Question - Certification Exam-New

The document describes an MRP run that resulted in an "Reschedule In Operation" exception message. This message indicates that the requirements date occurs before the firmed planned receipt date. It provides answers to multiple choice questions about MRP, production planning, and SAP S/4HANA capabilities. Key topics covered include MRP strategies, production order types, repetitive manufacturing, supply chain planning, and digital transformation aspects of SAP S/4HANA.

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
489 views94 pages

Question - Certification Exam-New

The document describes an MRP run that resulted in an "Reschedule In Operation" exception message. This message indicates that the requirements date occurs before the firmed planned receipt date. It provides answers to multiple choice questions about MRP, production planning, and SAP S/4HANA capabilities. Key topics covered include MRP strategies, production order types, repetitive manufacturing, supply chain planning, and digital transformation aspects of SAP S/4HANA.

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 94

At the end of the MRP run you receive the exception message “Reschedule In

Operation”. What caused the message to be generated?


Please choose the correct answer.

Response:

The requirements date occurs before that of a firmed planned receipt

Score 1 of 1
Question:

What could be the reason for multiple commitment of individual capacities, where
several operations have the same scheduled dates on a resource after capacity
planning?
There are 2 correct answers to this question.

Response:

The planning strategy is infinite.

The work center has several individual capacities.

Score 0 of 1
Question:
In which data objects do you maintain the production in as the work center for
repetitive manufacturing?
There are 2 correct answers to this question.

Response:

Production version

Routing

Score 1 of 1
Question:

In which data object is the production line (Repetitive manufacturing relevant


work center) maintained?
Please choose the correct answer.

Response:

Production version

Score 0 of 1
Question:

Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.

Response:

Control cycle

Score 0 of 1
Question:

What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Recommended SAP Fiori apps

Relevant simplification items


Custom code analysis

Score 0 of 1
Question:

Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Sales Order BOM

Functional Location BOM

Score 1 of 1
Question:

Which of the following business processes are controlled by production order


type-dependent parameters?
There are 2 correct answers to this question.

Response:

Implementation

Planning

Score 0 of 1
Question:

Where does the system check master data selection settings during the creation of
planned orders and production orders?
There are 3 correct answers to this question.

Response:

In the bill of materials (BOM)

In the routing

In the production version

Score 0 of 1
Question:

What are the key aspects of SAP S/4HANA?


There are 2 correct answers to this question.

Response:

SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of b

SAP S/4HANA is built on SAP HANA

Score 0 of 1
Question:

When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.

Response:

The most restrictive status

Score 1 of 1

Score 0 of 1
Question:

You want to schedule an operation finitely, without moving other operations.


Which scheduling strategy do you select?
Please choose the correct answer.

Response:

Find slot

Score 0 of 1
Question:

Which times are used for Basic Date Scheduling of manufacturing planned orders
in MRP?
There are 2 correct answers to this question.
Response:

Goods receipt processing time

Opening period

Score 0 of 1
Question:

Which functional capabilities does the Detailed Scheduling Board have?


There are 2 correct answers to this question.

Response:

Change planned order quantities

Undo for drag & Drop planning activities

Score 1 of 1

Score 1 of 1
Question:

How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By assigning different materials to the same routing

Score 0 of 1
Question:

What is the difference between co-products and by-products?


Please choose the correct answer.

Response:

Only co-products appear in the process or production order settlement rule.


Score 0 of 1
Question:

Which of the following is a valid sequence of the main activities in product on


order processing?
Please choose the correct answer.

Response:

Creation, scheduling, release, material withdrawal, confirmation

Score 1 of 1
Question:

Which task list types can have parallel sequences?


There are 2 correct answers to this question.

Response:

Routings (N)

Rate routings (R)

Score 0 of 1
Question:

Which technological advances enabled the development of SAP S/4HANA as the


digital core?
There are 3 correct answers to this question.

Response:

Wide adoption of web standards such as Service oriented architecture

Capability to add to server landscape and scale

Multi core processors enabling parallelism of tasks

Score 1 of 1
Question:

When can the material availability check occur automatically in a production


order?
There are 2 correct answers to this question.
Response:

At order release

At order creation

Score 1 of 1
Question:

You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

50 Planning without final assembly

Score 0 of 1
Question:

What is SAP’s strategic solution to perform Sales and Operations planning when
you use SAP S/4HANA Manufacturing?
Please choose the correct answer.

Response:

Integrated Business Planning

Score 0 of 1
Question:

What are the advantages of the new MRP Live in SAP S/4HANA compared to the
classic MRP from SAP ECC?
There are 2 correct answers to this question.

Response:

The MRP Live planning scope is more flexible.

MRP Live reads and writes data in parallel threads.

Score 1 of 1
Question:

You want to create a production order from a planned order. What methods could
you use?
There are 2 correct answers to this question.

Response:

Partial conversion

Full conversion

Score 1 of 1
Question:

What does a line hierarchy in repetitive manufacturing represent?


Please choose the correct answer.

Response:

A production line with more than one work center

Score 0 of 1
Question:

What are benefits of the Engineering Workbench?


There are 2 correct answers to this question.

Response:

Detailed selection of bill of materials (BOM)items and operations

Simultaneous processing of different bill of materials (BOM) items and operati

Score 1 of 1
Question:

The material master of your finished product contains MRP type “PD”. You set a
manual firming date in the stock requirements list. Which of the following will firm
planned orders”
There are 2 correct answers to this question.

Response:

Creating a planned order within the planning time fence


Manually changing the quantity of a planned order

Score 1 of 1
Question:

Your quality department detects a deviation in a raw material batch.


