CONTROL SURVEY FOR
CADASTRAL WORKS
          LECTURE CONTENT
1.   Introduction
2.   Types of control surveys
3.   Geodetic Networks
4.   Standard Traverse Networks
5.   Survey frames
6.   Control Survey in e-Cadastral Environment
             1. INTRODUCTION
 The purpose of Control Survey in cadastral
 work is to provide a reference framework
 which enables the position of earth related
 information to be expressed in a common
 coordinate system.
 It provides a practical basis for position
 fixing for a wide range of users who deal with
 cadastral surveying practices.
                     Cont…
Control surveys establish a common,
 consistent network of physical points that are
 the basis for controlling the horizontal
 positions and orientation of land parcels.
The ‘from whole to the part’ concept is
 applied
       2. TYPES OF SURVEY
       CONTROL NETWORKS
• Geodetic Networks
  • Nationwide (Triangulation, Trilateration & GPS)
• Standard Traverse Networks
  • Densification of control points
• Survey Frames
  • Developed and town area
• Cadastral Reference Mark (CRM)
  • e-Cadastral environment
3. GEODETIC NETWORKS
      3.1 GENERAL POLICY IN
       GEODETIC NETWORKS
Geodetic networks were established as a
 main reference for geodetic, mapping and
 cadastral survey purposes
  • Malaysian Revised Triangulation 1948 (MRT48)
    for Peninsular Malaysia
  • Borneo Triangulation 1968 (BT68) for East
    Malaysia
MRT48
   • 77 geodetic points
   • 240 primary points
   • 900 2nd & 3rd order points
                        BT68
• 145 geodetic points
PRIMARY GEODETIC NETWORKS
           • GPS technique
           • 238 points observed
3.2 ACCURACY STANDARD FOR
     GEODETIC NETWORK
 • Azimuth control by star observation
 • Baseline measurement acc. 1: 1,000,000
 • Horizontal Direction
    – Instrument 0”.2,
    – No. of positions: 16, 8, 4 (0,1st,2nd order)
 • Angle in a triangle Misc 1”.0
 • Side Length 1:100,000
 •   Source: The Surveying Handbook, Russell Charles Brinker
      3.3 PROCEDURES
• The accuracy of the triangulation
  network depends not only on the
  methods and precisions used in
  making observations, but also the
  shape of figures in the network
  (strength of figures).
• Spacing of station < 15 km
             Cont…
• Each station should have 2 reference
  marks and 1 azimuth mark
• The best time to start observing is at
  dusk (using guided lights)
• Other procedures…    (beyond the syllabus-GEODESY)
4. STANDARD TRAVERSE
   4.1 GENERAL POLICY FOR
     STANDARD TRAVERSE
• The main purpose of Standard traverse
  network is to strengthen (densification) the
  existing cadastral survey control throughout
  the state.
• To strengthen Geodesy Scientific network
• To supply cadastral control to a new
  settlement or development area.
• KPUP Circular 3/1995 and 5/1995
   4.2 ACCURACY STANDARD
• Standard traverse networks should be
  based on (tied and adjusted to) nearest
  trigonometric stations.
• All traverses shall conform to DSMM
  standard traverse accuracy standard.
  Linear misclosure 1:25,000
  Angular Misclosure 1.5” per station
        4.3 PROCEDURES
•   Survey should be started and closed on
    existing standard traverse points or
    trigonometric stations
•   Standard traverse mark should be
    placed at 300 m interval (if inter-
    visible) and 200 m (if not inter-visible)
•   Connection to the nearest trig station,
    SBM and GPS monument should be
    observed.
