TRANSFORMER INSPECTION CHECKLIST
For use of this form see TM 5-694; the proponent agency is COE.
SECTION A - CUSTOMER DATA
1. PLANT/BUILDING 2. LOCATION 3. JOB NUMBER
4. EQUIPMENT 5. CIRCUIT DESIGNATION 6. DATE (YYYYMMDD)
7. TEST EQUIPMENT TYPE/BRAND AND CALIBRATION DATE 8. TESTED BY
SECTION B - EQUIPMENT DATA
9. MANUFACTURER 10. STYLES/S.O. 11. VOLTAGE RATING 12. CURRENT RATING
13. WET BULB TEMPERATURE 14. DRY BULB TEMPERATURE 15. ENCLOSURE TYPE 16. FREQUENCY
SECTION C - VISUAL AND ELECTRICAL/MECHANICAL INSPECTION
17.
CHECK POINT COND* NOTES CHECK POINT COND* NOTES
PROPER PHASE CONNECTION AND COLOR
EXTERIOR OF EQUIPMENT
CODE
COMPLETENESS OF ASSEMBLY HAZARDOUS LOCATION
PROPER GROUNDING WORKING CLEARANCE
CONDITION OF INSULATION ANCHORAGE
TIGHTNESS OF BOLTED CONNECTIONS REFERENCE DRAWINGS
SEALS AND OIL LEVELS TURNS RATIO MEASUREMENTS
WINDING CONFIGURATION AUXILIARY DEVICE OPERATION
SECTION D - ELECTRICAL TESTS
18. INSULATION RESISTANCE A-GRD B-GRD C-GRD A-B B-C C-A
@ V
POLARIZATION INDEX
TURNS RATIO TEST
POWER FACTOR
PROPER VOLTAGE
19. NOTES:
1. PERFORM GROUND RESISTANCE TESTS PRIOR TO ENERGIZING EQUIPMENT.
2. GROUND RESISTANCE TESTS MUST BE PERFORMED IN DRY CONDITIONS AND SHALL BE PERFORMED
48 HOURS AFTER RAINFALL.
*CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA=NOT APPLICABLE
DA FORM 7464-R, AUG 2002 APD LC v1.00