Unfortunately, this batch has already been used in production. How can you
identify all affected finished goods stocks?
Please choose the correct answer.

Response:

Use the batch information cockpit.

Score 0 of 1
Question:

What does forecasting in the demand planning cycle include?


There are 3 correct answers to this question.

Response:

Past sales order quantities

Market intelligence

One-off events

Score 0 of 1
Question:

Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.

Response:

Net change planning

Score 1 of 1
Question:
How can SAP S/4HANA support a GMP compliant production process?
There are 3 correct answers to this question.

Response:

Recipe approval with Engineering Change Management

Use of the digital signature function to check and run business processes

Documentation of quality data with Quality Management

Score 1 of 1
Question:

A customer is considering switching from order-related settlement to product-


related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.

Response:

They can be used for repetitive manufacturing.

They can be applied to make-to-stock production order.

Score 1 of 1
Question:

Which SAP solutions support the supplier area in the portfolio of the Digital Value
Network?
There are 3 correct answers to this question.

Response:

SAP Ariba

SAP Field glass

SAP Concur

Score 1 of 1
Question:
Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Advanced Planning

Capacity Requirements Planning

Score 1 of 1
Question:

For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Sales Order

Document Structure

Score 0 of 1
Question:

Which material-specific information can be transferred to a transportation lane in


PP/DS?
There are 3 correct answers to this question.

Response:

Purchasing info records

Special procurement keys

Outline agreement

Score 0 of 1
Question:

Your customer wants to include restricted-use stock as a potential receipt in the


existing ATP check for component availability.
Which information is required to implement this change request in the scope of
check?
There are 2 correct answers to this question.

Response:

The checking rule from the business application

The checking group from the material master

Score 1 of 1
Question:

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.

Response:

Top of Green

Score 0 of 1
Question:

How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.

Response:

Maintain adjustment parameter in the MRP group

Reorganize planned independent requirements

Score 1 of 1
Question:

When would you use reporting point backflush in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

When you need to determine the work in progress


You require an up-to-date inventory for components

Score 0 of 1
Question:

You have a quality control check to avoid using a high-value component tin faulty
materials in subsequent assembly operations. How do you account for potentials
crap of the high-value material?
Please choose the correct answer.

Response:

master of the assembly and set the net indicator in the routing operation whe
component is used

Score 0 of 1
Question:

What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.

Response:

Material to bill of materials (BOM) assignment

Component assignment

Material to routing assignment

Score 0 of 1
Question:

Which of the following objects can you release so that the business transactions
for process order execution and process management can be executed?
There are 2 correct answers to this question.

Response:

Individual phases

Individual operations

Score 1 of 1
Question:

What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Solution Package

Scope Items

Building Blocks

Score 1 of 1
Question:

Which of the following is an advantage of MRP Live and NOT available in classical
MRP?
Please choose the correct answer.

Response:

MRP Live can propose alternative solutions

Score 1 of 1
Question:

What is a typical transportation processing SAP Transportation Management?


Please choose the correct answer.

Response:

Order Management, Transportation Planning, Transportation Execution, Freigh


Settlement, Analytics and Reporting

Score 1 of 1
Question:

What is the purpose of collective orders?


Please choose the correct answer.

Response:

To manage production orders for an entire finished production multiple levels


Score 0 of 1
Question:

What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.

Response:

Installation point

Quantity

Score 0 of 1
Question:

You want to represent setup time as a graphical object in the Detailed Scheduling
Planning Board. Which actions are needed?
There are 2 correct answers to this question.

Response:

Create and assign a setup matrix with setup transition time to the resource

Create and assign a new graphical object for setup time in the planning board

Score 0 of 1
Question:

You have a scheduling agreement with a vendor. You want classic MRP to
automatically create schedule lines in case of material shortage. What must you
do?
There are 2 correct answers to this question.

Response:

Set the creation indicator for delivery schedule lines on the initial screen of th

Add the agreement to the source list and mark it for MRP relevance

Add the agreement to the quota arrangement and mark it for MRP relevance.

Score 0 of 1
Question:
A resource was created in SAP S/4HANA PP/DS through the internal CIF
integration and named “W1904_1000_001”. What does the suffix 001 in the
resource name represent?
Please choose the correct answer.

Response:

Capacity category

Score 0 of 1
Question:

You are creating a production order manually. What activities are involved in this
process?
There are 3 correct answers to this question.

Response:

Capacity requirements determination

Order type determination

Master data selection

Score 0 of 1
Question:

You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

40 – Planning with-final-assembly

Score 1 of 1
Question:

Before a user can add multiple production versions in a material master, what
information should be collected?
There are 3 correct answers to this question.
Response:

Lot sizes

BOM status

Validity dates

Score 1 of 1
Question:

What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.

Response:

Pre computed aggregation views

Extract on, transformation, and loading (ETL)

Score 0 of 1
Question:

For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.

Response:

Material

Work center

Score 1 of 1
Question:

Your customer is using storage location is in SAP ECC and wants to switch to SAP
S/4HANA. What do you have to consider?
Please choose the correct answer.

Response:

You have to set one MRP area for every storage location.
Score 0 of 1
Question:

Your production planners must execute planning only for specific resources. How
can you achieve this in Advanced Planning (PP/OS)?
Please choose the correct answer.

Response:

Use a heuristic.

Score 1 of 1
Question:

What new technology is used in SAP S/4HANA Embedded Analytics?


Please choose the correct answer.

