DAILY_ FIELD INSPECTION SHEET (Date:- xx.xx.
2018)
S.No KEY INSPECTIONS TYPE OF CHECK / Ref DOC FREQUENCY STATUS INSPECTION OBSERVATIONS
1 Welding Qualification Visual verification of [WPS/PQR] Random
2 Personnel[Welder] Qualification WPQ /ID Card Verification Weekly
3 Calibration check NABL -TC & Visual check Monthly
4 Electrode baking check Visual verification of Batch No Daily
/Size & Sing in register
5 Electrode /Filler wire allocation / Job card Visual Verification of JOB Cards Daily
verification FWS /WPS/FQP
Received Material Inspection
6 [For fabricated mat & Erection] Verification of MTC Daily
7 Fit up /Edge Preparation of job Visual /FQP Random
8 Pre-heat of weld joint Visual / Heating chart recorder/ Daily
WPS
9 Post heating of weld joint Visual / Heating chart recorder/ Daily
WPS
Visual / Heating chart
10 PHWT- weld joints recorder/WPS Daily
11 Welding Size & visual check As per ASME B31.1 & Daily
Drawing/FQP
12 NDT [DPT] Visual -As per drawing /FQP Daily
13 NDT -RT Films Review Visual REVIEW / Reports review as pr RFI
14 NDT - UT Witness Inspection Witness inspection with NTPC as pr RFI
15 Hardness check Visual -As per drawing /FQP as pr RFI
16 Pipe Supports / small bore Pipe supports Visual /Drawing /FQP /Appd
Procedures as pr RFI
17 Walk down prior to pressure test/Leak As per Appd drawings /FQP as pr RFI
test
As per appd Procedures
18 Pressure testing as pr RFI
/FQP/Drawing
As per appd Procedures
19 Cleaning & Preservation /Restoration /FQP/Drawing as pr RFI
20 Painting As per appd Procedures as pr RFI
/FQP/Drawing
21 Insulation clearance As per appd Procedures as pr RFI
/FQP/Drawing
22 Insulation inspection As per appd Procedures as pr RFI
/FQP/Drawing
As per appd Procedures
23 Test Packs [NDT - LHS Preparation] /FQP/Drawing as pr RFI
24 General
Inspection Engineer Name Signed By:- D.BALKISHAN
Note:- Inspection frequency may change depends on requirement/urgency
DAILY WORK SHEET @ MEJA SITE
S.no DATE Day
1 7/30/2018 MONDAY
2 7/31/2018 TUESDAY
3 8/1/2018 WEDNESDAY
4 8/2/2018 THURSDAY
5 8/3/2018 FRIDAY
6 8/4/2018 SATURDAY
7 8/5/2018 SUNDAY
8 8/6/2018 MONDAY
9 8/7/2018 TUESDAY
10 8/8/2018 WEDNESDAY
11 8/9/2018 THURSDAY
12 8/10/2018 FRIDAY
13 8/11/2018 SATURDAY
14 8/12/2018 SUNDAY
15 8/13/2018 MONDAY
16 8/14/2018 TUESDAY
17 8/15/2018 WEDNESDAY
18 8/16/2018 THURSDAY
19 8/17/2018 FRIDAY
20 8/18/2018 SATURDAY
21 8/19/2018 SUNDAY
22 8/20/2018 MONDAY
23 8/21/2018 TUESDAY
24 8/22/2018 WEDNESDAY
25 8/23/2018 THURSDAY
26 8/24/2018 FRIDAY
27 8/25/2018 SATURDAY
28 8/26/2018 SUNDAY
29 8/27/2018 MONDAY
30 8/28/2018 TUESDAY
31 8/29/2018 WEDNESDAY
32 8/30/2018 THURSDAY
33 8/31/2018 FRIDAY
34 9/1/2018 SATURDAY
35 9/2/2018 SUNDAY
36 9/3/2018 MONDAY
37 9/4/2018 TUESDAY
38 9/5/2018 WEDNESDAY
39 9/6/2018 THURSDAY
40 9/7/2018 FRIDAY
41 9/8/2018 SATURDAY
42 9/9/2018 SUNDAY
43 9/10/2018 MONDAY
44 9/11/2018 TUESDAY
45 9/12/2018 WEDNESDAY
46 9/13/2018 THURSDAY
47 9/14/2018 FRIDAY
48 9/15/2018 SATURDAY
49 9/16/2018 SUNDAY
50 9/17/2018 MONDAY
51 9/18/2018 TUESDAY
52 9/19/2018 WEDNESDAY
53 9/20/2018 THURSDAY
54 9/21/2018 FRIDAY
55 9/22/2018 SATURDAY
56 9/23/2018 SUNDAY
57 9/24/2018 MONDAY
58 9/25/2018 TUESDAY
59 9/26/2018 WEDNESDAY
60 9/27/2018 THURSDAY
61 9/28/2018 FRIDAY
62 9/29/2018 SATURDAY
63 9/30/2018 SUNDAY
64 10/1/2018 MONDAY
DAILY WORK SHEET @ MEJA SITE
ACTIVITY
Remarks