SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full

The document is a quiz summary from an SAP Certified Application Associate exam for SAP S/4HANA Production Planning and Manufacturing. It provides questions asked in the exam and the user's responses and scores. The questions cover topics like MRP planning runs, routing operations, material statuses, production order types, repetitive manufacturing, and availability checks. The user answered 14 out of 15 questions correctly, scoring 94%.

Uploaded by

TRAINER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
597 views32 pages

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full

The document is a quiz summary from an SAP Certified Application Associate exam for SAP S/4HANA Production Planning and Manufacturing. It provides questions asked in the exam and the user's responses and scores. The questions cover topics like MRP planning runs, routing operations, material statuses, production order types, repetitive manufacturing, and availability checks. The user answered 14 out of 15 questions correctly, scoring 94%.

Uploaded by

TRAINER
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

SAP Certified Application Associate - SAP S/4HANA


Production Planning and Manufacturing - Full

You got 75 of 80 possible points.


Your score was: 94 %

Question Results

Question: Score 1 of 1

Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.

Response:

Planning horizon

Parallel processing across servers

MRP list

Net change planning

Question: Score 1 of 1

Which time elements are part of a routing operation?


There are 3 correct answers to this question.

Response:

Move time

Queue time

Wait time

Pick/pack time

Float before production

https://www.erpprep.com/user/quiz/1748826/userresults 1/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

When working with both cross-plant and plant-specific material statuses in the
mater al master, which status has the highest priority?
Please choose the correct answer.

Response:

The least restrictive status

The most restrictive status

The cross-plant status

The plant-specific status

Question: Score 1 of 1

Which SAP solutions support the supplier area in the portfolio of the Digital
Value Network?
There are 3 correct answers to this question.

Response:

SAP Field glass

SAP Concur

SAP Ariba

SAP SuccessFactors

SAP S/4HANA

Question: Score 1 of 1

Which of the following business processes are controlled by production order


type-dependent parameters?
There are 2 correct answers to this question.

Response:

Engineering change management

Planning
https://www.erpprep.com/user/quiz/1748826/userresults 2/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Inspection during production

Implementation

Question: Score 1 of 1

Which of the following functions can be performed when the production order
has the status “Created” (CRTD)?
Please choose the correct answer.

Response:

A user trigger printing of shop floor paper manually (transaction CO02).

A user can trigger material staging via mass processing (transaction COHV).

A user can schedule a background job to release production orders (transaction


COOIS).

A user trigger material availability check via mass processing (transaction COHV)

Question: Score 1 of 1

You are creating a production order manually. What activities are involved in
this process?
There are 3 correct answers to this question.

Response:

Actual cost calculation

Capacity requirements determination

Master data selection

Planning selection

Order type determination

https://www.erpprep.com/user/quiz/1748826/userresults 3/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which options do you have to plan both quant ties and capacities during line
loading in repetitive manufacturing?
There are 2 correct answers to this question.

Response:

Assign planned orders manual lying the planning table.

Run PP/DS heuristics for repetitive manufacturing.

Run MRP with automatic selection of production version.

Run MRP with quota arrangement.

Question: Score 1 of 1

Advanced Planning is delivered with standard out-of-the-box order and resource


evaluations. Which evaluations are available?
There are 2 correct answers to this question.

Response:

Order list

Resource utilization

Resource overview

Production list

Question: Score 1 of 1

A material has been set up as a phantom assembly by entering the special


procurement key in the material master. How can you switch off the phantom
assembly in a specific bill of material (BOM)?

Please choose the correct answer.

Response:

Change the item category of the phantom assembly in the BOM.

Change the special procurement key of the phantom assembly in the BOM.

https://www.erpprep.com/user/quiz/1748826/userresults 4/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Change the phantom item indicator for the phantom assembly in the BOM.

Change the explosion type of the phantom assembly in the BOM.

Question: Score 1 of 1

Which of the following time elements does MRP use during backward scheduling
for in-house production?
There are 2 correct answers to this question.

Response:

Goods receipt processing time

Planning time fence

Planned delivery time

Opening period

Question: Score 1 of 1

Which material master setting is required to use the repetitive planning table for
production with production orders?
Please choose the correct answer.

Response:

The Selection Method must be set to “2 Selection by production version”.