Response:

ABAP Managed Core Data Services (CDS)

Score 1 of 1
Question:

You are transferring data from SAP S/4HANA to embedded PP/OS. What master
data objects are mapped to a location?
There are 3 correct answers to this question.

Response:

Plant

Customer

Supplier

Score 1 of 1
Question:

When a developer creates a new SAP Fiori app, they begin by selecting a template
to ensure the application has a consistent look-and-feel.
What types of templates can a developer choose?
There are 3 correct answers to this question.

Response:

Transactional

Factsheet

Analytical

Score 1 of 1
Question:

What generates capacity requirements in a process order?


Please choose the correct answer.

Response:

Phases

Score 1 of 1
Question:

In Make-to-order production, which field controls whether the components will be


planned as sales order specific stock?
Please choose the correct answer.

Response:

The Individual/Collective indicator of the component

Score 0 of 1
Question:

What is a work center hierarchy in SAP S/4HANA capacity planning?


Please choose the correct answer.

Response:

A group of alternative work centers providing a cumulative available capacity

Score 1 of 1
Question:
Which materials have a negative quantity in a bill of materials or in a recipe?
There are 3 correct answers to this question.

Response:

Co-products

Waste products

By-products

Score 0 of 1
Question:

What are some of the advantages of using Kanban?


There are 2 correct answers to this question.

Response:

Replenishments are created close to the actual need

It is a simplified form of production control

Score 0 of 1
Question:

Which time elements does MRP consider in backward scheduling to determine the
order dates for components from dependent requirements?
There are 2 correct answers to this question.

Response:

Planned delivery time

In-house production time

Score 1 of 1
Question:

Which automotive-specific functionality is embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Response:
Packaging Logistics

Parts interchangeability

Enhanced Kanban Processing

Score 0 of 1
Question:

In Demand-Driven Replenishment, materials are classified according to several


criteria. What criteria can you use?
There are 3 correct answers to this question.

Response:

Usage in bill of materials

Goods issue value

Demand variation

Score 0 of 1
Question:

Which advanced functionality has been embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Backorder processing

Capacity planning

Available-to-promise

Score 0 of 1
Question:

You want to reduce planning efforts for B/C materials. Which planning procedure
do you recommend?
Please choose the correct answer.
Response:

Consumption-based planning

Score 0 of 1
Question:

Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.

Response:

Float after production

Total replenishment lead time

Score 1 of 1
Question:

In a production process, you need a certain amount of liquid as input material. The
source tank is directly connected to the reactor. How can you process consumption
postings?
Please choose the correct answer.

Response:

Backflushing

Score 0 of 1
Question:

In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.

Response:

Use a specific material status.

Use a specific MRP controller.

Score 0 of 1
Question:
For which data objects do you have to set up CIF integration models in S/4HANA
to use them in advanced planning?
There are 2 correct answers to this question.

Response:

Contract

Production plant

Score 0 of 1
Question:

What is the equivalent in SAP S/4HANA of the Production Data Structure in


PP/DS?
There are 3 correct answers to this question.

Response:

Bill of Material

Production Version

Routing

Score 0 of 1
Question:

Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.

Response:

Material master

Question

:
Advanced Planning is delivered with standard out-of-the-box order and resource
evaluations. Which evaluations are available?
There are 2 correct answers to this question.

Response:

Resource utilization

Order list

Score 1 of 1
Question:

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Purchase orders

Stock transfers

Transfers from batch to batch

Score 0 of 1
Question:

To trigger a goods receipt posting, which Kanban status do you have to set?
Please choose the correct answer.

Response:

Full

Score 1 of 1
Question:

A customer is considering switching from order-related settlement to product-


related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.

Response:

They can be applied to make-to-stock production order.


They can be used for repetitive manufacturing.

Score 1 of 1
Question:

What generates capacity requirements in a process order?


Please choose the correct answer.

Response:

Phases

Score 0 of 1
Question:

You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

50 Planning without final assembly

Score 1 of 1
Question:

Which of the following apply to MRP Live?


There are 2 correct answers to this question.

Response:

The sequence of planning materials is calculated across plants.

The definition of the planning scope is more flexible.

Score 1 of 1
Question:
Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.

Response:

MIGO

Score 0 of 1
Question:

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.

Response:

Top of Green

Score 0 of 1
Question:

How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By assigning different materials to the same routing

Question:

For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Document Structure

Sales Order

Score 0 of 1
Question:
How can Production Planning and Detailed Scheduling (PP/DS) enhance the
standard planning functionality?
Please choose the correct answer.

Response:

By providing replenishment proposals with exact times

Score 1 of 1
Question:

Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Advanced Planning

Capacity Requirements Planning

Score 1 of 1
Question:

The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.

Response:

Production Version

Score 1 of 1
Question:

What generates capacity requirements in a process order?


Please choose the correct answer.

Response:

Phases

Score 0 of 1
Question:
Which technological advances enabled the development of SAP S/4HANA as the
digital core?
There are 3 correct answers to this question.

Response:

Capability to add to server landscape and scale

Wide adoption of web standards such as Service oriented architecture

Multi core processors enabling parallelism of tasks

Score 1 of 1
Question:

You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

50 Planning without final assembly

Score 1 of 1
Question:

Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.

Response:

Sales orders

Planned independent requirements

Score 1 of 1
Question:

Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.
Response:

MIGO

Score 1 of 1
Question:

How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By assigning different materials to the same routing

Question:

How can Production Planning and Detailed Scheduling (PP/DS) enhance the
standard planning functionality?
Please choose the correct answer.

