1     6317    KB1-24-501574      PM       PM-KK-HKIBP-0001      HKI      BOP
2     6318    KB1-24-501575      PM       PM-KK-HKIBP-0009      HKI      BOP
3     6319    KB1-24-501576      PM       PM-KK-HKIBP-0010      HKI      BOP
4     6320    KB1-24-501577      PM       PM-KK-HKIBP-0011      HKI      BOP
5     6321    KB1-24-501578      PM       PM-KK-HKIEP-0003      HKI       CH
6     6322    KB1-24-501579      PM       PM-KK-HKIEP-0006      HKI       CH
7     6323    KB1-24-501580      PM       PM-KK-HKIEP-0007      HKI       CH
8     6324    KB1-24-501581      PM       PM-KK-HKIEP-0011      HKI       CH
9     6325    KB1-24-501582      PM       PM-KK-HKIEP-0014      HKI       CH
10    6326    KB1-24-501583      PM       PM-KK-HKIEP-0019      HKI       CH
11   6328   KB1-24-501585   PM   PM-KK-HKIU-0009   HKI   UNIT 1
12   6338   KB1-24-501595   PM   PM-KK-HKIU-0039   HKI   UNIT 1
13   6339   KB1-24-501596   PM   PM-KK-HKIU-0047   HKI   UNIT 1
14   6341   KB1-24-501598   PM   PM-KK-HKIU-0049   HKI   UNIT 1
15   6327   KB1-24-501584   PM   PM-KK-HKIU-0006   HKI   UNIT 2
16   6329   KB1-24-501586   PM   PM-KK-HKIU-0012   HKI   UNIT 2
17   6029   KB1-24-501370   PM   PM-KK-HKIU-0016   HKI   UNIT 2
18   6331   KB1-24-501588   PM   PM-KK-HKIU-0018   HKI   UNIT 2
19   6332   KB1-24-501589   PM   PM-KK-HKIU-0020   HKI   UNIT 2
20   6333   KB1-24-501590   PM   PM-KK-HKIU-0028   HKI   UNIT 2
21   6032   KB1-24-501373   PM   PM-KK-HKIU-0032   HKI   UNIT 2
22   6337   KB1-24-501594   PM   PM-KK-HKIU-0038   HKI   UNIT 2
23   6340   KB1-24-501597   PM   PM-KK-HKIU-0048   HKI   UNIT 2
24   6342   KB1-24-501599   PM   PM-KK-HKIU-0050   HKI   UNIT 2
1   6422   KB1-24-000554   CD   SR-24-000741   HKI    CH
2   5677   KB1-24-000440   CD   SR-24-000440   HKI   BOP
3   6572   KB1-24-000585   CD   SR-24-000818   HKI   ASH
4   6149   KB1-24-000523   CD   SR-24-000658   HKI   UNIT1
NTENANCE SCHEDULE WEEK 19 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                                     Job Description                         Crew Size   Duration
         Breafing Pagi                                                          8          0.5
         Sholat ashar                                                           8          0.5
         Fire Fighting Test                                                     2           2
         Kegiatan Budaya Kalbar 1                                               8          1.5
         Aux Boiler Test                                                        2           2
         PM
         PM I&C BOILER MAKE UP WATER TREATMENT PLAN (ANION, KATION,MIXEDBE
         D)
                                                                                2         4.00
         PM I&C COAL CONTAMINATED WASTE WATER SYSTEM                            2         3.00
         PM I&C INDUSTRIAL WASTE WATER TREATMENT AND UNIT DRAIN PIT             2         4.00
         PM I&C SANITARY SEWAGE TREATMENT SYSTEM                                2         3.00
         PM I&C BELT CONVEYOR C-1                                               2         4.00
         PM I&C CONVEYOR C3 DAN DUST COLLECTOR AREA CRUSHER HOUSE               2         5.92
         PM I&C CONVEYOR C4 AREA COAL BUNGKER                                   2         5.92
         PM I&C KALIBRASI BELT SCALE BC-2 BELT CONVEYOR ( 26W)                  2         5.00
         PM I&C DUST COLLECTOR AREA BUNKER                                      2         4.00
         PM I&C STACKER RECLAIMER                                               3         4.00
PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 1          2   7.50
PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 1           2   4.00
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 1      2   2.00
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT 1   2   2.00
PM I&C LOCAL TURBIN UNIT 2                            2   5.67
PM I&C FUNCTION TEST - SOOT BLOWER UNIT 2             2   7.42
PM I&C KALIBRASI COAL FEEDER A UNIT 2                 2   3.17
PM I&C FEED WATER SYSTEM UNIT 2                       3   2.17
PM I&C CONDENSATE WATER SYSTEM UNIT 2                 3   2.42
PM I&C 2000 JAM MEDIUM SPEED MILL D UNIT 2            2   4.08
PM I&C KALIBRASI COAL FEEDER B UNIT 2                 2   3.17
PM I&C ASSET MANAGEMENT SYSTEM UNIT 2                 2   4.00
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 2      2   2.00
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT 2   2   2.00
CORRECTIVE
COAL - Belt Scale C-3B Error Reading Flow Need to be Calibrated                  2   3.00
BOP-SWRO A, Pressure Guage LP Side Inlet Damaged                                 2   3.00
ASH - Bucket Elevator A Unit 1, Sensor Proximity 1 Error                         2   3.00
UNIT 1 - Oil Gun CD #2 Pneumatic water trap HSD leak side valve & IAC air leak
regulator for insert/retrack broken
                                                                                 2   3.00
SPONSOR WORK
                                                                                             Total Man Hours S
                                                                                              Total Man Hours
                                                                                      Total Scheduled Utility Ma
                                   9              10              11              3
Clock Hour   Man Hour    Senin          Selasa          Rabu            Kamis
                        6-May-24       7-May-24        8-May-24        9-May-24
  0:30          4         4.00           4.00            4.00
  0:30          4         4.00           4.00            4.00
  2:00          4                                                        4.00
  1:30          12
  2:00          4         4.00
  4:00         8.00                      8.00
  3:00         6.00                      6.00
  4:00         8.00                                      8.00
  3:00         6.00                      6.00
  4:00         8.00       4.00
  5:55        11.83                                     11.83
  5:55        11.83                     11.83
  5:00        10.00                      5.00            5.00
  4:00         8.00                      4.00            4.00
  4:00        12.00       6.00
7:30   15.00                        7.50
4:00   8.00    4.00
2:00   4.00                  4.00
2:00   4.00                  4.00
5:40   11.33   5.67   5.67
7:25   14.83   4.94   4.94   4.94
3:10   6.33                         6.33
2:10   6.50    6.50
2:25   7.25    7.25
4:05   8.17    4.08   4.08
3:10   6.33
4:00   8.00    8.00
2:00   4.00                  4.00
2:00   4.00                  4.00
           3:00         6.00                                   6.00
           3:00         6.00                     6.00
           3:00         6.00                                   6.00
           3:00         6.00                                                 6.00
                                    62.44        69.53         69.78         23.83
      Total Man Hours Scheduled
                                     64           64            64            16
        Total Man Hours Available
Total Scheduled Utility Man Hours   98%         108.64%       109.03%       148.96%
                                            8             8             8             2
            2
  Jumat                      Remarks                 Status WO            Status Permit       PIC
10-May-24
                Cleaning and checking equipment,
                                                 LE signed        Close                   Executor
                finish
                Cleaning and checking equipment,
                                                 LE signed        Close                   Executor
                finish
                Cleaning and checking equipment,
                                                 LE signed        Close                   Executor
                finish
                Level abnormal, Need new part,
                                                    LE signed     Close                   Executor
                Finish
                Dirty sensor, Cleanning sensor and
                add silicon pullcord and beltsway, SPS signed     Close                   Operator
                Finish
                cleaning panel box and
                                                    SPS signed    Close                   Operator
                equipment, visual cek, finish
                Coul plugh no 8 no read doang in
                                                 SPS signed       Close                   Operator
                dcs, Proximity broken, Report
                Span error 0.22% with span 40kg,
                                                 SPS signed       Close                   Operator
                Finish
                Dust collector 7 & 8 air the leak in
                                                     SPS signed   Close                   Operator
                the land, Report
                Dirty sensor, Cleanning and
                                                    SPS signed    Close                   Operator
                tightening sensor and panel, Finish
       need validation intens
       - Tiny 1 Not OK (Flame Abnormal,
       intensity can't read)
       - Tiny 2 Not OK (Flame Abnormal,
7.50   Intensity Hilang)                 SPS signed    Close      Operator
       - Tiny 3 Not OK ( Flame Abnormal)
       - Tiny 4 OK
       waiting SR, only function test
       Finish
       Visual Check parameter, cleaning
                                        SPS signed     Close      Operator
       equipment
       Normal, Finish                    SPS signed    Close      Operator
       Normal, Finish                    SPS signed    Close      Operator
       Cleaning, tethening, visuak check,
                                          SPS signed   Close      Operator
       Finish
       cleaning panel box and
                                         SPS signed    Close      Operator
       equipment, visual cek, finish
                                         Inprg         Approval   Executor
       Cleaning, tethening, visuak check,
                                          SPS signed   Close      Operator
       Finish
       Cleaning, tethening, visual check,
                                          SPS signed   Close      Operator
       finish
       cleaning panel box and
                                         SPS signed    Close      Operator
       equipment, visual cek, finish
6.33                                     Inprg         Approval   Executor
       Acknowledge CP, cleaning
                                         SPS signed    Close      Operator
       equitment
       Normal, Finish                    SPS signed    Close      Operator
       Normal, Finish                    SPS signed    Close      Operator
             Flow abnormal, Abnormal flow,
             after calibration = Flow Normal   SPS signed   Close    Operator
             Calibration Finish
             PI broken, Corrosive, Replacement
                                               LE signed    Close    Executor
             new part, Finish
                                               Inprg        Wstart   Executor
             replace regulator air             Inprg
13.83
 16
86.46%
         2
No   WO No.   No Work Order
1     6475    KB1-24-501678
2     6476    KB1-24-501679
4     6490    KB1-24-501693
5     6477    KB1-24-501680
6     6478    KB1-24-501681
7     6479    KB1-24-501682
8     6480    KB1-24-501683
9     6481    KB1-24-501684
10    6330    KB1-24-501587
11    6334    KB1-24-501591
12    6485    KB1-24-501688
13    6486    KB1-24-501689
14   6487   KB1-24-501690
15   6491   KB1-24-501694
16   6483   KB1-24-501686
17   6335   KB1-24-501592
18   6336   KB1-24-501593
19   6484   KB1-24-501687
20   6488   KB1-24-501691
1    6572   KB1-24-000585
2    6723   KB1-24-000605
3    6736   KB1-24-000618
4    6738   KB1-24-000620
5    6872   KB1-24-000630
1
2
                            Job Description                            Crew Size   Duration
Breafing Pagi                                                             9          0.5
Sholat ashar                                                              9          0.5
Fire Fighting Test                                                        2           2
Kegiatan Budaya Kalbar 1                                                  9           2
PM
PM I&C SODIUM HYPOCHLORITE GENERATION SYSTEM                              2          4.00
PM I&C RAW WATER PRE TREATMENT SYSTEM ( SETTLING BASIN, V BASIN, SEA
                                                                          2          4.00
WATER RESERVOIR) AND PUMP HOUSE
PM I&C FUEL OIL PUMP HOUSE AND OIL CONTAMINATED WASTE WATER
                                                                          2          3.50
PLANT
PM I&C AUXILIARY BOILER                                                   2          3.50
PM I&C CONVEYOR C2 DAN DUST COLLECTOR AREA C2                             2          5.92
PM I&C BOTTOM ASH SYSTEM UNIT 1                                           2          4.00
PM I&C ESP & FLY ASH SYSTEM UNIT 1                                        2          4.00
PM I&C WORKSTATION & CABINET DCS UNIT UNIT 1                              2          4.00
PM I&C MEDIUM SPEED MILL & COAL FEEDER A-D UNIT 1                         2          7.50
PM I&C KALIBRASI COAL FEEDER A UNIT 1                                     2          3.17
PM I&C KALIBRASI COAL FEEDER D UNIT 1                                     2          3.17
PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 1                               2          4.00
PM I&C KALIBRASI CEMS ANALYZER UNIT 1                                     2          3.50
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 1                                     2   2.00
PM I&C CABNET CWP AREA                                                             2   2.00
PM I&C STEAM DRUM UNIT 2                                                           2   2.08
PM I&C KALIBRASI COAL FEEDER C UNIT 2                                              2   3.17
PM I&C KALIBRASI COAL FEEDER D UNIT 2                                              2   3.17
PM I&C PAF,FDF & IDF SYSTEM UNIT 2                                                 3   4.00
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 2                                     2   2.00
CORRECTIVE
Inspection the Bucket Elevator A of Unit 1 - Indication Proximity Sensor
                                                                                   2   3.00
Abnormal
Inspection the Limit Switch of Diverter Gate Ash Crusher B Unit 2 - Limit Switch
                                                                                   2   3.00
Abnormal
Inspection the Beltsway Sensor of C1 - False Indication                            2   4.00
Unit 1, Tiny 1 Not OK (Flame Abnormal, intensity can't read)                       2   4.00
Coal, SU 2 Wire Rope Can't Up and Down                                             2   5.00
SPONSOR WORK
Replace the tube leakage sensor of boiler unit 1   2   4.00
Inspect pressure gauge of water treatment plant    2   6.00
                                                               Total Man Hou
                                                                Total Man Ho
                                                        Total Scheduled Utility
                                    8               5               6               6
Clock Hour   Man Hour     Senin          Selasa           Rabu            Kamis
                        13-May-24       14-May-24       15-May-24       16-May-24
  0:30         4.5        4.50            4.50            4.50            4.50
  0:30         4.5        4.50            4.50            4.50            4.50
  2:00          4                                                         4.00
  2:00          18
  4:00         8.00       8.00
  4:00         8.00
  3:30         7.00       7.00
  3:30         7.00                       7.00
  5:55        11.83                                       11.83
  4:00         8.00                                                       8.00
  4:00         8.00                                                       8.00
  4:00         8.00
  7:30        15.00       7.50            7.50
  3:10         6.33       6.33
  3:10         6.33                       6.33
  4:00         8.00
  3:30         7.00       3.50            3.50
2:00   4.00                          4.00
2:00   4.00                  4.00
2:05   4.17    4.17
3:10   6.33                          6.33
3:10   6.33                  6.33
4:00   12.00                 12.00
2:00   4.00                          4.00
3:00   6.00    6.00
3:00   6.00    6.00
4:00   8.00           8.00
4:00   8.00                  8.00
5:00   10.00
           4:00         8.00                                  8.00
           6:00         12.00                                               6.00
                                    57.50       41.33         59.17        49.33
      Total Man Hours Scheduled
                                    58.5         58.5         58.5          58.5
        Total Man Hours Available
Total Scheduled Utility Man Hours   98%         70.66%       101.14%       84.33%
                                            9            9             9            9
            4
  Jumat         Column1     Column2                   Remarks
17-May-24       18-May-24   19-May-24
  4.50
  4.50
  18.00
                                        Cleaning, Tightening, Visual Check
                                        Equipment
  8.00                                  Cleaning, tightening, visual check
                                        Cleaning, Tightening, Visual Check
                                        Equipment
                                        -Dirty panel and sensor
                                        -Cleanning and tightening
                                        termination
                                        -Finish
                                        cleaning, tifghtning, visual cek
                                        equipment and panel box
                                        cleaning, tightning, visual cek
                                        equipment and panel box
  8.00                                  Cleaning, tightening,
                                        Cleaning, Tethening, visual check
                                        Calibration
                                        Finish
  8.00                                  Visual check, ack
                                        Cleaning tightening visual check
                                        equipment
        Replace Sensor Alaram no.9
        Cleaning, tightening, visual check
        equipment and panel
        Cleaning, tethening,visual check
        Calibration
        Finish
        Calibration, cleaning ,visual check
        equipment
        The calibration results are
        attached
        Cleaning, tethening, visual check
        Cleaning, tethening , visual check
        -Indication error
        -Proximity error, Replace
        proximity
        -Finish
        "-Not have indication
        -Limit switch broken,Replace limit
        switch
        -Finish
        -Indication error
        -Limit switch corotion and not
        have lever
        -Replace belt sway
        -Finish
        -position inner side of flame
        -position of flame
        -need setting position of flame
        -self test by I&C about equipment
        fllame detector like module and
        fiber optic are good condition
        -fuse 400V hoist motor is loose
10.00   -vibration
        -tightning fuse 400V
        -finish
 6.00
57.00
 58.5
97.44%
         9
Status WO    Status Permit
                               PIC
SPS signed      Close        Operator
SPS signed      Close        Operator
SPS signed      Close        Operator
SPS signed      Close        Operator
  Inprg         Close        Operator
  Inprg         Close        Operator
SPS signed      Close        Operator
SPS signed      Close        Operator
SPS signed      Close        Operator
  Inprg        Hreview         HSE
SPS signed      Close        Operator
SPS signed      Close        Operator
  Inprg        Close      HSE
SPS signed     Close    Operator
SPS signed     Close    Operator
  Inprg        Close      HSE
SPS signed     Close    Operator
SPS signed     Close    Operator
  Inprg        Close      HSE
SPS signed     Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
  Inprg      WDREVIEW   Eksekutor
                                                             WEEKLY MAINTENANCE SCHEDULE W
                                                             PEMELIHARAAN KONTROL & INSTRU
