Indwell Constructions Private Limited Bhel/Nttps/U#8/Vijayawada Erection Programme For The Month of October'19

This document outlines the erection program for Indwell Constructions Private Limited for unit #8 of the NTTPS power plant in Vijayawada for the month of October 2019. It details the planned work for various structures, pressure parts, non-pressure parts, air preheater, and rotary parts. The total estimated weight to be erected is 556 metric tons. Immediate clearance and foundations are required for roads, mills, feeders and bunker columns.

Uploaded by

Alanka Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views6 pages

Indwell Constructions Private Limited Bhel/Nttps/U#8/Vijayawada Erection Programme For The Month of October'19

This document outlines the erection program for Indwell Constructions Private Limited for unit #8 of the NTTPS power plant in Vijayawada for the month of October 2019. It details the planned work for various structures, pressure parts, non-pressure parts, air preheater, and rotary parts. The total estimated weight to be erected is 556 metric tons. Immediate clearance and foundations are required for roads, mills, feeders and bunker columns.

Uploaded by

Alanka Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

INDWELL CONSTRUCTIONS PRIVATE LIMITED

BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

SL. NO. DESCRIPTION UNIT#1 REMARKS


1 STRUCTURE 147.000
2 PRESSURE PARTS 10.000
3 NON PRESSURE PARTS 224.000
4 APH 0.000
5 ROTARY PARTS 175.000
GRAND TOTAL 556.00 0.00

1 ROADS REQ. FOR MATERIAL MOVEMENT.


2 RHS MILLS FOUNDATIONS REQUIRED IMMEDIATELY.
3 LHS FEEDER ERECTION CLEARANCE REQUIRED IMMEDIATELY.
4 RHS BUNKER COLUMNS REQUIRED IMMEDIATELY.
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
1 35 GROUP 2.000
2 36 GROUP ALL PLATFORMS 70.000
36&38 75.000 RHS BUNKER COLUMNS
3 GROUP ALL PLATFORMS REQUIRED.

147.000

TOTAL 147.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
NON PRESSURE PARTS
1 48-012 FD DISCHARGE DUCT 55.000 PG 39 STRT. REQUIRED
2 48-112 PA DISCHARGE DUCT 14.000 PG 39 STRT. REQUIRED
3 48-142 TEMPERING DUCT 25.000 FEEDER FLOOR REQ.
4 48-222 PRIMARY HOT AIR DUCT 30.000 RHS BUNKER COLUMN REQ.
5 48-267 SOFA FLOW METERS 2.000
6 48-432 APH O/L TO BOF DUCT 30.000 PG 39 STRT. REQUIRED
7 48-662 MILL DUCT 10.000 RHS BUNKER COLUMN REQ.
8 57-010 FD DISCHARGE DUCT GATE 13.000 PG 39 STRT. REQUIRED
9 57-110 PA DISCHARGE DUCT GATE 10.000 PG 39 STRT. REQUIRED
10 30 GROUP FURNACE ENCLOSERS 10.000
11 47 GROUP COAL PIPE 15.000
12 45-858 BURNER SUPPORTS 10.000
13

224.000

TOTAL 224.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
PPARTS
1 ALL PRESSURE PARTS 10.000

10.000

TOTAL 10.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
AIR PRE HEATER
1

0.000

TOTAL 0.000
INDWELL CONSTRUCTIONS PRIVATE LIMITED
BHEL/NTTPS/U#8/VIJAYAWADA
ERECTION PROGRAMME FOR THE MONTH OF OCTOBER'19

WEIGHT
SL. NO. PGMA DESCRIPTION REMARKS
IN MT
ROTARY PARTS
FOUNDATION REQ. FOR MILLS
1 MILL A,B&C 175.000 A,B,C,D

175.000

TOTAL 175.000