0% found this document useful (0 votes)
616 views5 pages

Master List of SOP

The document provides a master list of standard operating procedures (SOPs) for the Electrical & Instrument department of Novatex Limited. It includes 43 SOP document numbers, their titles, and revision dates. The SOPs cover various electrical, instrumentation and process control activities like cleaning and checking of plant instruments and motors, calibration of transmitters and indicators, insulation testing, battery maintenance, and operation of backup systems. Responsible personnel are identified for preparing, reviewing, and approving each SOP.

Uploaded by

OSAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
616 views5 pages

Master List of SOP

The document provides a master list of standard operating procedures (SOPs) for the Electrical & Instrument department of Novatex Limited. It includes 43 SOP document numbers, their titles, and revision dates. The SOPs cover various electrical, instrumentation and process control activities like cleaning and checking of plant instruments and motors, calibration of transmitters and indicators, insulation testing, battery maintenance, and operation of backup systems. Responsible personnel are identified for preparing, reviewing, and approving each SOP.

Uploaded by

OSAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

NOVATEX LIMITED SOP / E&I / 04

MASTER LIST OF SOPs


ELECTRICAL & INSTRUMENT DEPARTMENT
REVISION DATES
S. No. DOCUMENT NO. DOCUMENT TITLE PREPARED BY REVIEWED BY APPROVED BY
LAST LATEST