No   WO No.   No Work Order   Work Type      No PM/SR         Division   Area
1     6615    KB1-24-501773      PM       PM-KK-HKIBP-0005      HKI       BOP
2     6616    KB1-24-501774      PM       PM-KK-HKIBP-0012      HKI       BOP
3     6617    KB1-24-501775      PM       PM-KK-HKIEP-0001      HKI       CH
4     6618    KB1-24-501776      PM       PM-KK-HKIEP-0002      HKI       CH
5     6619    KB1-24-501777      PM       PM-KK-HKIEP-0016      HKI       ASH
6     6620    KB1-24-501778      PM       PM-KK-HKIEP-0018      HKI       ASH
7     6621    KB1-24-501779      PM       PM-KK-HKIEP-0020      HKI       CH
8     6622    KB1-24-501780      PM       PM-KK-HKIU-0005       HKI      UNIT 1
9     6624    KB1-24-501782      PM       PM-KK-HKIU-0011       HKI      UNIT 1
10   6625   KB1-24-501783   PM    PM-KK-HKIU-0017   HKI   UNIT 1
11   6626   KB1-24-501784   PM    PM-KK-HKIU-0019   HKI   UNIT 1
12   6629   KB1-24-501787   PM    PM-KK-HKIU-0037   HKI   UNIT 1
13   6631   KB1-24-501789   PM    PM-KK-HKIU-0045   HKI   UNIT 1
14   6633   KB1-24-501791   PM    PM-KK-HKIU-0053   HKI   UNIT 1
15   6623   KB1-24-501781   PM    PM-KK-HKIU-0010   HKI   UNIT 2
16   6630   KB1-24-501788   PM    PM-KK-HKIU-0040   HKI   UNIT 2
17   6632   KB1-24-501790   PM    PM-KK-HKIU-0046   HKI   UNIT 2
18   6634   KB1-24-501792   PM    PM-KK-HKIU-0054   HKI   UNIT 2
1    6876   KB1-24-000634   CD     SR-24-000993     HKI    CH
2    3216   KB1-23-000551   RTF    SR-23-000765     HKI   UNIT 2
3    6886   KB1-24-000644   CD     SR-24-001043     HKI   UNIT 2
4    6740   KB1-24-000622   CD                      HKI   Unit1
5   6741   KB1-24-000623   CD   HKI   Unit1
6   6888   KB1-24-000646   CM   HKI    CH
2
NTENANCE SCHEDULE WEEK 21 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                                      Job Description                      Crew Size   Duration
         Breafing Pagi                                                        9          0.5
         Sholat ashar                                                         9          0.5
         Fire Fighting Test                                                   2           2
         Kegiatan Budaya Kalbar 1                                             9          1.5
         PM
         PM I&C BOP CONTROL ROOM DCS SYSTEM & CONTROL CABINET                 2          3.00
         PM I&C STEAM AND WATER SAMPLING AND ANALYZING AND DOSING SYSTEM      2          4.00
         PM I&C SHIP UNLOADER 1&2                                             3          4.50
         PM I&C BC1 & BC2 CONVEYOR                                            3          8.00
         PM I&C BOTTOM ASH SYSTEM UNIT 2                                      2          4.00
         PM I&C ESP & FLY ASH SYSTEM UNIT 2                                   2          4.00
         PM I&C COAL SAMPLING BELT CONVEYOR BC-2                              2          3.00
         PM I&C LOCAL TURBIN UNIT 1                                           2          5.67
         PM I&C FUNCTION TEST - SOOT BLOWER UNIT 1                            2          7.42
PM I&C FEED WATER SYSTEM UNIT 1                                               3   2.17
PM I&C CONDENSATE WATER SYSTEM UNIT 1                                         3   2.42
PM I&C ASSET MANAGEMENT SYSTEM UNIT 1                                         2   4.00
PM I&C FLAME DETECTION SYSTEM UNIT 1                                          2   2.00
PM I&C FUEL OIL BOILER AREA UNIT 1                                            2   2.00
PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 2                                  2   7.50
PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 2                                   2   4.00
PM I&C FLAME DETECTION SYSTEM UNIT 2                                          2   2.00
PM I&C FUEL OIL BOILER AREA UNIT 2                                            2   2.00
CORRECTIVE
Coal - Traveling MS C2 limit switch number 1 broken                           2   4.00
Unit 2, CEMS, NOx parameter value in DCS CCR is not the same (an indication
that the PC DCS CCR has not been converted to a NOx value) and the SO2        2   4.00
parameter value in the DCS CCR is not the same
UNIT 2, Oil gun AB 2 selenoid valve cannot full close (leakthru)              2   3.00
UNIT 1, Tiny 2 Not OK (Flame Abnormal, intensity can't read)                  2   3.00
UNIT 1, Tiny 3 Not OK ( Flame Abnormal)                            2   3.00
Coal, Proximity Coal plough bunker No.11 (bunker 4 line B) error   2   3.00
SPONSOR WORK
Inspection Flame Detector of Tiny Oil Gun #2                       2   8.00
Supporting HM Inspection Mill 1A                                   2   6.00
                                                                               Total Man Hours S
                                                                                Total Man Hours
                                                                        Total Scheduled Utility Ma
                                    12               9               9               3
Clock Hour   Man Hour     Senin           Selasa           Rabu            Kamis
                        20-May-24        21-May-24       22-May-24       23-May-24
  0:30         4.5        4.50             4.50            4.50
  0:30         4.5        4.50             4.50            4.50
  2:00          4                                                          4.00
  1:30         13.5
  3:00         6.00       6.00
  4:00         8.00                                        8.00
  4:30        13.50       6.75             6.75
  8:00        24.00       12.00            12.00
  4:00         8.00                                        8.00
  4:00         8.00                                        8.00
  3:00         6.00       6.00
  5:40        11.33                        5.67            5.67
  7:25        14.83       4.94             4.94            4.94
2:10   6.50    6.50
2:25   7.25    7.25
4:00   8.00                         8.00
2:00   4.00           4.00
2:00   4.00                  4.00
7:30   15.00                        7.50
4:00   8.00
2:00   4.00           4.00
2:00   4.00                  4.00
4:00   8.00    8.00
4:00   8.00           4.00   4.00
3:00   6.00                  6.00
3:00   6.00    6.00
           3:00         6.00        6.00
           3:00         6.00                                               6.00
          Err:507      Err:507
           8:00         16.00       8.00         8.00
           6:00         12.00       6.00         6.00
                                    92.44       64.36        61.61         25.50
      Total Man Hours Scheduled
                                     72          72           72            16
        Total Man Hours Available
Total Scheduled Utility Man Hours   128%        89.39%       85.57%       159.38%
                                            9            9            9             2
            2
  Jumat                      Remarks                 Status WO    Status Permit     PIC
24-May-24
                Cleaning equipment dan filter fan,
                                                     SPS signed      Close        Operator
                tightening, visual check
                Cleaning, tightening, visyal check
                                                     SPS signed      Close        Operator
                equipment
                Cleaning and tightening
                                                     SPS signed      Close        Operator
                sensor/panel
                -Wire pullcord 4pcs corotion and
                broken
                                                     SPS signed      Close        Operator
                -Replace 180M wirerope
                -Finish
                Cleaning and tightening
                                                     SPS signed      Close        Operator
                sensor/panel
                -Hoise supply air transporter 2A
                and 2B broken/leak
                                                     SPS signed      Close        Operator
                -Replace hoise
                -Finish
                Cleaning, tightening, run test,
                                                     SPS signed      Close        Operator
                visual check
                Cleaning, tethening, visuak check    SPS signed      Close        Operator
                Check limit switch
                Cleaning                             SPS signed      Close        Operator
                Consumable : 1 Kg
       Cleaning, Visual check, Tethening   SPS signed    Close    Operator
       Cleaning, Visual check, Tethening   SPS signed    Close    Operator
       ACK Alarm                           SPS signed    Close    Operator
       cleaning, tightning, visual cek
                                           SPS signed    Close    Operator
       panel and equipment
       Check PI
       Check flow meter                    SPS signed    Close    Operator
       Consumable : majun 0,5 kg
       -AB 1 flame no indication
       CD 1 valve purging cannot be
       opened locally and DCS
       CD 3 flame reads only up to 10
7.50   locally, needs further checking     SPS signed    Close    Operator
       Tiny 1 no flame read
       Tiny 2 valve hsd no open
       Tiny
       -function test
8.00                                         Inprg      Hreview     HSE
       Tes flame, cleaning, visuak check   SPS signed    Close    Operator
       Check PI
       Check flow meter                    SPS signed    Close    Operator
       Consumable : majun 0,5 kg
       -Cant traveling auto
       -LS corotion                          Inprg       Close    Operator
       -Replace limit switch
       -Indication NO not same dcs and
       local
                                             Inprg       Close    Operator
       -Splitter broken
       -Replace splitter
                                             Inprg      Wstart    Executor
                                             Inprg      Wstart    Executor
                                          Inprg   Wstart   Executor
              -proximity sensor broken
              -left time                  Inprg   Close    Operator
              -replace proximity sensor
 15.50
  14
110.71%
          2
                                               Job Description
No   WO No.   No Work Order
                              Breafing Pagi
                              Sholat ashar
                              Fire Fighting Test
                              Kegiatan Budaya Kalbar 1
                              PM
                              PM I&C BOILER MAKE UP WATER TREATMENT
1     6764    KB1-24-501879   PLAN (REGENERATION AND NETRALIZING SYST
                              EM)
2     6765    KB1-24-501880   PM PM I&C UF SYSTEM
3     6766    KB1-24-501881   PM I&C SWRO SYSTEM
4     6767    KB1-24-501882   PM I&C BWRO SYSTEM
5     6768    KB1-24-501883   PM I&C COMPRESSOR & DRYER
6     6769    KB1-24-501884   PM I&C COARSE ASH SILO SYSTEM
7     6770    KB1-24-501885   PM I&C FINE FLY ASH SILO
8     6771    KB1-24-501886   PM I&C 12W COMBINED AIR DRYER 1
                              PM I&C WORK STATION AND DCS CABINET
9     6787    KB1-24-501902
                              COAL HANDLING
                            PM I&C WORK STATION AND DCS CABINET ASH
10   6788   KB1-24-501903
                            HANDLING
11   6774   KB1-24-501889   PM I&C LOCAL BOILER UNIT 1
12   6776   KB1-24-501891   PM I&C STEAM DRUM UNIT 1
13   6627   KB1-24-501785   PM I&C KALIBRASI COAL FEEDER B UNIT 1
14   6628   KB1-24-501786   PM I&C KALIBRASI COAL FEEDER C UNIT 1
15   6779   KB1-24-501894   PM I&C PAF,FDF & IDF SYSTEM UNIT 1
                            PM I&C AIR PREHEATER & OXYGEN ANALYZER
16   6781   KB1-24-501896
                            SYSTEM UNIT 1
                            PM I&C FLAME DETECTOR COOLING AIR AND
17   6783   KB1-24-501898
                            SEAL AIR FAN A - B UNIT 1
18   6785   KB1-24-501900   PM I&C CEMS ANALYZER UNIT 1
                            PM I&C WORKSTATION & CABINET DCS UNIT
19   6772   KB1-24-501887
                            UNIT 2
                            PM I&C MEDIUM SPEED MILL & ELECTRIC COAL
20   6773   KB1-24-501888
                            FEEDER A-D UNIT 2
21   6482   KB1-24-501685   PM I&C LOCAL BOILER UNIT 2
                            PM I&C 2000 JAM MEDIUM SPEED MILL B UNIT
22   6777   KB1-24-501892
                            2
                            PM I&C DCS SYSTEM MANAGEMENT HANDLER
23   6780   KB1-24-501895
                            UNIT 2
                            PM I&C PM I&C AIR PREHEATER & OXYGEN
24   6782   KB1-24-501897
                            ANALYZER SYSTEM UNIT 2
                            PM I&C FLAME DETECTOR COOLING AIR AND
25   6784   KB1-24-501899
                            SEAL AIR FAN A - B UNIT 2
26   6786   KB1-24-501901   PM I&C CEMS ANALYZER UNIT 2
                            CORRECTIVE
                           UNIT 2, VACUM PUMP A TEMP NO 3 CAN NOT
1   6885   KB1-24-000643
                           BE READ
2   6883   KB1-24-000641   Coal - C2A pull-chord switch broken
                           UNIT 1 - BFP 1B Vibration Parameters on DE
3   6574   KB1-24-000587
                           Side Are Not Readable
                           Coal - Coal plough no 1 ( bunker 1 line A ) can't
4   7026   KB1-24-000664
                           up/dwon DCS
                           Unit 1- DP Debris 1A DCS and local values are
5   7025   KB1-24-000663
                           different
                           SPONSOR WORK
1                          Inspection CCTV in Furnace Boiler Unit 1
2                          Check boiler body temperature Unit 1
                                                Total Man Hours Scheduled
                                                 Total Man Hours Available
                                        Total Scheduled Utility Man Hours
             Remarks                           Tools             Consumable
cleaning, tightning, visual cek
                                                                               SPS signed
panel box and equipment
cleaning, tightning, visual cek
                                                                               SPS signed
equipment and panel box
                                       - Tool set
                                       - tang potong
                                                            - Majun 0.5kg
                                       - multimeter Fluke
cleaning, tightning,visual cek                              - Kuas 2 pcs
                                       17B
equipment and panel box                                     - Contact Cleaner 0.4
                                       - obeng - +
                                                            - WD 0.4
                                       - Tool set
                                       - tang potong
                                                            - Majun 0.5kg
                                       - multimeter Fluke
cleaning, tightning, visual cek                             - Kuas 2 pcs
                                       17B
panel box and equipment                                     - Contact Cleaner 0.4
                                       - obeng - +
                                                            - WD 0.4
cleaning, tightning, visual cek panl
                                                                               SPS signed
box and equipment
Cleanning and tightening
                                                                               SPS signed
termination sensor or panel
Cleanning and tightening
                                                                               SPS signed
termination sensor or panel
cleaning, tigthning, visual cek
                                                                               SPS signed
equipment and panel box
cleaning, tightning, visual cek
                                                                               SPS signed
terminasi cabinet
cleaning, tightning, visual cek
                                                                          SPS signed
terminasi cabinet
cleaning, tigthning, visual cek
                                                                          SPS signed
panel box and equipment
cleaning, tightning, visual cek
                                                                          SPS signed
equipment and panel box
span weight 80kg/m                                                        SPS signed
span weight 80kg/m                                                        SPS signed
cleaning, tightning, visual cek
                                                                          SPS signed
equipment and panel box
cleaning, tigthning, visual cek
                                                                          SPS signed
equipment and panel box
cleaning, tightning, visual cek
                                                                          SPS signed
panel box and equipment
                                                       - Majun 0.5kg
                                  - Tool set
cleaning, tightning, visual cek                        - Kuas 2 pcs
                                  - Multimeter Fluke
panel box and equipment                                - Contact Cleaner 0.4
                                  17B
                                                       - WD 0.4
cleaning, tightning, visual cek
                                                                          SPS signed
terminasi cabinet
                                                       - Majun 0.5kg
cleaning, tightning, visual cek                        - Kuas 2 pcs
                                  tool set
panel box and equipment                                - Contact Cleaner 0.4
                                                       - WD 0.4
cleaning, tightning, visual cek
                                                                          SPS signed
equipment and panel box
                                                       - Majun 0.5kg
cleaning, tightning, visual cek                        - Kuas 2 pcs
                                  tool set
equipment and panel box                                - Contact Cleaner 0.4
                                                       - WD 0.4
ACK alarm on CP                                                           SPS signed
cleaning, tightning, visual cek
                                                                          SPS signed
panel box and equipment
cleaning, tightning, visual cek
                                                                          SPS signed
equipment and panel box
                                                       - Majun 0.5kg
                                  - Tool set
cleaning, tightning, visual cek                        - Kuas 2 pcs
                                  - Multimeter Fluke
panel box and equipment                                - Contact Cleaner 0.4
                                  17B
                                                       - WD 0.4
                                      - Tool set
-Temperature winding 3 hunting                             - Majun 0.5kg
                                      - tang potong
-Termination dirty                                         - Kuas 2 pcs
                                      - multimeter Fluke
-Change chanel                                             - Contact Cleaner 0.4
                                      17B
-Finish                                                    - WD 0.4
                                      - obeng - +
                                      - Tool set
-Sensor not detect                    - tang potong        - Majun 0.5kg
-Proximty broken                      - multimeter Fluke   - Kuas 2 pcs
-Replace proximity                    17B                  - Contact Cleaner 0.4
-Finish                               - obeng - +          - WD 0.4
                                      - kunci pas 13,10
-sensor proximity broken
-exposed to pump shaft
                                                                              LE signed
-Replace new sensor proximity
-finish
-selector remote in local panel box
is broken
-left time                                                                    LE signed
-replace new selector
-finish
-splitter 4-20 mA is broken, input
4,3 mA, output 7.4 mA                                                         LE signed
-left time
-Replace new Spitter
-finish
                 0                                                                 ###
No   WO     No Work Order                 Job Description
     No.