Response:

By providing replenishment proposals with exact times

Score 0 of 1
Question:

What are uses of the low- level code assigned to each material?
There are 2 correct answers to this question.

Response:

It is used by product costing to determine how costs are rolled up

It is used in MRP to determine the sequence in which materials are planned.

Score 0 of 1
Question:

Which characteristics should a material have for re-order point planning?


There are 2 correct answers to this question.

Response:
Replenishment lead time is known and relatively constant.

Demand remains relatively constant.

Score 0 of 1
Question:

Which process order function uses a resource network?


Please choose the correct answer.

Response:

Resource selection

Score 0 of 1
Question:

What is the purpose of a reporting point confirmation in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

To provide timely updates of inventory management for the staged componen

To determine the work in progress along the production line

Score 1 of 1
Question:

You are using the document management system (DMS). Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.

Response:

Bill of material

Material master

Score 0 of 1
Question:
You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

40 – Planning with-final-assembly

Score 1 of 1
Question:

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Stock transfers

Transfers from batch to batch

Purchase orders

Score 0 of 1
Question:

When do you use variant bills of materials (BOMs)?


Please choose the correct answer.

Response:

When multiple material also have the same BOM

Score 0 of 1
Question:

You have maintained the parameters for simple discontinuation in the material
master of a component. Which business process will be affected if the available
stock is zero and the discontinuation date is in the past?
Please choose the correct answer.

Response:
Material requirements planning

Score 0 of 1
Question:

Which warehouse management functions are available in SAP EWM but NOT in SAP
WM?
There are 3 correct answers to this question.

Response:

Expected goods receipt

Labor Management

Slotting

Score 0 of 1
Question:

What is the first step in the MRP run?


Please choose the correct answer.

Response:

Net requirements calculation

Score 0 of 1
Question:

What are some uses for the low-level code assigned to each material?
There are 2 correct answers to this question.

Response:

It is used by product costing to determine how costs are rolled up.

It is used in MRP to determine the sequence in which materials are planned.

Score 1 of 1
Question:
You want to create a production order from a planned order. What methods could
you use?
There are 2 correct answers to this question.

Response:

Partial conversion

Full conversion

Score 0 of 1
Question:

Which of the following time elements does MRP use during backward scheduling
for in-house production?
There are 2 correct answers to this question.

Response:

Goods receipt processing time

Opening period

Score 0 of 1
Question:

In a production process, you need a certain amount of liquid as input material. The
source tank is directly connected to the reactor. How can you process consumption
postings?
Please choose the correct answer.

Response:

Backflushing

Score 0 of 1
Question:

The MRP run detected a shortage of a material that you source from an external
supplier in full pallets. How can you make sure you will only receive full pallets?
Please choose the correct answer.

Response:

Use the fixed lot size procedure.


Score 0 of 1
Question:

Advanced Planning uses master data and transaction data from SAP S/4HANA. In
which data objects can you set the advanced planning flag?
There are 2 correct answers to this question.

Response:

Material

Work center

Score 0 of 1
Question:

Which of the following business processes are controlled by production order


type-dependent parameters?
There are 2 correct answers to this question.

Response:

Planning

Implementation

Score 0 of 1
Question:

What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.

Response:

Quantity

Installation point

Score 0 of 1
Question:
The pegging situation was changed because of an MRP heuristic run. What is a
capability of dynamic pegging?
Please choose the correct answer.

Response:

It links receipts from an alternative location in case of a shortage in the defau

Score 0 of 1
Question:

What are some of the advantages of using Kanban?


There are 2 correct answers to this question.

Response:

It is a simplified form of production control

Replenishments are created close to the actual need

Score 0 of 1
Question:

How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question.

Response:

Using purchase orders for external procurement

Using run schedule quantities for in-house production

Using stock transfer reservations for stock transfer

Score 0 of 1
Question:

How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.

Response:

Reorganize planned independent requirements


Maintain adjustment parameter in the MRP group

Score 1 of 1
Question:

Your quality department detects a deviation in a raw material batch.


Unfortunately, this batch has already been used in production. How can you
identify all affected finished goods stocks?
Please choose the correct answer.

Response:

Use the batch information cockpit.

Score 1 of 1
Question:

What must be used in the system to plan the requirements for different
subcontractors separately?
Please choose the correct answer.

Response:

MRP areas

Score 0 of 1
Question:

Which task list types can have parallel sequences?


There are 2 correct answers to this question.

Response:

Rate routings (R)

Routings (N)

Score 0 of 1
Question:

When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.
Response:

The most restrictive status

Score 0 of 1
Question:

What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.

Response:

Allowed material type

Default values for the item status

Score 0 of 1
Question:

How would you define pegging in the context of Advanced Planning?


Please choose the correct answer.

Response:

An evaluation that is ordered according to the bill-of-material structure of all r


products and represents the relationship between the receipt and the issue ele

Score 0 of 1
Question:

The method in which a production order is credited or debited depends on the


variant of cost object controlling (COC). What basis can be used to carry this out?
There are 2 correct answers to this question.

Response:

Order-related

Product-related

Score 0 of 1
Question:

What does the industry sector determine?


There are 2 correct answers to this question.
Response:

Whether a material master field is required, changeable, displayed, or hidden

Which material master views can be maintained

Score 0 of 1
Question:

When would you use reporting point backflush in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

When you need to determine the work in progress

You require an up-to-date inventory for components

Score 0 of 1
Question:

Which material master setting is required to use the repetitive planning table for
production with production orders?
Please choose the correct answer.

