UDC
1.0 SCOPE
This procedures shall cover provisions to prevent injury, loss of life and loss of property from fire or
explosion as a result of hot work.
Races
2.0 PURPOSE
This procedure shall provide minimum requirements for all persons who manage, request, authorize,
perform or supervise hot work.
Seu Rane)
3.0 APPLICATION
This procedure shall apply to the following hot work processes:
3.1 Welding and allied processes
(3.2 Heat treating
3.3 Grinding
3.4 Thawing pipe
3.5 Torch-applied roofing
3.6 Similar applications producing or using a spark, flame, or heat
4.0 RESPONSIBILITY FOR HOT WORK
Contractor's management team, engineers or coordinator shall be responsible for the safe operations
of hot work activity.
4.1 Contractor engineers shall ensure that all equipment is examined to ensure itis in a safe
operating condition. When found to be incapable of reliable safe operation, the equipment shall be
withdrawn from service and tagged out of service.
4.2 Contractor engineers shall ensure that only approved apparatus, such as torches, manifolds,
regulators or pressure reducing valves, and acetylene generators, are used.
4.3 Contractor engineers shall ensure that all individuals involved in the hot work operations are
familiar with the provisions of this hot work procedure.UDC
4.4 Individuals involved in hot work operations shall be trained and third (3) party certified in the safe
operation of their equipment and in the safe use of the process.
4.5 Individuals involved in hot work operations shall have an awareness of the inherent risks involved
and understand the emergency procedures in the event of a fire.
4.6 Contractor engineers and supervisors shall advise all workers about site specific flammable
materials, hazardous processes or conditions, or other potential fire hazards.
4.7 contractor engineers and supervisors shall inspect the area while the hot work permit is in effect
to ensure that itis a fire-safe area,
4.1 HOT WORK OPERATOR / WELDER
The hot work operator shall handle equipment safely and use it as follows so as not to endanger lives
and property:
4.1.1 The operator / welder shall have third (3°) party certificate
third party certification company/ies.
sued by the government approved
4.1.2 The operator / welder shall have the hot work permit approval before starting hot work
operations.
4.1.3 All equipment shall be examined to ensure it is in a safe operating condition; if found to be
incapable of reliable safe operation, the equipment shall be withdrawn from service.
4.1.4 The operator shall cease hot work operations if unsafe conditions develop and shall notify
management, project manager/coordinator, engineer or supervisor for reassessment of the
situation.
4.2 FIRE WATCH
4.2.1 The fire watch shall be trained and third (3") party certified to understand the inherent hazards
of the work site and of the hot work.
4.2.2 The fire watch shall ensure that safe conditions are maintained during hot work operations.
4.2.3 The fire watch shall have the authority to stop the hot work operations if unsafe conditions
develop.
4.2.4 The fire watch shall have fire-extinguishing equipment readily available and shall be trained in
its use.
4.2.5 The fire watch shall be familiar with the facilities and procedures for sounding an alarm in the
event of a fire.Ube
4.2.6 The fire watch shall watch for fires in all exposed areas and try to extinguish them only when the
fires are obviously within the capacity of the equipment available. If the fire watch determines
that the fire is not within the capacity of the equipment, the fire watch shall sound the alarm
immediately.
4.2.7 The fire watch shall be permitted to perform addi
him from his fire watch responsibilities.
nal tasks, but those tasks shall not distract
4.2.8 Contractors. Before starting any hot work, contractors and their clients shall discuss the planned
project completely, including the type of hot work to be conducted and the hazards in the area.
4.2.8 Mutual Responsibility. Construction Management Team, contractors, the fire watch, and the
operators shall recognize their mutual responsibility for safety in hot work operations.
SSRN SSN erase VS ORM OS
5.0 ISSUANCE AND APPROVAL OF WORK PERMIT FORM
5.1 The receiver requests work permits from the operations supervisor (issuer) of the fac
5.2 The issuer will issue the work permit after he (or his designated representative) has visited the
Site.
5.3 The issuer's and receiver's signatures plus any other approvals and signatures must be on the
completed form.
5.4 The issuer and receiver are jointly responsible for the safety of people and equipment in the area.
The issuer is responsible for specifying precautions so the work can be done without incident. The
receiver is responsible for performing the work in accordance with the conditions and
requirements agreed upon with the issuer and written on the work permit.
5.5 When there is any doubt about whether a hazard e)
ts, the joint site inspection must be made
SECTION 6 : RIGHT TO STOP WORK AND CANCEL PERMITS
6.0 RIGHT TO STOP WORK AND CANCEL PERMITS
6.1 The issuer may stop a job and withdraw a work permit if he feels that safety of the job does not
meet with conditions specified on the work permit.