                            PM
                            PM I&C BOILER MAKE UP WATER TREATMENT PL
1    6913   KB1-24-501985
                            AN (ANION, KATION,MIXEDBED)
                            PM I&C COAL CONTAMINATED WASTE WATER
2    6914   KB1-24-501986
                            SYSTEM
                            PM I&C INDUSTRIAL WASTE WATER TREATMENT
3    6915   KB1-24-501987
                            AND UNIT DRAIN PIT
4    6916   KB1-24-501988 PM I&C SANITARY SEWAGE TREATMENT SYSTEM
5    6917   KB1-24-501989 PM I&C BELT CONVEYOR C-1
                            PM I&C CONVEYOR C3 DAN DUST COLLECTOR
6    6918   KB1-24-501990
                            AREA CRUSHER HOUSE
7    6919   KB1-24-501991 PM I&C CONVEYOR C4 AREA COAL BUNGKER
8    6920   KB1-24-501992 PM I&C DUST COLLECTOR AREA BUNKER
9    6921   KB1-24-501993 PM I&C STACKER RECLAIMER
10   6922   KB1-24-501994 PM I&C 12W COMBINED AIR DRYER 2
11   6923   KB1-24-501995 PM I&C 52W COMBINED AIR DRYER 1
12   6925   KB1-24-501997 PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 1
                            PM I&C DCS STEAM TURBINE SUPERVISORY UNIT
13   6931   KB1-24-502003
                            1
                            PM I&C SUPERHEATER & DESUPERHEATER
14   6932   KB1-24-502004
                            SYSTEM UNIT 1
                            PM I&C REHEATER & SPARE DESUPERHEATER
15   6934   KB1-24-502006
                            SYSTEM UNIT 1
16   6924   KB1-24-501996 PM I&C LOCAL TURBIN UNIT 2
17   6926   KB1-24-501998 PM I&C FUNCTION TEST - SOOT BLOWER UNIT 2
18   6927   KB1-24-501999 PM I&C 2000 JAM MEDIUM SPEED MILL A UNIT 2
19   6928   KB1-24-502000 PM I&C FEED WATER SYSTEM UNIT 2
20   6929   KB1-24-502001 PM I&C CONDENSATE WATER SYSTEM UNIT 2
21   6930   KB1-24-502002 PM I&C ASSET MANAGEMENT SYSTEM UNIT 2
                            PM I&C SUPERHEATER & DESUPERHEATER
22   6933   KB1-24-502005
                            SYSTEM UNIT 2
                            PM I&C REHEATER & SPARE DESUPERHEATER
23   6935   KB1-24-502007
                            SYSTEM UNIT 2
                            CORRECTIVE
1    7178   KB1-24-000695 Unit 2 CCWP B Strainer inlet indication DP H
                            Valve UF Backwash Sodium Inlet Control cant
2    7177   KB1-24-000694
                            open
                          Unit 2 For the PI on Filter 2 EH regen it cannot be
                          read, it is possible that the PI has an error or
3    7185   KB1-24-000702
                          there is a blockage on the EH regen to filter
                          number 2 line
                            ASH - Crusher Bottom Ash Silo Unit 2, Coil
4    6742   KB1-24-000624
                            Diverter Gate Can't be Operation
                            Unit 2, Valve pneumatik supply water bottom ash
5    7180   KB1-24-000697
                            (wet) can't operation
                            Unit 2,The indication is that the AB 2 oil gun
6    7182   KB1-24-000699
                            pneumatic valve is leaking
SPONSOR WORK
                Total Man Hours Scheduled
                  Total Man Hours Available
          Total Scheduled Utility Man Hours
            Remarks               Status WO   Status Permit
                                                                 PIC
Check Visual
Cleaning
Check parameter                   LE signed      Close        Eksekutor
Consumable : Majun 1/2 kg
Cleaning
Check parameter
                                  LE signed      Close        Eksekutor
Consumable : Majun1/2 kg
Cleaning
Check Parameter
                                  LE signed      Close        Eksekutor
Consumable : Majun 1/2 kg
Cleaning
Check Parameter
                                  LE signed      Close        Eksekutor
Consumable : 1/2 Kg
Cleaning
Check parameter
                                  LE signed      Close        Eksekutor
Consumable : 1/2 kg
Cleaning
Check parameter
Check selenoid
Check PLC                         LE signed      Close        Eksekutor
Tightening terminasi
Consumable : Majun 1 kg
Cleaning
Check sensor
Check instrumensasi panel
Tightening terminasi              LE signed      Close        Eksekutor
Consumable : Majun 1 Kg, Kuas 2
Pcs
-finding:dust collector no 7 not
stanndby because leak in the line
-Cleaning
Check Parameter
Check selenoid
                                        LE signed       Close       Eksekutor
Check Termination
Check instrumensasi panel
Consumable : Majun 1 kg, Kuas 2
pcs
Cleaning instrumensasi
Check Sensor
Check terminasi
                                        LE signed       Close       Eksekutor
Consumable : Majun 1 kg, Kuas 2
pcs
Cleaning Instrumensasi
Check Selenoid
Check pneumatic
Check parameter
Check Sensor                            LE signed       Close       Eksekutor
Check termination
Consumable : Majun 1 Kg, Kuas 2
pcs
Cleaning instrumansasi
Check sensor
Check parameter
Check selenoid
Check pneumatic                         LE signed       Close       Eksekutor
Check termination
Consumable : Majun 1 kg, Kuas 2
pcs
finding: AB 1 : Selenoid Oil valve is
damaged, CD 1 : Oil gun not full          Inprg      HSELWDreview     HSE
Insert (No Air Hose)
Checking Parameters, cleaning ,
                                        SPS signed      Close       Operator
tethening, visual check
cleaning , tethening, visual check      SPS signed      Close       Operator
cleaning , tethening, visual check      SPS signed      Close       Operator
Cleaning, tethening, visual check       SPS signed      Close       Operator
Cleaning
Check limit switch
Check control instrumensasi
Check terminasition                   LE signed       Close       Eksekutor
Consumable : Majun 1 kg, Kuas 2
pcs, WD 1 pcs
cleaning , tethening, visual check    SPS signed      Close       Operator
cleaning, tightning, visual cek
                                      SPS signed      Close       Operator
equipment and panel box
cleaning , tethening, visual check    SPS signed      Close       Operator
cleaning, tigthning, visual cek
                                      SPS signed      Close       Operator
equipment and panel box
cleaning , tethening, visual check    SPS signed      Close       Operator
cleaning , tethening, visual check    SPS signed      Close       Operator
-DP H aktif
-Always aktif form Dcs                  Inprg      HSELWDreview     HSE
-Validasi Pressure (Aktual), Filter
dirty
-Finish
-Valve Cant Open
- Indication abnormal                   Inprg      HSELWDreview     HSE
-Recalibration valve
-need to check the actuator
-PI no reading
-Low Flow                               Inprg      HSELWDreview     HSE
-Validasi PI (Normal)
-Follow HM, need to check the
filter
coil broken,left time,replace
                                        Inprg       WDREVIEW      Eksekutor
coil,finish
coil broken,left time,replace
                                        Inprg       WDREVIEW      Eksekutor
coil,finish
-leakthrough in ball valve
-left time                              Inprg      HSELWDreview     HSE
-need replace valve
-rework
                                                         WEEKLY MAINTENANCE SCHEDULE WEEK 24 202
                                                         PEMELIHARAAN KONTROL & INSTRUMENT PLTU
No   WO No. No Work Order Work Type      No PM/SR         Division   Area
1     7072   KB1-24-502084   PM       PM-KK-HKIBP-0003      HKI       BOP
2     7073   KB1-24-502085   PM       PM-KK-HKIBP-0006      HKI       BOP
3                            PM       PM-KK-HKIBP-0013      HKI       BOP
4     7092   KB1-24-502104   PM       PM-KK-HKIBP-0014      HKI       BOP
5     7074   KB1-24-502086   PM       PM-KK-HKIEP-0004      HKI       CH
6     7075   KB1-24-502087   PM       PM-KK-HKIEP-0015      HKI      UNIT 1
7     7076   KB1-24-502088   PM       PM-KK-HKIEP-0017      HKI      UNIT 1
8     7077   KB1-24-502089   PM       PM-KK-HKIEP-0023      HKI      UNIT 1
9     7078   KB1-24-502090   PM       PM-KK-HKIU-0001       HKI      UNIT 1
10    7079   KB1-24-502091   PM       PM-KK-HKIU-0003       HKI      UNIT 1
11    7083   KB1-24-502095   PM       PM-KK-HKIU-0024       HKI      UNIT 1
12    7088   KB1-24-502100   PM       PM-KK-HKIU-0041       HKI      UNIT 1
13   7089   KB1-24-502101   PM   PM-KK-HKIU-0057   HKI   UNIT 1
14   7093   KB1-24-502105   PM   PM-KK-HKIU-0061   HKI   UNIT 1
15   6775   KB1-24-501890   PM   PM-KK-HKIU-0016   HKI   UNIT 2
16   7082   KB1-24-502094   PM   PM-KK-HKIU-0022   HKI   UNIT 2
17   6778   KB1-24-501893   PM   PM-KK-HKIU-0032   HKI   UNIT 2
18   7087   KB1-24-502099   PM   PM-KK-HKIU-0036   HKI   UNIT 2
19   7090   KB1-24-502102   PM   PM-KK-HKIU-0058   HKI   UNIT 2
1    5219   KB1-24-000349   CM    SR-24-000345     HKI    BOP
2    7179   KB1-24-000696   CD    SR-24-001274     HKI   UNIT 1
3    7184   KB1-24-000701   CD    SR-24-001273     HKI    CH
4    7181   KB1-24-000698   CM    SR-24-001248     HKI    BOP
5    7186   KB1-24-000703   CD    SR-24-001276     HKI   UNIT 2
6    7334   KB1-24-000721   CD                     HKI    CH
7    7346   KB1-24-000733   CD                     HKI   UNIT 1
2
MAINTENANCE SCHEDULE WEEK 24 2024
ARAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                                                                                                           8
                              Job Description                Crew Duration Clock Hour Man Hour     Senin
                                                             Size
                                                                                                 10-Jun-24
         Breafing Pagi                                        9      0.5      0:30      4.5        4.50
         Sholat ashar                                         9      0.5      0:30      4.5        4.50
         Fire Fighting Test                                   2      2        2:00       4
         Kegiatan Budaya Kalbar 1                             9      1.5      1:30     13.5
         Training                                             1      4        4:00       4
         PM
         PM I&C SODIUM HYPOCHLORITE GENERATION SYSTEM         2     4.00      4:00     8.00        8.00
         PM I&C RAW WATER PRE TREATMENT SYSTEM ( SETTLING
         BASIN, V BASIN, SEA WATER RESERVOIR) AND PUMP        2     4.00      4:00     8.00
         HOUSE
         PM I&C FUEL OIL PUMP HOUSE AND OIL CONTAMINATED
                                                              2     3.50      3:30     7.00        7.00
         WASTE WATER PLANT
         PM I&C AUXILIARY
                                                              2     3.50      3:30     7.00
         BOILER/PM INSTRUMENTASI AUXILIARY BOILER
         PM I&C CONVEYOR C2 DAN DUST COLLECTOR AREA C2        2     5.92      5:55     11.83
         PM I&C BOTTOM ASH SYSTEM UNIT 1                      2     4.00      4:00     8.00
         PM I&C ESP & FLY ASH SYSTEM UNIT 1                   2     4.00      4:00     8.00
         PM I&C 12W COMBINED AIR DRYER 3                      2     4.00      4:00     8.00
         PM I&C WORKSTATION & CABINET DCS UNIT UNIT 1         2     4.00      4:00     8.00
         PM I&C MEDIUM SPEED MILL & COAL FEEDER A-D UNIT 1    2     7.50      7:30     15.00       7.50
         PM I&C 2000 JAM MEDIUM SPEED MILL C UNIT 1           2     4.08      4:05     8.17        4.08
         PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 1          2     4.00      4:00     8.00
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 1                 2   2.00    2:00      4.00
PM I&C CABNET CWP AREA                                         2   2.00    2:00      4.00
PM I&C KALIBRASI COAL FEEDER A UNIT 2                          2   3.17    3:10      6.33     6.33
PM I&C STEAM DRUM UNIT 2                                       2   2.08    2:05      4.17     4.17
PM I&C KALIBRASI COAL FEEDER B UNIT 2                          2   3.17    3:10      6.33
PM I&C PAF,FDF & IDF SYSTEM UNIT 2                             3   4.00    4:00     12.00
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 2                 2   2.00    2:00      4.00
CORRECTIVE
BOP, The sensor light in the UF A turbidity outlet is off or
                                                               2   4.00    4:00      8.00
does not turn on
UNIT 1, Motor Bearing CEP 1B No.1 Indikasi Bad In DCS          2   4.00    4:00      8.00
Coal, The CCTV Monitor In The SU2 Roller Drum Area Was
                                                               2   3.00    3:00      6.00     6.00
Damaged
BOP - Coal Waste Boosting Pump, Pressure Gauge Indicator
                                                               2   4.00    4:00      8.00
a Error
Unit 2, Mill A Outlet Temperature #1 Error indication          2   3.00    3:00      6.00     6.00
Coal - The diverter gate limit switch cable from C2B to
                                                               2   4.00   Err:507   Err:507
Roller Screen B short
UNIT 1 - LTE #1 STEAM SOOTBLOWER CANT START AND
                                                               2   4.00   Err:507   Err:507
FAULT INDICATION
SPONSOR WORK
Inspection CCTV in Furnace Boiler Unit 1                       2   3.00    3:00      6.00
Blow Pressure Transmitter of Header Hot Primary Air No.1
                                                               2   3.00    3:00      6.00
Unit 1
                                    58.08
      Total Man Hours Scheduled
                                    58.5
        Total Man Hours Available
Total Scheduled Utility Man Hours   99%
                                            9
          7           6           5           5
 Selasa       Rabu        Kamis       Jumat                    Remarks                  Status WO
11-Jun-24 12-Jun-24 13-Jun-24 14-Jun-24
  4.50        4.50        4.50        4.50
  4.50        4.50        4.50        4.50
                          4.00
                                      13.50
                          4.00        4.00
                                                  Cleaning, tightening, visual check      Close
                                                  cleaning, tightning, visual cek
                                      8.00                                                Close
                                                  equipment and panel box
                                                  cleaning, tightning, visual cek
  7.00                                                                                    Close
                                                  equipment and panel box
                                                  cleaning, tightning, visual cek
              11.83                                                                       Close
                                                  panel box and equipment
                                                  cleaning, tightning, visual cek
                          8.00                                                            Close
                                                  equipment and panel box
                                                  cleaning, tightning, visual cek
                          8.00                                                            Close
                                                  equipment and panel box
                                                  cleaning, tightning, visual cek
  8.00                                                                                    Close
                                                  equipment and panel box
                                      8.00        cleaning panel cabinet                  Close
                                                  cleaning, tightning, visual cek
  7.50                                                                                    Close
                                                  equipment and panel box
                                                  Cleaning, tightening, visual check,
  4.08                                                                                    Close
                                                  equipment
                                      8.00        ack alarm on CP                         Close
                                    -boiler sensor leakage number 15
                                    active
                    4.00            -tube leakage is actual, local        Close
                                    indicator area is noise
                                    -need  repair
                                    cleaning,      tube boiler,
                                               tigthning, visualFinish
                                                                 cek
           4.00                                                           Close
                                    cabinet  and   equipment
                                    -load cell broken, measurement
                                    value resistance is abnormal
                                    -to hot area inside coal feeder       Close
                                    -Replace 2 pcs Load cell and
                                    calibrate, tightning,
                                    cleaning,   Finish    visual cek
                                                                          Close
                                    equipment and panel box
 6.33                               Calibrasi, normal                     Inprg
                                    cleaning, tightning, visual cek
          12.00                                                           Close
                                    equipment and panel box
                                    -PC still waiting material
                    4.00            -broken                               Close
                                    -replace board PC, Finish
                                    -Sensor nothing read actual
                                    -Sensor dirty
 8.00                               -the sensor needs to be calibrated    Comp
                                    -Nothing buffer for calibrated span
                                    and need buffer for span
                                    -Io bad
           8.00                     -Losses termination                   Comp
                                    -Tightening, Finish
                                   -monitor LCD broken
                                   -left time                             Comp
                                   -Validasi pressure Finish
                                   -replace monitor,   gauge
                                   -Nothing
                                   -Temperature
                                   -validasi       read error
                    8.00           -Termocouple    Broken                 Comp
                                   -Pressure gauge   good
                                   -Replace sensor Termocouple
                                   -Trip
                                   -Finish (after replace = indication
                                   -Cable                                 Comp
                                   normal)broken and proximity
                                   broken
Err:507   Err:507                  -Replace and isolation                 Comp
                                   -cant
                                   -finishstart
                                   -fault
                           Err:507 -reset fault                           Comp
                                   -finish
                            6.00
           6.00
53.92        54.83        49.00         60.50
 58.5         58.5         58.5         58.5
92.17%       93.73%       83.76%       103.42%
         9            9            9            9
Status Permit   PIC
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
HSELWDreview   HSE
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
No   WO No.   No Work Order                 Job Description                Crew Duratio Clock
                                                                           Size   n     Hour
                              PM
                              PM I&C STEAM AND WATER SAMPLING AND
1     7218    KB1-24-502182                                                 2    4.00   4:00
                              ANALYZING AND DOSING SYSTEM
2     7219    KB1-24-502183 PM I&C SHIP UNLOADER 1&2                        3    4.50   4:30
3     7220    KB1-24-502184 PM I&C BC1 & BC2 CONVEYOR                       3    8.00   8:00
4     7221    KB1-24-502185 PM I&C BOTTOM ASH SYSTEM UNIT 2                 2    4.00   4:00
5     7222    KB1-24-502186 PM I&C ESP & FLY ASH SYSTEM UNIT 2              2    4.00   4:00
6     7224    KB1-24-502188 PM I&C LOCAL TURBIN UNIT 1                      2    5.67   5:40
7     7226    KB1-24-502190 PM I&C FUNCTION TEST - SOOT BLOWER UNIT 1       2    7.42   7:25
8     7081    KB1-24-502093 PM I&C KALIBRASI COAL FEEDER A UNIT 1           2    3.17   3:10
9     7227    KB1-24-502191 PM I&C FEED WATER SYSTEM UNIT 1                 3    2.17   2:10
10    7228    KB1-24-502192 PM I&C CONDENSATE WATER SYSTEM UNIT 1           3    2.42   2:25
                              PM I&C 2000 JAM MEDIUM SPEED MILL D UNIT
11    7229    KB1-24-502193                                                 2    4.08   4:05
                              1
12    7084    KB1-24-502096 PM I&C KALIBRASI COAL FEEDER D UNIT 1           2    3.17   3:10
13    7230    KB1-24-502194 PM I&C ASSET MANAGEMENT SYSTEM UNIT 1           2    4.00   4:00
14    7232    KB1-24-502196 PM I&C FLAME DETECTION SYSTEM UNIT 1            2    2.00   2:00
15    7225    KB1-24-502189 PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 2    2    7.50   7:30
16   7085   KB1-24-502097 PM I&C KALIBRASI COAL FEEDER C UNIT 2                 2    3.17    3:10
17   7086   KB1-24-502098 PM I&C KALIBRASI COAL FEEDER D UNIT 2                 2    3.17    3:10
                            PM I&C DCS STEAM TURBINE SUPERVISORY
18   7231   KB1-24-502195                                                       2    4.00    4:00
                            UNIT 2
19   7233   KB1-24-502197 PM I&C FLAME DETECTION SYSTEM UNIT 2                  2    2.00    2:00
                            CORRECTIVE
1    7189   KB1-24-000706 Coal, C4A Pull Chord Lever Sea Side is Broken         2    3.00    3:00
                            Unit 1 - The opening recirculation of the BFP 1B