                Cont…
•    Traverse control
    – Starts and ends at existing standard
       traverse points
    – Intermediate closure checking by
       solar observation at interval not
       exceeding 25 stations
    – Exceptions may be permitted in
       special cases
                      Cont…
•    Conditions for observations
    a. Observation to be done in the early morning or
       late afternoon
    b. EDM or continuous steel/invar tape (200m)
    c. Distance to be recorded 0.001 meter
    d. EDM to be calibrated before the completion of
       40km of traverse
          4.4 STATION MARKING
a.   Iron pipes set in concrete
b.   Emplace at least likely to be disturbed
c.   Far from railways, banks of rivers
d.   Emplace few days prior to observation
e.   Complete offsets to adjacent features
             Cont…
•   Monumentation
4.5 FIELD OBSERVATIONS AND
        ADJUSTMENT
•  Horizontal Angles
  – 1” theodolite (TS) to be used
  – Two zero setting at 0 and 90
  – Taken with C.L. and C.R
• Vertical Angles
  – Are to be read on both faces to the
     nearest second (if not using EDM)
                            Cont…
 FIRST ZERO SETTING
1. Instrument is at stn 101
2. Set 0 00 00 at C.L. to station 100
3. Turn clockwise to 102 and record angle 1
4. Set 180 00 00 at C.R. to stn 100
5. Turn anti- clockwise to 102 and record angle 2
 SECOND ZERO SETTING
 1. Instrument is at stn 101
 2. Set 90 00 00 at C.L. to station 102
 3. Turn clockwise to 100 and record angle 3
 4. Set 270 00 00 at C.R. to stn 102
 5. Turn anti- clockwise to 100 and record angle 4
Sample of Angle Observation
          Station       Circle Left          Circle Right    Mean Angle   Bearing    Final Bearing
                        Azimuth 1-2 by Solar Observation                  89 20 20   89 20 20
                    2        00 00 00            180 00 00
                    3        60 10 12            240 10 08
                    3        90 00 00            270 00 00
                    4       155 18 27            335 18 23
                    4       180 00 00             00 00 00
                    2        54 31 26            234 31 30
                    1        00 00 00            180 00 00
                    5       155 45 23            335 45 19
                    5        90 00 00            270 00 00
                    1       294 14 35            114 14 35
                                                                                           Copyright: hassim baruddin ®
                                              Sample of angle observation
Station       Circle Left     Circle Right    Mean Angle   Bearing   Final Bearing
          4        00 00 00       180 00 10
          6       203 51 16        23 51 30
          6        90 00 00       270 00 01
          4       246 08 42        66 08 48
          5        00 00 00       180 00 01
          7       110 30 42       290 30 39
          7        90 00 10       270 00 05
          8       220 30 19        40 30 17
          8       180 00 00        00 00 00
          5       298 59 15       118 59 13
                                                                           Copyright: hassim baruddin ®
                                                             Angle Adjustment
Station   Circle Left      Circle Right     Mean Angle    Bearing       Final Bearing
          Azimuth 1-2 by Solar                            89 20 20      89 20 20
          Observation
      2      00 00 00        180 00 00        60 10 10      149 30 29
1                                                  - 01
      3      60 10 12        240 10 08
      3      90 00 00        270 00 00        65 18 25      214 48 53
1                                                 - 01
      4     155 18 27        335 18 23
      4     180 00 00            00 00 00     234 31 28     89 20 20
1                                                  -01
      2      54 31 26        234 31 30
      1      00 00 00        180 00 00        155 45 21     190 34 16
4                                                 +02
      5     155 45 23        335 45 19
      5      90 00 00        270 00 00        204 14 35     34 48 53
4                                                 +02
      1     294 14 35        114 14 35
                                                                             Copyright: hassim baruddin ®
                                                         Angle Adjustment
Station   Circle Left   Circle Right   Mean Angle     Bearing       Final Bearing
      4      00 00 00     180 00 10      203 51 18      214 25 32
5                                            -01.2         nil
      6     203 51 16      23 51 30
      6      90 00 00     270 00 01     156 08 44.5     10 34 16
5                                             -01.2
      4     246 08 42      66 08 48
      5      00 00 00     180 00 01      110 30 40      144 56 10
6                                           -01.5
      7     110 30 42     290 30 39
      7      90 00 10     270 00 05     130 30 10.5     275 26 19
6                                             -01.5
      8     220 30 19      40 30 17
      8     180 00 00      00 00 00      118 59 14      34 25 32
6                                            -01.5
      5     298 59 15     118 59 13
                                                                         Copyright: hassim baruddin ®
         4.6 Standard Traverse Plan
Standard traverse plan is to be drawn according to
 DSMM Circular 5/1997.
a. Scale 1:5000
b. Paper size = A0
c. Except for the text size and graphic spacing, the
    format of existing Certified Plan (CP) should be
    used.