6.2 All unnecessary personnel whose presence adversely affects the safety of the job must be
removed and kept from the job site or work shall be stopped.
SECTION 7: HOT WORK PERMIT VALIDITY
7.7 HOT WORK PERMIT VALIDITY
7.7.1 Hot Work Permit is valid only for the job and time frame for which they are issuedUDC
7.7.2 Hot Work Permit may be invalidated or canceled under any of the following conditions:
{a) Failure to commence work within one (1) day of being issued or if there is an interruption.
(b) If the conditions on the permit are not in compliance.
(c) Ifthe area or unit conditions change
THEN a new Hot Work Permit is required before resuming the work,
773
the responsibility of the contactor to ensure that all permit conditions are complied with at all
times. Any deviation, without appropriate authority, shall result in immediate suspension of the
permit.
7.7.4 Hot Work Permits are valid only for the time limit specified on the permit.
Sep OOS NCM OU sES
8.0 CLOSING WORK PERMITS
8.1 Work permits shall be closed by the signatures of both the issuer and the receiver
8.2 Work permit approved form required to be returned back to security department for the purpose of
verifications and recordkeeping.
SECTION 9 ; FIRE PREVENTION PRECAUTIONS
9.9 FIRE PREVENTION PRECAUTIONS (HOT WORK PERMIT & FIRE WATCH)
9.9.1 HOT WORK PERMIT
9.9.1.2 Before hot work oper
permit shall be required
ns begin in any part of The Pearl Qatar areas / location, a hot work
9.9.1.3 Before a hot work permit is issued, the following conditions shall be verified by UDC Security
Department.
9.9.1.3.1 Hot work operator / welder third (3") party certificate is provided.
9.9.1.3.2 Fire watcher third (3°) party certificate is provided.
9.9.1.3.3 The hot work equipment to be used shall be in satisfactory operating condition and in
good repair.
9.9.1.3.4 Where combustible materials such as paper clippings, wood shavings or textile
fibers are on the floor, the floor shall be swept of 36 ft. (11 m) and the following
criteria also be met.
{a) Combustible floors shall be kept wet, covered with damp sand, or protected by a
QCD approved / listed welding blanket, welding pad, or equivalent.(b) Where floors have been wet down, personnel operating arc welding equipment or
cutting equipment shall be protected from possible shock
9.9.2 All combustibles shall be relocated at least 35 ft. (11 m) in all directions from the work site, and
the following criteria also shall be met:
(a) If relocation is impractical, combustibles shall be protected by a QCD approved / listed
welding curtain, welding blanket, welding pad, or equivalent.
(b) To prevent the entrance of sparks, the edges of covers at the floor shall be tight, including
at the point at which several covers overlap where a large pile is being protected.
9.9.3 Openings or cracks in walls, floors or ducts within 35 ft. (11 m) of the site shall be covered or
sealed with QCD approved / listed fire-rated or non-combustible material to prevent the passage
of sparks to adjacent areas.
9.9.4 If hot work is done near walls, partitions, ceilings, or roofs of combustible construction, they
shall be protected by a listed welding curtain, welding blanket, welding pad, or equivalent.
9.9.5 If hot work is done on one side of a wall, partition, ceiling, or roof, the following criteria shall be
met:
(a) Precautions shall be taken to prevent ignition of combustibles on the other side by
relocating the combustibles.
(b) If it is impractical to relocate combustibles, a fire watch shall be provided on the side
opposite from where the work is being performed.
9.9.6 Hot work shail not be attempted on a partition, wall, ceiling, or roof that has a combustible
covering or insulation, or on walls or parlitions of combustible sandwich type panel construction.
9.9.7 Hot work that is performed on pipes or other metal that is in contact with combustible walls,
partitions, ceilings, roofs, or other combustibles shall not be undertaken if the work is close
enough to cause ignition by conduction,
9.9.8 Fully charged and operable fire extinguishers that are appropriate for the type of possible fire
shall be available immediately at the work area.
9.9.9 If existing hose lines are located within the hot work area defined by the permit, they shall be
connected and ready for service but shall not be required to be unrolled or charged.
9.9.10 The following shall apply to hot work done in close proximity to a sprinkler head:
(a) A wet rag shall be laid over the sprinkler head and then removed at the conclusion of the
welding or cutting operation.
(b) During hot work, special precautions shall be taken to avoid accidental operation of automatic
fire detection or suppression systems (e.g., special extinguishing systems or sprinklers).UDC
9.9.11 The operator and nearby personnel shall be suitably protected against dangers such as heat,
sparks, and slag.
9.9.2 FIRE WATCH
9.9.2.1 A fire watch shall be required when hot work is performed in a location where other than a
minor fire might develop or where the following conditions exist:
(a) Combustible materials in building construction or contents are closer than 35 ft. (11m) to the
point of operation.
