Question Results
Question: Score 1 of 1
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
Planning horizon
MRP list
Question: Score 1 of 1
Response:
Move time
Queue time
Wait time
Pick/pack time
https://www.erpprep.com/user/quiz/1748826/userresults 1/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
When working with both cross-plant and plant-specific material statuses in the
mater al master, which status has the highest priority?
Please choose the correct answer.
Response:
Question: Score 1 of 1
Which SAP solutions support the supplier area in the portfolio of the Digital
Value Network?
There are 3 correct answers to this question.
Response:
SAP Concur
SAP Ariba
SAP SuccessFactors
SAP S/4HANA
Question: Score 1 of 1
Response:
Planning
https://www.erpprep.com/user/quiz/1748826/userresults 2/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Implementation
Question: Score 1 of 1
Which of the following functions can be performed when the production order
has the status “Created” (CRTD)?
Please choose the correct answer.
Response:
A user can trigger material staging via mass processing (transaction COHV).
A user trigger material availability check via mass processing (transaction COHV)
Question: Score 1 of 1
You are creating a production order manually. What activities are involved in
this process?
There are 3 correct answers to this question.
Response:
Planning selection
https://www.erpprep.com/user/quiz/1748826/userresults 3/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Which options do you have to plan both quant ties and capacities during line
loading in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
Question: Score 1 of 1
Response:
Order list
Resource utilization
Resource overview
Production list
Question: Score 1 of 1
Response:
Change the special procurement key of the phantom assembly in the BOM.
https://www.erpprep.com/user/quiz/1748826/userresults 4/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Change the phantom item indicator for the phantom assembly in the BOM.
Question: Score 1 of 1
Which of the following time elements does MRP use during backward scheduling
for in-house production?
There are 2 correct answers to this question.
Response:
Opening period
Question: Score 1 of 1
Which material master setting is required to use the repetitive planning table for
production with production orders?
Please choose the correct answer.
Response:
At least one valid production version must exist on the MRP4 view
Question: Score 0 of 1
On which of the following levels can you influence the availability check for the
components of production orders?
There are 2 correct answers to this question.
https://www.erpprep.com/user/quiz/1748826/userresults 5/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
MRP controller
Production controller
Material master
Question: Score 1 of 1
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
Stock transfers
Planned orders
Purchase orders
Collective orders
Question: Score 1 of 1
What are uses of the low- level code assigned to each material?
There are 2 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 6/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.
Response:
Question: Score 1 of 1
For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.
Response:
Plant
Production version
Material
Work center
Question: Score 1 of 1
Your customer is using storage location is in SAP ECC and wants to switch to
SAP S/4HANA. What do you have to consider?
Please choose the correct answer.
Response:
MRP Live does NOT support storage locations, but classic MRP still does.
You have to set one MRP area for every storage location.
Question: Score 1 of 1
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
SAP Fieldglass
SAP Hybris
Concur
Question: Score 1 of 1
In which material master views can you select the batch management
checkbox?
There are 2 correct answers to this question.
Response:
Work Scheduling
MRP 4
Purchasing
Basic Data 1
Question: Score 1 of 1
In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.
https://www.erpprep.com/user/quiz/1748826/userresults 8/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
Control recipe
Process order
PI sheet
Process message
Process order
Control recipe
Process message
PI sheet
Control recipe
Process order
Process message
PI sheet
Process order
Control recipe
PI sheet
Process message
Question: Score 1 of 1
Your project uses process orders for the production of liquid chemicals. What
can you define to ensure that the production flow happens only in physically
connected tanks?
Please choose the correct answer.
Response:
Setup matrix
Resource network
Operation network
Question: Score 1 of 1
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 9/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Response:
Operations
Activities
Phases
Resources
Question: Score 1 of 1
Response:
Packaging Logistics
Parts interchangeability
https://www.erpprep.com/user/quiz/1748826/userresults 10/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Response:
Question: Score 1 of 1
The setup time on the production line to produce a material is extensive. You
would like to avoid multiple setups and limit the production of the material
based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
Question: Score 1 of 1
Where can you find the latest in version of the Simplification List for SAP
S/4HANA?
Please choose the correct answer.
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 11/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
/SAPAPO/CREATE_LOCATION
/SAPAPO/UPD_LOC_SP_PL
/SAPAPO/CURTO_CREATE
/SAPAPO/PPDS_DELTA_ORD_TRANS
Question: Score 1 of 1
https://www.erpprep.com/user/quiz/1748826/userresults 12/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Response:
Top of Red
Top of Green
Top of Yellow
Question: Score 1 of 1
Which of the following elements does MRP take into account during net
requirement calculation?
There are 2 correct answers to this question.
Response:
Lot size
Purchase orders
Safety stock
Question: Score 1 of 1
What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.
Response:
Component assignment
https://www.erpprep.com/user/quiz/1748826/userresults 13/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Response:
HANA Live
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Which material master data can you copy when you use the Copy Material
program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 14/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 0 of 1
In order to use strategy 70 – Planning At Assembly Level, what order field must
be set besides the planning strategy?
Please choose the correct answer.
Response:
Individual/Collective Indicator
Question: Score 1 of 1
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 15/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
What are possible configuration steps when setting up the alert monitor in
Advanced Planning?
There are 3 correct answers to this question.
Response:
Question: Score 1 of 1
What must be used in the system to plan the requirements for different
subcontractors separately?
Response:
Production versions
Storage locations
Planning plant
MRP areas
Question: Score 1 of 1
What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Question: Score 1 of 1
Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.
Response:
Rate routing
Control cycle
Kanban container
Question: Score 1 of 1
Response:
Flow manufacturing
Question: Score 1 of 1
What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.
https://www.erpprep.com/user/quiz/1748826/userresults 17/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
Wait
Full
Empty
In use
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 18/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 0 of 1
Response:
Demand variation
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 19/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Which warehouse management functions are available in SAP EWM but NOT in
SAP WM?
There are 3 correct answers to this question.
Response:
Slotting
Yard Management
Labor Management
Question: Score 1 of 1
In your project, you have several materials that are planned by different people.
How can you assign the planning responsibility?
Please choose the correct answer.
Response:
MRP group
MRP controller
MRP type
Question: Score 1 of 1
https://www.erpprep.com/user/quiz/1748826/userresults 20/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
You are using heuristic SAP_ERP_001. Which of the following criteria are
included in the automatic source determination logic when a planned order is
created?
Please choose the correct answer.
Response:
Delivery date
Quota arrangement
Costs
Component availability
Vendor rating
Question: Score 1 of 1
Response:
BOM explosion
Source determination
Question: Score 1 of 1
Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
Response:
Shipments
Material documents
Sales orders
https://www.erpprep.com/user/quiz/1748826/userresults 21/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Building Blocks
Scope Items
Test Scripts
Process Flows
Solution Package
Question: Score 1 of 1
Response:
Question: Score 1 of 1
https://www.erpprep.com/user/quiz/1748826/userresults 22/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
Guided Configuration
SAP MaxAttention
Premium engagement
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
Simulation of planned changes for costing and mater all requirements planning
Question: Score 0 of 1
https://www.erpprep.com/user/quiz/1748826/userresults 23/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
Move time
Queue time
Processing time
Floating time
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 24/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.
Response:
The maximum mater all number length is 40 for external numbers and 18 for
internal numbers
In Customizing you can decide by material type whether to use the long material
number.
Question: Score 1 of 1
What are the consequences when you assign a planned order to a production
line manually, using the planning table in repetitive manufacturing?
Please choose the correct answer.
Response:
Question: Score 1 of 1
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 25/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
What does it mean for the production planner when MRP works with infinite
capacities?
Please choose the correct answer.
Response:
MRP creates capacity requirements only if the work center has sufficient capacity.
MRP creates capacity requirements without checking the capacity of a work center.
MRP assigns capacity requirements automatically to work center is with the earliest
available capacity.
MRP assigns capacity requirements automatically after the last scheduled order on
a work center.
Question: Score 1 of 1
Response:
Move time
Queue time
Wait time
https://www.erpprep.com/user/quiz/1748826/userresults 26/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Question: Score 1 of 1
Response:
Question: Score 1 of 1
Response:
At order release
At order confirmation
At order settlement
At order creation
Question: Score 1 of 1
In the Manage Shortage view of the new SAP Fiori app “Monitor Material
Coverage”, what do the stars indicate?
Please choose the correct answer.
Response:
Question: Score 0 of 1
Which methods can you use achieve a feasible production planning case of
capacity constraints?
There are 3 correct answers to this question.
Response:
Question: Score 1 of 1
In which of the following master data objects can you define the production
order default storage location for a material component?
There are 2 correct answers to this question.
Response:
Question: Score 1 of 1
Which master data object governs the relationship between supply source and
demand source in the Kanban process?
https://www.erpprep.com/user/quiz/1748826/userresults 28/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Response:
Replenishment strategy
Control cycle
Rate routing
Question: Score 1 of 1
Response:
Question: Score 1 of 1
How does the new Inventory Management Data model contribute to the
reduction of the data footprint?
There are 3 correct answers to this question.
Response:
Question: Score 1 of 1
Response:
Question: Score 1 of 1
How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.
Response:
Question: Score 1 of 1
Response:
Capacity leveling
https://www.erpprep.com/user/quiz/1748826/userresults 30/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Resource scheduling
Resource selection
Capacity planning
Question: Score 1 of 1
Which of the following data objects are updated when a user confirms an
operation?
Please choose the correct answer.
Response:
Question: Score 1 of 1
The material master of your finished product contains MRP type “PD”. You set a
manual firming date in the stock requirements list. Which of the following will
firm planned orders”
There are 2 correct answers to this question.
Response:
https://www.erpprep.com/user/quiz/1748826/userresults 31/32
7/19/2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing - Full | ERPPrep
Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us
https://www.erpprep.com/user/quiz/1748826/userresults 32/32