Response:

A repetitive manufacturing profile must be assigned on the MRP4 view

Score 1 of 1
Question:

You are creating a production order manually. What activities are involved in this
process?
There are 3 correct answers to this question.

Response:

Order type determination

Capacity requirements determination

Master data selection


Score 0 of 1
Question:

Which of the following are capabilities of multidimensional reporting in SAP


S/4HANA embedded analytics?
There are 3 correct answers to this question.

Response:

Filters

Sort

Drilldown

Score 0 of 1
Question:

What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.

Response:

Component assignment

Material to bill of materials (BOM) assignment

Material to routing assignment

Score 0 of 1
Question:

The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.

Response:

Production Version
Score 0 of 1
Question:

Which times are used for Basic Date Scheduling of manufacturing planned orders
in MRP?
There are 2 correct answers to this question.

Response:

Goods receipt processing time

Opening period

Score 0 of 1
Question:

What is the purpose of collective orders?


Please choose the correct answer.

Response:

To manage production orders for an entire finished production multiple levels

Score 0 of 1
Question:

What are the consequences when you assign a planned order to a production line
manually, using the planning table in repetitive manufacturing?
Please choose the correct answer.

Response:

The planned order generates capacity requirements.

Score 0 of 1
Question:

What are some of the SAP Fiori user types?


There are 3 correct answers to this question.

Response:

Developer

Occasional
Expert

Score 0 of 1
Question:

You need to model goods receipt processing time in Detailed Scheduling. Which
modelling options do you have?
There are 2 correct answers to this question.

Response:

Model a handling resource in the location master and goods receipt time in the
master.

Model a transportation resource in the location master.

Score 0 of 1
Question:

What steps are possible in a PP/DS production planning run?


There are 3 correct answers to this question.

Response:

Optimization

Detailed scheduling functions

Heuristics

Score 0 of 1
Question:

When can the material availability check occur automatically in a production


order?
There are 2 correct answers to this question.

Response:

At order creation
At order release

Score 0 of 1
Question:

What are prerequisites for using batch derivation?


There are 2 correct answers to this question.

Response:

Batch where-used list

Receiver-sender relationships

Score 0 of 1
Question:

Which actions does the system perform by default when you save a confirmation
for a finished product in repetitive manufacturing?
There are 3 correct answers to this question.

Response:

Reduction of associated capacity requirements

Posting of production costs to the production cost collector

Posting of goods receipt for the product

Score 0 of 1
Question:

Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.

Response:

Elimination of document index tables

Elimination of customer master tables


Elimination of status tables

Score 0 of 1
Question:

What does it mean for the production planner when MRP works with infinite
capacities?
Please choose the correct answer.

Response:

MRP creates capacity requirements without checking the capacity of a work ce

Score 0 of 1
Question:

Before a user can add multiple production versions in a material master, what
information should be collected?
There are 3 correct answers to this question.

Response:

Lot sizes

BOM status

Validity dates

Score 0 of 1
Question:

In Demand-Driven Replenishment, materials are classified according to several


criteria. What criteria can you use?
There are 3 correct answers to this question.

Response:

Demand variation

Usage in bill of materials

Goods issue value


Score 1 of 1
Question:

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.

Response:

Top of Green

Score 1 of 1
Question:

What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.

Response:

Full

Score 1 of 1
Question:

Where do you maintain the duration of a production operation?


Please choose the correct answer.

Response:

Routing

Score 0 of 1
Question:

What is the sequence of the five steps of Demand-Driven Replenishment in SAP


S/4HANA?
Please choose the correct answer.

Response:

Analytics, buffer positioning, buffer sizing, replenishment planning, replenishm


execution

Score 0 of 1
Question:

Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.

Response:

Planned delivery time

Float after production

Score 1 of 1
Question:

In which customizing activity do you set up automatic routing selection for


production orders?
Please choose the correct answer.

Response:

Define order-type-dependent parameter

Score 0 of 1
Question:

You want to schedule an order in the graphical planning board. What are valid
planning directions?
There are 2 correct answers to this question.

Response:

Backwards

Forward with reverse

Score 0 of 1
Question:

Which technological advances enabled the development of SAP S/4HANA as the


digital core?
There are 3 correct answers to this question.

Response:

Capability to add to server landscape and scale


Multi core processors enabling parallelism of tasks

Wide adoption of web standards such as Service oriented architecture

Score 0 of 1
Question:

What is a typical transportation processing SAP Transportation Management?


Please choose the correct answer.

Response:

Order Management, Transportation Planning, Transportation Execution, Freigh


Settlement, Analytics and Reporting

Score 0 of 1
Question:

At the end of the MRP run you receive the exception message “Reschedule In
Operation”. What caused the message to be generated?
Please choose the correct answer.

Response:

The requirements date occurs before that of a firmed planned receipt

Score 1 of 1
Question:

In which data object is the production line (Repetitive manufacturing relevant


work center) maintained?
Please choose the correct answer.

Response:

Production version

Score 0 of 1
Question:

A production order is created from a planned order. The system should determine
a valid production version. What must you doing the system for the selection to
occur?
Please choose the correct answer.

Response:

Set the customizing setting Automatic Selection of Production Version active.

Score 0 of 1
Question:

You want to perform capacity availability checks on your production orders. What
must be set for this to occur?
There are 2 correct answers to this question.

Response:

Checking control must have an overall profile assigned in customizing.

Indicator Relevant for finite scheduling must be set

Score 0 of 1
Question:

For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.

