Question - Certification Exam-New
Question - Certification Exam-New
Response:
Score 1 of 1
Question:
What could be the reason for multiple commitment of individual capacities, where
several operations have the same scheduled dates on a resource after capacity
planning?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
In which data objects do you maintain the production in as the work center for
repetitive manufacturing?
There are 2 correct answers to this question.
Response:
Production version
Routing
Score 1 of 1
Question:
Response:
Production version
Score 0 of 1
Question:
Which Kanban master data object controls the relationship between the supply
and demand source?
Please choose the correct answer.
Response:
Control cycle
Score 0 of 1
Question:
What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Score 0 of 1
Question:
Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Implementation
Planning
Score 0 of 1
Question:
Where does the system check master data selection settings during the creation of
planned orders and production orders?
There are 3 correct answers to this question.
Response:
In the routing
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.
Response:
Score 1 of 1
Score 0 of 1
Question:
Response:
Find slot
Score 0 of 1
Question:
Which times are used for Basic Date Scheduling of manufacturing planned orders
in MRP?
There are 2 correct answers to this question.
       Response:
Opening period
Score 0 of 1
Question:
Response:
Score 1 of 1
Score 1 of 1
Question:
How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Response:
Response:
Score 1 of 1
Question:
Response:
Routings (N)
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
At order release
At order creation
Score 1 of 1
Question:
You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.
Response:
Score 0 of 1
Question:
What is SAP’s strategic solution to perform Sales and Operations planning when
you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
What are the advantages of the new MRP Live in SAP S/4HANA compared to the
classic MRP from SAP ECC?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
You want to create a production order from a planned order. What methods could
you use?
There are 2 correct answers to this question.
Response:
Partial conversion
Full conversion
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
The material master of your finished product contains MRP type “PD”. You set a
manual firming date in the stock requirements list. Which of the following will firm
planned orders”
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
Response:
Market intelligence
One-off events
Score 0 of 1
Question:
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
How can SAP S/4HANA support a GMP compliant production process?
There are 3 correct answers to this question.
Response:
Use of the digital signature function to check and run business processes
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Which SAP solutions support the supplier area in the portfolio of the Digital Value
Network?
There are 3 correct answers to this question.
Response:
SAP Ariba
SAP Concur
Score 1 of 1
Question:
Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Advanced Planning
Score 1 of 1
Question:
For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Sales Order
Document Structure
Score 0 of 1
Question:
Response:
Outline agreement
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.
Response:
Top of Green
Score 0 of 1
Question:
How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
You have a quality control check to avoid using a high-value component tin faulty
materials in subsequent assembly operations. How do you account for potentials
crap of the high-value material?
Please choose the correct answer.
Response:
               master of the assembly and set the net indicator in the routing operation whe
               component is used
Score 0 of 1
Question:
What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.
Response:
Component assignment
Score 0 of 1
Question:
Which of the following objects can you release so that the business transactions
for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
Individual phases
Individual operations
Score 1 of 1
Question:
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Solution Package
Scope Items
Building Blocks
Score 1 of 1
Question:
Which of the following is an advantage of MRP Live and NOT available in classical
MRP?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Response:
What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.
Response:
Installation point
Quantity
Score 0 of 1
Question:
You want to represent setup time as a graphical object in the Detailed Scheduling
Planning Board. Which actions are needed?
There are 2 correct answers to this question.
Response:
Create and assign a setup matrix with setup transition time to the resource
Create and assign a new graphical object for setup time in the planning board
Score 0 of 1
Question:
You have a scheduling agreement with a vendor. You want classic MRP to
automatically create schedule lines in case of material shortage. What must you
do?
There are 2 correct answers to this question.
Response:
Set the creation indicator for delivery schedule lines on the initial screen of th
Add the agreement to the source list and mark it for MRP relevance
Add the agreement to the quota arrangement and mark it for MRP relevance.
