G & S Building Group Tender Offer

This document is a tender submitted by G & S Building Group to Mr. and Mrs. Smith for the construction of a new brick veneer home. The total tender price is $341,000 including GST. The tender includes standard inclusions, site costs, and an exclusion list. It also includes schedules for external finishes, internal finishes, services, kitchen, laundry, bathrooms, and a progress payment schedule. Mr. and Mrs. Smith sign to accept the tender.

Uploaded by

Johnny Salame
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views8 pages

G & S Building Group Tender Offer

This document is a tender submitted by G & S Building Group to Mr. and Mrs. Smith for the construction of a new brick veneer home. The total tender price is $341,000 including GST. The tender includes standard inclusions, site costs, and an exclusion list. It also includes schedules for external finishes, internal finishes, services, kitchen, laundry, bathrooms, and a progress payment schedule. Mr. and Mrs. Smith sign to accept the tender.

Uploaded by

Johnny Salame
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

G & S Building Group

3 Alto Street South Wentworthville 2145

24th March 2011

Dear Mr & Mrs Smith

Re: 22 Pitt Street Merrylands 2160

We have pleasure in submitting our tender for the construction of your new brick veneer
home by G & S Building Group on the above mentioned property as follows.

Total $310,000

GST $31,000

Total Inc. GST $341,000

 All standard inclusions as per G & S Building Group range


unless noted below.
 Standard development application fee Not Included
 Construction certificate application fee Not Included
 Home Warranty insurance Included
 Long service fees Included
 Construction insurance and public liability Included
 Security locks to all windows and glass doors Included
 Smoke detectors connected to electrical main supply with
back up operation Included
 All details as per plan Included
 All prefabricated wall frame and roof trusses in accordance with
AS 1684, also incorporating 90 mm external stud wall framing
to a wind velocity of W33N Included
 Clear glazing to all windows other than those in bathroom
Ensuite and toilet
 Termite protection to all penetrations through slab and
perimeter of dwelling is to be in accordance with AS 3600-93 Included
 Hot water supply tempered to 50 degrees at all hot water outlets Included
 2.4m ceilings Included
 Vacuum formed kitchen Included
 Electric oven, Gas cooktop and electric range hood Included
 R3.0 ceiling insulation Included
 R1.5 wall insulation Included
 Timber sheet flooring to ground floor Included
 Concrete slab on ground to lower ground floor Included
 1800mm bath to main bathroom Included
 All vanities to be 900mm with polymarble moulded tops Included
 Sarking to roof Included

Site Costs

 Landscaping Not Included


 Provide all weather access using coarse aggregate fill Included
 Internal sewer points, internal and external run connected
To existing service on site Included
 External stormwater drainage including surface drainage
Points and connection to council easement within 10m Included
 Consumer 3 phase electrical mains Included
 Environmental protection fencing and waste receptacle Included
 Provide concrete pump Included
 Provide onsite storage shed and toilet Included
 Gas run in to dwelling Included
 Water front run including meter connection and 2 yard taps Included
 Scaffolding as required for roof tiler to the satisfaction of
Occupational Health and Safety Act Included
 Shadow diagrams Included
 Brick scaffold to external walls Included
 Excavation and export including rock breaking at the
Provisional Sum of $6000
 Piering to the underside of edge beams of “M” classification
Slab to AS2870, standards, 60 metres allowed at the
Provisional Sum of $4500

Total Site Costs Incl. GST $ 38500

Exclusions
Note: The following items are excluded from the total tender price unless otherwise stated
in the client’s request variations section or site costs section of this tender.

 Demolition or removal of existing structures


 Stormwater detention system design or construction
 Dropped edge beam
 Retaining walls, footpath, landscaping, driveway or pergola
 Connection Fee from electrical service authority
 Any floor covering other than wet area tiling
 Ornamental light fittings, Air Conditioning, Alarm, Intercom, Curtains, Dishwasher, or
Microwave
 Acoustic study
 Provision of deposited plan
 Rock or shale excavation or removal
 Drilling or pinning in rock
 Grubbing or removal of trees, removal of excess spoil or vegetation
 Cleaning or maintenance of stormwater detention system after handover of keys
 Maintenance or upkeep of landscaped areas after handover
 Road opening or restoration
 Any security deposit/bonds/fees or contributions associated with
development/building application or sub-division unless otherwise stated
 Any other special requirement by Council or other Statutory Authorised body
Inclusion Schedule

Note: All items listed below are to chosen from G & S building Group Selection unless
otherwise stated. Items may be upgraded or varied in the client requested variations section
of the tender.

External Finishes
A. Bricks – Joints and Colour must be chosen
B. Roof Tiles – Sarking. Profile and Colour must be chosen
C. Windows – Sliding with MDF reveals. Colour must be chosen
D. Fascia & Gutter – Colour bond gutters. Colour must be chosen
E. Garage Door – Panel lift doors. Colour must be chosen
F. Taps External – 2 garden taps to be installed

Internal Finishes
A. Architraves and Skirting – 50mm colonial style, MDF with a paint finish
B. Cornice – 90mm Cove
C. Door Hardware – Style must be chosen
D. Front door – Solid timber. Style and colour must be chosen
E. Internal door – Hollow core door. Colour to be chosen
F. Wardrobes – Mirrored doors. Colour must be chosen
G. Staircase – Timber balusters. MDF treds and risers.

Services
A. Hot Water Services – 400 litre single element
B. Electrical System – Connection of circuit breakers and earth leakage circuit.
C. T.V Points – 1 point
D. Gas Connections – 1 bayonet point
E. Telephone Provision – Nil (By Owner)

Kitchen
A. Cupboards Doors – Vacuum Formed or Hard Form Laminate
B. Bench Top – Round edge Laminated
C. Sink – 1 and half bowl
D. Tap ware – must be chosen

Laundry
A. Wash Trough – 45 litre
B. Tap ware – Must be chosen

Bathroom – Main
A. Shower Screen – Sliding glass with aluminium frame
B. Vanity Unit – Polyurphan 900mm
C. Toilet – Caroma Concorde Pan
D. Mirrors – Frameless mirror
E. Bath – 1800mm acrylic white
F. Tape ware – Must be chosen

Ensuite
A. Shower Screen – Sliding glass with aluminium frame
B. Vanity Unit – Polyurphan 900mm
C. Toilet – Caroma Concorde Pan
D. Mirrors – Frameless mirror
E. Tape ware – Must be chosen

WC
A. Vanity Unit – Polyurphan 900mm
B. Toilet – Caroma Concorde Pan
C. Mirrors – Frameless mirror
D. Tape ware – Must be chosen
Acceptance of Tender

We, Mr & Mrs Smith accept the conditions of this tender and request G & S Building Group
to commence work as per contract at 22 Pitt Street Merrylands 2160, for the sum of
$341,000 (Three Hundred, & Forty Thousand Dollars)

Signed ______________________ Date___________

Print Name __________________________________

Signed ____________________ Date_____________

Print Name__________________________________

Witness Name ______________________________

Signature__________________________________

Date______________________________________
Progress Payment Schedule

Deposit $17,050

Progress Payment 1 (on completion of slab) $20,000

Progress Payment 2 (on completion of frame) $78,000

Progress Payment 3 (on completion of roof) $35,000

Progress Payment 4 (on completion of brickwork) $80,000

Progress Payment 5 (on completion of plaster board) $35,000

Progress Payment 6 (on completion of kitchen) $45,850

Final Payment $30100


Preparation of the Bill of Quantities

When preparing a Bill of Quantities you must make sure that you have all the information
you need to make an accurate estimate. Next you must prepare your list. Once you have
completed the list go over it again and make sure that you have not missed anything.

Once that has been done you can put all the information together to form you Bill of
Quantities.

Pricing Techniques

We stay competitive so our pricing must stay low and our quality high. Once the Bill of
Quantities has been completed the break down can commence. Each section must be priced
to get the total cost of the project.

When it is complete it will be compared to our per square metre rate to make sure we have
not under or overpriced the construction

Quotation

We have a template where all the information is entered to produce the quote. Once it is
complete you must go over the whole quote to make sure that there is no errors. If any
errors are found they must be corrected and the whole quote must be rechecked.

Tender with the Client


Once the tender has been prepared we make an appointment to meet with the client.
When with the client we must go through each item and explain everything so that they are
aware of what is go to happen.

Once we have finished explaining the tender we can answer any questions they may have.
We leave the tender with the client so that they can go through the tender at their own
pace. We make sure to let them know that they can contact us with any questions they may
have.