Response:

Material

Work center

Score 0 of 1
Question:

In which of the following master data objects can you define the production order
default storage location for a material component?
There are 2 correct answers to this question.

Response:

Work center, in the production supply area


BOM, in the item for the material

Score 0 of 1
Question:

The SAP Kanban procedure could be used to trigger which of the following kinds of
replenishment?
There are 2 correct answers to this question.

Response:

Stock transfer

In-house production

Score 0 of 1
Question:

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Optimization of the production plan

Source determination for external procurement

Score 0 of 1
Question:

You define forecast consumption as an integral part of your Production Planning


and Detailed Scheduling process. Which of the following order types consume the
forecast?
There are 2 correct answers to this question.

Response:

Dependent demand

Sales order

Score 0 of 1
Question:
A warehouse manager likes to streamline the goods receipt (GR) process for
production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.

Response:

Production scheduling profile

Operation control key

Score 0 of 1
Question:

Which time elements can be reduced by a reduction strategy?


There are 3 correct answers to this question.

Response:

Move time

Wait time

Queue time

Score 0 of 1
Question:

In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.

Response:

Process order
Control recipe
PI sheet
Process message

Score 0 of 1
Question:

What capabilities does SAP S/4HANA embedded analytics provide?


There are 2 correct answers to this question.

Response:
Real time decision support

Strategic analysis

Score 0 of 1
Question:

What do you use to schedule operations from planned orders so that the
production plan can be fulfilled?
Please choose the correct answer.

Response:

Material Requirements Planning (MRP)

Score 0 of 1
Question:

How can you limit the validity of a bill of material (BOM)?


There are 2 correct answers to this question.

Response:

By plant

By period

Score 0 of 1
Question:

Your customer complains about incorrect duration for production order operations.
What time elements could cause the issue?
There are 3 correct answers to this question.

Response:

Processing time

Queue time

Tear down time

Score 0 of 1
Question:

In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.

Response:

Work Scheduling

Purchasing

Score 1 of 1
Question:

How can you carry out cost object controlling for production orders?
There are 2 correct answers to this question.

Response:

Order-related

Product-related

Score 0 of 1
Question:

Which SAP solutions support the supplier area in the portfolio of the Digital Value
Network?
There are 3 correct answers to this question.

Response:

SAP Concur

SAP Field glass

SAP Ariba

Score 0 of 1
Question:

How can SAP S/4HANA support a GMP compliant production process?


There are 3 correct answers to this question.
Response:

Documentation of quality data with Quality Management

Use of the digital signature function to check and run business processes

Recipe approval with Engineering Change Management

Question:

Which characteristics should a material have for re-order point planning?


There are 2 correct answers to this question.

Response:

Replenishment lead time is known and relatively constant.

Demand remains relatively constant.

Score 0 of 1
Question:

Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.

Response:

The maximum mater all number length is 40 for external numbers and 18 for
numbers

The display template for material numbers applies to all clients.

Score 0 of 1
Question:

How Is the bill of material (BOM) exploded when you use a BOM explosion
number?
Please choose the correct answer.

Response:
With respect to defined separate key dates for product and each assembly

Score 1 of 1
Question:

You are using the document management system (DMS). Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.

Response:

Bill of material

Material master

Score 0 of 1
Question:

What are the three transition scenarios for an S/4HANA implementation?


There are 3 correct answers to this question.

Response:

Landscape transformation

System conversion

New implementation

Score 1 of 1
Question:

What is the equivalent in SAP S/4HANA of the Production Data Structure in


PP/DS?
There are 3 correct answers to this question.

Response:

Bill of Material

Production Version
Routing

Score 1 of 1
Question:

The planning strategy requires the entry of planned independent requirements at


the subassembly level, so the in-house production of this component can be
triggered before a finished goods sales order is received?
Please choose the correct answer.

Response:

Planning at assembly level

Score 1 of 1
Question:

What are the consequences if operation status Dispatched is set for a production
order operation?
Please choose the correct answer.

Response:

You can reschedule the operation using finite Scheduling in a planning board.

Score 1 of 1
Question:

Which functional capabilities does the Detailed Scheduling Board have?


There are 2 correct answers to this question.

Response:

Change planned order quantities

Undo for drag & Drop planning activities

Score 1 of 1
Question:

Advanced Planning uses master data and transaction data from SAP S/4HANA. In
which data objects can you set the advanced planning flag?
There are 2 correct answers to this question.

Response:
Work center

Material

Score 0 of 1
Question:

What are drawbacks of the separation of OLTP and OLAP?


There are 4 correct answers to this question.

Response:

Only the OLAP system has a predefined subset of the data

Batch process are required to keep OLTP and OLAP in sync

Multiple copies of the data exist

The OLAP system needs to write back the data to the OLTP system

Score 0 of 1
Question:

Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.

Response:

Material master

Score 0 of 1
Question:

A production order is created from a planned order. The system should determine
a valid production version. What must you doing the system for the selection to
occur?
Please choose the correct answer.

Response:

Set the customizing setting Automatic Selection of Production Version active.

Score 0 of 1
Question:

You are using heuristic SAP_ERP_001. Which of the following criteria are included
in the automatic source determination logic when a planned order is created?
Please choose the correct answer.

Response:

Quota arrangement

Score 1 of 1
Question:

Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.

Response:

MIGO

Score 1 of 1
Question:

The production plan is being disrupted by last minute demands that are entered in
the system. Which is the most efficient way to handle last minute demands and
protect the current production plan?
There are 2 correct answers to this question.

