAL MOV MAIN STEAM, REHEAT STEAM, BYPASS, GLAND STEAM,
                                                                                2          4.50
          EXTRACTION STEAM DAN AUXILIARY STEAM UNIT 2
          PM ELECTRICAL 230/400V PC SECTION UNIT 2                              2          2.00
          PM ELECTRICAL 230/400V MCC TURBINE UNIT 2                             2          2.00
          PM ELECTRICAL 6.3KV UNIT SECTION UNIT 2                               2          2.00
          PM ELECTRICAL PAINTING OF MOTOR BOILER AREA UNIT 2                    2          3.00
          CORRECTIVE
SPONSOR WORK
                      Total Man Hours S
                       Total Man Hours
               Total Scheduled Utility Ma
                                8        5        6        8        5
Clock Hour   Man Hour     Senin   Selasa    Rabu    Kamis    Jumat
                        2-Sep-24 3-Sep-24 4-Sep-24 5-Sep-24 6-Sep-24
  0:30         4.5         4.50    4.50     4.50     4.50     4.50
  0:30         4.5         4.50    4.50     4.50     4.50     4.50
  2:00          4                                    4.00
  1:30         13.5                                           13.5
  2:00          4        4.00
  2:30          5                           5.00
  2:00          4                                    4.00
  3:00          6        3.00      3.00
  2:00          4                                    4.00
  1:30          3                           3.00
  3:00          6        3.00      3.00
  2:00          4                                             4.00
  1:30          3                                    3.00
  1:30          3                                             3.00
  1:30          3                                    3.00
  2:30          5                                    5.00
  1:30          3                           3.00
  1:30          3                           3.00
  4:30          9                           4.50     4.50
  3:00          6        6.00
  1:30          3                                    3.00
  3:00          6        1.20      1.20     1.20     1.20     1.20
  2:30          5        5.00
  2:30         7.5                 7.50
  2:00          6                  6.00
  4:30          9                                             9.00
  2:00          4        4.00
  2:00          4                                             4.00
  2:00          4        4.00
  3:00          6
       Total Man Hours Scheduled 39.20          29.70        28.70        40.70        43.70
        Total Man Hours Available   72           72           72           72           63
Total Scheduled Utility Man Hours 54.44%       41.25%       39.86%       56.53%       69.37%
                                           9            9            9            9            9
Remarks   Status WO   Status Permit   PIC