Score 0 of 1
Question:
A resource was created in SAP S/4HANA PP/DS through the internal CIF
integration and named “W1904_1000_001”. What does the suffix 001 in the
resource name represent?
Please choose the correct answer.
Response:
Capacity category
Score 0 of 1
Question:
You are creating a production order manually. What activities are involved in this
process?
There are 3 correct answers to this question.
Response:
Score 0 of 1
Question:
You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.
Response:
40 – Planning with-final-assembly
Score 1 of 1
Question:
Before a user can add multiple production versions in a material master, what
information should be collected?
There are 3 correct answers to this question.
       Response:
Lot sizes
BOM status
Validity dates
Score 1 of 1
Question:
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.
Response:
Material
Work center
Score 1 of 1
Question:
Your customer is using storage location is in SAP ECC and wants to switch to SAP
S/4HANA. What do you have to consider?
Please choose the correct answer.
Response:
               You have to set one MRP area for every storage location.
Score 0 of 1
Question:
Your production planners must execute planning only for specific resources. How
can you achieve this in Advanced Planning (PP/OS)?
Please choose the correct answer.
Response:
Use a heuristic.
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
You are transferring data from SAP S/4HANA to embedded PP/OS. What master
data objects are mapped to a location?
There are 3 correct answers to this question.
Response:
Plant
Customer
Supplier
Score 1 of 1
Question:
When a developer creates a new SAP Fiori app, they begin by selecting a template
to ensure the application has a consistent look-and-feel.
What types of templates can a developer choose?
There are 3 correct answers to this question.
Response:
Transactional
Factsheet
Analytical
Score 1 of 1
Question:
Response:
Phases
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
Which materials have a negative quantity in a bill of materials or in a recipe?
There are 3 correct answers to this question.
Response:
Co-products
Waste products
By-products
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
Which time elements does MRP consider in backward scheduling to determine the
order dates for components from dependent requirements?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
       Response:
               Packaging Logistics
Parts interchangeability
Score 0 of 1
Question:
Response:
Demand variation
Score 0 of 1
Question:
Response:
Backorder processing
Capacity planning
Available-to-promise
Score 0 of 1
Question:
You want to reduce planning efforts for B/C materials. Which planning procedure
do you recommend?
Please choose the correct answer.
       Response:
Consumption-based planning
Score 0 of 1
Question:
Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
In a production process, you need a certain amount of liquid as input material. The
source tank is directly connected to the reactor. How can you process consumption
postings?
Please choose the correct answer.
Response:
Backflushing
Score 0 of 1
Question:
In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
For which data objects do you have to set up CIF integration models in S/4HANA
to use them in advanced planning?
There are 2 correct answers to this question.
Response:
Contract
Production plant
Score 0 of 1
Question:
Response:
Bill of Material
Production Version
Routing
Score 0 of 1
Question:
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
Material master
Question
:
Advanced Planning is delivered with standard out-of-the-box order and resource
evaluations. Which evaluations are available?
There are 2 correct answers to this question.
Response:
Resource utilization
Order list
Score 1 of 1
Question:
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
Purchase orders
Stock transfers
Score 0 of 1
Question:
To trigger a goods receipt posting, which Kanban status do you have to set?
Please choose the correct answer.
Response:
Full
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Response:
Phases
Score 0 of 1
Question:
You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.
Response:
MIGO
Score 0 of 1
Question:
You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.
Response:
Top of Green
Score 0 of 1
Question:
How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
Question:
For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Document Structure
Sales Order
Score 0 of 1
Question:
How can Production Planning and Detailed Scheduling (PP/DS) enhance the
standard planning functionality?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Advanced Planning
Score 1 of 1
Question:
The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
Production Version
Score 1 of 1
Question:
Response:
Phases
Score 0 of 1
Question:
Which technological advances enabled the development of SAP S/4HANA as the
digital core?
There are 3 correct answers to this question.