2    7482   KB1-24-000751                                                       2    3.00    3:00
                            control valve cannot be 100% open
                            SPONSOR WORK
                            Supporting Repair Boiler Tube #1                    1    20.00 20:00
                            Start Up #1                                         2    5.00    5:00
                                                                                     Total Man Hours Scheduled
                                                                                       Total Man Hours Available
                                                                               Total Scheduled Utility Man Hours
              3           3           8           8                    7
Man Hour                                                    Jumat           Sabtu
             Senin      Selasa       Rabu       Kamis
           17-Jun-24   18-Jun-24   19-Jun-24   20-Jun-24   21-Jun-24       22-Jun-24
  8.00                               8.00
 13.50                               6.75        6.75
 24.00                              12.00       12.00
  8.00                                                       8.00
  8.00                                                       8.00
 11.33                               5.67
 14.83       4.94        4.94        4.94
  6.33                               6.33
  6.50                                            6.5
  7.25                                                       7.25
  8.17                                                       8.17
  6.33                                                                       6.33
  8.00                                           8.00
  4.00       4.00
 15.00                                            7.5         7.5
                6.33                                    6.33
                6.33
                8.00                                               4.0
                4.00                4.00
                6.00                                    6.00
                6.00                          6.00
               20.00       20.00    20.00     20.00     20.00
               10.00                                              10.00
                           28.94    28.94     82.69     90.08     61.92         6.33
tal Man Hours Scheduled
                            8        8         64        64        56            7
otal Man Hours Available
eduled Utility Man Hours   362%    361.81%   129.21%   140.76%   110.57%       90.48%
                            1        1          8         8                8            1
 Minggu                     Remarks                     Status WO   Status Permit
23-Jun-24
            cleaning, tightning, visual cek equipment
                                                          Close        Close
            and panel box
            cleaning, tightning, visual cek equipment
                                                          Close        Close
            and panel box
            -finding: 2 wirerope pullcord are broken
            -corrosive
                                                          Close        Close
            -spliced with clamp
            -finish
                                                          Inprg       Wfinish
                                                          Inprg       Wfinish
            cleaning, tightning, visual cek equipment
                                                          Close        Close
            and panel box
            cleaning, tightning, visual cek equipment
                                                        LE signed      Close
            and panel box
            Calibrasi                                   LE signed      Close
            cleaning, tightning, visual cek equipment
                                                          Close        Close
            and panel box
            cleaning, tethening, visual check           LE signed      Close
            Cleaning, tethening, visual check           LE signed      Close
            Calibrasi                                   LE signed      Close
            -finding: alarm on cp1003 and cp1011
            -ACK, but still alarm                         Close        Close
            -finish
            cleaning, tigthning, visual cek equipment
                                                        LE signed      Close
            and panel box
            -finding: AB1 Not OK (no flame) , CD1
            Not Ok (Selenoid purge broken & hose
                                                        LE signed      Close
            leak), CD3 Not OK (Not insert),
            -function test, finish
                                                          Inprg        Hreview
 6.33                                                     Inprg        Hreview
             indication check                            LE signed      Close
             cleaning, tightning, visual cek equipment
                                                         LE signed      Close
             and panel box
             -Pullcord bypass
             -Laver pullcord broken                       Inprg      HSELWDreview
             -Replace laver
             -finish
             -Cant full clos
             -Limit switch and stem Valve not touch
             -Adjustable
             -finish
 6.33
90.48%
         1
  PIC      Column1
executor
executor
executor
executor
executor
executor
executor
executor
executor
  HSE
  HSE
executor
executor
  HSE
No WO No. No Work Order                     Job Description       Crew Size
                                                                         Duration
                                                                               Clock Hour
                                                                                      Man Hour
                            Breafing Pagi                            9     0.5   0:30   4.5
                            Sholat ashar                             9     0.5   0:30    4.5
                            Fire Fighting Test                       2      2    2:00     4
                            Kegiatan Budaya Kalbar 1                 9     1.5   1:30   13.5
                            Performance Test #1                      1      2    2:00     2
                            PM
                          PM I&C BOILER MAKE UP WATER TREATMENT
1    7369   KB1-24-502285 PLAN (REGENERATION AND NETRALIZING SYST    2    4.00   4:00   8.00
                          EM)
2    7370   KB1-24-502286 PM PM I&C UF SYSTEM                        2    4.00   4:00   8.00
3    7371   KB1-24-502287 PM I&C SWRO SYSTEM                         2    4.00   4:00   8.00
4    7372   KB1-24-502288 PM I&C BWRO SYSTEM                         2    4.00   4:00   8.00
5    7373   KB1-24-502289 PM I&C COMPRESSOR & DRYER                  2    1.50   1:30   3.00
6    7374   KB1-24-502290 PM I&C COARSE ASH SILO SYSTEM              2    2.42   2:25   4.83
7    7375   KB1-24-502291 PM I&C FINE FLY ASH SILO                   2    2.42   2:25   4.83
                            PM I&C WORK STATION AND DCS CABINET
8    7390   KB1-24-502306                                            2    2.50   2:30   5.00
                            COAL HANDLING
                            PM I&C WORK STATION AND DCS CABINET
9    7391   KB1-24-502307                                            2   2.50   2:30   5.00
                            ASH HANDLING
10   7378   KB1-24-502294 PM I&C LOCAL BOILER UNIT 1                 2   4.00   4:00   8.00
11   7379   KB1-24-502295 PM I&C STEAM DRUM UNIT 1                   2   2.08   2:05   4.17
12   7382   KB1-24-502298 PM I&C PAF,FDF & IDF SYSTEM UNIT 1         3   4.00   4:00 12.00
                            PM I&C AIR PREHEATER & OXYGEN ANALYZER
13   7384   KB1-24-502300                                            2   2.00   2:00   4.00
                            SYSTEM UNIT 1
                            PM I&C FLAME DETECTOR COOLING AIR AND
14   7386   KB1-24-502302                                            2   2.00   2:00   4.00
                            SEAL AIR FAN A - B UNIT 1
15   7388   KB1-24-502304 PM I&C CEMS ANALYZER UNIT 1                2   4.00   4:00   8.00
                            PM I&C WORKSTATION & CABINET DCS UNIT
16   7376   KB1-24-502292                                            2   4.00   4:00   8.00
                            UNIT 2
                            PM I&C MEDIUM SPEED MILL & ELECTRIC
17   7377   KB1-24-502293                                            2   7.50   7:30 15.00
                            COAL FEEDER A-D UNIT 2
18   7080   KB1-24-502092 PM I&C LOCAL BOILER UNIT 2                 2   4.00   4:00   8.00
                            PM I&C DCS SYSTEM MANAGEMENT
19   7383   KB1-24-502299                                            2   4.00   4:00   8.00
                            HANDLER UNIT 2
                            PM I&C PM I&C AIR PREHEATER & OXYGEN
20   7385   KB1-24-502301                                                      2     2.00   2:00   4.00
                            ANALYZER SYSTEM UNIT 2
                            PM I&C FLAME DETECTOR COOLING AIR AND
21   7387   KB1-24-502303                                                      2     2.00   2:00   4.00
                            SEAL AIR FAN A - B UNIT 2
22   7389   KB1-24-502305 PM I&C CEMS ANALYZER UNIT 2                          2     4.00   4:00   8.00
                            CORRECTIVE
                            Inspection the Valve Field 1 Unit 2 to Coarse -
1    7500   KB1-24-000769                                                      2     4.00   4:00   8.00
                            Limit Switch Indication Abnormal
                            Inspection the Limit Switch of Gate Hopper SU
2    7628   KB1-24-000784                                                      2     4.00   4:00   8.00
                            2 - Can't Operate Open & Close
                            Inspection the Coal Feeder 2A - Indication
3    7629   KB1-24-000785                                                      2     3.00   3:00   6.00
                            Flow Abnormal
                            Supporting HM for Replace Belt Coal Feeder
4    7629   KB1-24-000785                                                      3     4.00   4:00 12.00
                            2A
                            SPONSOR WORK
                                                                              Total Man Hours Scheduled
                                                                               Total Man Hours Available
                                                                      Total Scheduled Utility Man Hours
            8               9               8               7               4
  Senin          Selasa           Rabu           Kamis           Jumat                       Remarks
24-Jun-24       25-Jun-24       26-Jun-24       27-Jun-24       28-Jun-24
  4.50            4.50            4.50            4.50            4.50
  4.50            4.50            4.50            4.50            4.50
                                                  4.00
                                                                 13.50
                                                  2.00
                                                                                Tightening, Visual Check, Cleaning
  4.00            4.00
                                                                                Equipment, Finish
                                                                                cleaning, tightning, visual cek
                                  4.00            4.00
                                                                                equipment and panel box, Finish
                                                                                Tightening, Cleaning, Visual check
  4.00            4.00
                                                                                Equipment
                                                                                Tightening, cleaning, visual check
  4.00            4.00
                                                                                equipment
                                                                                Cleaning Tightening Visual Check
                                  3.00
                                                                                Equipment
                                                                                -The panel and protection system
                                                                                on coarse fly ash silo system has
                                                                                been dirty
                                  4.83
                                                                                - Cleaning the panel and limit
                                                                                switch
                                                                                - finish
                                                                                -The control and protection
                                                                                equipment on fine fly ash silo has
                                                                                been dirty
                                  4.83
                                                                                - Cleaning the control and
                                                                                protection system
                                                                                - Finish
                                                                                - Workstation and DCS cabinet
                                                                                coal handling has been drty
                                                                  5.00          - Cleaning the workstation and
                                                                                DCS cabinet coal handling
                                                                                - Finish
                                    - The workstation and DCS cabinet
                                    ash handling has been dirty
                             5.00   - Cleaning the workstation and
                                    DCS cabinet ash handling
                                    - Finish
                                    - Cleaning panel, tethening
              4.00    4.00          terminasion, Visual check
                                    - finish
                                    Cleaning panel
                                    Cek parameter
              4.17
                                    Consumable : majun 1/2Kg
                                    - Temperature PAF B for local not
                                    oke error
                                    - Temperature channel for local
              12.00                 broken
                                    - Need replace new sensor
                                    - Cleaning tightening, visual check
                                    equipment
                      4.00          Cleaning, visual check, finish
                                    Cleaning, tethening, visual check,
                      4.00
                                    finish
                                    - Pm ( Co2 parameter aborm )
                                    - Dirty, Cleaning panel and
                                    tightening and drain water
4.00   4.00
                                    condensation , waiting gas
                                    sampling
                                    - Finish
                                    - NO Alarm
                             8.00   - Cleaning, tethening, visual check
                                    - finish
                                    Cleaning panel
                                    Check termination
7.50   7.50                         Check parameter
                                    Consumable : Majun 1Kg
                                    Cleaning panel
                                    Check parameter
4.00   4.00
                                    Consumable : majun 1/2Kg
                                    - nothing, no alarm at FCP and DCS
                                    cabinet
                             8.00
                                    - cek alarm and ACK alarm
                                    - finish
                           4.00
                           4.00
                                            - Dirty panel
                                            - Cleaning panel and tightening
4.00     4.00
                                            and drain water condensation
                                            - finish
                                            - The valve field 1 unit 2 to coarse
                                            can't operated
                                            - The limit switch has been broken
8.00
                                            - Replace and repair the limit
                                            switch
                                            - Finish
                                            - Gate hopper SU2 can't operation
                                            open/close
                                            - The limit switch broken
         8.00
                                            - Repair the limit switch and reset
                                            the system
                                            - Finish
                                            - Abnormal Read
                                            - Belt Broken
         3.00     3.00
                                            - Replace Belt conveyor
                                            - Finish
                          12.00
48.50   51.50    48.83    51.00    48.50
58.5     58.5     58.5     58.5     58.5                     0
83%     88.03%   83.48%   87.18%   82.91%
9   9   9   9   9
Status WO    Status Permit     PIC
  Close         Close
SPS signed      Close        Operator
  Close         Close
  Close         Close
  Close         Close
  Close         Close
  Close         Close
LE signed       Close        Executor
  Close      Close
SPS signed   Close   Operator
  Close      Close
  Close      Close
SPS signed   Close
SPS signed   Close   Operator
  Close      Close
SPS signed   Close   Operator
  Close      Close
  Close      Close
SPS signed   Close   Operator
 Inprg         Wfinish     Executor
 Inprg         Wfinish     Executor
 Close          Close
 Inprg      HSELWDreview     HSE
 Inprg      HSELWDreview     HSE
LE signed       Close      Executor
   0             0            0
                                                   WEEKLY MAINTENANCE SCHEDULE WEEK 27 2024
                                                   PEMELIHARAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENG
No WO No Work Order      Work      No PM/SR        Division   Area
   No.                   Type
1   7529 KB1-24-502385   PM     PM-KK-HKIBP-0001     HKI      BOP
2   7530 KB1-24-502386   PM     PM-KK-HKIBP-0009     HKI      BOP
3   7531 KB1-24-502387   PM     PM-KK-HKIBP-0010     HKI      BOP
4   7532 KB1-24-502388   PM     PM-KK-HKIBP-0011     HKI      BOP
5   7533 KB1-24-502389   PM     PM-KK-HKIEP-0003     HKI      CH
6   7534 KB1-24-502390   PM     PM-KK-HKIEP-0006     HKI      CH
7   7535 KB1-24-502391   PM     PM-KK-HKIEP-0007     HKI      CH
8   7536 KB1-24-502392   PM     PM-KK-HKIEP-0014     HKI      CH
9   7537 KB1-24-502393   PM   PM-KK-HKIEP-0019   HKI    CH
10 7539 KB1-24-502395    PM   PM-KK-HKIU-0009    HKI   UNIT 1
11 7380 KB1-24-502296    PM   PM-KK-HKIU-0029    HKI   UNIT 1
12 7381 KB1-24-502297    PM   PM-KK-HKIU-0030    HKI   UNIT 1
13 7546 KB1-24-502402    PM   PM-KK-HKIU-0039    HKI   UNIT 1
14 7547 KB1-24-502403    PM   PM-KK-HKIU-0047    HKI   UNIT 1
15 7549 KB1-24-502405    PM   PM-KK-HKIU-0049    HKI   UNIT 1
16 7538 KB1-24-502394    PM   PM-KK-HKIU-0006    HKI   UNIT 2
17 7540 KB1-24-502396    PM   PM-KK-HKIU-0012    HKI   UNIT 2
18 7542 KB1-24-502398    PM   PM-KK-HKIU-0018    HKI   UNIT 2
19 7543 KB1-24-502399    PM   PM-KK-HKIU-0020    HKI   UNIT 2
20 7545 KB1-24-502401    PM   PM-KK-HKIU-0038    HKI   UNIT 2
21 7548 KB1-24-502404    PM   PM-KK-HKIU-0048    HKI   UNIT 2
22 7550 KB1-24-502406    PM   PM-KK-HKIU-0050    HKI   UNIT 2
1   7775 KB1-24-000814   RTF   HKI   unit 1
2   7776 KB1-24-000815   RTF   HKI   UNIT 2
3   7504 KB1-24-000773   RTF   HKI   unit 1
                                                    Total Man
                                                     Total Ma
                                              Total Scheduled U
MAINTENANCE SCHEDULE WEEK 27 2024
ARAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                             Job Description                                 Remarks                 Status WO
         PM
                                                            cleaning, tightning, visual cek
         PM I&C BOILER MAKE UP WATER TREATMENT PLAN (ANION,
                                                            equipment and panel box                    Close
         KATION,MIXEDBED)
                                                            Finish.
                                                                cleaning, tightning, visual cek
         PM I&C COAL CONTAMINATED WASTE WATER SYSTEM            equipment and panel box                Close
                                                                Finish.
                                                          cleaning, tightning, visual cek
         PM I&C INDUSTRIAL WASTE WATER TREATMENT AND UNIT
                                                          equipment and panel box                      Close
         DRAIN PIT
                                                          finish.
                                                                cleaning, tightning, visual cek
         PM I&C SANITARY SEWAGE TREATMENT SYSTEM                equipment and panel box                Close
                                                                finish.
