Schedule Scoring System
Schedule Scoring System
Scales
0
Mandatory Assessment Status Level 01
1
Mandatory Assessment Level No. 02 - General 1
Schedule Requirements
0
0
Criterial Implementation
1
1
Criteria assessment 2
3
breviations
Colors
Criteria for Updated Schedule evaluation Only
Criteria for Baseline Schedule evaluation Only
Criteria for Baseline and Updated Schedule evaluation
Scales
The Schedule doesn’t contain the Mandatory Criteria
The Schedule contains the Mandatory Criteria
The Schedule doesn’t contain Unacceptable Criteria
The Schedule contains Unacceptable Criteria
SR
IF any of the above mandatory requirements of level 01 fails, the Schedule confident index will be multiplied by zero and
have a "Rejected" Status
SR
6
7
If the Schedule contains any of the unacceptable Criteria above in level 2, the Schedule Confident Index will be multiplied
Schedule will have a "Rejected" Status
Mandatory Assessment Level No. 01 - General Schedule Requirements
Traceable: Include realistic and meaningful network logic – horizontally and vertically integrated and
showing the realistic sequence of Project execution.
Resourced: Enable the Stakeholders to assess the time phased labor and other cost requirement to
achieve successful Project completion.
Controlled: Use the approved Baseline as a reference and regularly propose recoveries according to
the recorded variances (if any).
IF any of the above mandatory requirements of level 01 fails, the Schedule confident index will be multiplied by zero and the Schedu
have a "Rejected" Status
The Schedule contains any unjustified "As Late As Possible" or "As Early As Possible Constraints
The Schedule uses the Expenses to load the Project Budget or Relative weight Budget
The Schedule doesn’t Contain Procurement, Design, Engineering, Testing and Commissioning Activities
The Schedule doesn’t use the "Subtract Actual from at completion" method for resource assignment
calculation
The Schedule doesn’t use the Activity percent complete to calculate the Activity performance Percent
Complete
If the Schedule contains any of the unacceptable Criteria above in level 2, the Schedule Confident Index will be multiplied by zero an
Schedule will have a "Rejected" Status
dule Requirements
BL
BL
BL
UP
UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
BL and UP
Required
Schedule Conditional Schedule Components Submission Score Counting
Components Submission Score Weighted
Assessment
Baseline Comments, Clarifications and Criterial Implementation (Data Entry Fields)
SR or Update Schedule Criteria
Criteria requirements Criteria Assessment (Data Entry
Fields)
CRC RRC ERC KRC OPT CRC RRC ERC KRC OPT CRC RRC ERC KRC OPT
1 Total Credited Project Submitted Schedule Score for Baseline Criteria only 0 0 0 0 1 0 0 0 0
Total
Credited 2 Total Credited Project Submitted Schedule Score for Baseline and Update Criteria 0 0 0 0 0 2 0 0 0 0 0
Score
3 Total Credited Project Submitted Score for Update Criteria only (Updated Schedule Only) 0 0 0 0 3 0 0 0 0
Project Evaluation Sco
Mandatory Required
Requirement Category Mandatory Mandatory
Level 1 Level 2 CRC
1.Ge
Requirement Category Mandatory
Go Or No-Go Credit
Schedule Type Required
(CRC)
Level 1 Level 2
45
40
40
35
45
40
40
35
30
25
20
15
15
10
10
0
Required (CRC)
Mandatory Level 1
8 3 3 11 44 Mandatory Level 2
CRC
RRC
7 7 3 14 52 ERC
KRC
OPT
15 10 6 25 96
0 0 0 0 0
0 0 0 0 0 Conditional
0 0 0 0 0
Optional (OPT
Total Schedule Comp
Index
P
Required (CRC)
25 Conditional 1 (RRC)
Conditional 2 (ERC)
Conditional 3 (KRC)
Optional (OPT)
10 P
6 Required (CRC)
Conditional 1 (RRC)
Conditional 2 (ERC)
Conditional 3 (KRC)
Optional (OPT)
Conditional 1 (RRC) Conditional 2 (ERC)
Project Baseline
quired (CRC)
nditional 1 (RRC)
nditional 2 (ERC)
nditional 3 (KRC)
tional (OPT)
Project Update
quired (CRC)
nditional 1 (RRC)
nditional 2 (ERC)
nditional 3 (KRC)
tional (OPT)
Mandatory Required
Requirement Category
Level 1 Level 2 CRC
Total Required Score for
Requirement Categories (Baseline) 4 9 19
1.Ge
Requirement Category Mandatory
Go Or No-Go Credit Required
Schedule Type (CRC)
Level 1 Level 2
45
40
40
35
45
40
40
35
30
25
20
15
15
10
10
0
Required (CRC)
2. Weighte
Conditional Optional Total for
RRC ERC KRC OPT Schedule Type
8 3 3 11 44
7 7 3 14 52
15 10 6 25 96
35% 15%
0 0 0 0 0
0 0 0 0 0 Conditional
0 0 0 0 0
Optional (OPT
Total Schedule Comp
Index
P
Required (CRC)
25 Conditional 1 (RRC)
Conditional 2 (ERC)
Conditional 3 (KRC)
Optional (OPT)
10 P
6 Required (CRC)
Conditional 1 (RRC)
Conditional 2 (ERC)
Conditional 3 (KRC)
Optional (OPT)
Conditional 1 (RRC) Conditional 2 (ERC)
Project Baseline
quired (CRC)
nditional 1 (RRC)
nditional 2 (ERC)
nditional 3 (KRC)
tional (OPT)
Project Update
quired (CRC)
nditional 1 (RRC)
nditional 2 (ERC)
nditional 3 (KRC)
tional (OPT)