MAINTENANCE & INSPECTION SCHEDULE OF PACKING HOUSE
Weekly Routine
Week   RoutineMaintenance   Additonal               Trouble Shooting   Catatan                               Packer Machine                                  Bag Aplicator                              Palletizer                                     BOCEDI                                                Silo Cement & Bulk
                                                                                              (Maint) Clean and Tightening Spout Panel,      (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety          (Insp) Check- Clean-Function test of machine
                                         Januari                                              (Insp) Function Test : Gate, Aeration,         Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.
 1                                                                                            impeller,bag clamp, bag evacuation, seat                                                 machine sensor. Then, running simmulation.
                                                                                   PM1
 2                                                                                            adjustment, Safety Microswitch, Safety Door
 3                                                                                            Switch, Mainenace Switch, Level Stick Tank,
 4            PM2              M1                                                             Throtle Limit Switch, Speed Monitor Rotary
 5            PM3                                                                             (Maint) Spout Calibration, Ventocheck          (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety          (Insp) Check- Clean-Function test of machine
                                         Februari                                             Calibration (Static)                           Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.
 1            PM1                                                                             (Insp) Manual Test : Gate, Aeration,                                                     machine sensor. Then, running simmulation.
                                                                                   PM2
 2            PM2              M2                                                             impeller,bag clamp, bag evacuation, seat
 3            PM3                                                                             adjustment, Safety Microswitch, Safety Door
 4            PM4              M4                                                             Switch, Mainenace Switch, Level Stick Tank,
                                          Maret                                               (Insp) Manual Test : Gate, Aeration,           (Insp) Check & Function test Safety Door, (Maint) Clean and Tightening all Panel and    (Maint) Clean and Tightening all Panel and
 1            PM1              M3                                                             impeller,bag clamp, bag evacuation, seat       Machine Sensor. Then, Running Simulation. Junction Box                                  Junction Box
 2            PM2                                                                             adjustment, Safety Microswitch, Safety Door                                              (Insp) heck & Function test Safety            (Insp) Check- Clean-Function test of machine
                                                                                   PM3
 3            PM3                                                                             Switch, Mainenace Switch, Level Stick Tank,                                              Door/Barrier, Check- Clean-Function test of   sensor. Then, running simmulation.
 4            PM4                                                                             Throtle Limit Switch, Speed Monitor Rotary                                               machine sensor. Then, running simmulation.
                                          April                                               Feeder, Sonar on Evacuation Belt, Bag reject
 1            PM1                                                                             (Insp) Manual Test : Gate, Aeration,           (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety          (Insp) Check- Clean-Function test of machine     (Maint) Clean and Tightening all Panel
 2            PM2              M1                                                             impeller,bag clamp, bag evacuation, seat       Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.               (Insp) Check & Function test BV, PG, Telescopic (Loading Spout under
 3            PM3                                                                             adjustment, Safety Microswitch, Safety Door                                              machine sensor. Then, running simmulation.                                                   silo)
 4            PM4              M4                                                  PM4        Switch, Mainenace Switch, Level Stick Tank,
 5                                                                                            Throtle Limit Switch, Speed Monitor Rotary
                                           Mei                                                Feeder, Sonar on Evacuation Belt, Bag reject
 1            PM1             M3                                                              limitswitch)
 2            PM2            M2 M1
 3            PM3
 4            PM4
                                           Juni
 1            PM1                                                                Additional
 2            PM2              M2                                                                                         Item Check/Repair                                              Durration                        Catatan
 3            PM3                                                                   M1                   Ventocheck (Body, Belt, V-Belt, Motor, Loadcell, Battery)                Check and Test/ 3 bulan
 4            PM4              M4                                                   M2                             Dynamic Calibration (Ventocheck)                               Check and Test/ 3 bulan
                                           Juli                                     M3                                Encoder, Optical Jumpper,                                   Check and Test/ 2 bulan
 1            PM1              M3                                                   M4                       Server Database (Supervision, Ventolink), CCTV                           Check / 2 bulan
 2            PM2              M1
 3            PM3
 4            PM4
 5
                                         Agustus
 1            PM1
 2            PM2              M2
 3            PM3
 4            PM4              M4
                                        September
 1            PM1              M3
 2            PM2
 3            PM3
 4            PM4
 5
                                         Oktober
 1            PM1
 2            PM2              M1
 3            PM3
 4            PM4              M4
                                        November
 1            PM1              M3
 2            PM2              M2
 3            PM3
 4            PM4
                                        Desember
 1            PM1
 2            PM2
 3            PM3
 4            PM4              M4
 5