                                                                -The protection equipment has
                                                                been dirty
         PM I&C BELT CONVEYOR C-1                               -Cleaning and repair the               Close
                                                                protection equipment
                                                                -finish
                                                                -The protection equipment on
                                                                Conveyor c3 and dust collector c3
         PM I&C CONVEYOR C3 DAN DUST COLLECTOR AREA             has been dirty
                                                                                                       Close
         CRUSHER HOUSE                                          -Cleaning the equipment and drain
                                                                the tank compressor dust collector
                                                                -finish
                                                                -The protection equipment on C4
                                                                Conveyor has been dirty
         PM I&C CONVEYOR C4 AREA COAL BUNGKER                                                          Close
                                                                -Cleaning the equipment
                                                                -finish
                                                                -The protection equipment and
                                                                filter on dust collector has been
                                                                dirty
         PM I&C DUST COLLECTOR AREA BUNKER                      -Cleaning the protection               Close
                                                                equipment and drain the tank
                                                                compressor
                                                                -finish
                                                       -Dirty on protection and control
                                                       equipment
PM I&C STACKER RECLAIMER                               -Cleaning and tightening              Close
                                                       equipment
                                                       -finish
PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 1                                                 Inprg
PM I&C KALIBRASI COAL FEEDER B UNIT 1                                                        Inprg
PM I&C KALIBRASI COAL FEEDER C UNIT 1                                                        Inprg
                                                       cleaning, tightning, visual cek
PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 1            equipment and panel box              LE signed
                                                       Finish.
                                                       cleaning, tightning, visual cek
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 1       equipment and panel box               Inprg
                                                       Finish.
                                                  cleaning, tightning, visual cek
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT
                                                  equipment and panel box                   LE signed
1
                                                  Finish.
                                                       cleaning, tightning, visual cek
PM I&C LOCAL TURBIN UNIT 2                             equipment and panel box               Close
                                                       Finish.
                                                       -inding: B9 error, click start and
                                                       immediately retrack
PM I&C FUNCTION TEST - SOOT BLOWER UNIT 2                                                    Close
                                                       -need continue inspection
                                                       -finish
                                                       cleaning, tightning, visual cek
PM I&C FEED WATER SYSTEM UNIT 2                        equipment and panel box               Close
                                                       Finish.
                                                       cleaning, tightning, visual cek
PM I&C CONDENSATE WATER SYSTEM UNIT 2                  equipment and panel box               Close
                                                       Finish.
                                                       cek abnormal parameter and
PM I&C ASSET MANAGEMENT SYSTEM UNIT 2                                                        Close
                                                       alarm condition, finish
                                                       cleaning, tightning, visual cek
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 2       equipment and panel box              LE signed
                                                       Finish.
                                                  cleaning, tightning, visual cek
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT
                                                  equipment and panel box                   LE signed
2
                                                  Finish.
CORRECTIVE
Replace the Regulator Cup of Drain Pneumatic Valve
                                                                                                Inprg
Extraction 7 - Regulator Leaks
Replace the Regulator Cup of Pneumatic Valve Drain              -Cup regulator broken
                                                                -Ambient Hot                    Inprg
Extraction 5 Lv 1 - Regulator Cup Broken
                                                                -Replace cup regulator
                                                                -finish
                                                                -Reading temperatur oil 1
Replace the Transducer for UAT Oil Temperature 1 Unit 1 -       transformer error               Inprg
Error in DCS                                                    -Transducer error
                                                                -Replace transducer
                                                                -finish
SPONSOR WORK
Calibrate the Belt Scale of BC02
Inspection the Vibration Sensor of Mill B, C & D Unit 1
Check Sensor of Boiler Leakage Unit 2
                                   Total Man Hours Scheduled
                                    Total Man Hours Available
                           Total Scheduled Utility Man Hours
                                                                                            8           8
Status Permit
                PIC
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
   Close
  Approval     OPERATOR
HSELWDreview     HSE
HSELWDreview     HSE
   Close       EXECUTOR
HSELWDreview     HSE
   Close       EXECUTOR
   Close
   Close
   Close
   Close
   Close
   Close       EXECUTOR
   Close       EXECUTOR
   Wfinish         EXECUTOR
HSELWDreview         HSE
HSELWDreview         HSE
               8      8
                                                         WEEKLY MAINTENANCE SCHEDULE WEEK 28 2024
                                                         PEMELIHARAAN KONTROL & INSTRUMENT PLTU
No   WO No. No Work Order Work Type      No PM/SR         Division    Area
1     7667   KB1-24-502477   PM       PM-KK-HKIBP-0003      HKI       BOP
2     7668   KB1-24-502478   PM       PM-KK-HKIBP-0006      HKI       BOP
3                            PM       PM-KK-HKIBP-0013      HKI       BOP
4     7684   KB1-24-502494   PM       PM-KK-HKIBP-0014      HKI       BOP
5     7669   KB1-24-502479   PM       PM-KK-HKIEP-0004      HKI       CH
6     7670   KB1-24-502480   PM       PM-KK-HKIEP-0012      HKI       CH
7     7671   KB1-24-502481   PM       PM-KK-HKIEP-0015      HKI      UNIT 1
8     7672   KB1-24-502482   PM       PM-KK-HKIEP-0017      HKI      UNIT 1
9     7673   KB1-24-502483   PM       PM-KK-HKIU-0001       HKI      UNIT 1
10    7674   KB1-24-502484   PM       PM-KK-HKIU-0003       HKI      UNIT 1
11    7676   KB1-24-502486   PM       PM-KK-HKIU-0013       HKI      UNIT 1
12    7679   KB1-24-502489   PM       PM-KK-HKIU-0041       HKI      UNIT 1
13    7681   KB1-24-502491   PM       PM-KK-HKIU-0057       HKI      UNIT 1
14    7685   KB1-24-502495   PM       PM-KK-HKIU-0061       HKI      UNIT 1
15    7677   KB1-24-502487   PM       PM-KK-HKIU-0022       HKI      UNIT 2
16    7678   KB1-24-502488   PM       PM-KK-HKIU-0036       HKI      UNIT 2
17    7680   KB1-24-502490   PM       PM-KK-HKIU-0044       HKI      UNIT 2
18   7682   KB1-24-502492   PM    PM-KK-HKIU-0058   HKI   UNIT 2
1    7636   KB1-24-000792   RTF    SR-24-001703     HKI    CH
2    5361   KB1-24-000374   CD     SR-24-000341     HKI    BOP
3    7783   SR-24-001788    CD     SR-24-001788     HKI   UNIT 2
4    7929   KB1-24-000835   RTF    SR-24-001810     HKI    CH
5    7926   KB1-24-000832   CM     SR-24-001795     HKI    BOP
6                                  SR-24-001823     HKI   UNIT 2
7    7774   KB1-24-000813   RTF                     HKI   UNIT 1
8    7934   KB1-24-000840   CM                      HKI   UNIT 2
9    2875   KB1-23-000446   CD                      HKI    BOP
10   8065   KB1-24-000854   CM   HKI   UNIT 2
                                                      Total Man
                                                       Total Man
                                                Total Scheduled U
NTENANCE SCHEDULE WEEK 28 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                     Job Description                               Remarks                       Status WO
         PM
         PM I&C SODIUM HYPOCHLORITE            cleaning, tightning, visual cek equipment and
                                                                                                  CLOSE
         GENERATION SYSTEM                     panel box
         PM I&C RAW WATER PRE TREATMENT
         SYSTEM ( SETTLING BASIN, V BASIN, SEA Cleaning, Tightening, visual check equipment       CLOSE
         WATER RESERVOIR) AND PUMP HOUSE
         PM I&C FUEL OIL PUMP HOUSE AND OIL
         CONTAMINATED WASTE WATER PLANT
         PM I&C AUXILIARY BOILER                 Visual Check, Tightening, cleaning equipment     CLOSE
                                                 -Protection & Control equipment on C2 and
         PM I&C CONVEYOR C2 DAN DUST
                                                 C2 dust collector has been dirty                 CLOSE
         COLLECTOR AREA C2
                                                 -Cleaning the equipment
         PM I&C KALIBRASI BELT SCALE C-3A BELT -Belt scale C3A need to calibration
                                                                                                  CLOSE
         CONVEYOR (26W)                        -Calibration the belt scale
         PM I&C BOTTOM ASH SYSTEM UNIT 1         Cleanning and tightening                        LE signed
         PM I&C ESP & FLY ASH SYSTEM UNIT 1      Cleanning and tightening                        LE signed
         PM I&C WORKSTATION & CABINET DCS -Dirty panel
                                                                                                   Inprg
         UNIT UNIT 1                      -Cleanning with vacum
         PM I&C MEDIUM SPEED MILL & COAL
                                                 Cleaning, tethening, visual check                CLOSE
         FEEDER A-D UNIT 1
         PM I&C 2000 JAM MEDIUM SPEED MILL
                                           Cleaning, Tethening, Visual check                      CLOSE
         A UNIT 1
         PM I&C DCS SYSTEM MANAGEMENT
                                                 Ack alarm and check                               Inprg
         HANDLER UNIT 1
         PM I&C BOILER TUBE LEAKAGE ALARM
                                                 Cleaning, visual check, Tethening                 Inprg
         SYSTEM UNIT 1
         PM I&C CABNET CWP AREA                  Visual check, cleaning, tightening equipment    LE signed
                                                 cleaning, tightning, visual cek equipment and
         PM I&C STEAM DRUM UNIT 2                                                                 CLOSE
                                                 panel box
         PM I&C PAF,FDF & IDF SYSTEM UNIT 2      Cleaning, visual check, Tethening                 Inprg
         PM I&C KALIBRASI CEMS ANALYZER UNIT
                                             Cleaning, visual check, Tethening                     Inprg
         2
                                          -Dont have PC
PM I&C BOILER TUBE LEAKAGE ALARM          -Alaram aktif (need pc)
                                                                                      Inprg
SYSTEM UNIT 2                             -Visual check, Cleaning
                                          -finish
CORRECTIVE
                                          -Cable LS motor DG coalsampling bc2 not
                                          instaled
ODR- Gate motor bypass coal sampling
                                          -The LS cable is not used                   Inprg
BC2, cable not installed
                                          -Remove the LS cable
                                          -finish
                                          -Parameter not reading
                                          -Replace module
BOP, Sodium Hypochlorite for UF
                                          -Setting range output equipment            Wdone
Backwash flow meter error
                                          -The parameter has been read in DCS but
                                          there is no flow for the value
                                       -Level error
Unit 2 - Separator Vacuum Pump A Level -Dirty line and switch stuck
                                                                                     LE signed
Faulty Indication                      -Setting range output equipment
                                       -The parameter has been read in DCS but
                                       there is no flow for the value
ODR, Coal - Support Belt Sway C5 Broken                                               Inprg
BOP - Pneumatic UF Backwash Sodium        -Feedback not actual
Inlet Control Cannot Be Opened at DCS     -Replace positioner                        Wdone
or Locally                                -Calibration new positioner
                                          -Feedback and set point same
UNIT 2, TEMPERATURE MOTOR CWP 5
CAN NOT BE READ IN DCS
Hot reheat Gas Temperature Left Side      -reading temperatur in DCS error
                                          -thermocouple broken                       LE signed
Fault indication
                                          -replace termocouple
                                          -Finish
Unit 2 - CWP 5, Temperatur Motor Can't -Io bad
                                       -Termination losses                           LE signed
Be Read In DCS
                                       -Tightening
                                       -Finish
                                       -Inspection The temperature sensor of CWP 5
BOP, Sampling Rack error in sensor DO in -membrane of sensor is broken
                                         -left time                                   Inprg
Condensate Unit 1
                                         -replace membrane DO
                                         -finish
Unit 2, Coal Feeder 2A Frequency is 5Hz -coal feeder 2A reading is different from
Lower Than Other Coal Feeders With the other coal feeders                           Inprg
Same Coal Flowb                         -stretchy belt
                                        -adjust belt and calibration
                                        -Finish
SPONSOR WORK
START UP UNIT 1
             Total Man Hours Scheduled
               Total Man Hours Available
      Total Scheduled Utility Man Hours
Status Permit     PIC
   CLOSE
   CLOSE
   CLOSE
   CLOSE
   CLOSE
   Close        EXECUTOR
   CLOSE        EXECUTOR
HSELWDreview      HSE
   CLOSE
   CLOSE
HSELWDreview      HSE
HSELWDreview      HSE
   CLOSE        EXECUTOR
   CLOSE
HSELWDreview      HSE
HSELWDreview      HSE
HSELWDreview     HSE
HSEWDreview      HSE
   CLOSE
   CLOSE       EXECUTOR
  Hreview        HSE
   CLOSE
   CLOSE       EXECUTOR
   CLOSE       EXECUTOR
HSELWDreview     HSE
HSELWDreview   HSE
                                                      WEEKLY MAINTENANCE SCHEDULE WEEK 29 2024
                                                      PEMELIHARAAN KONTROL & INSTRUMENT PLTU KALBAR-
No   WO     No Work Order   Work      No PM/SR        Division   Area
     No.                    Type
1    7811   KB1-24-502570   PM     PM-KK-HKIBP-0005     HKI       BOP
2    7812   KB1-24-502571   PM     PM-KK-HKIBP-0012     HKI       BOP
3    7813   KB1-24-502572   PM     PM-KK-HKIEP-0001     HKI       CH
4    7814   KB1-24-502573   PM     PM-KK-HKIEP-0002     HKI       CH
5    7815   KB1-24-502574   PM     PM-KK-HKIEP-0013     HKI       CH
6    7816   KB1-24-502575   PM     PM-KK-HKIEP-0016     HKI       ASH
7    7817   KB1-24-502576   PM     PM-KK-HKIEP-0018     HKI       ASH
8    7818   KB1-24-502577   PM     PM-KK-HKIEP-0020     HKI       CH
9    7819   KB1-24-502578   PM     PM-KK-HKIU-0005      HKI      UNIT 1
10   7821   KB1-24-502580   PM    PM-KK-HKIU-0011   HKI   UNIT 1
11   7823   KB1-24-502582   PM    PM-KK-HKIU-0017   HKI   UNIT 1
12   7824   KB1-24-502583   PM    PM-KK-HKIU-0019   HKI   UNIT 1
13   7828   KB1-24-502587   PM    PM-KK-HKIU-0037   HKI   UNIT 2
14   7830   KB1-24-502589   PM    PM-KK-HKIU-0045   HKI   UNIT 2
15   7832   KB1-24-502591   PM    PM-KK-HKIU-0053   HKI   UNIT 2
16   7820   KB1-24-502579   PM    PM-KK-HKIU-0010   HKI   UNIT 2
17   7541   KB1-24-502397   PM    PM-KK-HKIU-0016   HKI   UNIT 2
18   7544   KB1-24-502400   PM    PM-KK-HKIU-0032   HKI   UNIT 2
19   7829   KB1-24-502588   PM    PM-KK-HKIU-0040   HKI   UNIT 2
20   7831   KB1-24-502590   PM    PM-KK-HKIU-0046   HKI   UNIT 2
21   7833   KB1-24-502592   PM    PM-KK-HKIU-0054   HKI   UNIT 2
1    7936   KB1-24-000842   RTF    SR-24-001771     HKI    CH
2    7937   KB1-24-000843   CM     SR-24-001822     HKI    CH
3   7933   KB1-24-000839   CM   SR-24-001820   HKI    CH
4   2871   KB1-23-000442   CD   SR-23-000632   HKI   BOP
5   2875   KB1-23-000446   CD   SR-23-000642   HKI   BOP
6   7944   KB1-24-000850   CM                  HKI   BOP
7   2414   KB1-23-000338   CD                  HKI   BOP
8   3028   KB1-23-000479   CD                  HKI   Unit 2
Y MAINTENANCE SCHEDULE WEEK 29 2024
HARAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                               Job Description                  Crew Duratio Clock Hour   Man Hour
                                                                Size   n
         Breafing Pagi                                           9     0.5      0:30        4.5
         Sholat ashar                                            9     0.5      0:30        4.5
         Fire Fighting Test                                      2      2       2:00         4
         Kegiatan Budaya Kalbar 1                                9     1.5      1:30        13.5
         PM
         PM I&C BOP CONTROL ROOM DCS SYSTEM & CONTROL
                                                                 2     3.00     3:00        6.00
         CABINET
         PM I&C STEAM AND WATER SAMPLING AND ANALYZING AND
                                                                 2     4.00     4:00        8.00
         DOSING SYSTEM
         PM I&C SHIP UNLOADER 1&2                                3     4.50     4:30       13.50
         PM I&C BC1 & BC2 CONVEYOR                               3     8.00     8:00       24.00
         PM I&C KALIBRASI BELT SCALE C-3B BELT CONVEYOR (26W)    2     5.00     5:00       10.00
         PM I&C BOTTOM ASH SYSTEM UNIT 2                         2     4.00     4:00        8.00
         PM I&C ESP & FLY ASH SYSTEM UNIT 2                      2     4.00     4:00        8.00
         PM I&C COAL SAMPLING BELT CONVEYOR BC-2                 2     3.00     3:00        6.00
         PM I&C LOCAL TURBIN UNIT 1                              2     5.67     5:40       11.33
PM I&C FUNCTION TEST - SOOT BLOWER UNIT 1             2   7.42   7:25   14.83
PM I&C FEED WATER SYSTEM UNIT 1                       3   2.17   2:10   6.50
PM I&C CONDENSATE WATER SYSTEM UNIT 1                 3   2.42   2:25   7.25
PM I&C ASSET MANAGEMENT SYSTEM UNIT 1                 2   4.00   4:00   8.00
