Maintenance Schedule1

The document outlines a detailed maintenance and inspection schedule for a packing house, specifying weekly routines for various machines including the Packer Machine, Bag Applicator, and Palletizer. Each week includes maintenance tasks, inspections, and troubleshooting procedures to ensure optimal functioning of the equipment. Additional checks and repairs are also scheduled periodically throughout the year.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Maintenance Schedule1

The document outlines a detailed maintenance and inspection schedule for a packing house, specifying weekly routines for various machines including the Packer Machine, Bag Applicator, and Palletizer. Each week includes maintenance tasks, inspections, and troubleshooting procedures to ensure optimal functioning of the equipment. Additional checks and repairs are also scheduled periodically throughout the year.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MAINTENANCE & INSPECTION SCHEDULE OF PACKING HOUSE

Weekly Routine
Week RoutineMaintenance Additonal Trouble Shooting Catatan Packer Machine Bag Aplicator Palletizer BOCEDI Silo Cement & Bulk
(Maint) Clean and Tightening Spout Panel, (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety (Insp) Check- Clean-Function test of machine
Januari (Insp) Function Test : Gate, Aeration, Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.
1 impeller,bag clamp, bag evacuation, seat machine sensor. Then, running simmulation.
PM1
2 adjustment, Safety Microswitch, Safety Door
3 Switch, Mainenace Switch, Level Stick Tank,
4 PM2 M1 Throtle Limit Switch, Speed Monitor Rotary
5 PM3 (Maint) Spout Calibration, Ventocheck (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety (Insp) Check- Clean-Function test of machine
Februari Calibration (Static) Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.
1 PM1 (Insp) Manual Test : Gate, Aeration, machine sensor. Then, running simmulation.
PM2
2 PM2 M2 impeller,bag clamp, bag evacuation, seat
3 PM3 adjustment, Safety Microswitch, Safety Door
4 PM4 M4 Switch, Mainenace Switch, Level Stick Tank,
Maret (Insp) Manual Test : Gate, Aeration, (Insp) Check & Function test Safety Door, (Maint) Clean and Tightening all Panel and (Maint) Clean and Tightening all Panel and
1 PM1 M3 impeller,bag clamp, bag evacuation, seat Machine Sensor. Then, Running Simulation. Junction Box Junction Box
2 PM2 adjustment, Safety Microswitch, Safety Door (Insp) heck & Function test Safety (Insp) Check- Clean-Function test of machine
PM3
3 PM3 Switch, Mainenace Switch, Level Stick Tank, Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation.
4 PM4 Throtle Limit Switch, Speed Monitor Rotary machine sensor. Then, running simmulation.
April Feeder, Sonar on Evacuation Belt, Bag reject
1 PM1 (Insp) Manual Test : Gate, Aeration, (Insp) Check & Function test Safety Door, (Insp) heck & Function test Safety (Insp) Check- Clean-Function test of machine (Maint) Clean and Tightening all Panel
2 PM2 M1 impeller,bag clamp, bag evacuation, seat Machine Sensor. Then, Running Simulation. Door/Barrier, Check- Clean-Function test of sensor. Then, running simmulation. (Insp) Check & Function test BV, PG, Telescopic (Loading Spout under
3 PM3 adjustment, Safety Microswitch, Safety Door machine sensor. Then, running simmulation. silo)
4 PM4 M4 PM4 Switch, Mainenace Switch, Level Stick Tank,
5 Throtle Limit Switch, Speed Monitor Rotary
Mei Feeder, Sonar on Evacuation Belt, Bag reject
1 PM1 M3 limitswitch)
2 PM2 M2 M1
3 PM3
4 PM4
Juni
1 PM1 Additional
2 PM2 M2 Item Check/Repair Durration Catatan
3 PM3 M1 Ventocheck (Body, Belt, V-Belt, Motor, Loadcell, Battery) Check and Test/ 3 bulan
4 PM4 M4 M2 Dynamic Calibration (Ventocheck) Check and Test/ 3 bulan
Juli M3 Encoder, Optical Jumpper, Check and Test/ 2 bulan
1 PM1 M3 M4 Server Database (Supervision, Ventolink), CCTV Check / 2 bulan
2 PM2 M1
3 PM3
4 PM4
5
Agustus
1 PM1
2 PM2 M2
3 PM3
4 PM4 M4
September
1 PM1 M3
2 PM2
3 PM3
4 PM4
5
Oktober
1 PM1
2 PM2 M1
3 PM3
4 PM4 M4
November
1 PM1 M3
2 PM2 M2
3 PM3
4 PM4
Desember
1 PM1
2 PM2
3 PM3
4 PM4 M4
5