Response:

Manually firm all planned orders for materials within the replenishment lead ti
material

In the stock requirements list, set a manual firming fence for a date based on
replenishment lead time of the material

Score 1 of 1
Question:

In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.

Response:
Process order
Control recipe
PI sheet
Process message

Score 1 of 1
Question:

What is the correct sequence of the following Activate methodology phases?


Please choose the correct answer.

Response:

Prepare, Explore, Realize, Deploy

Score 1 of 1
Question:

What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Building Blocks

Scope Items

Solution Package

Score 1 of 1
Question:

When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.

Response:

The most restrictive status

Score 1 of 1
Question:
What is the first step in the MRP run?
Please choose the correct answer.

Response:

Net requirements calculation

Score 1 of 1
Question:

For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Sales Order

Document Structure

Score 1 of 1
Question:

Which automotive-specific functionality is embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Packaging Logistics

Enhanced Kanban Processing

Parts interchangeability

Score 0 of 1
Question:

You want to reduce planning efforts for B/C materials. Which planning procedure
do you recommend?
Please choose the correct answer.

Response:

Consumption-based planning
Score 1 of 1
Question:

Which material-specific information can be transferred to a transportation lane in


PP/DS?
There are 3 correct answers to this question.

Response:

Purchasing info records

Outline agreement

Special procurement keys

Score 0 of 1
Question:

You want to insert an operation at a certain time on a work center. The planning
direction is forward. The desired dispatching time coincides with an operation that
has previously been dispatched.

How does the insertion take place?


Please choose the correct answer.

Response:

The new operation is inserted at the desired time the previously dispatched op
moved backward.

Score 1 of 1
Question:

You are working with planning strategy 40 (Planning-with-final assembly). When


does consumption of planned independent requirements take place?
Please choose the correct answer.

Response:

When you create a sales order

Score 1 of 1
Question:
What are the advantages of the new MRP Live in SAP S/4HANA compared to the
classic MRP from SAP ECC?
There are 2 correct answers to this question.

Response:

MRP Live reads and writes data in parallel threads.

The MRP Live planning scope is more flexible.

Score 1 of 1
Question:

An issue storage location was NOT found through the work center, bill of material
(BOM) item, or material master. What determines whether the storage location
can be derived from the production version?
Please choose the correct answer.

Response:

MRP Group

Score 0 of 1
Question:

Where can you maintain consumption mode and consumption periods for planning
strategies?
There are 2 correct answers to this question.

Response:

In the MRP group

In the material master

Score 1 of 1
Question:

What is a typical transportation processing SAP Transportation Management?


Please choose the correct answer.

Response:

Order Management, Transportation Planning, Transportation Execution, Freigh


Settlement, Analytics and Reporting

Score 1 of 1
Question:

Which master data object governs the relationship between supply source and
demand source in the Kanban process?
Please choose the correct answer.

Response:

Control cycle

Score 1 of 1
Question:

Which document is skipped when SAP EWM is embedded in SAP S/4HANA?


Please choose the correct answer.

Response:

Outbound delivery request

Score 1 of 1
Question:

You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.

Response:

Top of Green

Score 0 of 1
Question:

What must be used in the system to plan the requirements for different
subcontractors separately?
Please choose the correct answer.

Response:

MRP areas
Score 1 of 1
Question:

Your project uses process orders for the production of liquid chemicals. What can
you define to ensure that the production flow happens only in physically
connected tanks?
Please choose the correct answer.

Response:

Resource network

Score 1 of 1
Question:

Which material master data can you copy when you use the Copy Material program
(transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.

Response:

Storage location data

Warehouse number data

Score 0 of 1
Question:

A material has been set up as a phantom assembly by entering the special


procurement key in the material master. How can you switch off the phantom
assembly in a specific bill of material (BOM)?
Please choose the correct answer.

Response:

Change the explosion type of the phantom assembly in the BOM.

Score 1 of 1
Question:

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Purchase orders
Transfers from batch to batch

Stock transfers

Score 0 of 1
Question:

What does forecasting in the demand planning cycle include?


There are 3 correct answers to this question.

Response:

One-off events

Market intelligence

Past sales order quantities

Score 1 of 1
Question:

The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.

Response:

Production Version

Score 1 of 1
Question:

MRP created a planned order for a material that has one single material from stock
as a component. What happens to this dependent requirement when you convert
the planned order into a production order?
Please choose the correct answer.

Response:

It is converted into a reservation.


Score 1 of 1
Question:

At the end of the MRP run you receive the exception message “Reschedule In
Operation”. What caused the message to be generated?
Please choose the correct answer.

Response:

The requirements date occurs before that of a firmed planned receipt

Score 0 of 1
Question:

In which of the following master data objects can you define the production order
default storage location for a material component?
There are 2 correct answers to this question.

Response:

BOM, in the item for the material

Work center, in the production supply area

Score 1 of 1
Question:

Which of the following data objects are updated when a user confirms an
operation?
Please choose the correct answer.

Response:

Shop floor information system

Score 1 of 1
Question:

Which time elements are part of a routing operation?


There are 3 correct answers to this question.

Response:

Wait time
Queue time

Move time

Score 1 of 1
Question:

Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.

Response:

Concur

SAP Hybris

SAP Fieldglass

Score 0 of 1
Question:

How can SAP S/4HANA support a GMP compliant production process?


There are 3 correct answers to this question.

Response:

Use of the digital signature function to check and run business processes

Documentation of quality data with Quality Management

Recipe approval with Engineering Change Management

Score 1 of 1
Question:

What are main innovations in manufacturing in SAP S/4HANA?


