Option 1                             2.
11             65
100mm Ø G.I PIPE Painted Finish      11.4 ln.m 351.1848 ln.m
200mm Ø G.I PIPE Painted Finish       5.8 ln.m 178.673 ln.m
Tensile Fabric                        7.5 sq.m 231.0427 sq.m
Option 2                              2.18               65
2" x 4" GIRDER                       32.9 ln.m    980.9633    ln.m
200mm x 200mm Palochina                9.6 sq.m   286.2385    sq.m
Rebar                             141.568 kg.s    4221.064     kg.s
Formworks                              9.6 sq.m   286.2385    sq.m
Concrete                             0.48 cu.m    14.31193    cu.m
                                                             BILL OF QUANTITIES
                                               (CP-01) GENERAL CONSTRUCTION & TRADE WORKS
                                                            (Civil / Structural Works)
Project :       NOURISH: WELL-BEING ECO-PARADISE
Location :      Brgy. Pagolingin Bata, Lipa Batangas
Bill No.        WALK WAY
                                                                                                  UNIT COST
 CODE
                               DESCRIPTION                  UNIT     QTY                                                      TOTAL AMOUNT
  NO.                                                                                            Labor & Other
                                                                                  Material                       Total
                                                                                                    Cost
             Include all cost necessary to complete the
             works specified in the plans and
             specifications including all accessories and
             incidentals in an approved methodology.
    I.       OPTION 1
   1.0       100mm Ø G.I PIPE Painted Finish                 kg.s    2,643.90                -          287.50       287.50       760,119.82
   2.0       200mm Ø G.I PIPE Painted Finish                 kg.s    2,733.43                -          287.50       287.50       785,860.74
   3.0       Welding Rod                                     kg.s      537.73                -          288.75       288.75       155,270.22
   4.0       Tensile Fabric                                 sq.m       242.59                -          287.50       287.50        69,746.00
   5.0       Others (Please Specify)
                                                                           SUB-TOTAL (Formworks)                                 1,770,996.79
             OPTION 2
   1.0       Tubular 2" x 4" x 3mm                           kg.s    6,859.88               -            10.00        10.00        68,598.76
   2.0       200mm x 200mm Palochina                        sq.m       300.55               -            10.00        10.00         3,005.50
   3.0       Rebar                                           kg.s    4,432.12            47.50           10.00        57.50       254,846.75
   4.0       Tie Wire                                        kg.s    1,129.20            75.00           10.00        85.00        95,981.95
   5.0       Formworks                                      sq.m       300.55           768.75          287.50     1,056.25       317,456.42
   6.0       Concrete                                       cu.m        15.03         6,250.00          375.00     6,625.00        99,557.34
   7.0       Others (Please Specify)
                                                                    SUB-TOTAL (Labor of Reinforcing Bars)                          839,446.73