Sample of Standard Traverse Plan
5. SURVEY FRAMES
         5.1 GENERAL POLICY FOR
              SURVEY FRAMES
• In a developing area, where boundary marks
  were planted before building or
  infrastructure constructions take place, most
  of the boundary marks will likely to be
  destroyed.
• In order to replace the destroyed boundary
  marks in the future, a ‘survey frame’ is
  required.
• Survey frame will be used as a reference /
  control in the future.
    5.2 ACCURACY STANDARD
• The accuracy standard for survey frame is
  equivalent to the normal cadastral works
  which 1:8000
        5.3 PROCEDURES
•   Survey frame marks should be planted on
    a suitable location which is less likely to
    be disturbed
•   It is recommended that the surveyor to
    study the future development plan for the
    area in identifying the suitable position for
    the survey frame marks.
•   Survey frame marks can be established on
    existing permanent structure such as road,
    sump, drainage etc.
 6. CONTROL SURVEY IN e-
CADASTRAL ENVIRONMENT
                6.1 e-CADASTRAL
• The e-Cadastral Survey System were
  implemented at JUPEM in 2007
• Using Coordinated Cadastral System to replace
  conventional cadastral surveying methods
  (bearing and distance measurements).
• National Digital Cadastral Data Base(NDCDB)
  is the heart of the e-cadastral implementation.
                      Cont…
• In the e-Cadastral environment, the land
  parcel is represented by the coordinates of
  its boundary marks.
• The coordinates of the boundary marks are
  derived from observation to the Global
  Navigation Satellite Systems (GNSS).
• The Cassini coordinates were referred to a
  common datum for the whole Peninsular
  Malaysia which called GDM2000.
         6.2 CADASTRAL SURVEY DATUM
According to DSMM Circular 6/2009, all cadastral
survey works shall start from;
• Two (2) Cadastral Reference Marks.
   – 5 procedures for CRM points
• Two (2) existing NDCDB points
   – Distance not less than 40m
   – Proved to be in position (direct observation or by traverse and
     calculation)
   – Solar Observation / MyRTKnet
• Two (2) adjacent NDCDB points
   – Proved to be in position with 3rd mark
   – By angle and distance measurement
           6.3 PROCEDURES OF CRM
a)   Two CRM (distant not less than 30m), observed simultaneously; 1st
     mark with MyRTKnet and 2nd mark with Static method.
b)   Two CRM (distant not less than 30m), observed simultaneously with
     Static method.
c)   Two new CRM (distant not less than 30m), both observed by
     MyRTKnet in one initialization.
d)   Two CRM (distant not less than 75m), observed by real time
     MyRTKnet in two initialization.
e)   Two existing CRM proved to be in position another CRM or existing
     NDCDB mark by angle and distance measurement .
 6.4 ACCURACY STANDARD FOR CRM
• Distance not less than 30 meters
• Within the limit of acceptable displacement
  as stated in 39(2) of PUK2009
• Internal angle not exceed 10”
                E-CADASTRE : eCRM
                      RTK net
1                                   GEOPORTAL       2
eCRM
Extract
PU/QT &
CRM                                             -   Planning
Layer                                           -   Establish CRM
                                                -   Observation
                                                -   Processing
                                  JUPEM2U
                       Internet                 -   Transform Module
CRM
Layer
Update
      CRM/CCI LAYER
        DATABASE