Right-of-Way Claims for Crops

This document contains a list of right-of-way claims for 6 landowners along a road construction project in Southern Bukidnon, Philippines. It details the types and areas of crops/trees destroyed for each landowner, the unit price per hectare, the individual claim amounts, and a total claim amount of 593,580 Philippine pesos. The largest single claim is for Mr. Nonoy Juridico for the destruction of 10,800 square meters of sugarcane.

Uploaded by

Reymundo Beja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views1 page

Right-of-Way Claims for Crops

This document contains a list of right-of-way claims for 6 landowners along a road construction project in Southern Bukidnon, Philippines. It details the types and areas of crops/trees destroyed for each landowner, the unit price per hectare, the individual claim amounts, and a total claim amount of 593,580 Philippine pesos. The largest single claim is for Mr. Nonoy Juridico for the destruction of 10,800 square meters of sugarcane.

Uploaded by

Reymundo Beja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LIST OF RIGHT-OF-WAY CLAIMS FOR FOR CROPS & TREES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE X

Annex C
21K00171 - Construction of Southern Bukidnon Agri-Industrial Economic Zone, Road Network Development Project (Package 2), Don
PROJECT TITLE & LOCATION:
Carlos, Bukidnon

KINDS OF CROPS & UNIT PRICE PER AMOUNT OF TOTAL AMOUNT


No. NAME OF OWNERS STATION NO. OF CROPS TAXES
TREES HECTARE CLAIM (in pesos)
1 Mr. Tanajura/ Del Monte 18+420 - 18+700 B/S Pineapple 4200 sq.m. 232,000 97,440.00 97,440.00

2 Mrs. Patriarca 18+760 - 18+920 B/S Sugacane 2400 sq.m. 176,000 42,240.00 42,240.00

Sugarcane 3750 sq.m. 176,000 66,000.00


3 Mr. Barnido 19+360 - 19+860 B/S 91,500.00
Cornfield 3750 sq.m. 68,000 25,500.00
Sugarcane 3600 sq.m. 176,000 63,360.00
4 Mr. Lingling Juridico 18+920 - 19+400 R/S 87,840.00
Cornfield 3600 sq.m. 68,000 24,480.00
5 Mr. Cabuenas 19+400 - 19+540 B/S Sugarcane 4800 sq. m. 176,000 84,480.00 84,480.00

19+540 - 19+840 B/S


6 Mr. Nonoy Juridico Sugarcane 10800 sq.m. 176,000 190,080.00 190,080.00
19+880 - 20+300 B/S
TOTAL AMOUNT REQUESTED 593,580.00 593,580.00

Prepared by: Checked and Reviewed by:

REYMUNDO C. BEJA LIBERTY M. VALLAR


Focal Person Chief, RROW Section