(b) Combustible materials are more than 35 ft. (11 m) away from the point of operation but are
easily ignited by sparks.
(c) Wall or floor openings within a 35 ft. (11 m) radius expose combustible materials in adjacent
areas, including concealed spaces in walls or floors.
(d) Combustible materials are adjacent to the opposite side of partitions, walls, ceilings, or roofs
and are likely to be ignited.
9.9.2.2 A fire watch shall be maintained for at least half (‘/2) hour after completion of hot work
operations in order to detect and extinguish smoldering fires. The duration of the fire watch
shall be extended if the UDC safety & security inspectors / engineers determine the fire
hazards warrant the extension,
SAMPLE SAFE WORK AREA
— co
Ts a waa postin pea
pening pot copy of port {Gotng work or
ror goa ccan (plan eaboral
(prevent {fre cursor
25h (41 mp | equivalentELEVATED SAMPLE SAFE HOT WORK AREA
1, Application of 35 Foot Rule involving
clevatod work —adktional safeguards wit
apply. Close doors, seal oor openings. post
copy of parm, shut down conveyors. and
prevent goneral accoss. Consider whether
‘reas can be tonted to contain spatter. PAL
‘ll datarmine how mary acon fro
watchors vil be required,
22 possbie, positon operator to redirect
(lit) spattor during work
“z Ralocate combustible storage or
‘separate with approved barriers
{Seal area below dividers) or cover
‘with approved welding pads, bankats,
curtains, oF fire-resiive tarpaulins.
“4. Equipment below might need to
fe
‘Suitable fio extinguichars to protact
+ potential hazard aroas and oquip
‘ham with means for emergency
| communications.
Sen ON Raa ea
10.0 PERIODIC REVIEWS
10.1 All UDC Directorates / Departments are required to review their own operations to ensure
compliance with this procedure. In addition, Security Department will conduct periodic reviews of
the hot work permit system.
SESE sass
14.0 REFERENCE
11.4 QCD / NFPA 51B /NFPA 241 (QCD Qatar Civil Defense / NFPA National Fire Protection
Association
11.2 QCS 2014 (QCS Qatar Construction Specification)
11.3 UDC Construction Regulations/ HSE Manual Section 11ContractorDare] [PEmmitno._| ‘CHECKLIST
‘CONTRACTOR |
YS [no
PERIOD OF WORK "avaiable spikes, hose reals & portable fire
ertingushers ae allin service and operable
DATE [FROM Time | FROM Hot work equipment are alli good operational
TO. 70 condition
Work LocaTion REQUIREMENTS WITHIN 35 ft. (13 m) OF HOT WORK
RETALUNT® FHaramabie liquid dust, it and oll deponits removed
PARCEL / AREA Explosive atmosphere in area eliminated
‘TENANT NAME Remove other combustible where possbie otherwise
protect with fire resistant tarpaulins or metal shields
WORK DESCRIPTION
‘All wall and floor opening covered
Fire resistant tarpaulins suspended beneath work
‘WORK ON WALLS / CEILINGS / ENCLOSED EQUIPMENT
Construction & noncombustible and without
combustible covering or Insulation
EQUIPMENT TO BE USED
Combustible on other side of walls, cellings or roofs is
moved away
Danger exist by conduction of heat into anather area
Enclosed equipment cleaned of al combustible
Containers purged of flammable iquids/vapors
PERSONS PERFORMING HOT WORK.
FIRE WATCH / HOT WORK AREA MONITORING
NAME NUMBER
Trained / Certified fire watch shal be provided during
and for 30 mins. After work, Including breaks
Fire watch is supplied / equipped with fire extinguishers
WORK PERMIT RECEIVER
Fire watch i trained in use of this equipment and in
sounding alarms.
EOE
the undersign receiver of this permit confiem that
No dema
‘Working area has been
NAME Fire watch may be required for adjoiing areas, above
Posmon and below.
‘MOBILE®
SIGNATURE. (OTHER PRECAUTIONS TAKEN
WORK PERMIT ISSUER
NAME ‘Work method statement submitted
POSITION, Risk Assessment submitted
MOBILE® Exit ways identified and maintained ear
‘SIGNATURE.
Eee
on)
“The work area has been inspected 30 minutes after work completion
s were caused during my work
‘All working contractor materials have been removed from site on completion
‘cleaned up to UDC acceptable standardsUDC
REQUIRED SIGNAGE DURING HOT WORK
PV les we
HOT WORK
IN PROGRESS
EMERGENCY NOTIFICATION
lIN CASE OF EMERGENCY
CONTACT THIS NUMBER
FIRE BRIGADE — 999
UDC — 800-6222