QUALIFICATION REPORT
____________________________________________________________________
Address:
Protocol number :
____________________________________________________________________
INSTALLATION AND OPERATIONAL QUALIFICATION –
Facility:
Estimate complete date:
____________________________________________________________________
 Prepared by          ……………………………………..……                 ……………….
                                                           Date
 Agreed by            ……………………………………..……                 ……………….
                                                           Date
 Reviewed by          ……………………………………..……                 ……………….
                                                           Date
 Approved by          ……………………………………..……                 ……………….
                                                           Date
 Authorized by        ……………………………………..……                 ……………….
                                                           Date
PART A.   Filling And Capping Machine (IQ&OQ)
PART B.   Labeling Machine (IQ&OQ)
PART C.   Cartoning Machine (IQ&OQ)
PART D.   Cellophane Wrapping Machine (IQ&OQ)
PART E.   Overall Summary of Cannabis Oil Packing System
                                  FINAL REPORT
                                                 Conclusion Results
        Qualification Report Review                                        Reference Page
                                                    (Pass/Fail)
IQ Report has been reviewed.                         Pass/ Fail
OQ Report has been reviewed.                         Pass/ Fail
Overall Conclusion:
 All IQ/OQ acceptance criteria are met.
  …………………………………………………………………………
  ………………………………………………………………….………
  …………………………………………………………….……………
  ……………………………………………………….…………………
  ………………………………………………….………………………
  ………………………………………………….………………………
 Pass /  Fail
Recommendation: For general GMP, validation status maintenance, calibration, requalification,
risk potentials awareness, and safety requirements.
………………………………………………………………………………………………..………
………………………………………………………………………………………..………………
………………………………………………………………………………..………………………
………………………………………………………………………..………………………………
………………………………………………………………..………………………………………
………………………………………………………..………………………………………………
………………………………………………..………………………………………………………
………………………………………..………………………………………………………………
………………………………..………………………………………………………………………
………………………..………………………………………………………………………………
………………..………………………………………………………………………………………
………………..………………………………………………………………………………………
………………..………………………………………………………………………………………
………………..………………………………………………………………………………………
   PART A.
INSTALLATION
QUALIFICATION
                           TABLE OF CONTENTS
FINAL REPORT                                                                   2
   I.  INTRODUCTION                                                            5
  II.  PURPOSE                                                                 5
 III.  SCOPE                                                                   5
 IV.   RESPONSIBILITY                                                          6
  V.   INSTALLATION QUALIFICATION (IQ)                                         6
           1. Machine Description                                              6
           2. Machine Identification                                           7
           3. Utilities                                                        8
           4. Major Components                                                 9
           5. Safety Features                                                  10
           6. Documents Required to Support IQ Requirements                    10
           7. Installation Qualification (IQ) Deviation Report                 11
           8. Installation Qualification (IQ) Report                           12
 VI.    OPERATIONAL QUALIFICATION (OQ)                                         13
        1. General Modes of Function in Both Cleaning Units                    13
        2. Quality Mode of Function in Cleaning for glass bottle 60 ml.   14
        3. Cleanliness Test Results                                       14
        4. Safety Mode of Function in Both Cleaning Units                      15
        5. Documents Required to Support OQ Requirements                       16
        6. Operational Qualification (OQ) Deviation Report                     17
        7. Operational Qualification (OQ) Report                          18
VII.    REPORT ACCEPTANCE CRITERIA                                             19
VIII.   REFERENCES                                                             19
 IX.    APPENDIX                                                               19
  X.    ATTACHMENTS                                                            19
DOC No. :
 I.     INTRODUCTION
 Background
    1. According to PIC/S [1&2] and WHO [3] Guidelines, qualification of equipment
 including installation qualification (IQ) and operational qualification (OQ) is required to
 confirm its installation per manufacturer’s specifications and intended functionality as initially
 designed.
    2. The Cannabis Oil Packing System Machine is manufactured by Data-Pak, And The
 Machine is planned to install by A Grateful Rich Co., Ltd. in Government Pharmaceutical
 Organization Facility (GPO) Patumthani Branch . in July 2021 and requires such a
 qualification.
 Rationale
    3. The IQ/OQ study will be carried out to confirm the machine’s conformance to installation
 and operational requirements.
 IQ requirements include identification of the basic machine and auxiliary unit’s major
 components (generating impact on product quality and safety to product, personnel, or
 environment as appropriate) and supporting utilities as well as calibration reports of key
 instruments and identification of manufacturer’s Operation & Maintenance (O & M) Manuals
 and major change/spare parts.
 OQ requirement includes verification of all key modes of function (having an impact on quality
 and safety as appropriate). The scope of IQ/OQ studies can be summarized as below.
 II. PURPOSE
    1. To verify that the machine is installed in compliance with GMP regulations,
 manufacturer’s specification, and The GPO engineering & safety standards (IQ objective).
    2. To identify the key instruments which need to be calibrated and ensure that the
 calibration reports are in place.
    3. To identify the major components and supporting utilities as well as the manufacturer’s
 Operation & Maintenance (O&M) Manuals and major change/spare parts (IQ objective).
    4. To verify that the machine does operate as designed in all key modes of function (OQ
 objective).
 III. SCOPE
 The scope of this qualification report is applied to Installation, and Operational Qualification
 Cannabis Oil Packing System Machine is manufactured by Data-Pak, And The Machine is
 planned to install by A Grateful Rich Co., Ltd. in Government Pharmaceutical Organization
 Facility (GPO) Patumthani Branch
 Checked by A Grateful Rich                Review by GPO                        Approved by GPO
Name:                             Name:                                 Name:
Date:                             Date:                                 Date:
                                             Page 6 of 28