STANDARDS – BASED SCHOOL IMPROVEMENT PLAN TEMPLATE
AREA: F. PHYSICAL PLANT AND INSTRUCTIONAL SUPPORT FACILITIES
IMPROVEMENT SMART GOALS OUTPUT ACTION TIME SYSTEM OF PERSON IN CHARGE BUDGET AND
PLAN ITEM STEPS PERIOD MONITORING BUDGET
SOURCE
1.A system for the To review current -report on -form Property
design, documentation proposed committee 1 month Attendance list Custodians,principal, 100,000.00
development, regarding update and consisting of Meeting Assisted by SSIP
construction and alignment of policy revisions on selected minutes working group
maintenance of on design, the protocol Faculty, school
different school development, on design, engineer, and
facilities in line construction and constraction property
with National maintenance of and custodian,
Building Code different school maintenance - review and
standards for size, facilities with of different discuss
safety & security, National building school possible
environment Code Standards facilities in updates and
protection, etc. line with revision on
National the protocol
Building code on design,
standards development,
construction
and
maintenance
of different
school
facilities.
-write report
based on the
results of the
meetings
2. A system for To review current -report on -form Attendance
providing documentation proposed and committee 2 months list School maintenance
adequate space regarding policy on revisions on consisting of Meeting Principal, assisted by 100,000.00
and materials and providing adequate the policy on selected minutes SSIP working group.
equipment space and providing Faculty, and
procurement, materials and adequate property
repair and equipment space and custodian.
maintenance for procurement,repai materials and -review and
instructional r and maintenance equipment discuss
support facilities for instructional procurement, possible
such as Science support facilities. repair and update and
laboratories, maintenance revision in the
Computer for policy on
laboratories, TLE instructional providing
laboratories and support adequate
others to ensure facilities. space and
enhancement of materials and
learning equipment
encounters. procurement ,
repair and
maintenance
for
instructional
support
facilities,
- write report
based on the
result of the
meetings,
3.A school To review current -updated - form 2 months Attendance Property
facilities documentation development committee list Custodians,principal,
development plan regarding status of plan that consisting of Meeting Assisted by SSIP
that provides for development plan provides for selected minutes working group
the growth and that provides for the growth Faculty, school
improvement of the growth and and engineer,and
different learning improvement of improvement property
space and different learning of different costodian
addresses varied spaces and learning -review and
needs for student addresses varied spaces and discuss
learning needs for student needs for possible
learning and student updates and
update if learning. revision
neccessary regarding the
development.
plan on
provision for
the growth
and
improvement
of different
learning
spaces
-write report
based on the
result of the
meetings
4. A system for To review current Report on -form 2 month Attendance Property
providing documentation proposed committee list Custodians,principal,
adequate apace regarding update and consisting of Meeting Assisted by SSIP
and procuring provision of revision on selected minutes working group
equipment and adequate space and the protocol Faculty and
supplies procuring on provision property
necessary for equipment and of adquate custodian.
conducting suplies for space and -review and
annual check-ups delivering medical procuring discuss
and delivering and dental services equipment possible
emergency and conducting and supplies updates and
medical and annual check-up for delivering revisions on
dental services. medical and the protocol
dental on provision
services and adequate
conducting space and
annual check procuring
up equipment
and supplies
for delivering
medical and
dental
services and
conducting
annual check-
ups
-write report
based on the
result of the
meetings
5.A system for To review current To report on -form 2 months Attendance Property
ensuring proper documentation proposed committee list Custodians,principal,
health of the regarding update and consisting of Meeting Assisted by SSIP
school community provision of proper revision on selected minutes working group
and sanitation in health and the protocol Faculty ,
the canteen or sanitation to the on provision school
nutrition center, school community; of proper engineers and
drinking facilities, canteen or health and property
comfort rooms nutrition center, sanitation to custodian.
and play areas. drinking facilities, the school -review and
comfort rooms and community: discuss
play areas . canteen or possible
nutrition updates and
center, revisions on
drinking the protocol
facilities, on provision
comfort rooms of proper
and play areas. health and
sanitation to
the school
community;
canteen or
nutrition
center,
drinking
facilities,
comfort rooms
and play areas.
To write
report based
on the results
of the
meetings.
6.A system for To review current To report on - form 2 months Attendance Property
ensuring the documentation proposed commitee list Custodians,principal, 30,000.00
academic regarding safety of update and consisting of Meeting Assisted by SSIP
community’s the academic revisions on selected, minutes working group
safety and community and the protocol Faculty, School
disaster disaster on safety of engineer, and
preparedness in preparedness in all the academic property
all the buildings, the buildings, community custodian.
classrooms and classrooms and and disaster -review and
facilities. facilities. preparedness discuss
in all the possible
building, updates and
classrooms revision on
and facilities the protocol
on safety of
the academic
community
and disaster
preparedness
in all the
buildings,
classrooms
and facilities.
To write
report based
on the result
of the
meetings
F. PHYSICAL PLAN AND INSTRUCTIONAL SUPPORT FACILITIES
Current school policies, programs and operation in this areas show the following:
IMPROVEMENT PLAN ITEM 2 1 0 PERSON
DONE AND PARTIALLY DONE; NOT DONE FOR RATING
CONSISTENTLY CERTAIN PARTS ARE
APPLIED IN SCHOOL INCOMPLETE OR
WORK INCONSISTENT WITH
OTHERS SECTION;
PARTIALLY APPLIED IN
SCHOOL WORK
1.A system for the design, development, construction and 2
maintenance of different school facilities in line with
National Building Code standards for size, safety &
security, environment protection, etc
2. A system for providing adequate space and materials 2
and equipment procurement, repair and maintenance for
instructional support facilities such as Science
laboratories, Computer laboratories, TLE laboratories and
others to ensure enhancement of learning encounters.
3.A school facilities development plan that provides for 2
the growth and improvement of different learning space
and addresses varied needs for student learning
4. A system for providing adequate apace and procuring 2
equipment and supplies necessary for conducting annual
check-ups and delivering emergency medical and dental
services
5.A system for ensuring proper health of the school 2
community and sanitation in the canteen or nutrition
center, drinking facilities, comfort rooms and play areas
6.A system for ensuring the academic community’s safety 2
and disaster preparedness in all the buildings, classrooms
and facilities .