0% found this document useful (0 votes)
365 views7 pages

Moisture Correction Sheet Date-04-11-2020

The document outlines details of a four-laning highway project in Telangana, India. The 42 km project on NH-363 from Mancherial to Repallewada is being carried out by the National Highway Authority of India under the hybrid annuity model. Key parties involved include the concessionaire Mancherial-Repallewada Road Pvt. Ltd., EPC contractor Adani Road Transport Limited, and sub-contractor HG Infra Engineering Limited. Moisture correction sheets are also provided for concrete mix designs and proportions for the project.

Uploaded by

Sandeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
365 views7 pages

Moisture Correction Sheet Date-04-11-2020

The document outlines details of a four-laning highway project in Telangana, India. The 42 km project on NH-363 from Mancherial to Repallewada is being carried out by the National Highway Authority of India under the hybrid annuity model. Key parties involved include the concessionaire Mancherial-Repallewada Road Pvt. Ltd., EPC contractor Adani Road Transport Limited, and sub-contractor HG Infra Engineering Limited. Moisture correction sheets are also provided for concrete mix designs and proportions for the project.

Uploaded by

Sandeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing KM 288.510) (Design
Name of the Project
Length = 42.000 KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid Annuity Mode

Client : National Highway Authority of India


IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET DATE-04-11-2020
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)

INGREDIENTS M15 PCC M20 PCC M25 RCC M30 RCC M35 RE M 40
M15 M20 M25 M30 M35 RE M-40 Pannel Pump M-15 M-20 M-25 M-30 M35 RE M 40
PCC PCC RCC RCC Pannel Pump % % % PCC PCC RCC RCC Pannel Pump

CEMENT 280 300 340 360 400 430 280 300 340 360 400 430

20 MM 569 571 616 673 575 649 0.39 0.00 -0.39 -2.22 -2.23 -2.40 -2.62 -2.24 -2.53 567 569 614 670 573 646

10 MM 577 579 625 559 584 584 0.34 0.13 -0.21 -1.21 -1.22 -1.31 -1.17 -1.23 -1.23 576 578 624 558 583 583

SAND 881 885 778 773 789 711 1.65 1.60 -0.05 -0.44 -0.44 -0.39 -0.39 -0.39 -0.36 881 885 778 773 789 711

WATER 168 159 153 151.2 160 151 172 163 157 155 164 155

ADMIXTURE 2.52 2.4 3.4 3.6 2.0 4.7 - 2.52 2.40 3.40 3.60 2.00 4.73

TOTAL 2478 2496 2515 2520 2510 2530 2478 2496 2515 2520 2510 2530

2.38 1.73 -0.65 -3.87 -3.89 -4.10 -4.19 -3.86 -4.11

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing
Name of the Project KM 288.510) (Design Length = 42.000 KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid
Annuity Mode
Client : National Highway Authority of India
IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET DATE-22-09-2020
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)

INGREDIENTS M15 M20 M25 M30 M35 RE


M15 M20 M25 M30 M35 RE PCC PCC RCC RCC Pannel M-15 M-20 M-25 M-30 M35 RE
PCC PCC RCC RCC Pannel % % % PCC PCC RCC RCC Pannel

CEMENT 224 240 272 292 320 224 240 272 292 320

FLYASH 56 60 68 73 80 56 60 68 73 80

20 MM 574 643 614 597 651 0.39 0.43 0.04 0.23 0.26 0.25 0.24 0.26 574 643 614 597 651

10 MM 582 534 622 605 541 0.34 0.62 0.28 1.63 1.50 1.74 1.69 1.51 584 535 624 607 543

SAND 889 836 775 754 748 1.65 5.08 3.43 30.49 28.67 26.58 25.86 25.66 919 865 802 780 774

WATER 154 159 146.2 157.0 152 122 129 118 129 125

ADMIXTURE 2.24 1.8 3.4 3.65 1.8 2.24 1.80 3.40 3.65 1.80

TOTAL 2481 2474 2501 2482 2494 2481 2474 2501 2482 2494

2.38 6.13 3.75 32.35 30.43 28.57 27.80 27.43

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing
Name of the Project KM 288.510) (Design Length = 42.000 KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid
Annuity Mode
Client : National Highway Authority of India
IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET DATE-04-07-2020
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)
M15 M20 M25 M30 M35 RE
INGREDIENTS PCC PCC RCC RCC Pannel
M15 M20 M25 M30 M35 RE M-15 M-20 M-25 M-30 M35 RE
PCC PCC RCC RCC Pannel % % % PCC PCC RCC RCC Pannel

