0% found this document useful (0 votes)
1K views2 pages

ISMB Erection Protocol

The document provides an ISMB erection report template for a sewerage collection, treatment and reuse system project in Naya Raipur. The template includes sections for beam elevation check, beam straightness, welded joints, insert plates condition, splice plate position, weld visuals, roughness of the vertical beam, weld visual check and finishing, stopper check, and lubrication check before starting.

Uploaded by

Kumar Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

ISMB Erection Protocol

The document provides an ISMB erection report template for a sewerage collection, treatment and reuse system project in Naya Raipur. The template includes sections for beam elevation check, beam straightness, welded joints, insert plates condition, splice plate position, weld visuals, roughness of the vertical beam, weld visual check and finishing, stopper check, and lubrication check before starting.

Uploaded by

Kumar Abhishek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

L&T CONSTRUCTION FORMAT NO:

WATER & EFFLUENT TREATMENT IC LTCD/WET/ER/ISMB/QSF-MR 01


ISMB ERECTION REPORT DATE:
Sewerage Collection, Treatment and Reuse System including Operation & Maintenance for Zone 1,2,3 & Specified Area at Naya Raipur
Project Name UGDS-NRDA-LE131542
Area/Location Time
Referance Drawing Report No

Description Details Remarks

Beam Elevation Check

Beam Straightness

Welded joints

Insert Plates condition ( Bolted or erected by civil)

Splice plate position

Weld visuals

Roughness of the vertical beam


Comments:

Perfomed By Inspected By
© LARSEN & TOUBRO LIMITED –CONSTRUCTION 2015– ALL RIGHTS RESERVED
L&T CONSTRUCTION FORMAT NO:
WATER & EFFLUENT TREATMENT IC LTCD/WET/ER/ISMB/TR-MR 01
ISMB ERECTION REPORT TRAIL RUN DATE:
Sewerage Collection, Treatment and Reuse System including Operation & Maintenance for Zone 1,2,3 & Specified Area at Naya Raipur
Project Name UGDS-NRDA-LE131542
Area/Location Time
Referance Drawing Report No

Description Details Remarks

Weld Visual Check and Finishing

Stopper Check

oil and lubrication check before starting

Check for nose , Vibration and some dynamic nature


Comments:

Perfomed By Inspected By