1 SOP / E & I / 01 CLEANING & CHECKING OF PLANT INSTRUMENTS CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

2 SOP / E & I / 02 CLEANING & CHECKING OF PLANT MOTORS CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

3 SOP / E & I / 03 CURRENT MONITORING OF PLANT MOTORS CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

4 SOP / E & I / 04 ISOLATE MOTOR SWITCHGEAR (FROM MCC) CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

5 SOP / E & I / 05 RESET / ENERGIZE MOTOR SWITCHGEAR (FROM MCC) CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

6 SOP / E & I / 06 MONITORING OF PANEL VOLTAGE & CURRENT CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

7 SOP / E & I / 07 OPERATION OF BACK-UP INVERTER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

8 SOP / E & I / 08 BATTERY CHARGING PROCEDURE CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

9 SOP / E & I / 09 WASHING & VARNISHING OF MOTOR WINDING CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

DOSE RATE MEASUREMENT OF RADIOACTIVE


10 SOP / E & I / 10 CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012
SOURCES

11 SOP / E & I / 11 OVERHAULING OF ELECTRICAL MOTORS CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

12 SOP / E & I / 12 GREASING OF ELECTRICAL MOTORS CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

13 SOP / E & I / 13 PANEL LAMP TEST & REPLACEMENT OF PANEL BULB CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

WATER & LIME SLOUTION POURING & CHECKING


14 SOP / E & I / 14 CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012
EARTH RESISTANCE

15 SOP / E & I / 15 INSULATION TESTING OF MOTORS CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

16 SOP / E & I / 16 INSULATION TESTING OF CABLES CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

17 SOP / E & I / 17 POWER CABLE JOINTING CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

18 SOP / E & I / 18 CHECKING OF BATTERY CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

19 SOP / E & I / 19 LOAD TESTING OF BATTERY CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

Page 1 of 5 Revision : 03 Revision Date : 31st MAR, 2012


NOVATEX LIMITED SOP / E&I / 04

REVISION DATES
S. No. DOCUMENT NO. DOCUMENT TITLE PREPARED BY REVIEWED BY APPROVED BY
LAST LATEST

20 SOP / E & I / 20 RESETTING OF INVERTER CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

21 SOP / E & I / 21 UPS LOAD TESTING CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

22 SOP / E & I / 22 RESISTANCE CHECKING OF MOTOR WINDINGS CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

23 SOP / E & I / 23 TEMPERATURE MONITORING OF MOTOR CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

24 SOP / E & I / 24 ROTAMETER FUNCTION TESTING / CLEANING CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

25 SOP / E & I / 25 PANEL FILTER CLEANING CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

26 SOP / E & I / 26 TARGET WEIGHT CHANGING OF BAGGING MACHINE CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

27 SOP / E & I / 27 INSPECTION & CHECKING OF PLANT LIFT CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

CALIBRATION & CHECKING OF TEMPERATURE


28 SOP / E & I / 28 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
INDICATOR

CALIBRATION & ZERO CHECKING OF PRESSURE


29 SOP / E & I / 29 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
INDICATOR

CALIBRATION OF DISPLACER TYPE LEVEL


30 SOP / E & I / 30 CONCERNED HOD CONCERNED HOD GMP / MR MAY-2000 FEB-2012
TRANSMITTER

31 SOP / E & I / 31 CALIBRATION OF CONTROL VALVE. CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

32 SOP / E & I / 32 CLEANING OF CONTROL VALVE CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

33 SOP / E & I / 33 CALIBRATION OF BAGGING STATION CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

34 SOP / E & I / 34 CALIBRATION WITH DEAD WEIGHT TESTER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

35 SOP / E & I / 35 CALIBRATION OF VACUUM PRESSURE TRANSMITTER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

36 SOP / E & I / 36 CALIBRATION OF LABOM PRESSURE TRANSMITTER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

CALIBRATION & ZERO CHECKING OF SUB-MASTER


37 SOP / E & I / 37 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 MAR-2012
PRESSURE INDICATOR

38 SOP / E & I / 38 CLEANING / REPLACEMENT OF UV SENSOR CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 MAR-2012

39 SOP / E & I / 39 CHECKING / VERIFICATION OF FIELD THERMOCOUPLE CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 MAR-2012

40 SOP / E & I / 40 STARTUP OF LOSS IN WEIGHT TYPE SCHENCK UNIT CONCERNED HOD CONCERNED HOD GMP / MR MAR-2012

Page 2 of 5 Revision : 03 Revision Date : 31st MAR, 2012


NOVATEX LIMITED SOP / E&I / 04

REVISION DATES
S. No. DOCUMENT NO. DOCUMENT TITLE PREPARED BY REVIEWED BY APPROVED BY
LAST LATEST

41 SOP / E & I / 41 CALIBRATION OF SCHENCK UNIT CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

42 SOP / E & I / 42 SSP PLANT LOAD SHIFTING CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

CALIBRATION OF DIGITAL TRANSMITTER FOR


43 SOP / E & I / 43 (PRESSURE, DIFFERENTIAL PRESSURE, FLOW & CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
LEVEL).
CALIBRATION OF RADIOACTIVE BASED LEVEL
44 SOP / E & I / 44 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
MONITORING SYSTEM
ADJUSTMENT OF SELF ACTUATED PRESSURE
45 SOP / E & I / 45 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
CONTROL VALVE

46 SOP / E & I / 46 CALIBRATION OF MICROMOTION FLOW METER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

47 SOP / E & I / 47 FUNCTION TESTING & CLEANING OF LEVEL SWITCH CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

48 SOP / E & I / 48 FUNCTION TESTING & ADJUSTMENT OF FLOW SWITCH CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

CHECKING / VERIFICATION OF FIELD TEMPERATURE


49 SOP / E & I / 49 ELEMENT (Pt-100) / RESISTANCE TEMPERATURE CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012
DETECTOR (RTD)

50 SOP / E & I / 50 CHECKING OF TEMPERATURE SWITCH THERMOSTAT CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

FUNCTION TESTING & ADJUSTMENT OF PRESSURE


51 SOP / E & I / 51 CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
INDICATOR SWITCH
MAGNETIC LEVEL GAUGE FUNCTION TESTING /
52 SOP / E & I / 52 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 JAN-2012
CLEANING