CEMENT 280 300 340 360 400 280 300 340 360 400

20 MM 569 571 616 674 643 0.39 0.45 0.06 0.34 0.34 0.37 0.40 0.39 569 571 616 674 643

10 MM 577 579 625 559 533 0.34 0.85 0.51 2.94 2.95 3.19 2.85 2.72 580 582 628 562 536

SAND 882 885 778 773 801 1.65 3.90 2.25 19.85 19.91 17.51 17.39 18.02 902 905 796 790 819

WATER 168 159 153 151.2 160 145 136 132 131 139

ADMIXTURE 2.24 2.25 3.40 3.60 3.20 2.24 2.25 3.40 3.60 3.20

TOTAL 2478 2496 2515 2521 2540 2478 2496 2515 2521 2540

2.38 5.20 2.82 23.13 23.21 21.06 20.65 21.13

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing
Name of the Project KM 288.510) (Design Length = 42.000 KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid
Annuity Mode
Client : National Highway Authority of India
IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET DATE-04-07-2020
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)

INGREDIENTS M15 M20 M25 M30 M35 RE


M15 M20 M25 M30 M35 RE PCC PCC RCC RCC Pannel M-15 M-20 M-25 M-30 M35 RE
PCC PCC RCC RCC Pannel % % % PCC PCC RCC RCC Pannel

CEMENT 224 245 272 288 320 224 245 272 288 320

FLYASH 56 55 68 72 80 56 55 68 72 80

20 MM 573 580 614 664 652 0.39 0.71 0.32 1.83 1.86 1.96 2.12 2.09 575 582 616 666 654

10 MM 581 589 622 551 541 0.34 1.01 0.67 3.89 3.95 4.17 3.69 3.62 585 593 626 555 545

SAND 888 829 775 762 748 1.65 4.75 3.10 27.53 25.70 24.03 23.62 23.19 916 855 799 786 771

WATER 154 165 146.2 151.2 152 121 133 116 122 123

ADMIXTURE 2.52 2.10 3.40 2.88 1.60 2.52 2.10 3.40 2.88 1.60

TOTAL 2479 2465 2501 2491 2495 2479 2465 2501 2491 2495

2.38 6.47 4.09 33.25 31.50 30.16 29.44 28.90

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM
Name of the Project 42.000/Existing KM 288.510) (Design Length = 42.000 KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala
Pariyojna On Hybrid Annuity Mode
Client : National Highway Authority of India
IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET (Ultratech OPC 43 +Fosroc Auramix 350) DATE-20-01-2021
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)

M20
INGREDIENTS M15 PCC M20 PCC M25 RCC M30 RCC
M15 M20 M20 M25 M30 KERB M-15 M-20 M20 M-25 M-30
PCC PCC KERB RCC RCC % % % PCC PCC KERB RCC RCC

CEMENT 280 300 340 340 360 280 300 340 340 360

20 MM 569 571 567 617 651 0.39 0.00 -0.39 -2.22 -2.23 -2.21 -2.41 -2.54 567 569 565 615 648

10 MM 577 579 463 625 540 0.50 0.14 -0.36 -2.08 -2.08 -1.67 -2.25 -1.94 575 577 461 623 538

SAND 882 885 973 779 812 1.77 1.82 0.05 0.44 0.44 0.49 0.39 0.41 882 885 973 779 812

WATER 168 159 153 153 151.2 172 163 156 157 155

ADMIXTURE 1.68 1.8 2.72 3.06 3.6 1.68 1.80 2.72 3.06 3.60

TOTAL 2478 2496 2499 2517 2518 2478 2496 2498 2517 2518

2.66 1.96 -0.70 -3.86 -3.87 -3.39 -4.27 -4.08

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing KM 288.510) (Design Length = 42.000
Name of the Project
KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid Annuity Mode

Client : National Highway Authority of India


IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET (Ultratech OPC 43 +Fosroc Auramix 400) DATE- 05.02-2021
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)
M35 M15 M20 M20 M25 M30 M35 M40 M45 M50
INGREDIENTS
M15 M20 M20 M25 M30 RE M40 M45 M50 % % %
PCC PCC KERB RCC RCC RCC RCC RCC RCC M-15 M-20 M20 M-25 M-30 M-35 M-40 M-45 M-50
PCC PCC KERB RCC RCC Panne RCC RCC RCC PCC PCC KERB RCC RCC RCC RCC RCC RCC
l

CEMENT 250 300 340 340 360 400 410 430 450 250 300 340 340 360 400 410 430 450

20 MM 699 710 567 702 695 592 589 679 672 0.39 0.00 -0.39 -2.73 -2.77 -2.21 -2.74 -2.71 -2.31 -2.30 -2.65 -2.62 696 707 564 699 692 590 587 676 669

10 MM 570 579 463 573 567 548 545 553 548 0.50 0.13 -0.37 -2.11 -2.14 -1.71 -2.12 -2.10 -2.03 -2.02 -2.05 -2.03 568 577 461 571 565 546 543 551 546

SAND 868 812 973 770 762 849 845 744 736 1.77 1.63 -0.14 -1.22 -1.14 -1.36 -1.08 -1.07 -1.19 -1.18 -1.04 -1.03 867 811 972 769 761 848 844 743 735

WATER 138 135 153 143 144 144 144 138 135 144 141 148 149 150 150 149 144 141

ADMIXTURE 1.5 1.8 2.72 2.04 2.16 2.4 2.9 3.4 3.6 1.50 1.80 2.72 2.04 2.16 2.40 2.87 3.40 3.60

TOTAL 2527 2538 2499 2530 2530 2535 2536 2547 2545 2527 2538 2488 2530 2530 2535 2536 2547 2545

2.66 1.76 -0.90 -6.05 -6.05 -5.29 -5.94 -5.88 -5.53 -5.50 -5.74 -5.68

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative
NATIONAL HIGHWAY AUTHORITY OF INDIA

: Four Laning of NH-363 From Mancherial (DESIGN KM 0.000/EXISTING KM 251.900) TO Repallewada (DESIGN KM 42.000/Existing KM 288.510) (Design Length = 42.000
Name of the Project
KM) in the State of Telangana Under NHDP Phase-4 Under Bharatmala Pariyojna On Hybrid Annuity Mode

Client : National Highway Authority of India


IE :CEMOSA In Association With ARMENGE Engineering And Management Consultant Pvt. Ltd.
Concessionaire : Mancherial-Repallewada Road Pvt. Ltd.
EPC Contractor : Adani Road Transport Limited
EPC Sub-Contractor : HG Infra Engineering Limited
MOISTURE CORRECTION SHEET (Ultratech OPC 53 +Fosroc Auramix 400) DATE- 06-02-2021
GRADE OF CONCRETE W/A NMC Diff. CORRECTED WEIGHT (KG)
M35 M15 M20 M20 M25 M30 M35 M40 M45 M50
INGREDIENTS
M15 M20 M20 M25 M30 RE M40 M45 M50 % % %
PCC PCC KERB RCC RCC RCC RCC RCC RCC M-15 M-20 M20 M-25 M-30 M-35 M-40 M-45 M-50
PCC PCC KERB RCC RCC Panne RCC RCC PSC PCC PCC KERB RCC RCC RCC RCC RCC RCC
l

CEMENT 250 300 340 340 360 380 400 435 450 250 300 340 340 360 380 400 435 450

20 MM 699 710 567 691 695 696 690 675 672 0.39 0.00 -0.39 -2.73 -2.77 -2.21 -2.69 -2.71 -2.71 -2.69 -2.63 -2.62 696 707 564 688 692 693 687 672 669

10 MM 570 579 463 563 567 567 563 551 548 0.50 0.11 -0.39 -2.22 -2.26 -1.81 -2.20 -2.21 -2.21 -2.20 -2.15 -2.14 568 577 461 561 565 565 561 549 546

SAND 868 812 973 790 762 763 757 740 736 1.77 1.52 -0.25 -2.17 -2.03 -2.43 -1.98 -1.91 -1.91 -1.89 -1.85 -1.84 866 810 971 788 760 761 755 738 734

WATER 138 135 153 143 144 137 136 139 135 145 142 149 150 151 144 143 146 142

ADMIXTURE 1.5 1.8 2.72 2.04 2.16 2.28 2.8 3.48 4.05 1.50 1.80 2.72 2.04 2.16 2.28 2.80 3.48 4.05

TOTAL 2527 2538 2499 2529 2530 2545 2549 2543 2545 2527 2538 2488 2529 2530 2545 2549 2543 2545

2.66 1.63 -1.03 -7.12 -7.06 -6.45 -6.87 -6.83 -6.83 -6.78 -6.63 -6.60

Remarks

Name: Name: Name:


Date: Date: Date:
Contractor's Representative Concessionaire's Representative IE's Representative

You might also like