PM I&C FLAME DETECTION SYSTEM UNIT 1                  2   2.00   2:00   4.00
PM I&C FUEL OIL BOILER AREA UNIT 1                    2   2.00   2:00   4.00
PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 2          2   7.50   7:30   15.00
PM I&C KALIBRASI COAL FEEDER A UNIT 2                 2   3.17   3:10   6.33
PM I&C KALIBRASI COAL FEEDER B UNIT 2                 2   3.17   3:10   6.33
PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 2           2   4.00   4:00   8.00
PM I&C FLAME DETECTION SYSTEM UNIT 2                  2   2.00   2:00   4.00
PM I&C FUEL OIL BOILER AREA UNIT 2                    2   2.00   2:00   4.00
CORRECTIVE
ODR Coal - C3A , Area Coal Sampling Can't Operation   2   4.00   4:00   8.00
Coal - C3B Coal Sampling Fault                        2   4.00   4:00   8.00
Coal, Sensor limit switch Belt sway C2A corrosion and error     2   4.00   4:00   8.00
BOP, Sampling Rack Unit 2, DO sensor Deaerator sample,
                                                                2   4.00   4:00   8.00
Indication abnormal reading
BOP, Sampling Rack error in sensor DO in Condensate Unit 1      2   4.00   4:00   8.00
The shock dosing pump outlet flow cannot be read in the DCS
                                                                2   4.00   4:00   8.00
control room BOP
BOP, Concentration pump A cannot suck                           2   4.00   4:00   8.00
Unit 2, DCS Left Side Main Steam pressure no 2, reading error   2   4.00   4:00   8.00
SPONSOR WORK
      Total Man Hours Scheduled
        Total Man Hours Available
Total Scheduled Utility Man Hours
 Senin       Selasa       Rabu       Kamis       Jumat       Sabtu                  Remarks
15-Jul-24   16-Jul-24   17-Jul-24   18-Jul-24   19-Jul-24   20-Jul-24
  4.50        4.50        4.50        4.50        4.50
  4.50        4.50        4.50        4.50        4.50
                                      4.00
                                                 13.50
  6.00                                                                  Check and Cleaning
                          8.00                                          Check and cleaning
                                                                        -Indication SU 1 abnormal
                                                                        -Change Settings
  6.75        6.75
                                                                        -Resetting camswitch
                                                                        -Finish
                                                                        -Wirerope broken
                                                                        -Corrosive
 12.00       12.00
                                                                        -Need replacement new part
                                                                        -Finish
                                                                        -INDICATION ABNORMAL
                                                                        -DIFFERENT DEVIATION
                                     10.00
                                                                        -RE-CALIBRATE
                                                                        -FINISH
                                                                        CLEANING AND CHECKING
                          8.00
                                                                        EQUIPMENT
                          8.00                                          CLEANING, CHECKING EQUIPMENT
                                                                        cleaning, check termination, check
  6.00                                                                  instrumentation
                                                                        consumable : majun 1 Kg
                                                                        Cleanning and tightening sensor
              5.67        5.67
                                                                        and check alarm
                                   -Cleanning and tightening limit
                                   switch
4.94   4.94   4.94
                                   -Limit switch A9 and A12 broken
                                   -Replace limit switch
                                   cleaning, tightning, visual cek
                            6.50
                                   equipment and panel box
                     7.25          Visual check, tightening, cleaning
                                   -Check alarm and ack if needed
                                   -CP1003 and CP1011 alarm , time
              8.00
                                   interval
                                   -finish
                     4.00          Visual check, tightening, cleaning
                                   -on schedule to check and
                     4.00          cleaning all equipment
                                   -Check, cleaning and lubrucating
                     7.50   7.50
       6.33
                                   -schedule of calibrate
                            6.33
                                   -span weight 80kg/m
                                   Visual check, tightening, cleaning,
                            8.00
                                   monitoring
                     4.00          Visual check, tightening, cleaning
                     4.00          Visual check, tightening, cleaning
                                   -C3A , Area Coal Sampling Can't
                                   Operation
                                   -The slip sensor and push button
              8.00                 has been dirty
                                   -The slip sensor and push button
                                   has been cleaned by operator
                                   -finish
                                   -Motor crusher cannot start
                                   -Mechanical motor stuck
       8.00
                                   -Need follow up mechanical team
                                   -Inprogres
                            -Limit switch broken
8.00                        -Limit switch Corrosive
                            -Replacement limit switch
                            -finish
                            -DO sensor Deaerator sample,
                            Indication abnormal reading
       4.00   4.00          -The membrane of DO sensor has
                            been damaged
                            -Replace the membrane of the DO
                            sensor
                            -finish
                            -membrane of sensor is broken
       4.00   4.00          -left time
                            -replace membrane DO
                            -finish
                            -The shock dosing pump outlet
                            flow cannot be read in the DCS
8.00                        control room BOP
                            -The flow sensor has been dirty
                            -Cleaning the flow sensor
                            -finish
                            -Concentration pump A cannot
                            suck
       8.00                 -The air venting not working due
                            equipment has been damaged
                            -Replace the air venting
                            equipment
                            -finish
                            -Unit 2, DCS Left Side Main Steam
              4.00   4.00   pressure no 2, reading error
                            -The pressure transmitter is not
                            properly installed
                            -Correctly reinstall the pressure
                            transmitter
                            -Finish
60.69       52.69        59.61        69.75        62.83
 72          72           72           72           63
84%         73.19%       82.79%       96.88%       99.74%
        9            9            9            9            9
Status WO    Status Permit     PIC
SPS signed      Close        Operator
SPS signed      Close        Operator
  Close         Close
  Close         Close
  Inprg      HSELWDreview      HSE
  Inprg      HSELWDreview      HSE
  Inprg      HSELWDreview      HSE
  Close         Close
SPS signed      Close        Operator
SPS signed     Close    Operator
  Inprg        Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
  Inprg       Wfinish   Executor
  Inprg       Hreview     HSE
  Inprg        Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
SPS signed     Close    Operator
  Inprg      WDREVIEW   Executor
  Inprg      WDREVIEW   Executor
  Inprg      WDREVIEW   Executor
  Inprg      WDREVIEW   Executor
SPS signed     Close    Operator
  Inprg      WDREVIEW   Executor
  Inprg      WDREVIEW   Executor
  Inprg      WDREVIEW   Executor
                                                         WEEKLY MAINTENANCE SCHEDULE WEEK 30 202
                                                         PEMELIHARAAN KONTROL & INSTRUMENT PLTU
No   WO No. No Work Order Work Type      No PM/SR         Division   Area
1     7965   KB1-24-502676   PM       PM-KK-HKIBP-0002      HKI       BOP
2     7966   KB1-24-502677   PM       PM-KK-HKIBP-0004      HKI       BOP
3     7967   KB1-24-502678   PM       PM-KK-HKIBP-0007      HKI       BOP
4     7968   KB1-24-502679   PM       PM-KK-HKIBP-0008      HKI       BOP
5     7969   KB1-24-502680   PM       PM-KK-HKIEP-0008      HKI       CH
6     7970   KB1-24-502681   PM       PM-KK-HKIEP-0009      HKI       ASH
7     7971   KB1-24-502682   PM       PM-KK-HKIEP-0010      HKI       ASH
8     7986   KB1-24-502697   PM       PM-KK-HKIEP-0027      HKI       ASH
9     7987   KB1-24-502698   PM       PM-KK-HKIEP-0028      HKI       ASH
10    7974   KB1-24-502685   PM       PM-KK-HKIU-0007       HKI       ASH
11    7975   KB1-24-502686   PM       PM-KK-HKIU-0021       HKI      UNIT 1
12    7976   KB1-24-502687   PM       PM-KK-HKIU-0023       HKI      UNIT 1
13    7822   KB1-24-502581   PM       PM-KK-HKIU-0015       HKI      UNIT 1
14    7825   KB1-24-502584   PM       PM-KK-HKIU-0031       HKI      UNIT 1
15   7978   KB1-24-502689   PM   PM-KK-HKIU-0035   HKI   UNIT 1
16   7980   KB1-24-502691   PM   PM-KK-HKIU-0051   HKI   UNIT 1
17   7982   KB1-24-502693   PM   PM-KK-HKIU-0055   HKI   UNIT 1
18   7984   KB1-24-502695   PM   PM-KK-HKIU-0059   HKI   UNIT 1
19   7972   KB1-24-502683   PM   PM-KK-HKIU-0002   HKI   UNIT 2
20   7973   KB1-24-502684   PM   PM-KK-HKIU-0004   HKI   UNIT 2
21   7675   KB1-24-502485   PM   PM-KK-HKIU-0008   HKI   UNIT 2
22   7977   KB1-24-502688   PM   PM-KK-HKIU-0027   HKI   UNIT 2
23   7826   KB1-24-502585   PM   PM-KK-HKIU-0033   HKI   UNIT 2
24   7827   KB1-24-502586   PM   PM-KK-HKIU-0034   HKI   UNIT 2
25   7979   KB1-24-502690   PM   PM-KK-HKIU-0042   HKI   UNIT 2
26   7981   KB1-24-502692   PM   PM-KK-HKIU-0052   HKI   UNIT 2
27   7983   KB1-24-502694   PM   PM-KK-HKIU-0056   HKI   UNIT 2
28   7985   KB1-24-502696   PM   PM-KK-HKIU-0060   HKI   UNIT 2
1    8234   KB1-24-000904   CM    SR-24-001912     HKI   UNIT 2
2   6570   KB1-24-000583   CM    HKI   UNIT 2
3   5057   KB1-24-000302   RTF   HKI   UNIT 2
4   8237   KB1-24-000907   CM    HKI   UNIT 2
5   8239   KB1-24-000909   CD    HKI    CH
6   7335   KB1-24-000722   CD    HKI   Unit 2
7   8233   KB1-24-000903   CM    HKI   Unit 2
8   8243   KB1-24-000913   CD    HKI   Unit 2
9   8227   KB1-24-000897   CM    HKI   Unit 2
                                                Tota
MAINTENANCE SCHEDULE WEEK 30 2024
 RAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                             Job Description                            Remarks                 Status WO
          PM
          PM I&C BOILER MAKE UP WATER TREATMENT PLAN (RE Visual check and cleaning
                                                                                                LE signed
          GENERATION AND NETRALIZING SYSTEM)             equipment,finish
                                                           cleaning tightning visual cek
          PM PM I&C UF SYSTEM                                                                   LE signed
                                                           equipment and panel box, finish
                                                           -SWRO SYSTEM need to check and
                                                           cleaning
          PM I&C SWRO SYSTEM                               -Visual check and cleaning           LE signed
                                                           equipment
                                                           -finish
                                                           -BWRO SYSTEM has been dirty,
                                                           need to check and cleaning
          PM I&C BWRO SYSTEM                                                                    LE signed
                                                           -Check and cleaning equipment
                                                           -Finish
                                                           cleaning tightning visual cek
          PM I&C COMPRESSOR & DRYER                                                             LE signed
                                                           equipment and panel box, finish
                                                           Cleaning & checking
          PM I&C COARSE ASH SILO SYSTEM                                                         LE signed
                                                           equipment,finish
                                                           Cleaning & checking
          PM I&C FINE FLY ASH SILO                                                              LE signed
                                                           equipment,finish
          PM I&C WORK STATION AND DCS CABINET COAL         cleaning FCP panel and visual cek,
                                                                                                  Inprg
          HANDLING                                         finish
          PM I&C WORK STATION AND DCS CABINET ASH          cleaning FCP panel and visual cek,
                                                                                                LE signed
          HANDLING                                         finish
                                                           Cleaning, checking
          PM I&C LOCAL BOILER UNIT 1                                                            LE signed
                                                           equipment,Finish
                                                           Cleaning, checking
          PM I&C STEAM DRUM UNIT 1                                                              LE signed
                                                           equipment,Finish
                                                           cleaning tightning visual cek
          PM I&C 2000 JAM MEDIUM SPEED MILL B UNIT 1                                            LE signed
                                                           equipment and panel box,finish
                                                           -schedule of calibrate
          PM I&C KALIBRASI COAL FEEDER A UNIT 1            -span weight 80kg/m                  LE signed
                                                           -finish
                                                           -schedule of calibrate
          PM I&C KALIBRASI COAL FEEDER D UNIT 1            -span weight 80kg/m                  LE signed
                                                           -finish
                                                  cleaning tightning visual cek
PM I&C PAF,FDF & IDF SYSTEM UNIT 1                                                   LE signed
                                                  equipment dan panel box,finish
PM I&C AIR PREHEATER & OXYGEN ANALYZER SYSTEM     cleaning, tightning, visual cek
                                                                                     LE signed
UNIT 1                                            panel and equipment,finish
PM I&C FLAME DETECTOR COOLING AIR AND SEAL AIR    cleaning, tightning, visual cek
                                                                                     LE signed
FAN A - B UNIT 1                                  equipment and panel box,finish
                                                  -CEMS ANALYZER UNIT 1 need to
                                                  check and cleaning
PM I&C CEMS ANALYZER UNIT 1                       -Visual check and cleaning         LE signed
                                                  equipment
                                                  -Finish
PM I&C WORKSTATION & CABINET DCS UNIT UNIT 2      cleaning panel box, finish         LE signed
PM I&C MEDIUM SPEED MILL & ELECTRIC COAL FEEDER cleaning tightning visual cek
                                                                                     LE signed
A-D UNIT 2                                      equipment and panel box,finish
                                                  -line pressure transmitter dirty
                                                  -for clean the line
PM I&C LOCAL BOILER UNIT 2                                                           LE signed
                                                  -blow line transmitter
                                                  -finish
                                                  cleaning, tightning, visual cek
PM I&C 2000 JAM MEDIUM SPEED MILL C UNIT 2                                           LE signed
                                                  equipment and panel box,finish
                                                  -schedule of calibrate
PM I&C KALIBRASI COAL FEEDER C UNIT 2             -span weight 80kg/m                LE signed
                                                  -finish
                                                  -schedule of calibrate
PM I&C KALIBRASI COAL FEEDER D UNIT 2             -span weight 80kg/m                LE signed
                                                  -finish
PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 2       ACK alarm,finish                   LE signed
PM I&C PM I&C AIR PREHEATER & OXYGEN ANALYZER     cleaning, tightning, visual cek
                                                                                     LE signed
SYSTEM UNIT 2                                     equipment and panel box,finish
PM I&C FLAME DETECTOR COOLING AIR AND SEAL AIR    cleaning, tightning, visual cek
                                                                                     LE signed
FAN A - B UNIT 2                                  equipment and panel box,finish
PM I&C CEMS ANALYZER UNIT 2                       Visual check and cleaning,Finish   LE signed
CORRECTIVE
Unit 2 - Oil Gun AB 1 oil valve auto close                                            Inprg
                                                          -cannot open
                                                          -different voltage on SV 1 and 2,
                                                          servo card module is broken
Replace the Servo Card Module of CV1 Unit 2                                                   Inprg
                                                          -replace servo card module for
                                                          CV1 and ICV1
                                                          -finish
                                                          -no pressure
Inspection the Line of Pressure Gauge of Local Gland      -needle valve stuck
                                                                                              Inprg
Steam Seal Unit 2                                         -need replace needle valve
                                                          -finish
Unit 2 - TINY OIL NO 2 SENSOR TEMPERATURE ERROR                                               Wappr
                                                          -PLC not connect
                                                          -Cable broken
Rejoint the Cable PLC of the STRE - Cable Broken                                              Inprg
                                                          -Reconnect cable
                                                          -FINISH
                                                        -proximity sensor is broken
Inspection the Shut Off Hot Damper Mill 2A - Can't Open -left time, not active
                                                                                              Inprg
Close From DCS                                          -replace proximity sensor
                                                        -finish
                                                      -thermocouple is broken
Inspection the Temperature Sensor of Hot Reheat Right -left time
                                                                                              Inprg
Side Unit 2 - Parameter Abnormal in DCS               -replace TC
                                                      -finish
                                                          -hose is broken
Replace the Hose of IPB Compressor Unit 2 - Hose          -left time
                                                                                              Inprg
Broken                                                    -replace hose
                                                          -finish
Replace the Regulator and Fiber Optic for Oil Gun CD3
                                                                                              Inprg
Unit 2
SPONSOR WORK
Check the Current Parameter of Belt Conveyor -
Indication not Actual in DCS and Local
Check the Instrumentation Sensor in STRE
Start Up Unit 2
                             Total Man Hours Scheduled
                                                                            0                   0
                              Total Man Hours Available
                      Total Scheduled Utility Man Hours
Status Permit
                  PIC
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
WDREVIEW        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
   Close        Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
 Close    Executor
Mreview   Executor
WDREVIEW   Executor
WDREVIEW   Executor
WDREVIEW   Executor
WDREVIEW   Executor
WDREVIEW   Executor
WDREVIEW   Executor
 Wstart    Executor
   0          0
                                                      WEEKLY MAINTENANCE SCHEDULE WEEK 31 2024
                                                      PEMELIHARAAN KONTROL & INSTRUMENT PLTU K
No   WO     No Work Order   Work      No PM/SR         Division   Area
     No.                    Type
1    8118   KB1-24-502775   PM     PM-KK-HKIBP-0001      HKI       BOP
2    8119   KB1-24-502776   PM     PM-KK-HKIBP-0009      HKI       BOP
3    8120   KB1-24-502777   PM     PM-KK-HKIBP-0010      HKI       BOP
4    8121   KB1-24-502778   PM     PM-KK-HKIBP-0011      HKI       BOP
5    8122   KB1-24-502779   PM     PM-KK-HKIEP-0003      HKI       CH
6    8123   KB1-24-502780   PM     PM-KK-HKIEP-0006      HKI       CH
7    8124   KB1-24-502781   PM     PM-KK-HKIEP-0007      HKI       CH
8    8125   KB1-24-502782   PM     PM-KK-HKIEP-0014      HKI       CH
9    8126   KB1-24-502783   PM     PM-KK-HKIEP-0019      HKI       CH
10   8128   KB1-24-502785   PM     PM-KK-HKIU-0009       HKI      UNIT 1
11   8136   KB1-24-502793   PM     PM-KK-HKIU-0039       HKI      UNIT 1
12   8137   KB1-24-502794   PM    PM-KK-HKIU-0047   HKI   UNIT 1
13   8139   KB1-24-502796   PM    PM-KK-HKIU-0049   HKI   UNIT 1
14   8127   KB1-24-502784   PM    PM-KK-HKIU-0006   HKI   UNIT 2
15   8129   KB1-24-502786   PM    PM-KK-HKIU-0012   HKI   UNIT 2
16   8130   KB1-24-502787   PM    PM-KK-HKIU-0018   HKI   UNIT 2
17   8131   KB1-24-502788   PM    PM-KK-HKIU-0020   HKI   UNIT 2
18   8132   KB1-24-502789   PM    PM-KK-HKIU-0028   HKI   UNIT 3
19   8135   KB1-24-502792   PM    PM-KK-HKIU-0038   HKI   UNIT 2
20   8138   KB1-24-502795   PM    PM-KK-HKIU-0048   HKI   UNIT 2
21   8140   KB1-24-502797   PM    PM-KK-HKIU-0050   HKI   UNIT 2
1    8218   KB1-24-000889   RTF    SR-24-001899     HKI    BOP
2    6434   KB1-24-000566   CM                      HKI   UNIT 1
3    8362   KB1-24-000918   RTF    SR-24-001935     HKI   UNIT 2
4    8246   KB1-24-000916   RTF    KB1-24-000916    HKI   UNIT 1
5    8237   KB1-24-000907   CM     SR-24-001919     HKI   UNIT 2
6    8375   KB1-24-000931   CD     SR-24-001952     HKI    ASH
MAINTENANCE SCHEDULE WEEK 31 2024
 RAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                               Job Description           Crew   Duration Clock Hour   Man Hour
                                                         Size
          Breafing Pagi                                   9       0.5       0:30        4.5
          Sholat ashar                                    9       0.5       0:30        4.5
          Fire Fighting Test                              2        2        2:00         4
          Kegiatan Budaya Kalbar 1                        9       1.5       1:30        13.5
          Performance Test Unit 2                         2        2        2:00         4
          PM
          PM I&C BOILER MAKE UP WATER TREATMENT PLAN
          (ANION, KATION,MIXEDBED)
                                                          2      4.00       4:00        8.00
          PM I&C COAL CONTAMINATED WASTE WATER
          SYSTEM
                                                          2      3.00       3:00        6.00
          PM I&C INDUSTRIAL WASTE WATER TREATMENT AND
          UNIT DRAIN PIT
                                                          2      4.00       4:00        8.00
          PM I&C SANITARY SEWAGE TREATMENT SYSTEM         2      3.00       3:00        6.00
          PM I&C BELT CONVEYOR C-1                        2      4.00       4:00        8.00
          PM I&C CONVEYOR C3 DAN DUST COLLECTOR AREA
          CRUSHER HOUSE
                                                          2      5.92       5:55       11.83
          PM I&C CONVEYOR C4 AREA COAL BUNGKER            2      5.92       5:55       11.83
          PM I&C DUST COLLECTOR AREA BUNKER               2      4.00       4:00        8.00
          PM I&C STACKER RECLAIMER                        3      4.00       4:00       12.00
          PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 1    2      7.50       7:30       15.00
          PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 1     2      4.00       4:00        8.00
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM
UNIT 1
                                                        2   2.00   2:00   4.00
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM
UNIT 1
                                                        2   2.00   2:00   4.00
PM I&C LOCAL TURBIN UNIT 2                              2   5.67   5:40   11.33
PM I&C FUNCTION TEST - SOOT BLOWER UNIT 2               2   7.42   7:25   14.83
PM I&C FEED WATER SYSTEM UNIT 2                         3   2.17   2:10   6.50
PM I&C CONDENSATE WATER SYSTEM UNIT 2                   3   2.42   2:25   7.25
PM I&C 2000 JAM MEDIUM SPEED MILL D UNIT 2              2   4.08   4:05   8.17
PM I&C ASSET MANAGEMENT SYSTEM UNIT 2                   2   4.00   4:00   8.00
PM I&C SUPERHEATER & DESUPERHEATER SYSTEM
UNIT 2
                                                        2   2.00   2:00   4.00
PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM
UNIT 2
                                                        2   2.00   2:00   4.00
CORRECTIVE
BOP-Settling Basin A, Sludge discharge pneumatic
valve#4 is leak
                                                        2   4.00   4:00   8.00
Calibrate the Parameter of CEMS Unit 1 - CO2
Parameter Abnormal
                                                        2   6.00   6:00   12.00
UNIT 2, Cooling Air Flame,Pressure gauge at local 6.9
KPa and DCS 0 KPa. Condition of all fans stop
                                                        2   4.00   4:00   8.00
Unit 1 - Pyrite panel boxes Mill 1B do not have
protective doors
                                                        2   4.00   4:00   8.00
Unit 2 - TINY OIL NO 2 SENSOR TEMPERATURE
ERROR
                                                        2   4.00   4:00   8.00
ASH - Regulator field 2B unit 2 leak                    2   4.00   4:00   8.00
SPONSOR WORK
      Total Man Hours Scheduled
        Total Man Hours Available
Total Scheduled Utility Man Hours
            7               9            10              7              5
 Senin           Selasa           Rabu         Kamis          Jumat
29-Jul-24       30-Jul-24       31-Jul-24     1-Aug-24       2-Aug-24
  4.50            4.50            4.50          4.50           4.50
  4.50            4.50            4.50          4.50           4.50
                                                4.00
                                                              13.50
                                  4.00
                                                8.00
                                                               6.00
                                                               8.00
                                                               6.00
  4.00            4.00
                                  5.92          5.92
                  5.92            5.92
                  4.00            4.00
  6.00            6.00
                                                7.50           7.50
                                  4.00          4.00
              4.00
              4.00
5.67   5.67
4.94   4.94   4.94
6.50
       7.25
                     8.17
8.00
              4.00
              4.00
       8.00
6.00   6.00
              8.00
                     8.00
                            8.00
                     8.00
50.11       60.78        61.78        62.58        58.00
 72          72           72           72           72
70%         84.41%       85.80%       86.92%       80.56%
        9            9            9            9            9
                                                           WEEKLY MAINTENANCE SCHEDULE WEEK 32
                                                           PEMELIHARAAN KONTROL & INSTRUMENT P
No   WO No.   No Work Order Work Type      No PM/SR         Division   Area
1     8272    KB1-24-502873   PM        PM-KK-HKIBP-0003      HKI       BOP
2     8273    KB1-24-502874   PM        PM-KK-HKIBP-0006      HKI       BOP
3                             PM        PM-KK-HKIBP-0013      HKI       BOP
4     8289    KB1-24-502890   PM        PM-KK-HKIBP-0014      HKI       BOP
5     8274    KB1-24-502875   PM        PM-KK-HKIEP-0004      HKI       CH
6     8275    KB1-24-502876   PM        PM-KK-HKIEP-0015      HKI      UNIT 1
7     8276    KB1-24-502877   PM        PM-KK-HKIEP-0017      HKI      UNIT 1
8     8277    KB1-24-502878   PM        PM-KK-HKIEP-0025      HKI      UNIT 1
9     8278    KB1-24-502879   PM        PM-KK-HKIU-0001       HKI      UNIT 1
10    8279    KB1-24-502880   PM        PM-KK-HKIU-0003       HKI      UNIT 1
11   8133   KB1-24-502790   PM    PM-KK-HKIU-0029   HKI   UNIT 1
12   8134   KB1-24-502791   PM    PM-KK-HKIU-0030   HKI   UNIT 1
13   8285   KB1-24-502886   PM    PM-KK-HKIU-0041   HKI   UNIT 1
14   8286   KB1-24-502887   PM    PM-KK-HKIU-0057   HKI   UNIT 1
15   8290   KB1-24-502891   PM    PM-KK-HKIU-0061   HKI   UNIT 1
16   8282   KB1-24-502883   PM    PM-KK-HKIU-0022   HKI   UNIT 2
17   8284   KB1-24-502885   PM    PM-KK-HKIU-0036   HKI   UNIT 2
18   8287   KB1-24-502888   PM    PM-KK-HKIU-0058   HKI   UNIT 2
1    8363   KB1-24-000919   RTF    SR-24-001936     HKI    CH
NTENANCE SCHEDULE WEEK 32 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                              Job Description                Crew Size   Duration   Clock Hour
         Breafing Pagi                                          8          0.5        0:30
         Sholat ashar                                           8          0.5        0:30
         Fire Fighting Test                                     2           2         2:00
         Kegiatan Budaya Kalbar 1                               8          1.5        1:30
         PM
         PM I&C SODIUM HYPOCHLORITE GENERATION SYSTEM           2          4.00       4:00
         PM I&C RAW WATER PRE TREATMENT SYSTEM ( SETTLING
         BASIN, V BASIN, SEA WATER RESERVOIR) AND PUMP          2          4.00       4:00
         HOUSE
         PM I&C FUEL OIL PUMP HOUSE AND OIL CONTAMINATED
                                                                2          3.50       3:30
         WASTE WATER PLANT
         PM I&C AUXILIARY BOILER                                2          3.50       3:30
         PM I&C CONVEYOR C2 DAN DUST COLLECTOR AREA C2          2          5.92       5:55
         PM I&C BOTTOM ASH SYSTEM UNIT 1                        2          4.00       4:00
         PM I&C ESP & FLY ASH SYSTEM UNIT 1                     2          4.00       4:00
         PM I&C 52W COMBINED AIR DRYER 2                        2          5.00       5:00
         PM I&C WORKSTATION & CABINET DCS UNIT UNIT 1           2          4.00       4:00
         PM I&C MEDIUM SPEED MILL & COAL FEEDER A-D UNIT 1      2          7.50       7:30
PM I&C KALIBRASI COAL FEEDER B UNIT 1            2   3.17        3:10
PM I&C KALIBRASI COAL FEEDER C UNIT 1            2   3.17        3:10
PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 1      2   4.00        4:00
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 1   2   2.00        2:00
PM I&C CABNET CWP AREA                           2   2.00        2:00
PM I&C STEAM DRUM UNIT 2                         2   2.08        2:05
PM I&C PAF,FDF & IDF SYSTEM UNIT 2               3   4.00        4:00
PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 2   2   2.00        2:00
CORRECTIVE
COAL, MAGNETIC SEPARATOR C3A LIMIT SWITCH STOP
                                                 2   4.00        4:00
INDICATION FAULT
SPONSOR WORK
                                                            Total Man Hours Scheduled
                                                              Total Man Hours Available
                                                      Total Scheduled Utility Man Hours
                      6              4              4              4              3
Man Hour    Senin          Selasa         Rabu           Kamis          Jumat
           5-Aug-24       6-Aug-24       7-Aug-24       8-Aug-24       9-Aug-24
   4         4.00           4.00           4.00           4.00           4.00
   4         4.00           4.00           4.00           4.00           4.00
   4                                                      4.00
   12                                                                   12.00
  8.00       8.00
  8.00                                                                   8.00
  7.00       7.00
  7.00                      7.00
 11.83                                    11.83
  8.00                                                    8.00
  8.00                                                    8.00
 10.00       5.00           5.00
  8.00                                                                   8.00
 15.00       7.50           7.50
                6.33                6.33
                6.33                         6.33
                8.00                                           8.00
                4.00                                  4.00
                4.00                         4.00
                4.17       4.17
               12.00                        12.00
                4.00                                  4.00
                8.00       8.00
                           47.67   33.83    42.17    36.00    44.00
tal Man Hours Scheduled
                            64      64       64       64       64
otal Man Hours Available
eduled Utility Man Hours   74%     52.86%   65.89%   56.25%   68.75%
8   8   8   8   8
      Eko Junianto
52 WEEKS MATERIAL PLANNING 2024 -
    PEMELIHARAAN KONTROL &
           INSTRUMEN
                                                                     7-13
NO.                            PM DESCRIPTION                UNIT    W32
 1    Majun ; Lembaran Katun Putih                           KG      4.10
 2    WIPERS ; WYPALL X60 WIPER JUMBO ROLL                   ROLL    0.09
 3    KUAS ; Eterna 2"                                       PCS     1.70
 4    KUAS ; KWAS CAT 4" MERK. ETERNA                        PCS     1.70
 5    RUST PENETRANT ; RUST PENETRANT WD.40 @ 333 ML         CAN     1.50
 6    SARUNG TANGAN ; SARUNG TANGAN BINTIK - BINTIK KATUN   PAIRS    3.40
 7    THREEBOND 5211 SILICONE SEALENT                        TUBE
 8    SABUN ; SABUN TANGAN ISI3.7 LITER (Permatex)          GALLON
 9    CONTACT CLEANER CONTACT CLEANER 350 GRAM CRC 2016      CAN     0.85
10    Isolasi Scotch 35                                      Pcs
11    Sealtape                                               Pcs
12    Masker 3M N95                                          Pcs     35.00
                                                                             36.4
                                 ADE ARIFIN
No   WO    No Work Order   Work      No PM/SR
     No.                   Type
1                          PM     PM-KK-HKIBP-0005
2                          PM     PM-KK-HKIBP-0012
3                          PM     PM-KK-HKIEP-0001
4                          PM     PM-KK-HKIEP-0002
5                          PM     PM-KK-HKIEP-0016
6                          PM     PM-KK-HKIEP-0018
7                          PM     PM-KK-HKIEP-0020
8                          PM     PM-KK-HKIU-0005
9                          PM     PM-KK-HKIU-0011
10                         PM     PM-KK-HKIU-0017
11                         PM     PM-KK-HKIU-0019
12                         PM     PM-KK-HKIU-0037
13        PM-KK-HKIU-0043
14   PM   PM-KK-HKIU-0045
15   PM   PM-KK-HKIU-0053
16   PM   PM-KK-HKIU-0010
17   PM   PM-KK-HKIU-0040
18   PM   PM-KK-HKIU-0046
19   PM   PM-KK-HKIU-0054
                           Job Description                 Crew Durati Clock Hour
                                                           Size  on
Breafing Pagi                                               9     0.5     0:30
Sholat ashar                                                9     0.5     0:30
Fire Fighting Test                                          2      2      2:00
Kegiatan Budaya Kalbar 1                                    9     1.5     1:30
PM
PM I&C BOP CONTROL ROOM DCS SYSTEM & CONTROL CABINET        2    3.00     3:00
PM I&C STEAM AND WATER SAMPLING AND ANALYZING AND DOSING
                                                            2    4.00     4:00
SYSTEM
PM I&C SHIP UNLOADER 1&2                                    3    4.50     4:30
PM I&C BC1 & BC2 CONVEYOR                                   3    8.00     8:00
PM I&C BOTTOM ASH SYSTEM UNIT 2                             2    4.00     4:00
PM I&C ESP & FLY ASH SYSTEM UNIT 2                          2    4.00     4:00
PM I&C COAL SAMPLING BELT CONVEYOR BC-2                     2    3.00     3:00
PM I&C LOCAL TURBIN UNIT 1                                  2    5.67     5:40
PM I&C FUNCTION TEST - SOOT BLOWER UNIT 1                   2    7.42     7:25
PM I&C FEED WATER SYSTEM UNIT 1                             3    2.17     2:10
PM I&C CONDENSATE WATER SYSTEM UNIT 1                       3    2.42     2:25
PM I&C ASSET MANAGEMENT SYSTEM UNIT 1                       2    4.00     4:00
PM I&C KALIBRASI CEMS ANALYZER UNIT 1          2   3.50   3:30
PM I&C FLAME DETECTION SYSTEM UNIT 1           2   2.00   2:00
PM I&C FUEL OIL BOILER AREA UNIT 1             2   2.00   2:00
PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 2   2   7.50   7:30
PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 2    2   4.00   4:00
PM I&C FLAME DETECTION SYSTEM UNIT 2           2   2.00   2:00
PM I&C FUEL OIL BOILER AREA UNIT 2             2   2.00   2:00
CORRECTIVE
SPONSOR WORK
      Total Man Hours Scheduled
        Total Man Hours Available
Total Scheduled Utility Man Hours
Man Hour     Senin      Selasa       Rabu      Kamis      Jumat
           12-Aug-24   13-Aug-24   14-Aug-24 15-Aug-24   16-Aug-24
  4.5        4.50        4.50        4.50      4.50        4.50
  4.5        4.50        4.50        4.50      4.50        4.50
   4                                           4.00
  13.5                                                     13.50
  6.00       6.00
  8.00                               8.00
 13.50      Err:507     Err:507
 24.00      Err:507     Err:507
  8.00                               8.00
  8.00                               8.00
  6.00       6.00
 11.33                   5.67        5.67
 14.83       4.94        4.94        4.94
  6.50                                                     6.50
  7.25                                         7.25
  8.00                               8.00
7.00    7.00
4.00           4.00
4.00           4.00
15.00          7.50   7.50
8.00                  8.00
4.00           4.00
4.00           4.00
                           51.69       38.36        51.61        43.75        44.50
tal Man Hours Scheduled
                            72          72           72           72           63
otal Man Hours Available
eduled Utility Man Hours   72%         53.28%       71.68%       60.76%       70.63%
                                   9            9            9            9            9
                                                        WEEKLY MAINTENANCE SCHEDULE WEE
                                                        PEMELIHARAAN KONTROL & INSTRUME
No   WO No.   No Work Order   Work      No PM/SR         Division   Area
                              Type
1                             PM     PM-KK-HKIBP-0002      HKI       BOP
2                             PM     PM-KK-HKIBP-0004      HKI       BOP
3                             PM     PM-KK-HKIBP-0007      HKI       BOP
4                             PM     PM-KK-HKIBP-0008      HKI       BOP
5                             PM     PM-KK-HKIEP-0008      HKI        CH
6                             PM     PM-KK-HKIEP-0009      HKI       ASH
7                             PM     PM-KK-HKIEP-0010      HKI       ASH
                                     PM-KK-HKIEP-0021
9                             PM     PM-KK-HKIEP-0027      HKI       ASH
10                            PM     PM-KK-HKIEP-0028      HKI       ASH
11                            PM     PM-KK-HKIU-0007       HKI       ASH
12                            PM     PM-KK-HKIU-0021       HKI      UNIT 1
13                            PM     PM-KK-HKIU-0035       HKI      UNIT 1
14                            PM     PM-KK-HKIU-0051       HKI      UNIT 1
15                            PM     PM-KK-HKIU-0055       HKI      UNIT 1
16                            PM     PM-KK-HKIU-0059       HKI      UNIT 1
17                            PM     PM-KK-HKIU-0002       HKI      UNIT 2
18                            PM     PM-KK-HKIU-0004       HKI      UNIT 2
19                            PM     PM-KK-HKIU-0008       HKI      UNIT 2
                                     PM-KK-HKIU-0016
                                     PM-KK-HKIU-0026
                                     PM-KK-HKIU-0032
23                            PM     PM-KK-HKIU-0042       HKI      UNIT 2
24                            PM     PM-KK-HKIU-0052       HKI      UNIT 2
25                            PM     PM-KK-HKIU-0056       HKI      UNIT 2
26                            PM     PM-KK-HKIU-0060       HKI      UNIT 2
27
28
NTENANCE SCHEDULE WEEK 34 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                                   Job Description                          Crew Size   Duration
         Breafing Pagi                                                         9          0.5
         Sholat ashar                                                          9          0.5
         Fire Fighting Test                                                    2           2
         Kegiatan Budaya Kalbar 1                                              9          1.5
         Aux Boiler Test                                                       2           2
         PM
         PM I&C BOILER MAKE UP WATER TREATMENT PLAN (REGENERATION AND NET
                                                                               2          4.00
         RALIZING SYSTEM)
         PM PM I&C UF SYSTEM                                                   2          4.00
         PM I&C SWRO SYSTEM                                                    2          4.00
         PM I&C BWRO SYSTEM                                                    2          4.00
         PM I&C COMPRESSOR & DRYER                                             2          1.50
         PM I&C COARSE ASH SILO SYSTEM                                         2          2.42
         PM I&C FINE FLY ASH SILO                                              2          2.42
         PM I&C 12W COMBINED AIR DRYER 1                                       2          4.00
         PM I&C WORK STATION AND DCS CABINET COAL HANDLING                     2          2.50
         PM I&C WORK STATION AND DCS CABINET ASH HANDLING                      2          2.50
         PM I&C LOCAL BOILER UNIT 1                                            2          4.00
         PM I&C STEAM DRUM UNIT 1                                              2          2.08
         PM I&C PAF,FDF & IDF SYSTEM UNIT 1                                    3          4.00
         PM I&C AIR PREHEATER & OXYGEN ANALYZER SYSTEM UNIT 1                  2          2.00
         PM I&C FLAME DETECTOR COOLING AIR AND SEAL AIR FAN A - B UNIT 1       2          2.00
         PM I&C CEMS ANALYZER UNIT 1                                           2          4.00
         PM I&C WORKSTATION & CABINET DCS UNIT UNIT 2                          2          4.00
         PM I&C MEDIUM SPEED MILL & ELECTRIC COAL FEEDER A-D UNIT 2            2          7.50
         PM I&C LOCAL BOILER UNIT 2                                            2          4.00
         PM I&C KALIBRASI COAL FEEDER A UNIT 2                                 2          3.17
         PM I&C 2000 JAM MEDIUM SPEED MILL B UNIT 2                            2          4.08
         PM I&C KALIBRASI COAL FEEDER B UNIT 2                                 2          3.17
         PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 2                           2          4.00
         PM I&C PM I&C AIR PREHEATER & OXYGEN ANALYZER SYSTEM UNIT 2           2          2.00
         PM I&C FLAME DETECTOR COOLING AIR AND SEAL AIR FAN A - B UNIT 2       2          2.00
         PM I&C CEMS ANALYZER UNIT 2                                           2          4.00
                                                                               0          0.00
                                                                               0          0.00
         CORRECTIVE
SPONSOR WORK
                      Total Man Hours S
                       Total Man Hours
               Total Scheduled Utility Ma
                                    7               7               6               6               4
Clock Hour   Man Hour     Senin          Selasa           Rabu           Kamis           Jumat
                        19-Aug-24       20-Aug-24       21-Aug-24       22-Aug-24       23-Aug-24
   0:30        4.5         4.50            4.50            4.50            4.50            4.50
   0:30        4.5
   2:00         4                                                         4.00
   1:30        13.5                                                                       13.50
   0:00         0
   4:00        8.00       4.00            4.00
   4:00        8.00                                       4.00            4.00
   4:00        8.00       4.00            4.00
   4:00        8.00       4.00            4.00
   1:30        3.00                                       3.00
   2:25        4.83                                       4.83
   2:25        4.83                                       4.83
   2:30        5.00                                                                       5.00
   4:00        8.00                                                                       8.00
   2:05        4.17                                       2.08            2.08
   4:05        8.17                                       8.17
   3:10        6.33
   3:10        6.33                                                        6.33
   4:00       12.00                                                       12.00
   2:00        4.00       2.00            2.00
   2:00        4.00                                                                       4.00
   4:00        8.00       4.00            4.00
   4:00        8.00       4.00            4.00
   3:10        6.33                                                                       6.33
   3:10        6.33                                                       6.33
   4:00        8.00                                                       8.00
   2:00        4.00       2.00            2.00
   2:00        4.00
   4:00        8.00
       Total Man Hours Scheduled    28.50        28.50        31.42        47.25        41.33
        Total Man Hours Available    58.5         58.5         58.5         58.5         58.5
Total Scheduled Utility Man Hours    49%        48.72%       53.70%       80.77%       70.66%
                                            9            9            9            9            9
                                                        WEEKLY MAINTENANCE SCHEDULE WEEK 35 2024
                                                        PEMELIHARAAN KONTROL & INSTRUMENT PLTU KA
No   WO No.   No Work Order   Work      No PM/SR        Divisi   Area
                              Type                       on
1                             PM     PM-KK-HKIBP-0001    HKI      BOP
2                             PM     PM-KK-HKIBP-0009    HKI      BOP
3                             PM     PM-KK-HKIBP-0010    HKI      BOP
4                             PM     PM-KK-HKIBP-0011    HKI      BOP
5                             PM     PM-KK-HKIEP-0003    HKI       CH
6                             PM     PM-KK-HKIEP-0006    HKI       CH
7                             PM     PM-KK-HKIEP-0007    HKI       CH
8                             PM     PM-KK-HKIEP-0014    HKI       CH
9                             PM     PM-KK-HKIEP-0019    HKI       CH
10                            PM     PM-KK-HKIEP-0022    HKI
11                            PM     PM-KK-HKIU-0009     HKI     UNIT 1
12                            PM     PM-KK-HKIU-0015     HKI
13                            PM     PM-KK-HKIU-0031     HKI
14                            PM     PM-KK-HKIU-0039     HKI     UNIT 1
15                            PM     PM-KK-HKIU-0047     HKI     UNIT 1
16                            PM     PM-KK-HKIU-0049     HKI     UNIT 2
17                            PM     PM-KK-HKIU-0006     HKI     UNIT 2
18                            PM     PM-KK-HKIU-0012     HKI     UNIT 2
21                            PM     PM-KK-HKIU-0014     HKI
20                            PM     PM-KK-HKIU-0018     HKI     UNIT 2
21                            PM     PM-KK-HKIU-0020     HKI     UNIT 2
22                            PM     PM-KK-HKIU-0033     HKI
23                            PM     PM-KK-HKIU-0034     HKI
24                            PM     PM-KK-HKIU-0038     HKI     UNIT 2
25                            PM     PM-KK-HKIU-0048     HKI     UNIT 2
26                            PM     PM-KK-HKIU-0050     HKI     UNIT 2
EKLY MAINTENANCE SCHEDULE WEEK 35 2024
MELIHARAAN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                                     Job Description                   Crew Durati Clock Man
                                                                       Size  on Hour Hour
          Breafing Pagi                                                 9    0.5   0:30    4.5
          Sholat ashar                                                  9    0.5   0:30    4.5
          Fire Fighting Test                                            2     2    2:00     4
          Kegiatan Budaya Kalbar 1                                      9    1.5   1:30   13.5
          PM
          PM I&C BOILER MAKE UP WATER TREATMENT PLAN (ANION,
          KATION,MIXEDBED)
                                                                        2   4.00 4:00     8.00
          PM I&C COAL CONTAMINATED WASTE WATER SYSTEM                   2   3.00   3:00    6.00
          PM I&C INDUSTRIAL WASTE WATER TREATMENT AND UNIT DRAIN PIT    2   4.00   4:00    8.00
          PM I&C SANITARY SEWAGE TREATMENT SYSTEM                       2   3.00   3:00    6.00
          PM I&C BELT CONVEYOR C-1                                      2   4.00   4:00    8.00
          PM I&C CONVEYOR C3 DAN DUST COLLECTOR AREA CRUSHER HOUSE      2   5.92   5:55   11.83
          PM I&C CONVEYOR C4 AREA COAL BUNGKER                          2   5.92   5:55   11.83
          PM I&C DUST COLLECTOR AREA BUNKER                             2   4.00   4:00    8.00
          PM I&C STACKER RECLAIMER                                      3   4.00   4:00   12.00
          PM I&C 12W COMBINED AIR DRYER 2                               2   4.00   4:00    8.00
          PM I&C FUNCTION TEST - TINY & OIL GUN UNIT 1                  2   7.50   7:30   15.00
          PM I&C KALIBRASI COAL FEEDER A UNIT 1                         2   3.20   3:12    6.40
          PM I&C KALIBRASI COAL FEEDER D UNIT 1                         2   3.20   3:12    6.40
          PM I&C DCS STEAM TURBINE SUPERVISORY UNIT 1                   2   4.00   4:00    8.00
          PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 1              2   2.00   2:00    4.00
          PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT 1           2   2.00   2:00    4.00
          PM I&C LOCAL TURBIN UNIT 2                                    2   5.67   5:40   11.33
          PM I&C FUNCTION TEST - SOOT BLOWER UNIT 2                     2   7.42   7:25   14.83
          PM I&C 2000 JAM MEDIUM SPEED MILL A UNIT 2                    2   4.10   4:06    8.20
          PM I&C FEED WATER SYSTEM UNIT 2                               3   2.17   2:10    6.50
          PM I&C CONDENSATE WATER SYSTEM UNIT 2                         3   2.42   2:25    7.25
          PM I&C KALIBRASI COAL FEEDER C UNIT 2                         2   3.17   3:10    6.33
          PM I&C KALIBRASI COAL FEEDER D UNIT 2                         2   3.17   3:10    6.33
          PM I&C ASSET MANAGEMENT SYSTEM UNIT 2                         2   4.00   4:00    8.00
          PM I&C SUPERHEATER & DESUPERHEATER SYSTEM UNIT 2              2   2.00   2:00    4.00
          PM I&C REHEATER & SPARE DESUPERHEATER SYSTEM UNIT 2           2   2.00   2:00    4.00
          CORRECTIVE
SPONSOR WORK
                      Total Man Hours Scheduled
                       Total Man Hours Available
               Total Scheduled Utility Man Hours
          6               7            9            4               4
  Senin        Selasa           Rabu       Kamis         Jumat
26-Aug-24     27-Aug-24       28-Aug-24 29-Aug-24       30-Aug-24
   4.50          4.50            4.50      4.50            4.50
   4.50          4.50            4.50      4.50            4.50
                                           4.00
                                                          13.50
                                           8.00
                                                          6.00
                                                          8.00
                                                          6.00
  4.00          4.00
                                5.92       5.92
                5.92            5.92
                4.00            4.00
  6.00          6.00
                                           7.50           7.50
                                4.00       4.00
                                4.00
                                4.00
  5.67          5.67
  4.94          4.94            4.94
  6.50
                7.25
  8.00
                                4.00
                                4.00
44.11        46.78        49.78        38.42        50.00
  72          72           72           72           72
 61%        64.97%       69.14%       53.36%       69.44%
        9            9            9            9            9
                                                           WEEKLY MAINTENANCE SCHEDULE WEEK 36
                                                           PEMELIHARAAN KONTROL & INSTRUMENT P
No   WO No.   No Work Order Work Type      No PM/SR         Division   Area
1                             PM        PM-KK-HKIBP-0003      HKI       BOP
2                             PM        PM-KK-HKIBP-0006      HKI       BOP
3                             PM        PM-KK-HKIBP-0013      HKI       BOP
4                             PM        PM-KK-HKIBP-0014      HKI       BOP
5                             PM        PM-KK-HKIEP-0004      HKI        CH
6                             PM        PM-KK-HKIEP-0015      HKI      UNIT 1
7                             PM        PM-KK-HKIEP-0017      HKI      UNIT 1
8                                       PM-KK-HKIEP-0023
9                             PM        PM-KK-HKIU-0001       HKI      UNIT 1
10                            PM        PM-KK-HKIU-0003       HKI      UNIT 1
11                                      PM-KK-HKIU-0024       HKI      UNIT 1
12                            PM        PM-KK-HKIU-0041       HKI      UNIT 1
13                            PM        PM-KK-HKIU-0057       HKI      UNIT 1
14                            PM        PM-KK-HKIU-0061       HKI      UNIT 1
15                            PM        PM-KK-HKIU-0022       HKI      UNIT 2
16                            PM        PM-KK-HKIU-0036       HKI      UNIT 2
17                            PM        PM-KK-HKIU-0058       HKI      UNIT 2
NTENANCE SCHEDULE WEEK 36 2024
AN KONTROL & INSTRUMENT PLTU KALBAR-1 BENGKAYANG
                              Job Description                Crew Size   Duration    Clock Hour
         Breafing Pagi                                          9          0.5          0:30
         Sholat ashar                                           9          0.5          0:30
         Fire Fighting Test                                     2           2           2:00
         Kegiatan Budaya Kalbar 1                               9          1.5          1:30
         PM
         PM I&C SODIUM HYPOCHLORITE GENERATION SYSTEM           2          4.00         4:00
         PM I&C RAW WATER PRE TREATMENT SYSTEM ( SETTLING
         BASIN, V BASIN, SEA WATER RESERVOIR) AND PUMP          2          4.00         4:00
         HOUSE
         PM I&C FUEL OIL PUMP HOUSE AND OIL CONTAMINATED
                                                                2          3.50         3:30
         WASTE WATER PLANT
         PM I&C AUXILIARY BOILER                                2          3.50         3:30
         PM I&C CONVEYOR C2 DAN DUST COLLECTOR AREA C2          2          5.92         5:55
         PM I&C BOTTOM ASH SYSTEM UNIT 1                        2          4.00         4:00
         PM I&C ESP & FLY ASH SYSTEM UNIT 1                     2          4.00         4:00
         PM I&C 12W COMBINED AIR DRYER 3                        2          4.00         4:00
         PM I&C WORKSTATION & CABINET DCS UNIT UNIT 1           2          4.00         4:00
         PM I&C MEDIUM SPEED MILL & COAL FEEDER A-D UNIT 1      2          7.50         7:30
         PM I&C 2000 JAM MEDIUM SPEED MILL C UNIT 1             2          4.10         4:06
         PM I&C DCS SYSTEM MANAGEMENT HANDLER UNIT 1            2          4.00         4:00
         PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 1         2          2.00         2:00
         PM I&C CABNET CWP AREA                                 2          2.00         2:00
         PM I&C STEAM DRUM UNIT 2                               2          2.08         2:05
         PM I&C PAF,FDF & IDF SYSTEM UNIT 2                     3          4.00         4:00
         PM I&C BOILER TUBE LEAKAGE ALARM SYSTEM UNIT 2         2          2.00         2:00
         CORRECTIVE
         SPONSOR WORK
                                                                                    Total Man Hours Scheduled
        Total Man Hours Available
Total Scheduled Utility Man Hours
                                     4              2              3              4              3
            Man Hour        Senin         Selasa          Rabu          Kamis          Jumat
                          2-Sep-24       3-Sep-24       4-Sep-24       5-Sep-24       6-Sep-24
              4.5            4.50          4.50           4.50           4.50           4.50
              4.5            4.50          4.50           4.50           4.50           4.50
               4                                                         4.00
              13.5                                                                     13.50
              8.00          8.00
              8.00                                                                      8.00
              7.00          7.00
               7.00                        7.00
              11.83                                      11.83
               8.00                                                      8.00
               8.00                                                      8.00
               8.00
               8.00                                                                     8.00
              15.00         7.50           7.50
               8.20
               8.00                                                                     8.00
               4.00                                                      4.00
               4.00                                       4.00
               4.17         4.17
              12.00                                      12.00
               4.00                                                      4.00
tal Man Hours Scheduled    35.67          23.50          36.83          37.00          46.50
otal Man Hours Available    72         72           72           72           72
eduled Utility Man Hours   50%       32.64%       51.16%       51.39%       64.58%
                                 9            9            9            9            9