0% found this document useful (0 votes)
197 views1 page

Handrails Erection Protocl

The document is a hand rail report for a sewerage collection, treatment and reuse system project in Naya Raipur. It details visual inspections performed on the alignment, fitting, base welding, straightness, and smoothness of hand rails.

Uploaded by

Kumar Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views1 page

Handrails Erection Protocl

The document is a hand rail report for a sewerage collection, treatment and reuse system project in Naya Raipur. It details visual inspections performed on the alignment, fitting, base welding, straightness, and smoothness of hand rails.

Uploaded by

Kumar Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

L&T CONSTRUCTION FORMAT NO:

WATER & EFFLUENT TREATMENT IC LTCD/WET/ER/HR/QSF-MR 01

HAND RAIL REPORT DATE:


Sewerage Collection, Treatment and Reuse System including Operation & Maintenance for Zone 1,2,3 & Specified Area at Naya Raipur
Project Name UGDS-NRDA
Area/Location Time
Referance Drawin g Report No
Description Details Remarks

Alingment an d Fit up of the Rails

Base weld Of Hand Rails

Visual Inspection

Straightness of the rails

Smoothness/ Painting at weld joints


Comments if any:

Performed by Inspected by
© LARSEN & TOUBRO LIMITED –CONSTRUCTION 2015– ALL RIGHTS RESERVED