An overall profile be assigned on the Work Scheduling view

A repetitive manufacturing profile must be assigned on the MRP4 view

At least one valid production version must exist on the MRP4 view

Question: Score 0 of 1

On which of the following levels can you influence the availability check for the
components of production orders?
There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/1748826/userresults 5/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

Production order type

MRP controller

Production controller

Material master

Question: Score 1 of 1

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Transfers from batch to batch

Stock transfers

Planned orders

Purchase orders

Collective orders

Question: Score 1 of 1

What are uses of the low- level code assigned to each material?
There are 2 correct answers to this question.

Response:

It is used by engineering to identify sub items in engineering bill of materials


(BOMs).

It is used by ATP to determine the priority of alternative components.

It is used in MRP to determine the sequence in which materials are planned.

It is used by product costing to determine how costs are rolled up

https://www.erpprep.com/user/quiz/1748826/userresults 6/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.

Response:

Use a specific MRP type.

Use a specific material status.

Use a specific MRP controller.

Use a specific material group

Question: Score 1 of 1

For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.

Response:

Plant

Production version

Material

Work center

Question: Score 1 of 1

Your customer is using storage location is in SAP ECC and wants to switch to
SAP S/4HANA. What do you have to consider?
Please choose the correct answer.

Response:

MRP Live does NOT support storage locations, but classic MRP still does.

Storage location MRP is replaced by MRP area functionality.

Storage locations are NO longer supported.


https://www.erpprep.com/user/quiz/1748826/userresults 7/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

You have to set one MRP area for every storage location.

Question: Score 1 of 1

Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.

Response:

SAP Fieldglass

SAP Visual Enterprise

SAP Hybris

SAP Human Capital Management

Concur

Question: Score 1 of 1

In which material master views can you select the batch management
checkbox?
There are 2 correct answers to this question.

Response:

Work Scheduling

MRP 4

Purchasing

Basic Data 1

Question: Score 1 of 1

In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.

https://www.erpprep.com/user/quiz/1748826/userresults 8/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

Control recipe
Process order
PI sheet
Process message

Process order
Control recipe
Process message
PI sheet

Control recipe
Process order
Process message
PI sheet

Process order
Control recipe
PI sheet
Process message

Question: Score 1 of 1

Your project uses process orders for the production of liquid chemicals. What
can you define to ensure that the production flow happens only in physically
connected tanks?
Please choose the correct answer.

Response:

Setup matrix

Resource network

Work center hierarchy

Operation network

Question: Score 1 of 1

What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/1748826/userresults 9/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Pre computed aggregation views

Online analytical processing (OLAP)

Extract on, transformation, and loading (ETL)

Online transaction processing (OLTP)

Question: Score 1 of 1

What generates capacity requirements in a process order?


Please choose the correct answer.

Response:

Operations

Activities

Phases

Resources

Question: Score 1 of 1

Which automotive-specific functionality is embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Enhanced characteristics based processes

Equipment and Tools Management

Packaging Logistics

Parts interchangeability

Enhanced Kanban Processing

https://www.erpprep.com/user/quiz/1748826/userresults 10/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which functional capabilities does the Detailed Scheduling Board have?


There are 2 correct answers to this question.

Response:

Undo for drag & Drop planning activities

Change planned order quantities

Enter time-ticket confirmation for production orders

Change sales order quantities

Question: Score 1 of 1

The setup time on the production line to produce a material is extensive. You
would like to avoid multiple setups and limit the production of the material
based on a planning calendar.

Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.

Response:

Periodic lot sizing

Exact lot sizing

Fixed lot sizing

Minimum lot sizing

Question: Score 1 of 1

Where can you find the latest in version of the Simplification List for SAP
S/4HANA?
Please choose the correct answer.

Response:

SAP Solution Manager 7.2

SAP Help Portal

https://www.erpprep.com/user/quiz/1748826/userresults 11/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

SAP Best Practices Explorer

SAP Support Portal

Question: Score 1 of 1

During planning you are facing an overload situation on a resource. Which


activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.

Response:

Use a bucket-oriented capacity check

Use DS heuristic “Schedule Sequence”

Use multilevel MRP run for the products on the resource

Use optimization with respect to set-up times

Use rescheduling with an alternative mode

Question: Score 1 of 1

You want to integrate an existing planned order into Advanced Production


Planning. Which report do you use?
Please choose the correct answer.

Response:

/SAPAPO/CREATE_LOCATION

/SAPAPO/UPD_LOC_SP_PL

/SAPAPO/CURTO_CREATE

/SAPAPO/PPDS_DELTA_ORD_TRANS

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/1748826/userresults 12/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?

Please choose the correct answer.

