Material Control for Oil Facilities
Material Control for Oil Facilities
Document Number
CLASS : 1
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
                                    REVISION                                                              REVISION
   SHEET                                                                SHEET
               0.1   0.2   0.3   0.4    0.5   0.6   0.7   0.8   0.9                  0.1   0.2   0.3   0.4   0.5    0.6   0.7   0.8   0.9
1 X 31
2 X 32
3 X 33
4 X 34
5 X 35
6 X 36
7 X 37
8 X 38
9 X 39
10 X 40
11 X 41
12 X 42
13 X 43
14 X 44
15 X 45
16 X 46
17 X 47
18 X 48
19 X 49
20 X 50
21 X 51
22 X 52
23 X 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
COMMENT TABULATION
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                                  Document Number
TABLE OF CONTENTS
 1.      INTRODUCTION............................................................................................................................. 5 
        1.1  Plant Description ................................................................................................................... 5 
        1.2  Project General Description and Purpose .......................................................................... 5 
 2.      DOCUMENT SCOPE ...................................................................................................................... 7 
 3.      REFERENCE DOCUMENT ............................................................................................................ 7 
        3.1  Company Specification......................................................................................................... 7 
        3.2  International Code and Standard ......................................................................................... 7 
        3.3  COMPANY Supplied Document ........................................................................................... 7 
        3.4  Project Document.................................................................................................................. 8 
 4.      ABBREVIATIONS .......................................................................................................................... 8 
 5.      RESPONSIBILTIES ........................................................................................................................ 8 
         a.     Fabrication Coordinator ...................................................................................................... 8 
         b.     QA/QC Coordinator .............................................................................................................. 8 
         c.     QC Inspector ......................................................................................................................... 8 
         d.     Material Man .......................................................................................................................... 8 
         e.     Warehouse Supervisor ........................................................................................................ 8 
         f.     Fabrication Supervisor ........................................................................................................ 9 
 6.      MATERIAL RECEIVING ................................................................................................................. 9 
 7.      STORAGE MATERIAL MANAGEMENT ........................................................................................ 9 
 8.      MATERIAL IDENTIFICATION ...................................................................................................... 10 
 9.      MATERIAL INSPECTION............................................................................................................. 11 
 10.     MATERIAL SUBSTITUTION ........................................................................................................ 11 
 11.     TRANSFERRING OF MATERIAL HEAT NUMBER .................................................................... 11 
         11.1  Marking Identifications ...................................................................................................... 11 
         11.2  Marking Verification ........................................................................................................... 11 
 12.     MATERIAL TRACEABILITY ........................................................................................................ 12 
 13.     APPENDICES ............................................................................................................................... 13 
         Appendix – 1  : Material Receiving Flowchart ........................................................................ 14 
         Appendix – 2  : Material Receiving Inspection Report (MRIR) .............................................. 15 
         Appendix – 3  : Material Verification Report (MVR) ................................................................ 16 
         Appendix – 4  : Over, Shortage and Damage Report (OSDR) ............................................... 17 
         Appendix – 5  : Non-Conformance Report (NCR) ................................................................... 18 
         Appendix – 6  : Material Traceability Form ............................................................................. 19 
         Appendix – 7  : Material Subtitution Record Form ................................................................. 20 
         Appendix – 8  : Surplus Material Report Form ....................................................................... 21 
         Appendix – 9  : Waste Material Report .................................................................................... 22 
         Appendix – 10 : Material issue slip............................................................................................ 23 
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 1.       INTRODUCTION
 1.1      Plant Description
          Bekapai is a COMPANY’s oil field located at offshore area in the Mahakam delta (East
          Kalimantan) with water depths 30 – 40 meters and located about 40 kilometers south east of
          the Senipah terminal.
          COMPANY continues to develop of mature Bekapai offshore oil filed which was discovered in
          1972 and start to production in 1974, with current facilities are:
               Nine (9) satellite wellhead platforms & inter-platform pipelines;
               Production (BP) & LQ platforms;
               12” export pipeline to Senipah Terminal (BP1-SNP);
               12” export pipeline to Peciko field SWP-K (BA-SWPK).
          All effluents from satellite platforms are transported to BP1 and BA in order to have gas-oil-
          water processing unit (separation, pumping, compression, and oily water treatment).
          Production fluid from Bekapai field is routed to two (2) locations; multiphase production (mostly
          gas and oil) is exported to Senipah Terminal (TPA) via 12” BP1-SNP pipeline and gas
          production is exported to Peciko Field via 12” BA-SWPK Pipeline. The network of BEKAPAI
          Platforms is shown in figure below.
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
                                                        BE & BH Platform
          Project Purpose
               Increase oil and gas reserves recovery by Reserve: 22.1 BcfGas & 2.8 MbblOil +
                Condensate
               Drilling of 5 new wells from existing BE & BH platforms, with :
                -   Modification of the existing BE & BH
                -   Reuse of existing 6" pipeline from BE to BG (3.6 km) & 6" pipeline from BH to BG (1.9 km)
                -   Modification and integration work at the BA, BG & BP platforms
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 2.       DOCUMENT SCOPE
          Purpose of this document is to describe the required Material Control procedure work to
          deliver the Bekapai 3 Surface Facilities Modification and Dogleg Installation (EPCIC) project.
          This is required in order to prove that the work is
          carried out properly accordingly to the applicable Code / Specification.
3. REFERENCE DOCUMENT
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 4.            ABBREVIATIONS
               MDR          : Master Document Register
               MRIR         : Material Receiving Inspection Report
               MVR          : Material Verification Report
               NCR          : Non-Conformance Report
               OSDR         : Over, Shortage and Damage Report
               SWP-G        : Satellite Wellhead Platform G
               HSE          : Health Safety & Environment
               DAN          : Dispatch Advice Note
 5.            RESPONSIBILTIES
      a.       Fabrication Coordinator
               Responsible for all fabrication activities in yard including work planning and ensure all the
               works are in line with HSE manual, project work plan and COMPANY specification. He is also
               responsible to implement health, safety and environment management plan. Related with
               Material Management he is Contractor's Focal Point with COMPANY representative Ensure
               this procedure is implemented. Responsible with company's material delivered/stored at his
               site.
      b.       QA/QC Coordinator
               Responsible to make sure that the corresponding filing system is clear, accurate and that is no
               case original traceability report are removed from such file.
      c.       QC Inspector
               Responsible to carry out inspection and verification of all the received material and record it in
               Material Verification Report (MVR) and welding traceability. Non-Conformity Report (NCR)
               shall be carried out when receiving material does not comply with project requirement.
      d.       Material Man
               Responsible to monitor and record the outgoing / incoming material and to update the status of
               material stock.
      e.       Warehouse Supervisor
               Responsible issue the material against the appropriate requisition and maintain material or
               equipment as per site material controller instruction.
               - Prepare the location storage in accordance with the specifications, grades, and the size of
                 the material to be store
               - Checks in accordance with Delivery Order/Packing List. Make a report when there are
                 material conditions were found over, shortage or damage
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
      f.   Fabrication Supervisor
           Responsible to request the material for construction purpose as per approved as per approved
           drawing which have stamp "APPROVED FOR CONSTRUCTION" from engineering and
           ensure that material which should be used is meet with the requirement.
 6.        MATERIAL RECEIVING
               Before material arrives at warehouse, Warehouse Supervisor prepare detail storage
                location by each material category specification, classification, size as well as area to be
                stored. These activities shall be planned prior to commencement warehousing operation.
                And when material arrives, he is fully responsible for material allocation and under
                authority of Project Manager / Construction Manager.
               Based on complete shipping documents and or shipping schedule from forwarding /
                delivery Coordinator, Warehouse Supervisor shall prepare or anticipate for allocation of
                material storage arrival.
               Material man, Warehouse Supervisor, QA/QC Inspector shall check package total quantity
                based on forwarding / delivery order information or Bill of Loading/ Master List/ Packing
                List.
               All actual received materials and equipment shall be checked against packing list and
                package number and ensure that receiving material shall comply with Purchase Order or
                Bill of Material
               All actual received materials and equipment shall be recorded in Material Receiving
                Inspection Report (MRIR) by Material man and Material Verification Report (MVR) by QC
                Inspector.
               All actual received materials shall have supporting document such as material certificates,
                purchase order and packing list. Calibration Certificate, Test instrumentation and
                functional test shall be attached for electrical and instrument material.
               When material arrives at warehouse, QC Inspector verify all documents of material, such
                as Purchase Order, Packing list, etc.
               All COMPANY supplied materials which arrives at warehouse will be checked together
                with Contractor inspector according to the delivery order note and to be recorded at
                separated material receiving report. COMPANY should provide to Contractor with the
                necessary documents such as mill certificates, etc.
               If the received materials were found to be over quantity, shortage, or damaged,
                Warehouse Supervisor shall make report on the Over, Shortage and Damage Report
                (OSDR) form.
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
               All material shall be segregated between Carbon steel, Stainless steel and other special
                material (If any).
               All stainless-steel material shall be protected against the risk of saline corrosion during
                cleaning, transport, fabrication and storage.
               Damage material shall be stored separately or in quarantine area warehouse shall
                prepare bonded.
               Special material, flammable or hazardous materials such as painting, chemical agent,
                gases, etc. shall be stored in special indoor or outdoor storage with roof, the location shall
                be separated from other material.
               Painting material such as paint and thinner shall be stored in optimal condition and
                delivered in their original packaging.
               All materials or consumables which require protection from moisture shall be stored indoor
                with controlled temperature & humidity (ex. welding electrodes and rod).
               Equipment for Instrumentation shall be suitable in a humid, salt laden and corrosive
                atmosphere.
               All the equipment for Electrical and Instrumentation shall have enclosure protection
                degrees based on project Specification.
 8.       MATERIAL IDENTIFICATION
               All material (including surplus and scrap) should have clear markings.
               Upon receipt of goods, QC Inspector shall verify the items for its conformance to
                specifications.
               Non-conforming products shall be segregated where feasible, in designated quarantine
                areas under HOLD status. The HOLD status shall be prominently displayed on the
                nonconformity item.
          To ensure the control of non-conforming items, the following steps need to be done:
               MVR shall be submitted to COMPANY after material Inspection by QC Inspector.
               Non-conforming product or service are identified, marked, segregated and put in specific
                area to prevent them from being used for construction. The marking is using tags, marking
                ink, paint, tape, or any other specified way to identify.
               The entities concerned shall be notified.
               Before non-conformity or deviation is accepted by COMPANY, the material will be put
                HOLD status.
               The result of the dispositions of non-conformities (repair, use as is and reject) shall be
                documented.
               The Non-Conformance Report shall be closed – out. NCR follows the NCR procedure as
                mentioned in the document number ID-BKP-SOME-2009-504005 ( NCR Procedure )
               If there is similar case of non-conformance which happen several times, it should be
                recorded.
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 9.       MATERIAL INSPECTION
                  QC Inspector will check the conformity of material markings against material certificates
                   based on drawing and or Project Specification.
                  The inspection also covers a visual and dimensional check to the material in actual
                   condition and PMI inspection for low alloy steel and high alloy steel (if necessary).
                  If there is any material which is arrived not comply with project specification, QC Inspector
                   shall identify it as HOLD and shall be stored separately and raise NCR.
                  Contractor QA/QC Coordinator is responsible to make sure that the corresponding filing
                   system is clear, accurate and that is no case original traceability report are removed from
                   such file.
                  Contractor QA/QC will maintain a Traceability Form register.
                  Traceability report will be part of M.D.R (Manufacturer Data Report) to be handed over to
                   COMPANY.
                  Untraceable material is non-conformance; Contractor shall maintain heat number transfer
                   to material after cutting for avoid un-identification of material.
                  Company supplied material shall be traced / monitor & recorded separately.
                  All remaining material already fixed as redundant material by Contractor to be reported on
                   return balance material report.
              Material Transportation of reconciliation materials and surplus material to COMPANY’s
               assigned warehouse
                The basic scheme for material receiving and issuance as detailed below:
               -   Based on COMPANY Detail drawing (to be noted, detail engineering for Piping &
                   Structure are by COMPANY); Contractor verify and assess the required material based
                   on Contract Document. Most of piping and structure material are supplied by
                   COMPANY
               -   Then, the MTO submitted to COMPANY for agreement between both parties
               -   COMPANY inform the material reservation to Contractor
               -   Contractor expedite to COMPANY Warehouse for further follow up of releasing
                   Material
               -   When material ready for delivered to Contractor premise area, Contractor will arrange
                   for material pick up
               -   Material delivered to Contractor premise, and checking based on DAN
               -   Contractor material control will checking and verify the technical data; any discrepancy
                   will be inform to COMPANY for further rectification
               -   For material supplied by Contractor, similar process will be performed accordin
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 13.      APPENDICES
          Appendix – 1 : Material Receiving Flowchart
          Appendix – 2 : Material Receiving Inspection Report (MRIR)
          Appendix – 3 : Material Verification Report (MVR)
          Appendix – 4 : Over, Shortage and Damage Report (OSDR)
          Appendix – 5 : Non-Conformance Report (NCR)
          Appendix – 6 : Material Traceability
          Appendix – 7 : Material Subtitution Record
          Appendix – 8 : Surplus Material Report
          Appendix – 9 : Waste Material Report
          Appendix – 10 : Material issue slip
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
RESPONSIBILITY              ACTIVITY                                 INTERFACE
 Warehouse                Segregate to
  Supervisor             Inspection Area*
Replacement  OSDR
                                             No
                            Accepted
                                 Yes
 Material Inspector /    Prepare MVR
  QC Inspector
 QC Department                                                    MVR
                           Issue for
                          Construction
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                      BEKAPAI - 3                                                     Revision Index
                            Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                Contract No. 4500010835                                                 Rev      Status
Remarks :
                CONTRACTOR
                                                                CONTRACTOR                                                  CONTRACTOR
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                                           BEKAPAI - 3                                                                                 Revision Index
                                                 Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                                                                                                                                     Rev           Status
                                                                     Contract No. 4500010835
                                                                     MATERIAL CONTROL PROCEDURE                                                                      0.1            IFC
Remarks :
PT. ASTA REKAYASA UNGGUL PT PERTAMINA HULU MAHAKAM PT PERTAMINA HULU MAHAKAM
                                                                                                                                                                                                                         AR-QC-MVR-02/18
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                            BEKAPAI - 3                                          Revision Index
                                  Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                      Contract No. 4500010835                                   Rev         Status
Shortage in Packing, Package in Apparent Good but Content Short Damage - Visible Damage to Equipment or Material
Shortage in Delivery, SEE DETAIL BELOW Damage - Concealed Damage - Package in Apparent Good Order
NOTE :
Explanation :
                                                                                                                                           AR-QC-OSDR-02/18
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                          BEKAPAI - 3                                Revision Index
                                Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                    Contract No. 4500010835                          Rev    Status
Project : Report No :
Client              :                                                       Location           :
                                                          Reference Document
                                                         Document yang relevan
Root Cause
                                        :
Masalah Utama
Corrective Action :
Tindakan Perbaikan
Corrective Action By :
                                        :
Verification By :
Preventive Action :
Tindakan Pencegahan
Final Disposition :
Other
Closing of NCR :
Sign : Date :
                                                                                                                      AR-QC-NCR-02/18
Contract : 4500010835
                                                                                                         Document Number
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                                                                                                MATERIAL TRACEABILITY RECORD
                                                                                                                                     AND NDE CLEAREANCE
PROJECT NAME                   :
                                                                                                                                          WELDING PROCESS
                                                                                                           Dimentional Length
                                                      MATERIAL WELDED                                                                                                          WELDING CONSUMABLE                                        INSPECTION REPORT                                                      NON DESTRUCTIVE TEST (NDT)
                                                                                                                                                            WELDER STAMP
                                                                                                                                                                                                            INSPECTION REPORT
                                                                                                                                                                                                                                                                      (
                 Join Legend
                                                                                                                                                                                                                           ( FIT-UP )
                                                                                                                                                                                                                                                  VISUAL )
                                                                                                                                                                                                                                                                                   RT                           UT                        MT                          PT
                                                                                                                  (mm)
         Joint                     Type
No.                                                                                                                             WPS NO.                                                                                                                                                                                                                                                 Remarks
          No                       Joint                                   Sch/Thk/
                                                                                                                                                                              Brand
                                                                                                                                                                              Name
                                           Type of                   Dia                         MIRC or                                                                               AWS        Batch /
Report
Report
Report
Report
Report
                                                                                                                                                                                                                                                                                                                                                                      Report
                                                                                                                                                                                                                                Result
Result
Result
Result
Result
                                                                                                                                                                                                                                                                                                                                                                               Result
                                                          SPEC.              Rating   Heat No.
DATE
DATE
DATE
DATE
DATE
                                                                                                                                                                                                                                                                                                                                                               DATE
                                           Material                   Ø                           L No                                                                                 Class      Lot No.
NO.
NO.
NO.
NO.
NO.
                                                                                                                                                                                                                                                                                                                                                                       NO.
                                                                             (mm)
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                                             BEKAPAI - 3                                                                               Revision Index
                                                   Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                                       Contract No. 4500010835                                                                Rev.                    Status
                                                                             MATERIAL SUBTITUTION RECORD
Project                                 : 
Company                                 : 
Contractor                              : 
Location                                :                                                                                                                                               Date :
                                                                            Item / Material Description 
                                                                                                                                                                              Drawing / Isometric No. 
 No.          TQ NUMBER                      DATE                                                                                            Reason for substitution                                                 Remark
                                                              Initial Item / Material     Substitution Item / Material                                                               Related
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                 BEKAPAI - 3                         Revision Index
                                Surface Facilities Modification and Dogleg
                                           Installation (EPCIC)                     Rev.        Status
                                         Contract No. 4500010835
                                                                                    0.1          IFC
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                                                            Revision Index
                                                BEKAPAI - 3
                          Surface Facilities Modification and Dogleg Installation
                                                                                      Rev                 Status
                                                  (EPCIC)
                                          Contract No. 4500010835
                                                                                      0.1                    IFC
                                                                                     DATE OF            ( D.A.N )
 No.                      DESCRIPTION                              TOTAL QTY                                                 REMARKS
                                                                                    DELIVERY            NUMBER
 This document is the property of PT Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
 of the COMPANY. Electronic Filename: ID-BKP-SOME-2009-509007_rev0.1.pdf
                                                      BEKAPAI - 3                                              Revision Index
                            Surface Facilities Modification and Dogleg Installation (EPCIC)
                                                Contract No. 4500010835                                    Rev.               Status
                                                            Req'd     Issued
No.        Mat'l	no.           Item	Description                                Issued	Date   Drawing	No.   Folio         Service	line         Remarks          Location
                                                             Qty       Qty