There are 3 correct answers to this question.

Response:

Lock-free inventory movements


Monitor Production Orders Fiori app

Material Coverage Fiori app

Score 1 of 1
Question:

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Source determination for external procurement

Optimization of the production plan

Score 1 of 1
Question:

How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By assigning different materials to the same routing

Score 0 of 1
Question:

Your customer is using storage location is in SAP ECC and wants to switch to SAP
S/4HANA. What do you have to consider?
Please choose the correct answer.

Response:

You have to set one MRP area for every storage location.

Score 1 of 1
Question:

Why would you use phantom assemblies?


There are 3 correct answers to this question.

Response:
To make the assignment of components easier

To reduce the number of changes required in bills of materials

To simplify the structure of bills of materials

Score 0 of 1
Question:

What are prerequisites for using batch derivation?


There are 2 correct answers to this question.

Response:

Receiver-sender relationships

Batch where-used list

Score 0 of 1
Question:

Which alternative item strategies are available in bills of materials (BOM) in SAP
S/4HANA?
There are 2 correct answers to this question.

Response:

By usage probability

100% check

Score 1 of 1
Question:

Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Sales Order BOM


Functional Location BOM

Score 1 of 1
Question:

The MRP run detected a shortage of a material that you source from an external
supplier in full pallets. How can you make sure you will only receive full pallets?
Please choose the correct answer.

Response:

Use the fixed lot size procedure.

Score 1 of 1
Question:

When can the material availability check occur automatically in a production


order?
There are 2 correct answers to this question.

Response:

At order release

At order creation

Score 0 of 1
Question:

What is the sequence of the five steps of Demand-Driven Replenishment in SAP


S/4HANA?
Please choose the correct answer.

Response:

Analytics, buffer positioning, buffer sizing, replenishment planning, replenishm


execution

Score 1 of 1
Question:

What does the industry sector determine?


There are 2 correct answers to this question.

Response:
Which material master views can be maintained

Whether a material master field is required, changeable, displayed, or hidden

Score 1 of 1
Question:

What is the difference between co-products and by-products?


Please choose the correct answer.

Response:

Only co-products appear in the process or production order settlement rule.

Score 1 of 1
Question:

What determines whether the planned independent requirements in MRP consume


other requirements?
Please choose the correct answer.

Response:

Requirements type

Score 1 of 1
Question:

When do you use variant bills of materials (BOMs)?


Please choose the correct answer.

Response:

When multiple material also have the same BOM

Score 0 of 1
Question:

Which of the following elements does MRP take into account during net
requirement calculation?
There are 2 correct answers to this question.

Response:

Purchase orders
Safety stock

Score 0 of 1
Question:

What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.

Response:

Component assignment

Material to bill of materials (BOM) assignment

Material to routing assignment

Score 1 of 1
Question:

How can you carry out cost object controlling for production orders?
There are 2 correct answers to this question.

Response:

Order-related

Product-related

Score 1 of 1
Question:

When a developer creates a new SAP Fiori app, they begin by selecting a template
to ensure the application has a consistent look-and-feel.

What types of templates can a developer choose?


There are 3 correct answers to this question.

Response:

Analytical
Transactional

Factsheet

Score 1 of 1
Question:

In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.

Response:

Use a specific material status.

Use a specific MRP controller.

Score 1 of 1
Question:

Which options are available for an SAP S/4HANA deployment?


There are 2 correct answers to this question.

Response:

SAP S/4HANA on premise

SAP S/4HANA private cloud

Score 1 of 1
Question:

Which of the following are included as SAP S/4HANA Sales Simplifications?


There are 3 correct answers to this question.

Response:

SAP GTS replaces ERP SD Foreign Trade


Settlement Management replaces ERP SD Rebates

SAP Revenue Accounting replaces ERP SD Revenue Recognition

Score 1 of 1
Question:

You want to schedule an order in the graphical planning board. What are valid
planning directions?
There are 2 correct answers to this question.

Response:

Backwards

Forward with reverse

Score 1 of 1
Question:

What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.

Response:

Full

Score 0 of 1
Question:

You have a quality control check to avoid using a high-value component tin faulty
materials in subsequent assembly operations. How do you account for potentials
crap of the high-value material?
Please choose the correct answer.

Response:

master of the assembly and set the net indicator in the routing operation whe
component is used

Enter the operation scrap and set the net indicator in the component of the bi
of the assembly.
Score 1 of 1
Question:

In which data object is the production line (Repetitive manufacturing relevant


work center) maintained?
Please choose the correct answer.

Response:

Production version

Score 1 of 1
Question:

Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.

Response:

Total replenishment lead time

Float after production

Score 0 of 1
Question:

You need to model goods receipt processing time in Detailed Scheduling. Which
modelling options do you have?
There are 2 correct answers to this question.

Response:

Model a transportation resource in the location master.

Model a handling resource in the location master and goods receipt time in the
master.

Score 0 of 1
Question:

You define forecast consumption as an integral part of your Production Planning


and Detailed Scheduling process. Which of the following order types consume the
forecast?
There are 2 correct answers to this question.

Response:
Dependent demand

Sales order

Score 0 of 1
Question:

Mode selection is one of the scheduling options available in Advanced Planning in


SAP S/4HANA. When can you use mode selection?
Please choose the correct answer.

Response:

When alternate resources are used within one operation

Score 1 of 1
Question:

In the Manage Shortage view of the new SAP Fiori app “Monitor Material
Coverage”, what do the stars indicate?
Please choose the correct answer.

Response:

The viability of the proposed solution