Pending work for villa No: 22
Villa int/ext patch work 3000 3000
Toilet door shutter internal & side
enamel paint 3000 3000
Window grills painting & fixing 5000 5000
Total villa cleaning & acid wash 5000 5000
Kitchen utility tiles & p.c.c laying
excavation 40 sft 5000 5000
External plumbing water line drainages
etc., 5500 5500
Slooped roof tiles starters,3ways &
4ways 3000 3000
Shabad stone & wash area 110 Sft 4500 4500
st. glass 10000 10000
Electrical wiring & switches 5000 5000
Total compound wall Plastering 8000 8000
ext. Painting 25000 25000
Survent room & toilet Flooring and int
,ext painting 15000 15000
Elv Cladding Acid wash 2000 2000
Back filling with in the compound wall 5000 5000
TOTAL AMOUNT 104000 104000 104000
Pending work for villa No: 61
61 Civil patch work 3000 3000
Servent room finishing works
2 construction 40000 40000
4 Terrace above portico entrance tiles 1500 1500
6 Wash basin black granaite counters etc., 10000 10000
7 External plumbing water lines (c.p.v.c) 2500 2500
9 Villa external painting 25000 25000
10 Internal painting final coats 30000 30000
11 Kitchen utility tiles & p.c.c laying 5000 5000
Kithen/study room glass pending
12 &beeding 500 500
Stair case wood
work,fabrication,polishing 10000 10000
13 Stair case glass fixing 10000 10000
14 All toilets c.p & sanitary fittings 12000 12000
15 All toilets side enamel paint 3000 3000
16 Shabad stone laying 110 Sft 4500 4500
17 External cable pipe laying 1500 1500
20 TOTAL AMOUNT 158500 158500 158500
Pending work for villa No: 62
62 Villa int/ext patch work 3000 3000
1 Total villa survent room Painting 100000 100000
2 Children bed room tiles 250 Sft 1500 1500
3 Common toilet tiles 50 Sft 1500 1500
4 All door frames beeding 2000 2000
5 All door frames & shutters polishing 20000 20000
6 All door shutters hard ware 8000 8000
Head room door frames & shutters
8 enamel paint 1000 1000
Toilet door shutter internal & side
9 enamel paint 3000 3000
10 Window grills painting & fixing 5000 5000
11 Total villa cleaning & acid wash 5000 5000
12 Main door entrance step granaite 1000 1000
Kitchen utility tiles & p.c.c laying
13 excavation 40 sft 5000 5000
External plumbing water line drainages
14 etc., 5500 5500
Slooped roof tiles starters,3ways &
19 4ways 3000 3000
20 Shabad stone & wash area 110 Sft 4500 4500
Wash basin,kitchen plotform biack
22 granaite counters etc., 10000 10000
Above portico terrace ceramic tiles
23 laying 2000 2000
24 Chamber covers 3000 3000
25 Fenesta windows & door shutters 150000 150000
26 Electrical wiring & switches 5000 5000
27 Total compound wall Painting 5000 5000
344000 344000 344000
TOTAL AMOUNT
Pending work for villa No: 83
83 Internal painting G.F & F.F 9000 9000
1 2nd coat painting external 18000 18000
3 Acid wash in toilet tiles 3000 3000
Fenesta ventilators fixing in servent
5 toilets 6000 6000
7 Dooor shutter polishing 6000 6000
8 Grills fixing in side servent room 3000 3000
9 External Shabad Stone Laying 110 Sft 1500 1500
10 46500 46500 46500
Pending work for villa No: 93
1 Civil/Electricals patch worksat ext.etc., 3000 3000
2 Back filling with in the compound wall 5000 5000
3 Breakage tiles removing and laying 5000 5000
4 Man hole covers/Drainage works etc., 9000 9000
5 Shabsd stones laying at greenary area 110 Sft 2000 2000
6 External paintings (2 coats) 16800 16800
Window grills painting/Glass changing
7 etc., 9900 9900
8 Compound wall painting 5000 5000
9 Acid wash for floor tiles etc., 4000 4000
10 Acid wash for Elevation cladding etc., 2000 2000
Staircase glass fixing 10000 10000
71700 71700 71700
Pending work for villa No: 113
Total painting work including compound
113 wall 75000 75000
3 Acid wash 3500 3500
4 Tiles laying at portico 3000 3000
Front compound wall Brick work and
5 plastering 400 sft 7500 7500
6 Tiles patch 3000 3000
7 Miss masonary work 5000 5000
13 External Shabad Stone Laying 110 Sft 1500 1500
Door polishing 16000 16000
Staircase polishing 5400 5400
Staircase Glass fixing 10000 10000
Gravell leveling with in the compound
wall 3000 3000
14 132900 132900 132900
Pending work for villa No: 156
156 Parking tiles 7000 7000
1 Kitchen plat form z-block granaite 40 Sft 3000 3000
2 window grills 3000 3000
3 Cut out area railing glass work 20000 20000
4 Stair case railing top bar, fitness & glass 20000 20000
5 Toilet door shutter patches 3500 3500
6 Tiles for washing area at out side 2000 2000
7 Servent room door, fenesta & tiles etc., 80000 80000
8 Gypsum for all windows 4000 4000
10 Chamber covers 5000 5000
11 Total compound wall Painting 5000 5000
12 External Shabad Stone laying 110 Sft 1500 1500
Survet Room const. 120000
13 154000 274000 274000
Pending work for villa No: 187
187 Parking tiles 80 Sft 6000 6000
1 Fenesta glass for (6'/4'6") & (2'/2') 15000 15000
2 Tiles for washing area at out side 2000 2000
3 Stair case railing top bar, fitness & glass 20000 20000
4 Cut out area railing glass work 20000 20000
5 External plumbing 12000 12000
6 Chamber covers 5000 5000
7 Total compound wall Painting 5000 5000
External Shabad Stone laying 110 Sft 4500 4500
89500 89500 89500
Pending work for villa No: 205
Intenal lappam 2nd coat ,painting 1st &
1 205 2nd coats & External 50000 50000
2 Internal & Extwrnal patch work finishing 15000 15000
5 All window grills final painting 3500 3500
6 Staircase wooden railing with glass fixing 25000 25000
Slooped roof tiles starters, ways &
9 4ways 6000 6000
14 Villa external shabad stone laying 110 sft 1500 1500
15 Kitchen utiliyty tiles laying & P.C.C laying 4000 4000
External SWG lines & drainage chamber
17 laying 2500 2500
18 External plumbing water line laying 1500 1500
19 External soil levelling 4000 4000
21 Misslaneous works 10000 10000
22 Total compound wall painting 5000 5000
Servent room construction & Shabad
23 stone laying 80000 80000
208000 208000 208000
total 1429100
Miscellaneous works 70900
Approx 1500000