Response:
Score 1 of 1
Question:
You want to procure your material components based on a forecast for the
finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.
Response:
Score 1 of 1
Question:
Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
Response:
Sales orders
Score 1 of 1
Question:
Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.
       Response:
MIGO
Score 1 of 1
Question:
How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
Question:
How can Production Planning and Detailed Scheduling (PP/DS) enhance the
standard planning functionality?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
What are uses of the low- level code assigned to each material?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
       Response:
               Replenishment lead time is known and relatively constant.
Score 0 of 1
Question:
Response:
Resource selection
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
You are using the document management system (DMS). Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.
Response:
Bill of material
Material master
Score 0 of 1
Question:
You produce your material based on a forecast derived from historical sales and
expect it to be in inventory when your customer orders. If customers order more
that the forecasted quantity, you want to increase production to try to meet the
extra demand.
Response:
40 – Planning with-final-assembly
Score 1 of 1
Question:
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
Stock transfers
Purchase orders
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
You have maintained the parameters for simple discontinuation in the material
master of a component. Which business process will be affected if the available
stock is zero and the discontinuation date is in the past?
Please choose the correct answer.
       Response:
               Material requirements planning
Score 0 of 1
Question:
Which warehouse management functions are available in SAP EWM but NOT in SAP
WM?
There are 3 correct answers to this question.
Response:
Labor Management
Slotting
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
What are some uses for the low-level code assigned to each material?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
You want to create a production order from a planned order. What methods could
you use?
There are 2 correct answers to this question.
Response:
Partial conversion
Full conversion
Score 0 of 1
Question:
Which of the following time elements does MRP use during backward scheduling
for in-house production?
There are 2 correct answers to this question.
Response:
Opening period
Score 0 of 1
Question:
In a production process, you need a certain amount of liquid as input material. The
source tank is directly connected to the reactor. How can you process consumption
postings?
Please choose the correct answer.
Response:
Backflushing
Score 0 of 1
Question:
The MRP run detected a shortage of a material that you source from an external
supplier in full pallets. How can you make sure you will only receive full pallets?
Please choose the correct answer.
Response:
Advanced Planning uses master data and transaction data from SAP S/4HANA. In
which data objects can you set the advanced planning flag?
There are 2 correct answers to this question.
Response:
Material
Work center
Score 0 of 1
Question:
Response:
Planning
Implementation
Score 0 of 1
Question:
What data can you maintain in the sub items of a bill of material (BOM)?
There are 2 correct answers to this question.
Response:
Quantity
Installation point
Score 0 of 1
Question:
The pegging situation was changed because of an MRP heuristic run. What is a
capability of dynamic pegging?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question.
Response:
Score 0 of 1
Question:
How can you avoid order proposals for planned independent requirements with
dates in the past?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
What must be used in the system to plan the requirements for different
subcontractors separately?
Please choose the correct answer.
Response:
MRP areas
Score 0 of 1
Question:
Response:
Routings (N)
Score 0 of 1
Question:
When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.
       Response:
Score 0 of 1
Question:
What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
Response:
Order-related
Product-related
Score 0 of 1
Question:
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
Which material master setting is required to use the repetitive planning table for
production with production orders?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
You are creating a production order manually. What activities are involved in this
process?
There are 3 correct answers to this question.
Response:
Response:
Filters
Sort
Drilldown
Score 0 of 1
Question:
What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.
Response:
Component assignment
Score 0 of 1
Question:
The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
               Production Version
Score 0 of 1
Question:
Which times are used for Basic Date Scheduling of manufacturing planned orders
in MRP?
There are 2 correct answers to this question.
Response:
Opening period
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
What are the consequences when you assign a planned order to a production line
manually, using the planning table in repetitive manufacturing?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Response:
Developer
               Occasional
               Expert
Score 0 of 1
Question:
You need to model goods receipt processing time in Detailed Scheduling. Which
modelling options do you have?
There are 2 correct answers to this question.
Response:
               Model a handling resource in the location master and goods receipt time in the
               master.
Score 0 of 1
Question:
Response:
Optimization
Heuristics
Score 0 of 1
Question:
Response:
               At order creation
               At order release
Score 0 of 1
Question:
Response:
Receiver-sender relationships
Score 0 of 1
Question:
Which actions does the system perform by default when you save a confirmation
for a finished product in repetitive manufacturing?
There are 3 correct answers to this question.
Response:
Score 0 of 1
Question:
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:
Score 0 of 1
Question:
What does it mean for the production planner when MRP works with infinite
capacities?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Before a user can add multiple production versions in a material master, what
information should be collected?
There are 3 correct answers to this question.
Response:
Lot sizes
BOM status
Validity dates
Score 0 of 1
Question:
Response:
Demand variation
You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.
Response:
Top of Green
Score 1 of 1
Question:
What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.
Response:
Full
Score 1 of 1
Question:
Response:
Routing
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
You want to schedule an order in the graphical planning board. What are valid
planning directions?
There are 2 correct answers to this question.
Response:
Backwards
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
Response:
Score 0 of 1
Question:
At the end of the MRP run you receive the exception message “Reschedule In
Operation”. What caused the message to be generated?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
Response:
Production version
Score 0 of 1
Question:
A production order is created from a planned order. The system should determine
a valid production version. What must you doing the system for the selection to
occur?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
You want to perform capacity availability checks on your production orders. What
must be set for this to occur?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
For which planning-relevant data objects do you set just one indicator to include
then in PP/DS?
There are 2 correct answers to this question.
Response:
Material
Work center
Score 0 of 1
Question:
In which of the following master data objects can you define the production order
default storage location for a material component?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
The SAP Kanban procedure could be used to trigger which of the following kinds of
replenishment?
There are 2 correct answers to this question.
Response:
Stock transfer
In-house production
Score 0 of 1
Question:
What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
Response:
Dependent demand
Sales order
Score 0 of 1
Question:
A warehouse manager likes to streamline the goods receipt (GR) process for
production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
Response:
Move time
Wait time
Queue time
Score 0 of 1
Question:
In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.
Response:
               Process order
               Control recipe
               PI sheet
               Process message
Score 0 of 1
Question:
       Response:
               Real time decision support
Strategic analysis
Score 0 of 1
Question:
What do you use to schedule operations from planned orders so that the
production plan can be fulfilled?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Response:
By plant
By period
Score 0 of 1
Question:
Your customer complains about incorrect duration for production order operations.
What time elements could cause the issue?
There are 3 correct answers to this question.
Response:
Processing time
Queue time
Score 0 of 1
Question:
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
Work Scheduling
Purchasing
Score 1 of 1
Question:
How can you carry out cost object controlling for production orders?
There are 2 correct answers to this question.
Response:
Order-related
Product-related
Score 0 of 1
Question:
Which SAP solutions support the supplier area in the portfolio of the Digital Value
Network?
There are 3 correct answers to this question.
Response:
SAP Concur
SAP Ariba
Score 0 of 1
Question:
Use of the digital signature function to check and run business processes
Question:
Response:
Score 0 of 1
Question:
Your client is asking for your advice on material master numbering in SAP
S/4HANA. What do you need to consider?
There are 2 correct answers to this question.
Response:
               The maximum mater all number length is 40 for external numbers and 18 for
               numbers
Score 0 of 1
Question:
How Is the bill of material (BOM) exploded when you use a BOM explosion
number?
Please choose the correct answer.
       Response:
               With respect to defined separate key dates for product and each assembly
Score 1 of 1
Question:
You are using the document management system (DMS). Where should the DMS
document links be assigned, to have them automatically copied to production
orders?
There are 2 correct answers to this question.
Response:
Bill of material
Material master
Score 0 of 1
Question:
Response:
Landscape transformation
System conversion
New implementation
Score 1 of 1
Question:
Response:
Bill of Material
               Production Version
               Routing
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
What are the consequences if operation status Dispatched is set for a production
order operation?
Please choose the correct answer.
Response:
You can reschedule the operation using finite Scheduling in a planning board.
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Advanced Planning uses master data and transaction data from SAP S/4HANA. In
which data objects can you set the advanced planning flag?
There are 2 correct answers to this question.
       Response:
               Work center
Material
Score 0 of 1
Question:
Response:
The OLAP system needs to write back the data to the OLTP system
Score 0 of 1
Question:
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
Material master
Score 0 of 1
Question:
A production order is created from a planned order. The system should determine
a valid production version. What must you doing the system for the selection to
occur?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
You are using heuristic SAP_ERP_001. Which of the following criteria are included
in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:
Quota arrangement
Score 1 of 1
Question:
Which transaction code can you use in SAP S/4HANA to enter and display goods
movements?
Please choose the correct answer.
Response:
MIGO
Score 1 of 1
Question:
The production plan is being disrupted by last minute demands that are entered in
the system. Which is the most efficient way to handle last minute demands and
protect the current production plan?
There are 2 correct answers to this question.
Response:
               Manually firm all planned orders for materials within the replenishment lead ti
               material
               In the stock requirements list, set a manual firming fence for a date based on
               replenishment lead time of the material
Score 1 of 1
Question:
In a first step you have created master recipes. In which sequence are the
additional objects created?
Please choose the correct answer.
       Response:
               Process order
               Control recipe
               PI sheet
               Process message
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
What are the three layers in the SAP Best Practices Content for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Building Blocks
Scope Items
Solution Package
Score 1 of 1
Question:
When working with both cross-plant and plant-specific material statuses in the
material master, which status has the highest priority?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
What is the first step in the MRP run?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
For which categories can you define bills of materials (BOMs) in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Sales Order
Document Structure
Score 1 of 1
Question:
Response:
Packaging Logistics
Parts interchangeability
Score 0 of 1
Question:
You want to reduce planning efforts for B/C materials. Which planning procedure
do you recommend?
Please choose the correct answer.
Response:
               Consumption-based planning
Score 1 of 1
Question:
Response:
Outline agreement
Score 0 of 1
Question:
You want to insert an operation at a certain time on a work center. The planning
direction is forward. The desired dispatching time coincides with an operation that
has previously been dispatched.
Response:
               The new operation is inserted at the desired time the previously dispatched op
               moved backward.
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
What are the advantages of the new MRP Live in SAP S/4HANA compared to the
classic MRP from SAP ECC?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
An issue storage location was NOT found through the work center, bill of material
(BOM) item, or material master. What determines whether the storage location
can be derived from the production version?
Please choose the correct answer.
Response:
MRP Group
Score 0 of 1
Question:
Where can you maintain consumption mode and consumption periods for planning
strategies?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Which master data object governs the relationship between supply source and
demand source in the Kanban process?
Please choose the correct answer.
Response:
Control cycle
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
You run MRP for a material that was planned using Demand-Driven
Replenishment. Towards which buffer level does the MRP run create a
replenishment proposal?
Please choose the correct answer.
Response:
Top of Green
Score 0 of 1
Question:
What must be used in the system to plan the requirements for different
subcontractors separately?
Please choose the correct answer.
Response:
               MRP areas
Score 1 of 1
Question:
Your project uses process orders for the production of liquid chemicals. What can
you define to ensure that the production flow happens only in physically
connected tanks?
Please choose the correct answer.
Response:
Resource network
Score 1 of 1
Question:
Which material master data can you copy when you use the Copy Material program
(transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
               Purchase orders
               Transfers from batch to batch
Stock transfers
Score 0 of 1
Question:
Response:
One-off events
Market intelligence
Score 1 of 1
Question:
The procurement type of your material is set to "E" for In-house production.
Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
Production Version
Score 1 of 1
Question:
MRP created a planned order for a material that has one single material from stock
as a component. What happens to this dependent requirement when you convert
the planned order into a production order?
Please choose the correct answer.
Response:
At the end of the MRP run you receive the exception message “Reschedule In
Operation”. What caused the message to be generated?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
In which of the following master data objects can you define the production order
default storage location for a material component?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Which of the following data objects are updated when a user confirms an
operation?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
Response:
               Wait time
               Queue time
Move time
Score 1 of 1
Question:
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
Concur
SAP Hybris
SAP Fieldglass
Score 0 of 1
Question:
Response:
Use of the digital signature function to check and run business processes
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
How can you limit the number of master data objects to be created when the
manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Your customer is using storage location is in SAP ECC and wants to switch to SAP
S/4HANA. What do you have to consider?
Please choose the correct answer.
Response:
You have to set one MRP area for every storage location.
Score 1 of 1
Question:
       Response:
               To make the assignment of components easier
Score 0 of 1
Question:
Response:
Receiver-sender relationships
Score 0 of 1
Question:
Which alternative item strategies are available in bills of materials (BOM) in SAP
S/4HANA?
There are 2 correct answers to this question.
Response:
By usage probability
100% check
Score 1 of 1
Question:
Which bill of material (BOM) categories can you define in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
The MRP run detected a shortage of a material that you source from an external
supplier in full pallets. How can you make sure you will only receive full pallets?
Please choose the correct answer.
Response:
Score 1 of 1
Question:
Response:
At order release
At order creation
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
       Response:
               Which material master views can be maintained
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Response:
Requirements type
Score 1 of 1
Question:
Response:
Score 0 of 1
Question:
Which of the following elements does MRP take into account during net
requirement calculation?
There are 2 correct answers to this question.
Response:
               Purchase orders
               Safety stock
Score 0 of 1
Question:
What are examples of assignment objects you can maintain in the Engineering
Workbench?
There are 3 correct answers to this question.
Response:
Component assignment
Score 1 of 1
Question:
How can you carry out cost object controlling for production orders?
There are 2 correct answers to this question.
Response:
Order-related
Product-related
Score 1 of 1
Question:
When a developer creates a new SAP Fiori app, they begin by selecting a template
to ensure the application has a consistent look-and-feel.
Response:
               Analytical
               Transactional
Factsheet
Score 1 of 1
Question:
In your plant, MRP is activated. Which options do you have to exclude a material
from the MRP run?
There are 2 correct answers to this question.
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
Response:
Score 1 of 1
Question:
You want to schedule an order in the graphical planning board. What are valid
planning directions?
There are 2 correct answers to this question.
Response:
Backwards
Score 1 of 1
Question:
What Kanban status automatically posts goods receipt with reference to the
procurement element?
Please choose the correct answer.
Response:
Full
Score 0 of 1
Question:
You have a quality control check to avoid using a high-value component tin faulty
materials in subsequent assembly operations. How do you account for potentials
crap of the high-value material?
Please choose the correct answer.
Response:
               master of the assembly and set the net indicator in the routing operation whe
               component is used
               Enter the operation scrap and set the net indicator in the component of the bi
               of the assembly.
Score 1 of 1
Question:
Response:
Production version
Score 1 of 1
Question:
Which time elements are relevant for lead time scheduling of a product on order?
There are 2 correct answers to this question.
Response:
Score 0 of 1
Question:
You need to model goods receipt processing time in Detailed Scheduling. Which
modelling options do you have?
There are 2 correct answers to this question.
Response:
               Model a handling resource in the location master and goods receipt time in the
               master.
Score 0 of 1
Question:
       Response:
               Dependent demand
Sales order
Score 0 of 1
Question:
Response:
Score 1 of 1
Question:
In the Manage Shortage view of the new SAP Fiori app “Monitor Material
Coverage”, what do the stars indicate?
Please choose the correct answer.
Response: