NOVATEX LIMITED                                                                                                                                           SOP / E&I / 04
MASTER LIST OF SOPs
                                                                ELECTRICAL & INSTRUMENT DEPARTMENT
                                                                                                                                       REVISION DATES
      S. No.      DOCUMENT NO.                      DOCUMENT TITLE                     PREPARED BY    REVIEWED BY     APPROVED BY
                                                                                                                                     LAST            LATEST
        1          SOP / E & I / 01   CLEANING & CHECKING OF PLANT INSTRUMENTS        CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
        2          SOP / E & I / 02   CLEANING & CHECKING OF PLANT MOTORS             CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
        3          SOP / E & I / 03   CURRENT MONITORING OF PLANT MOTORS              CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
        4          SOP / E & I / 04   ISOLATE MOTOR SWITCHGEAR (FROM MCC)             CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
        5          SOP / E & I / 05   RESET / ENERGIZE MOTOR SWITCHGEAR (FROM MCC)    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
        6          SOP / E & I / 06   MONITORING OF PANEL VOLTAGE & CURRENT           CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
        7          SOP / E & I / 07   OPERATION OF BACK-UP INVERTER                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
        8          SOP / E & I / 08   BATTERY CHARGING PROCEDURE                      CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
        9          SOP / E & I / 09   WASHING & VARNISHING OF MOTOR WINDING           CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      DOSE RATE MEASUREMENT OF RADIOACTIVE
       10          SOP / E & I / 10                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      SOURCES
       11          SOP / E & I / 11   OVERHAULING OF ELECTRICAL MOTORS                CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       12          SOP / E & I / 12   GREASING OF ELECTRICAL MOTORS                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       13          SOP / E & I / 13   PANEL LAMP TEST & REPLACEMENT OF PANEL BULB     CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      WATER & LIME SLOUTION POURING & CHECKING
       14          SOP / E & I / 14                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      EARTH RESISTANCE
       15          SOP / E & I / 15   INSULATION TESTING OF MOTORS                    CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       16          SOP / E & I / 16   INSULATION TESTING OF CABLES                    CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       17          SOP / E & I / 17   POWER CABLE JOINTING                            CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       18          SOP / E & I / 18   CHECKING OF BATTERY                             CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       19          SOP / E & I / 19   LOAD TESTING OF BATTERY                         CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
Page 1 of 5                                                                          Revision : 03                                       Revision Date : 31st MAR, 2012
NOVATEX LIMITED                                                                                                                                            SOP / E&I / 04
                                                                                                                                        REVISION DATES
      S. No.      DOCUMENT NO.                      DOCUMENT TITLE                      PREPARED BY    REVIEWED BY     APPROVED BY
                                                                                                                                       LAST           LATEST
       20          SOP / E & I / 20   RESETTING OF INVERTER                            CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       21          SOP / E & I / 21   UPS LOAD TESTING                                 CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       22          SOP / E & I / 22   RESISTANCE CHECKING OF MOTOR WINDINGS            CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       23          SOP / E & I / 23   TEMPERATURE MONITORING OF MOTOR                  CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       24          SOP / E & I / 24   ROTAMETER FUNCTION TESTING / CLEANING            CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       25          SOP / E & I / 25   PANEL FILTER CLEANING                            CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       26          SOP / E & I / 26   TARGET WEIGHT CHANGING OF BAGGING MACHINE        CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       27          SOP / E & I / 27   INSPECTION & CHECKING OF PLANT LIFT              CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      CALIBRATION & CHECKING OF TEMPERATURE
       28          SOP / E & I / 28                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      INDICATOR
                                      CALIBRATION & ZERO CHECKING OF PRESSURE
       29          SOP / E & I / 29                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      INDICATOR
                                      CALIBRATION OF DISPLACER TYPE LEVEL
       30          SOP / E & I / 30                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    MAY-2000        FEB-2012
                                      TRANSMITTER
       31          SOP / E & I / 31   CALIBRATION OF CONTROL VALVE.                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       32          SOP / E & I / 32   CLEANING OF CONTROL VALVE                        CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       33          SOP / E & I / 33   CALIBRATION OF BAGGING STATION                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       34          SOP / E & I / 34   CALIBRATION WITH DEAD WEIGHT TESTER              CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       35          SOP / E & I / 35   CALIBRATION OF VACUUM PRESSURE TRANSMITTER       CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       36          SOP / E & I / 36   CALIBRATION OF LABOM PRESSURE TRANSMITTER        CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      CALIBRATION & ZERO CHECKING OF SUB-MASTER
       37          SOP / E & I / 37                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        MAR-2012
                                      PRESSURE INDICATOR
       38          SOP / E & I / 38   CLEANING / REPLACEMENT OF UV SENSOR              CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        MAR-2012
       39          SOP / E & I / 39   CHECKING / VERIFICATION OF FIELD THERMOCOUPLE    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        MAR-2012
       40          SOP / E & I / 40   STARTUP OF LOSS IN WEIGHT TYPE SCHENCK UNIT      CONCERNED HOD   CONCERNED HOD     GMP / MR    MAR-2012
Page 2 of 5                                                                           Revision : 03                                       Revision Date : 31st MAR, 2012
NOVATEX LIMITED                                                                                                                                           SOP / E&I / 04
                                                                                                                                       REVISION DATES
      S. No.      DOCUMENT NO.                       DOCUMENT TITLE                    PREPARED BY    REVIEWED BY     APPROVED BY
                                                                                                                                     LAST            LATEST
       41          SOP / E & I / 41   CALIBRATION OF SCHENCK UNIT                     CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       42          SOP / E & I / 42   SSP PLANT LOAD SHIFTING                         CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      CALIBRATION OF DIGITAL TRANSMITTER FOR
       43          SOP / E & I / 43   (PRESSURE, DIFFERENTIAL PRESSURE, FLOW &        CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      LEVEL).
                                      CALIBRATION OF RADIOACTIVE BASED LEVEL
       44          SOP / E & I / 44                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      MONITORING SYSTEM
                                      ADJUSTMENT OF SELF ACTUATED PRESSURE
       45          SOP / E & I / 45                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      CONTROL VALVE
       46          SOP / E & I / 46   CALIBRATION OF MICROMOTION FLOW METER           CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       47          SOP / E & I / 47   FUNCTION TESTING & CLEANING OF LEVEL SWITCH     CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       48          SOP / E & I / 48   FUNCTION TESTING & ADJUSTMENT OF FLOW SWITCH    CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      CHECKING / VERIFICATION OF FIELD TEMPERATURE
       49          SOP / E & I / 49   ELEMENT (Pt-100) / RESISTANCE TEMPERATURE       CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      DETECTOR (RTD)
       50          SOP / E & I / 50   CHECKING OF TEMPERATURE SWITCH THERMOSTAT       CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      FUNCTION TESTING & ADJUSTMENT OF PRESSURE
       51          SOP / E & I / 51                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      INDICATOR SWITCH
                                      MAGNETIC LEVEL GAUGE FUNCTION TESTING /
       52          SOP / E & I / 52                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        JAN-2012
                                      CLEANING
       53          SOP / E & I / 53   CALIBRATION OF FIELD DIGITAL INDICATOR          CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       54          SOP / E & I / 54   CLEANING / ADJUSTMENT OF PROXIMITY SENSOR       CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      FUNCTION TESTING OF DIGITAL TEMPERATURE
       55          SOP / E & I / 55                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      CONTROLLER
       56          SOP / E & I / 56   CALIBRATION OF P.H. METER                       CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999
       57          SOP / E & I / 57   CALIBRATION OF CONDUCTIVITY METER               CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999
       58          SOP / E & I / 58   DOWN-LOAD / UP-LAOD PLC PROGRAM PROCEDURE       CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       59          SOP / E & I / 59   FUNCTION TEST OF ROTARY FLOW COUNTER            CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       60          SOP / E & I / 60   DE-CHOCKING OF VAPOUR LINE                      CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
Page 3 of 5                                                                          Revision : 03                                       Revision Date : 31st MAR, 2012
NOVATEX LIMITED                                                                                                                                            SOP / E&I / 04
                                                                                                                                        REVISION DATES
      S. No.      DOCUMENT NO.                        DOCUMENT TITLE                    PREPARED BY    REVIEWED BY     APPROVED BY
                                                                                                                                      LAST            LATEST
       61          SOP / E & I / 61   CALIBRATION OF SUB MASTER DIGITAL MULTIMETER     CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
       62          SOP / E & I / 62   HOUSE KEEPING                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    JAN-2012
       63          SOP / E & I / 63   PROVIDING TEMPORARY ELECTRICAL CONNECTION        CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       64          SOP / E & I / 64   CALIBRATION OF SUB MASTER DIGITAL INDICATOR      CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      CALIBRATION OF SUB MASTER PRESSURE
       65          SOP / E & I / 65                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      TRANSMITTER
                                      CALIBRATION OF SUB MASTER DIGITAL TEMPERATURE
       66          SOP / E & I / 66                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      INDICATOR (Pt-100 / RTD INPUT POINT)
                                      CALIBRATION & CHECKING OF SUB-MASTER
       67          SOP / E & I / 67                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        JAN-2012
                                      TEMPERATURE INDICATOR
                                      CHECKING OF SUB-MASTER TEMPERATURE ELEMENT
       68          SOP / E & I / 68                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      (Pt-100)
       69          SOP / E & I / 69   CLEANING OF ALTERNATOR                           CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       70          SOP / E & I / 70   CHECKING OF IGNITION CABLE                       CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       71          SOP / E & I / 71   CLEANING / CHECKING OF SPEED PICK UP SENSOR      CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
       72          SOP / E & I / 72   CHECKING / TIGHTNESS OF ELECTRICAL CONTACTS      CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      CALIBRATION OF FIELD PANEL METERS (VOLTAGE,