Response:

Top of Red Base

Top of Red

Top of Green

Top of Yellow

Question: Score 1 of 1

Which of the following elements does MRP take into account during net
requirement calculation?
There are 2 correct answers to this question.

Response:

Maximum stock level

Lot size

Purchase orders

Safety stock

Question: Score 1 of 1

What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.

Response:

Material to production version assignment

Component assignment

Routing to sequence assignment

https://www.erpprep.com/user/quiz/1748826/userresults 13/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Material to routing assignment

Material to bill of materials (BOM) assignment

Question: Score 1 of 1

What new technology is used in SAP S/4HANA Embedded Analytics?


Please choose the correct answer.

Response:

Multidimensional Reporting client (MDRC)

HANA Live

Smart Business Cockpit

ABAP Managed Core Data Services (CDS)

Question: Score 1 of 1

Mode selection is one of the scheduling options available in Advanced Planning


in SAP S/4HANA. When can you use mode selection?
Please choose the correct answer.

Response:

When multiple production versions are maintained for one product

When multiple planned orders exist on one resource

When multiple operations are maintained for one product

When alternate resources are used within one operation

Question: Score 1 of 1

Which material master data can you copy when you use the Copy Material
program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.

Response:
https://www.erpprep.com/user/quiz/1748826/userresults 14/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

MRP area data

Warehouse number data

Production version data

Storage location data

Question: Score 0 of 1

In order to use strategy 70 – Planning At Assembly Level, what order field must
be set besides the planning strategy?
Please choose the correct answer.

Response:

Dependent Requirements indicator

Individual/Collective Indicator

Mixed MRP indicator

Storage Location MRP Indicator

Question: Score 1 of 1

Which of the following are included as SAP S/4HANA Sales Simplifications?


There are 3 correct answers to this question.

Response:

Settlement Management replaces ERP SD Rebates

SAP Sales Support replaces SAP CRM

SAP GTS replaces ERP SD Foreign Trade

SAP order Fulfillment replaces ERP SD Availability Checking

SAP Revenue Accounting replaces ERP SD Revenue Recognition

https://www.erpprep.com/user/quiz/1748826/userresults 15/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

What are possible configuration steps when setting up the alert monitor in
Advanced Planning?
There are 3 correct answers to this question.

Response:

Assign the overall profile to the authorization profile.

Create object selection variant for resource-related alerts

Create object selection variant for transportation lane-related alerts.

Create object selection variant for product-related alerts.

Assign the alert profile to the overall profile.

Question: Score 1 of 1

What must be used in the system to plan the requirements for different
subcontractors separately?

Response:

Production versions

Storage locations

Planning plant

MRP areas

Question: Score 1 of 1

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Long-term production planning

Source determination for external procurement

Calculation of inventory buffer size


https://www.erpprep.com/user/quiz/1748826/userresults 16/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Optimization of the production plan

Question: Score 1 of 1

Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.

Response:

Rate routing

Control cycle

Production supply area

Kanban container

Question: Score 1 of 1

What are main innovations in manufacturing in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Rough-cut capacity planning

Lock-free inventory movements

Flow manufacturing

Material Coverage Fiori app

Monitor Production Orders Fiori app

Question: Score 1 of 1

What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.

https://www.erpprep.com/user/quiz/1748826/userresults 17/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

Wait

Full

Empty

In use

Question: Score 1 of 1

When would you use reporting point backflush in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

When goods issues can wait for final confirmation

For production lines with short lead times

When you need to determine the work in progress

You require an up-to-date inventory for components

Question: Score 1 of 1

You want to triggering-house production of a semi-finished mater al before a


sales order for the corresponding finished good is received.

Which planning strategy supports the consumption of planned independent


requirements for the semi-finished material?
Please choose the correct answer.

Response:

Planning at assembly level (70)

Planning without final assembly (50)

Make-to-order production (20)

Planning with final assembly (40)

https://www.erpprep.com/user/quiz/1748826/userresults 18/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 0 of 1

In Demand-Driven Replenishment, materials are classified according to several


criteria. What criteria can you use?
There are 3 correct answers to this question.

Response:

Minimum order quantity

Usage in bill of materials

Goods issue value

Average daily usage

Demand variation

Question: Score 1 of 1

Your quality department detects a deviation in a raw material batch.


Unfortunately, this batch has already been used in production. How can you
identify all affected finished goods stocks?

Please choose the correct answer.

Response:

Use the material staging report.

Use the material where-used report.

Use batch determination.

Use the batch information cockpit.

Question: Score 1 of 1

In Make-to-order production, which field controls whether the components will


be planned as sales order specific stock?
Please choose the correct answer.

Response:

The MRP Type of the component

https://www.erpprep.com/user/quiz/1748826/userresults 19/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

The item category of the component in the BOM

The Planning Strategy of the finished product

The Individual/Collective indicator of the component

Question: Score 1 of 1

Which warehouse management functions are available in SAP EWM but NOT in
SAP WM?
There are 3 correct answers to this question.

Response:

Slotting

Yard Management

Expected goods receipt

Labor Management

Handling Unit Management

Question: Score 1 of 1

In your project, you have several materials that are planned by different people.
How can you assign the planning responsibility?
Please choose the correct answer.

Response:

MRP group

MRP controller

MRP planning file

MRP type

Question: Score 1 of 1
https://www.erpprep.com/user/quiz/1748826/userresults 20/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

You are using heuristic SAP_ERP_001. Which of the following criteria are
included in the automatic source determination logic when a planned order is
created?
Please choose the correct answer.

Response:

Delivery date

Quota arrangement

Costs

Component availability

Vendor rating

Question: Score 1 of 1

What is the first step in the MRP run?


Please choose the correct answer.

Response:

BOM explosion

Source determination

Net requirements calculation

Lot size calculation

Question: Score 1 of 1

Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.

Response:

Shipments

Material documents

Sales orders

https://www.erpprep.com/user/quiz/1748826/userresults 21/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Planned independent requirements

Question: Score 1 of 1

What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Building Blocks

Scope Items

Test Scripts

Process Flows

Solution Package

Question: Score 1 of 1

Your project team decides to use a make-to-order planning strategy for a


strategic material in discrete manufacturing. What is the impact of this decision?
There are 3 correct answers to this question.

Response:

Sales order-specific stock is created

Storage location MRP areas are required.

Sales order-specific planning run is required.

Net requirements calculation is sales order-specific.

Production orders are created with sales order reference.

Question: Score 1 of 1

What are pillars of SAP Activate?


There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/1748826/userresults 22/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Response:

SAP Best Practices

Guided Configuration

SAP MaxAttention

Premium engagement

Question: Score 1 of 1

What are properties of MRP Live?


There are 2 correct answers to this question.

Response:

The code is written in SQL Script

Data is read sequentially from the database tables

It is executed on the database server

It uses the same BAdis as classic MRP

Question: Score 1 of 1

What are benefits of the Engineering Workbench?


There are 2 correct answers to this question.

Response:

Simulation of planned changes for costing and mater all requirements planning

Simultaneous processing of different bill of materials (BOM) items and operations

Detailed selection of bill of materials (BOM)items and operations

Undo/redo functionality of planned changes

Question: Score 0 of 1

https://www.erpprep.com/user/quiz/1748826/userresults 23/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Your customer complains about incorrect duration for production order


operations. What time elements could cause the issue?
There are 3 correct answers to this question.

Response:

Move time

Queue time

Processing time

Tear down time

Floating time

Question: Score 1 of 1

What does a line hierarchy in repetitive manufacturing represent?


Please choose the correct answer.

Response:

A production line with an alternative sequence in the routing

A production line with more than one work center

A production line with a parallel sequence in the routing

A production line with prioritized alternative work centers

Question: Score 1 of 1

Production orders are used for what production type?


Please choose the correct answer.

Response:

Replenishment controlled by control cycles

Period and quantity-oriented production

Process manufacturing processes

https://www.erpprep.com/user/quiz/1748826/userresults 24/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Discrete manufacturing processes

Question: Score 1 of 1

Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.

Response:

The maximum mater all number length is 40 for external numbers and 18 for
internal numbers

In Customizing you can decide by material type whether to use the long material
number.

The display template for material numbers applies to all clients.

The number of leading zeros for internal numbers is client-specific.

Question: Score 1 of 1

What are the consequences when you assign a planned order to a production
line manually, using the planning table in repetitive manufacturing?
Please choose the correct answer.

Response:

The planned order's components are copied o the picking list.

The planned order generates capacity requirements.

The planned order is converted a production order.

The planned order's component availability is checked

Question: Score 1 of 1

Which of the following is an advantage of MRP Live and NOT available in


classical MRP?
There are 2 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/1748826/userresults 25/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

MRP Live can plan materials with recursive BOMs

MRP Live can propose alternative solutions

MRP Live can create production orders automatically

MRP Live can priorities demand from sales orders

Question: Score 1 of 1

What does it mean for the production planner when MRP works with infinite
capacities?
Please choose the correct answer.

Response:

MRP creates capacity requirements only if the work center has sufficient capacity.

MRP creates capacity requirements without checking the capacity of a work center.

MRP assigns capacity requirements automatically to work center is with the earliest
available capacity.

MRP assigns capacity requirements automatically after the last scheduled order on
a work center.

Question: Score 1 of 1

Which time elements can be reduced by a reduction strategy?


There are 3 correct answers to this question.

Response:

Move time

Queue time

Float after production

Wait time

Goods receipt processing time

https://www.erpprep.com/user/quiz/1748826/userresults 26/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Which of the following apply to MRP Live?


There are 2 correct answers to this question.

Response:

The sequence of planning materials is calculated across plants.

Planned orders need to be converted to purchase requisitions for externally


procured materials.

The BAdIs for classical MRP also apply to MRP Live.

The definition of the planning scope is more flexible.

Question: Score 1 of 1

When can the material availability check occur automatically in a production


order?
There are 2 correct answers to this question.

Response:

At order release

At order confirmation

At order settlement

At order creation

Question: Score 1 of 1

In the Manage Shortage view of the new SAP Fiori app “Monitor Material
Coverage”, what do the stars indicate?
Please choose the correct answer.

Response:

The priority of the proposed solution

The presence of production orders

The viability of the proposed solution


https://www.erpprep.com/user/quiz/1748826/userresults 27/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

The presence of firmed planned orders

Question: Score 0 of 1

Which methods can you use achieve a feasible production planning case of
capacity constraints?
There are 3 correct answers to this question.

Response:

Adjust the available capacity.

Reduce the planning window.

Select an alternative mode on a resource.

Form optimal sequences to reduce setup times.

Execute a new production planning run.

Question: Score 1 of 1

In which of the following master data objects can you define the production
order default storage location for a material component?
There are 2 correct answers to this question.

Response:

Material master of the finished product

Routing, in the component allocation

Work center, in the production supply area

BOM, in the item for the material

Question: Score 1 of 1

Which master data object governs the relationship between supply source and
demand source in the Kanban process?
https://www.erpprep.com/user/quiz/1748826/userresults 28/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Please choose the correct answer.

Response:

Replenishment strategy

Production supply area

Control cycle

Rate routing

Question: Score 1 of 1

Which options are available for an SAP S/4HANA deployment?


There are 2 correct answers to this question.

Response:

SAP S/4HANA on premise

SAP S/4AHANA Enterprise Management cloud

SAP S/4HANA Professional services cloud

SAP S/4HANA private cloud

Question: Score 1 of 1

How does the new Inventory Management Data model contribute to the
reduction of the data footprint?
There are 3 correct answers to this question.

Response:

By eliminating material master tables

By eliminating hybrid tables

By eliminating inventory tables

By eliminating inventory history tables

By eliminating fields for different stock types


https://www.erpprep.com/user/quiz/1748826/userresults 29/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Question: Score 1 of 1

Why would you use phantom assemblies?


There are 3 correct answers to this question.

Response:

To increase the number of planning levels

To reduce the number of changes required in bills of materials

To reduce the number of material masters

To simplify the structure of bills of materials

To make the assignment of components easier

Question: Score 1 of 1

How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.

Response:

Reorganize planned independent requirements

Maintain adjustment parameter in the MRP group

Set the requirements reduction indicator in the requirements class

Use a planning strategy with requirements consumption

Question: Score 1 of 1

Which process order function uses a resource network?


Please choose the correct answer.

Response:

Capacity leveling
https://www.erpprep.com/user/quiz/1748826/userresults 30/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep

Resource scheduling

Resource selection

Capacity planning

Question: Score 1 of 1

Which of the following data objects are updated when a user confirms an
operation?
Please choose the correct answer.

Response:

Warehouse transfer order status

Production order total order quantity

Production order header status

Shop floor information system

Question: Score 1 of 1

The material master of your finished product contains MRP type “PD”. You set a
manual firming date in the stock requirements list. Which of the following will
firm planned orders”
There are 2 correct answers to this question.

Response:

Setting a planning time fence in the Material Master Record

Assigning a production scheduling profile

Creating a planned order within the planning time fence

Manually changing the quantity of a planned order

https://www.erpprep.com/user/quiz/1748826/userresults 31/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep