Equipment Needed :
ITEM NO. SCOPE OF WORK % WT. QUANTITY UNIT UNIT PRICE TOTAL AMOUNT
101(6) Removal of structures and Obstruction Err:509 #NAME? #NAME? #NAME? ₱ 28,800.00
105 Subgrade Preparation Err:509 Err:509 sq.m Err:509 Err:509
900 Reinforced Concrete Err:509 Err:509 Err:509 Err:509 Err:509
Estimated Project Cost: Err:509 Err:509
Approved by:
MERALUNA SALVALEON ABROGAR
Municipal Mayor
Project : Proposed 2-storey commercial Building
Location: Tamboboan, Claveria, Misamis Oriental
Owner: Marciana D. Vanguardia
Subject: Bill of Materials
Item
DESCRIPTION Qty Unit Unit rate Amount
No.
1.0 GENERAL REQUIREMENTS
1.0 EARTHWORKS
Excavation Works (Ftg., WF, & Septic) 64.61 cu.m 32.28 2,085.45
Compaction 259.88 sq.m 120.00 31,185.00
Subtotal 1.0 > > > 33,270.45
C. PIPES @ FITTINGS:(Neltex)sched.40
½ Ø" PVC Pipes 5 lght 65.00 325.00
½ Ø" PVC Connector w/ Locknut 12 pc. 10.00 120.00
1¼"Ø PVC Pipes 4 lght 170.00 680.00
1¼"Ø PVC Elbow 3 pc. 65.00 195.00
1¼"Ø PVC Connector w/ Locknut 4 pc. 60.00 240.00
1¼"Ø EMT Pipe 2 lght 380.00 760.00
1¼"Ø EMT Connector w/ Locknut 10 pc. 75.00 750.00
1¼"Ø Entrance Headcup 1 pc. 65.00 65.00
1¼"Ø LB Conduit 3 pc. 180.00 540.00
2 Pole Secondary Rack 1 pc. 300.00 300.00
G. CONSUMABLE MATERIALS
Electrical Tape (3m) 15 roll 30.00 450.00
Solvent Cement (big) 2 can 80.00 160.00
3/8 Circular Loom 60 L 20.00 1,200.00
C. Consumable Materials
1. Newspaper 4 kg 20.00 80.00
2. Paint Brush 4" 7 pcs. 40.00 280.00
3. Paint Brush 2" 7 pcs. 30.00 210.00
4.Sand Paper # 100 15 rolls 28.00 420.00
5. Paint Roller/pale 2 pcs. 215.00 430.00
Red Lead Primer 1 gal. 384.00 384.00
Epoxy Primer 1 gal. 580.00 580.00
Subtotal 12.0 > > > 47,363.00
13.0 PLUMBING WORKS
½"Ø PVC pipe 15 lgth 65.00 975.00
½"Ø PVC elbow 10 pc. 10.00 100.00
½"Ø PVC coupling 10 pc. 3.00 30.00
½"Ø PVC tee 10 pc. 9.00 90.00
½" Ø Female Threaded Elbow 6 pc. 5.00 30.00
½" Ø Female Threaded Tee 6 pc. 11.00 66.00
3"Ø PVC pipe 4 pc. 382.00 1,528.00
4"Ø PVC pipes 10 lgth 562.00 5,620.00
4"Ø PVC tee wye 6 pc. 109.00 654.00
4"Ø Clean out 6 pc. 48.00 288.00
4"Ø P trap 6 pc. 151.00 906.00
4"Ø 90° Bend 4 pc. 55.00 220.00
1/2 '' PPR 4 lgth 360.00 1,440.00
Solvent (Medium) 3 qrts 105.95 317.85
Water Closet (HCG) 6 set 5,795.00 34,770.00
Floor Drain Cover 6 pc. 39.75 238.50
Faucet (brass) 6 pc. 289.95 1,739.70
Gate Valve 1 pc. 277.00 277.00
Check Valve 1 pc. 279.00 279.00
Tiplon tape (3/4) 5 rolls 18.00 90.00
Vulca Seal 2 quarts 302.00 604.00
Septic vault
4" x 8" x 16" CHB (NLB) 300 blks. 8.50 2,550.00
Cement 19 bg. 195.00 3,705.00
Wash Sand 2 cu.m 300.00 600.00
10 mm Ø x 6m 13 pc. 326.00 4,238.00
# 16 G.I. wire 2.00 kg. 68.00 136.00
Catch Basin
4" x 8" x 16" CHB (NLB) 21 blks. 8.50 178.50
Cement 1 bg. 195.00 195.00
Wash Sand 0.45 cu.m 300.00 135.00
8mm Ø x 6m 1 pc. 73.00 73.00
# 16 G.I. wire 0.25 kg. 68.00 17.00
Subtotal 13.0 > > > 62,090.55
Civil Engineer
Labor Cost
14,971.70
256,500.00
271
390
470
5
153,336.15
25
76,916.25
56,028.15
125,246.25
242,113.50
17,280.00
23,422.50 #REF!
42,714.45
30,005.33
28,417.80
catch basin
1.68
27,940.75 #REF!
25,833.60 25,833.60
#REF!
Republic of the Philippines
PROVINCE OF MISAMIS ORIENTAL
IMPROVEMENT OF PARMBUGAS COVERED COURT(FLOORING)
ITEM NO : 1
Scope of Earthworks
Works :
Description LENGTH (m) WIDTH (m) DEPTH (m) No. VOLUME (m3)
F1 1.5 1.5 1.3 3 8.78
F2 1.8 1.8 1.3 9 37.91
F3 0.8 0.8 1.3 3 2.50
Description LENGTH (m) WIDTH (m) DEPTH (m) PERIMETER (m) VOLUME (m3)
TB1 0.4 0.2 0.4 73 2.34
Description LENGTH (m) WIDTH (m) DEPTH (m) No. VOLUME (m3)
S.V 4.1 1.6 1.7 1 11.15
Description LENGTH (m) WIDTH (m) DEPTH (m) No. VOLUME (m3)
C.B 0.7 0.7 0.6 3 0.88
Description LENGTH (m) WIDTH (m) DEPTH (m) No. VOLUME (m3)
Stairs.Foundation 1.2 0.8 1.1 1 1.06
A. MATERIALS
B. LABOR
W.F T.B
perimeter 1 TB1
height 1 a Length 5 d Length
width 1 Width 0.3 Width 0
Depth 0.3 Depth 0
b Length 6 e Length
Width 0.3 Width 0
Depth 0.3 Depth 0
c Length f Length
Width 0 Width 0
Depth 0 Depth 0
SLAB
2nd Floor
S1 length Width s12 length Width
5 5 2 1.35
s2 length Width S13 length Width
5 5 2.5 1.35
s3 length Width s14 length Width
6 5 5 1.35
s4 length Width s15 length Width
5 5 6 1.35
s5 length Width s16 length Width
5 5 1.35 1.2
s6 length Width
6 5
s7 length Width
5 1.35
s8 length Width
5 1.35
s9 length Width
6 1.35
s10 length Width
5 2
s11 length Width
5 2
BEAM
2nd Floor
ATB-L
CTB
ATB-R
FOUNDATION
NO.OF DISTRIBUTION 12
F1
A CUT LENGTH 1.5 m BUILDING DIMENSION LENGTH WIDTH
B NO.OF DISTRIBUTION-FOOTING 12 pcs 20.5 10.5
C NO.OF FOOTING 3 Footings PERIMETER 1m
D STANDARD LENGTH OF DRB 6m
NO.OF DISTRIBUTION 16
F2
A CUT LENGTH 1.8 m
B NO.OF DISTRIBUTION-FOOTING 16 pcs
C NO.OF FOOTING 9 Footings
D STANDARD LENGTH OF DRB 6m
NO.OF DISTRIBUTION 8
F3
A CUT LENGTH 0.7 m
B NO.OF DISTRIBUTION-FOOTING 8 pcs
C NO.OF FOOTING 3 Footings
D STANDARD LENGTH OF DRB 6m
CONCRETE
COLUMN STIRRUPS
C1 C1
Determining Cut length: clear concrete cover. 45 mm
Height of Column from top surface of footing 9 m 1 No.of cut per length of DRB
half of the depth of Footing 0.15 m SIDE A 40 cm (D/A) unit
Length of bending Standard 0.2 m SIDE B 40 cm 3 pc
Total length of Cut: 9.35 m determining Cut length: 2 total no.of Cut
FORMULA [(SIDE A + SIDE B) x 2 )] 1.6 m (B x C ) unit
A CUT LENGTH 9.35 m 660 pcs
B NO.OF DISTRIBUTION/COLUMN 4 pcs 5 pcs 50 mm spacing 3 Devide 2 To 1
C NO.OF COLUMN 12 columns 10 pcs 100 mm spacing (2/1) unit
D STANDARD LENGTH OF DRB 12 m Rest 200 mm spacing 220 length 10 mm x 6 m long DRB
1 No.of cut per length of DRB I. Total length of 50 mm and 100 mm 1250 mm
(D/A) unit II. Heigth of Column: 9000 mm
1.0 pc III. B-A 7750 mm
2 total no.of Cut IV the rest for 200 mm spacing 40 pcs
(B x C ) unit V Total no. of Stiirups/ Column 55 pcs.
48 pcs A CUT LENGTH 1.6 m
3 Devide 2 To 1 B NO.OF DISTRIBUTION/COLUMN 55 pcs
(2/1) unit C NO.OF COLUMN 12 columns
48 length 16 mm x 6 m long DRB D STANDARD LENGTH OF DRB 6m
C2
Determining Cut length: STIRRUPS
Height of Column from top surface of footing 3 m C2
half of the depth of Footing 0.15 m clear concrete cover. 45 mm
Length of bending Standard 0.2 m 1 No.of cut per length of DRB
Total length of Cut: 3.35 m SIDE A 25 cm (D/A) unit
SIDE B 25 cm 6 pc
A CUT LENGTH 3.35 m determining Cut length: 2 total no.of Cut
B NO.OF DISTRIBUTION/COLUMN 4 pcs FORMULA [(SIDE A + SIDE B) x 2 )] 1m (B x C ) unit
C NO.OF COLUMN 3 columns 75 pcs
D STANDARD LENGTH OF DRB 12 m 5 pcs 50 mm spacing 3 Devide 2 To 1
10 pcs 100 mm spacing (2/1) unit
1 No.of cut per length of DRB Rest 200 mm spacing 13 length 10 mm x 6 m long DRB
(D/A) unit
3.0 pc I. Total length of 50 mm and 100 mm 1250 mm
2 total no.of Cut II. Heigth of Column: 3000 mm
(B x C ) unit III. B-A 1750 mm
12 pcs IV the rest for 200 mm spacing 10 pcs
3 Devide 2 To 1 V Total no. of Stiirups/ Column 25 pcs.
(2/1) unit A CUT LENGTH 1m
4 length 16 mm x 6 m long DRB B NO.OF DISTRIBUTION/COLUMN 25 pcs
C NO.OF COLUMN 3 columns
D STANDARD LENGTH OF DRB 6m
TIE BEAM
B1 C1
Top bars 2 A 0.4
bottom bar 2 b 0.4
length
A B C D E
L1 5 5 5 5 5
L2 5 5 5 5 5
L3 6 6 6 6 6
L4 2 2 2 2 1.2
19.6 19.6 19.6 19.6 18.8
STEEL REINFORCEMENT
A LENGTH 97.2 m
B NO.OF DISTRIBUTION-BEAM (TOP) 2 pcs
C NO.OF DISTRIBUTION-BEAM (BOT) 2 pcs
D STANDARD LENGTH OF DRB 6m
E TOTAL LENGTH 388.8 m
F NO.OF LENGTH 65 length' 16 mm x 6 m long DRB
TIE BEAM DIMENSION
A 0.25
B 0.2
BEAM REINFORCEMENT
Column:
C1
A 0.4
b 0.4
HORIZONTAL VERTICAL
A
1 B3 B3 B3 B3 END
2.5 5 6 1.2 14.7 m N/A
2 B1 B1 B1 B2 B1
5 5 6 2 18 m 5
3 B1 B1 B1 B2 B1
5 5 6 2 18 m 5
4 B1 B1 B1 B2 B2
5 5 6 2 18 m 1.35
B3 B3 B3 B3 11.35
5 5 6 2 18 m
STEEL REINFORCEMENT
B3
A LENGTH 51.315 m
B NO.OF DISTRIBUTION-BEAM (TOP) 2 pcs
C NO.OF DISTRIBUTION-BEAM (BOT) 3 pcs
D STANDARD LENGTH OF DRB 6m
E TOTAL LENGTH 159.945 m
F NO.OF LENGTH 27 length' 16 mm x 6 m long DRB
B2
A LENGTH 22.165 m
B NO.OF DISTRIBUTION-BEAM (TOP) 4 pcs
C NO.OF DISTRIBUTION-BEAM (BOT) 2 pcs
D STANDARD LENGTH OF DRB 6m
E TOTAL LENGTH 52.33 m
F NO.OF LENGTH 9 length' 16 mm x 6 m long DRB
B1
A LENGTH 96.8 m
B NO.OF DISTRIBUTION-BEAM (TOP) 2 pcs
C NO.OF DISTRIBUTION-BEAM (BOT) 3 pcs
D STANDARD LENGTH OF DRB 6m
E TOTAL LENGTH 296.4 m
F NO.OF LENGTH 50 length' 16 mm x 6 m long DRB
B3 B1 B1 B1 B3 B3 B3
A B C D E F G
L1 5 5 5 5 5 1.35 1.35
L2 5 5 5 5 5 5 5
L3 6 6 6 6 6 5 5
L4 2 2 2 2 1.2 1.35 1.35
19.6 19.6 19.6 19.6 18.8 14.3 14.3
STEEL REINFORCEMENT
A LENGTH 154.4 m
B NO.OF DISTRIBUTION-BEAM (TOP) 0 pcs
C NO.OF DISTRIBUTION-BEAM (BOT) 0 pcs
D STANDARD LENGTH OF DRB 6m
E TOTAL LENGTH 0m
F NO.OF LENGTH 0 length'
B C D E
B2 B2 B2 B2 B3 END
1.35 1.35 1.35 1.35 1.35 N/A
B1 B1 B1 B1 END B3
N/Z 5 5 5 N/A 5
B1 B1 B1 B1 END B3
N/A 5 5 5 N/A 5
B2 B2 B2 B2 END B3
N/A 1.35 1.35 1.35 N/A 1.35
1.35 12.7 12.7 12.7 1.35 11.35
mm x 6 m long DRB
mm x 6 m long DRB
mm x 6 m long DRB
B3 B3
H I
1.35 1.35
5 5
5 5
1.35 1.35
14.3 14.3
SLAB REINFORCEMENT
LS 5m
SS 5m
B 0.2 m
AT LONG SPAN CUT BARS (L/4 X 2 )
CUT LENGTH ( LS + B ) 5.4 m a 1.25
TOTAL NO. OF CUT 26 PCS b 1.25
TOTAL LENGTH 140.4 SS NO.OF CUT 25
STANDARD LENGTH DRB 6m LS NO.OF CUT 25
NO. OF LENGTH 24 le TOTAL LENGTH 62.5
AT SHORT SPAN NO.OF LENGTH 11
CUT LENGTH ( LS + B ) 5.4 m
TOTAL NO. OF CUT 26 PCS
TOTAL LENGTH 140.4
STANDARD LENGTH DRB 6m
NO. OF LENGTH 24 le
S-1
no.of slab 6 Units
12 mm DRB 390 12 mm DRB
ONE WAY
S-2
A CUT LENGTH SPACING NO.OF CUT LNM LENGTH
S1 2.5 2.9 0.2 8 23.2 4
S2 5 5 0.2 8 40 7
S3 6 6 0.2 8 48 8
S4 1.2 1.2 0.2 8 9.6 2
S5 5 5 0.2 11 55 10
S6 5 5 0.2 11 55 10
S7 2 2 0.2 8 16 3
S8 6 6 0.2 8 48 8
S9 5 5 0.2 8 40 7
S10 5 5 0.2 8 40 7
66
Material 156 10 mm DRB
MATERIAL
15 length 2'' X 4'' X 4 MM RECTUBE summary
2'' X 4'' X 4 MM RECTUBE
Web Members DIAGONALS 2'' X 4'' X 4 MM RECTUBE
a1 1.1 m a1 1.5 m 2'' X 4'' X 4 mm RECTUBE
a2 1.05 m a2 1.5 m 4 x 6 x 4 rec tube
a3 1m a3 1.4 m
a4 0.9 m a4 1.4 m
a5 0.8 m a5 1.3 m
a6 0.7 m a6 1.3 m
a7 0.6 m a7 1.2 m
a8 0.5 m a8 1.2 m
a9 0.4 m a9 1m
a10 0.35 m a10 1m
a11 0.3 m UNIT 4
unit 4 unit TOTAL 52 m
TOTAL 31 m
MATERIAL
14 length 2'' X 4'' X 4 MM RECTUBE
C-PURLINS
TOP CHORD SPAN 12.33
SAPCING 0.6 m
SPAN 18 m
TOTAL LENGTH 65 LENGTH
MATERIAL
65 length 2'' X 4'' X 4 mm RECTUBE
sum 94
original 10%
4 MM RECTUBE 15 17
4 MM RECTUBE 14 16
4 mm RECTUBE 65 72
ec tube 9 10
STEEL COLUMN
SC1 9
LENGTH 2.85
NO.OF LENGTH 25.65 m
Length 5 le
SUMMARY
16 MM DRB 87 Length
10 MM DRB 20 Length
APRROACH END
TOP BARS
0.15 Spacing 0.15
17 pcs no.of Cut 17 pcs
3m Cut length 3m
51 m Total lnm 51 m
no.of length 9 length no.of length 9 length
Footing 11.214 cu.m
TIE BEAM 4.4 cu.m
COLUMN 12 cu.m
STAIRS
Foundation 0.96 cu.m
Stairs 4.242 cu.m
2nd Floor Beam 17.273 cu.m
GROUND FLOOR SLAB 25.965 cu.m
2nd FLOOR SLAB 25.965 cu.m
TOTAL VOLUME : 102.019 cu.m
10% contingency 112.2209 cu.m
3.432
6.192
0.76875
10.39275
Republic of the Philippines
PROVINCE OF MISAMIS ORIENTAL
IMPROVEMENT OF PARMBUGAS COVERED COURT(FLOORING)
PARMBUGAS CLAVERIA MISAMIS ORIENTAL
= 32.60 sq.m.
A. MATERIALS
B. LABOR
C. EQUIPMENT
Name and Capacity Quantity No. of days Unit Rate Amount (P)
A. MATERIALS
B. LABOR
C. EQUIPMENT
Name and Capacity Quantity No. of days Unit Rate Amount (P)
A. MATERIALS
B. LABOR
C. EQUIPMENT
Name and Capacity Quantity No. of days Unit Rate Amount (P)
2.5
40
1 1.5
8 12
welding machine
13 17784
0.3375411 11.5
Republic of the Philippines
PROVINCE OF MISAMIS ORIENTAL
COMPLETION OF EARTHQUAKE PROOF BALAY TULUGAN AT DARUCA POBLACION
BARANGAY POBLACION, CLAVERIA, MISAMIS ORIENTAL
Area = (4.65m)(12.40m)(2)
115.32 sq.m.
A. MATERIAL
B. LABOR
C. EQUIPMENT
Name and Capacity Quantity No. of days Unit Rate Amount (P)