       73          SOP / E & I / 73                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 1999        FEB-2012
                                      FREQUENCY & CURRENT METERS)
       74          SOP / E & I / 74   CALIBRATION OF DIGITAL WEIGHING SCALE            CONCERNED HOD   CONCERNED HOD     GMP / MR    OCT 1999        FEB-2012
                                      REPLACEMENT OF TABULAR HEATER IN A
       75          SOP / E & I / 75                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      DISTRIBUTOR
       76          SOP / E & I / 76   SET POINT CHANGING OF ROTORY FLOW COUNTER        CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      CLEANING / ADJUSTMENT OF RADAR LEVEL
       77          SOP / E & I / 77                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      TRANSMITTER
                                      CALIBRATION OF FMC 662 TYPE CAPACITIVE LEVEL
       78          SOP / E & I / 78                                                    CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
                                      TRANSMITTER
       79          SOP / E & I / 79   CHECKING OF NITROGEN FLOW TRANSMITTER            CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
       80          SOP / E & I / 80   CHECKING OF ELECTRONIC TURBINE FLOW METER        CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
       81          SOP / E & I / 81   CHECKING OF FLOW METER                           CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
Page 4 of 5                                                                           Revision : 03                                       Revision Date : 31st MAR, 2012
NOVATEX LIMITED                                                                                                                                           SOP / E&I / 04
                                                                                                                                       REVISION DATES
      S. No.      DOCUMENT NO.                       DOCUMENT TITLE                    PREPARED BY    REVIEWED BY     APPROVED BY
                                                                                                                                      LAST           LATEST
       82          SOP / E & I / 82   CUTTERS INTER-CHANGING / TAKING IN-LINE         CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      COMMISSIONING, CALIBRATION & MONITORING OF
       83          SOP / E & I / 83                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
                                      HYDROCARBON ANALYZER
       84          SOP / E & I / 84   CALIBRATION OF ZIRCONIA OXYGEN ANALYZER         CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
                                      CHECKING / VERIFICATION OF FIELD TEMPERATURE
       85          SOP / E & I / 85                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    SEP 2002        FEB-2012
                                      TRANSMITTER
                                      REPLACEMENT OF FIRE ALARM SWITCH / GLASS /
       86          SOP / E & I / 86                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      SMOKE DETECTOR
       87          SOP / E & I / 87   PAINTING OF ELECTRICAL EQUIPMENTS               CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       88          SOP / E & I / 88   FLU GAS ANALYZING                               CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       89          SOP / E & I / 89   CHECKING OF PHOTO-EYE SENSORS                   CONCERNED HOD   CONCERNED HOD     GMP / MR    NOV 2008        FEB-2012
       90          SOP / E & I / 90   RADIATION EMERGENCY                             CONCERNED HOD   CONCERNED HOD     GMP / MR    JULY-2010
       91          SOP / E & I / 91   CLEANING OF DCS COMPUTERS                       CONCERNED HOD   CONCERNED HOD     GMP / MR    JAN-2012
       92          SOP / E & I / 92   REPLACEMENT OF DCS WORKSTATION                  CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       93          SOP / E & I / 93   DELTA-V COLD RESTART                            CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       94          SOP / E & I / 94   GREASING OF HYDRAULIC MOTORS                    CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       95          SOP / E & I / 95   CALIBRATION OF REXROTH AMPLIFIER CARD           CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      CHECKING OF SERVO VALVE THROUGH BREAKOUT
       96          SOP / E & I / 96                                                   CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      BOX
       97          SOP / E & I / 97   TORQUE CHECKING OF SIEMENS 611U DRIVE DC        CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      BUS BAR SCREW
       98          SOP / E & I / 98   DELTA-V SOFTWARE BACKUP                         CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
       99          SOP / E & I / 99   CAMERA SURVEILLANCE SYSTEM INSTALLATION &       CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
                                      MONITORING
       100        SOP / E & I / 100   REPLACEMENT OF RADIO ACTIVE SOURCE              CONCERNED HOD   CONCERNED HOD     GMP / MR    FEB-2012
Page 5 of 5                                                                          Revision : 03                                       Revision Date : 31st MAR, 2012