53 SOP / E & I / 53 CALIBRATION OF FIELD DIGITAL INDICATOR CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

54 SOP / E & I / 54 CLEANING / ADJUSTMENT OF PROXIMITY SENSOR CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

FUNCTION TESTING OF DIGITAL TEMPERATURE


55 SOP / E & I / 55 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
CONTROLLER

56 SOP / E & I / 56 CALIBRATION OF P.H. METER CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999

57 SOP / E & I / 57 CALIBRATION OF CONDUCTIVITY METER CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999

58 SOP / E & I / 58 DOWN-LOAD / UP-LAOD PLC PROGRAM PROCEDURE CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

59 SOP / E & I / 59 FUNCTION TEST OF ROTARY FLOW COUNTER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

60 SOP / E & I / 60 DE-CHOCKING OF VAPOUR LINE CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

Page 3 of 5 Revision : 03 Revision Date : 31st MAR, 2012


NOVATEX LIMITED SOP / E&I / 04

REVISION DATES
S. No. DOCUMENT NO. DOCUMENT TITLE PREPARED BY REVIEWED BY APPROVED BY
LAST LATEST

61 SOP / E & I / 61 CALIBRATION OF SUB MASTER DIGITAL MULTIMETER CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

62 SOP / E & I / 62 HOUSE KEEPING CONCERNED HOD CONCERNED HOD GMP / MR JAN-2012

63 SOP / E & I / 63 PROVIDING TEMPORARY ELECTRICAL CONNECTION CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

64 SOP / E & I / 64 CALIBRATION OF SUB MASTER DIGITAL INDICATOR CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

CALIBRATION OF SUB MASTER PRESSURE


65 SOP / E & I / 65 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
TRANSMITTER

CALIBRATION OF SUB MASTER DIGITAL TEMPERATURE


66 SOP / E & I / 66 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
INDICATOR (Pt-100 / RTD INPUT POINT)

CALIBRATION & CHECKING OF SUB-MASTER


67 SOP / E & I / 67 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 JAN-2012
TEMPERATURE INDICATOR

CHECKING OF SUB-MASTER TEMPERATURE ELEMENT


68 SOP / E & I / 68 CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012
(Pt-100)

69 SOP / E & I / 69 CLEANING OF ALTERNATOR CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

70 SOP / E & I / 70 CHECKING OF IGNITION CABLE CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

71 SOP / E & I / 71 CLEANING / CHECKING OF SPEED PICK UP SENSOR CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

72 SOP / E & I / 72 CHECKING / TIGHTNESS OF ELECTRICAL CONTACTS CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012

CALIBRATION OF FIELD PANEL METERS (VOLTAGE,


73 SOP / E & I / 73 CONCERNED HOD CONCERNED HOD GMP / MR NOV 1999 FEB-2012
FREQUENCY & CURRENT METERS)

74 SOP / E & I / 74 CALIBRATION OF DIGITAL WEIGHING SCALE CONCERNED HOD CONCERNED HOD GMP / MR OCT 1999 FEB-2012

REPLACEMENT OF TABULAR HEATER IN A


75 SOP / E & I / 75 CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
DISTRIBUTOR

76 SOP / E & I / 76 SET POINT CHANGING OF ROTORY FLOW COUNTER CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

CLEANING / ADJUSTMENT OF RADAR LEVEL


77 SOP / E & I / 77 CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
TRANSMITTER
CALIBRATION OF FMC 662 TYPE CAPACITIVE LEVEL
78 SOP / E & I / 78 CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012
TRANSMITTER

79 SOP / E & I / 79 CHECKING OF NITROGEN FLOW TRANSMITTER CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012

80 SOP / E & I / 80 CHECKING OF ELECTRONIC TURBINE FLOW METER CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012

81 SOP / E & I / 81 CHECKING OF FLOW METER CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012

Page 4 of 5 Revision : 03 Revision Date : 31st MAR, 2012


NOVATEX LIMITED SOP / E&I / 04

REVISION DATES
S. No. DOCUMENT NO. DOCUMENT TITLE PREPARED BY REVIEWED BY APPROVED BY
LAST LATEST

82 SOP / E & I / 82 CUTTERS INTER-CHANGING / TAKING IN-LINE CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

COMMISSIONING, CALIBRATION & MONITORING OF


83 SOP / E & I / 83 CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012
HYDROCARBON ANALYZER

84 SOP / E & I / 84 CALIBRATION OF ZIRCONIA OXYGEN ANALYZER CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012

CHECKING / VERIFICATION OF FIELD TEMPERATURE


85 SOP / E & I / 85 CONCERNED HOD CONCERNED HOD GMP / MR SEP 2002 FEB-2012
TRANSMITTER

REPLACEMENT OF FIRE ALARM SWITCH / GLASS /


86 SOP / E & I / 86 CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
SMOKE DETECTOR

87 SOP / E & I / 87 PAINTING OF ELECTRICAL EQUIPMENTS CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

88 SOP / E & I / 88 FLU GAS ANALYZING CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

89 SOP / E & I / 89 CHECKING OF PHOTO-EYE SENSORS CONCERNED HOD CONCERNED HOD GMP / MR NOV 2008 FEB-2012

90 SOP / E & I / 90 RADIATION EMERGENCY CONCERNED HOD CONCERNED HOD GMP / MR JULY-2010

91 SOP / E & I / 91 CLEANING OF DCS COMPUTERS CONCERNED HOD CONCERNED HOD GMP / MR JAN-2012

92 SOP / E & I / 92 REPLACEMENT OF DCS WORKSTATION CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

93 SOP / E & I / 93 DELTA-V COLD RESTART CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

94 SOP / E & I / 94 GREASING OF HYDRAULIC MOTORS CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

95 SOP / E & I / 95 CALIBRATION OF REXROTH AMPLIFIER CARD CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

CHECKING OF SERVO VALVE THROUGH BREAKOUT


96 SOP / E & I / 96 CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
BOX

97 SOP / E & I / 97 TORQUE CHECKING OF SIEMENS 611U DRIVE DC CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
BUS BAR SCREW

98 SOP / E & I / 98 DELTA-V SOFTWARE BACKUP CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012

99 SOP / E & I / 99 CAMERA SURVEILLANCE SYSTEM INSTALLATION & CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012
MONITORING

100 SOP / E & I / 100 REPLACEMENT OF RADIO ACTIVE SOURCE CONCERNED HOD CONCERNED HOD GMP / MR FEB-2012