C - TS4CO - 2021: There Are 2 Correct Answers To This Question
C - TS4CO - 2021: There Are 2 Correct Answers To This Question
1 Which default values can you configure for the product cost collector?
✘✘✘
c ✘
Costing variant for preliminary costing
Variance variant
c ✘
Results Analysis (RA) key
Results Analysis (RA) version
3 What are some of the characteristics of SAP Core Data Services (CDS) views?
c ✘
CDS views have no latency.
CDS views are considered system modifications.
c ✘
CDS views support authorizations.
CDS views duplicate data for reporting efficiencies.
c ✘
CDS views have ready-to-use content.
6 Which process can you use to credit internal orders during period-end closing?
✘
Assessment
Distribution
Indirect activity allocation
c ✘
Periodic reposting
7 You want to run an assessment cycle in Profitability Analysis to allocate cost cen
Template
Cycle iteration
PA transfer structure
c ✘
Tracing factor
8 You define rules in a status profile and assign the profile to your internal order ty
9 Which objects do you use when you assign costs and revenue to the value fields i
✘
✘
c ✘
Transfer structure
✘
Allocation structure
Allocation template
Overhead group
10 You want to set up integrated planning for your internal orders. What do you nee
✘
c ✘
As percentage rate
As equivalence number
As lot-based surcharge
c ✘
As quantity-based surcharge
c ✘
Allow revenue postings.
Set up work lists.
Define document type.
c ✘
Define default parameters for master record fields.
13 You want to maintain a cost component structure. What can you determine for ea
c ✘
Assignment of cost component to calculation base for overheads in costing
c ✘
Relevance of cost component to results analysis
Relevance of cost component to goods manufactured
c ✘
Relevance of cost component to inventory valuation
✘
✘
✘
Costing variant
Cost component structure
Transfer control
c ✘
Valuation variant
Functional areas
c ✘
Profit centers
General ledger accounts
c ✘
Cost centers
c ✘
By user entry during report execution
By user exit
By Business Add-In
By populating from user parameters
17 ✘
Which statement best describes a cost center standard hierarchy?
c ✘
Revenue
Maintenance overhead costs
Accrued production overhead
c ✘
Sales deductions
19 ✘ Which views can you use to analyze the costing results within the costing run too
c ✘
Analysis report
c ✘
Material list report
c ✘
Costing levels report
Variance report
Work in progress report
c ✘
By defining the characteristic value in the check table
By defining the characteristic value in the field catalog
By defining the characteristic value as a key figure
By defining the characteristic value as a value field
22 What are the prerequisites for automatic generation of the settlement rule to a m
Production order
c ✘
Product cost collector
Process order
c ✘
Cost object hierarchy
You use a production order with Product Cost by Period and you entered a resu
24 variances in Product Cost by Period?
25 Where can you find actual transaction data of account-based CO-PA in SAP S/4HA
CE1XXXX
c ✘
ACDOCA
BSEG
COEJ
26 For which of the following situations would you need to implement the transfer p
c ✘
They transfer primary and secondary costs.
They transfer only primary costs.
They use the original cost element during transfer.
c ✘
They use a secondary cost element during transfer.
c ✘
Client level
Sales organization level
Controlling area level
Company code level
29 To which objects do you assign the elements of the cost component split to ensur
Segments
G/L accounts
c ✘
Value fields
Controlling areas
30 ✘ You want to use a template for activity and process assignment to your material
✘
Internal order
c ✘
Cost center/activity type
Business process
WBS element
You want to configure different cost centers in your company. Which setting
32 ✘
attributes to similar cost centers?
Functional area
Activity type
c ✘
Cost center category
Cost center type
34 Which criteria do you use to specify the G/L account for the work in process (WIP
c ✘
Settlement of internal orders
Business processes price calculation
c ✘
Execution of the assessment cycles
Cost center/activity type price calculation
c Standard cost estimate of all the materials in all plants of a controlling area
c Current cost estimate of all the materials in all controlling areas
Inventory cost estimate of all the materials in one plant
Product cost collector cost estimate in one plant
c ✘
0-70
71-100
101-150
Over 150
39 Which settings can you configure per order type for the budget and availability co
c ✘
Budget tolerance limits
✘
41 ✘ When you define assessment cycles for the period-end closing in overhead cost a
Costing sheet
Template
Settlement rule
c ✘
Allocation structure
42 How does the system derive the requirement type from the material master data
Strategy group -> planning strategy -> requirements class -> requirements
MRP group requirements class -> planning strategy -> requirements type
c ✘
Strategy group -> planning strategy -> requirements type
c ✘
MRP group -> strategy group -> planning strategy -> requirements type
44 Which statements are relevant to the cost of sales accounting method in profitab
45 You want to understand why costs are collected on sales order item level. What d
Valuation variant
c ✘
Requirements class
c ✘
Account assignment category
Costing type
c ✘
Requirement type
46 What are some of the characteristics of Profit Center Accounting in SAP S/4HANA
c ✘
It is integrated in the universal journal.
It is possible to derive the profit center from the segment in configuration.
c ✘
It can be used with period and/or cost of sales accounting.
It can be used in the settlement rule for internal orders.
Operating concern
Cost center group
c ✘
CO version
Company code
c ✘
Work in progress
c ✘
Cost of sales
Gross margin
c ✘
Reserves for unrealized costs
Cost of goods manufactured
50 ✘
✘
You are implementing SAP S/4HANA and you want to run analytical reports off a
Reporting can be either broad and deep for analysis, or speedy and simple,
Reporting on data in real time is difficult, and complex to design.
Reporting analytical data is always done in a business warehouse system.
c ✘
Reporting on data is available in real-time at every level of detail.
c ✘
Defining flexible hierarchies
Configuring derivation rules
Creating multi-dimension sets
Copying groups with suffix
54 You would like to allocate primary and secondary costs from a cost center to ano
Periodic reposting
c ✘ Assessment
Indirect activity allocation
Distribution
55 In which SAP S/4HANA components can you report the results of the results ana
c ✘ Profitability analysis
Inventory management
c ✘ Profit center accounting
Sales and distribution
c ✘ Financial accounting
57 Which Customizing for Document Splitting settings do you maintain to ensure tha
Zero-balance
Inheritance
Dummy profit center
c ✘ Standard account assignment
58 A profit center standard hierarchy contains all profit centers that are assigned to
Client
Plant
c ✘ Controlling area
Operating concern
59 How can you configure the transfer price solution in SAP S/4HANA?
60 Which of the following statements are applicable to SAP S/4HANA embedded ana
c ✘ It is part of the core SAP S/4HANA license and uses the same technical stac
c ✘ It uses core data services (CDS) views to create virtual data models (VDMs
It is used by dedicated BI users who need to go beyond the capabilities of S
It is part of SAP S/4HANA Strategic Analytics tools stack that uses virtual d
61 Which tasks can you perform on a production order in a make-to-order scenario w
62 You enter the actual activity quality for work and vacation in the cross-applicatio
Which options can you choose in the master data of the activity type to ensure th
63 You want to create a new standard cost estimate based on the quantity structure
Costing type
Costing version
Transfer control
c ✘ Reference variant
64 You want to use a template to consider overhead during product costing. How do
65 Which receiver must be allowed in the settlement profile of a product cost collect
66 You use a ledger, an additional standard ledger and an extension ledger. You pos
For which ledger(s) are separate line items posted in the universal journal?
All ledgers
The standard ledgers
c The leading and extension ledgers
The leading ledger only
67 Which object do you configure to reuse material cost estimate for the costing pro
Valuation variant
c ✘ Transfer control
Group costing
Quantity structure control
68 You want to derive the profitability segment for a line item in the universal journ
c ✘ The type of the corresponding general ledger account must be primary cost
The type of the corresponding general ledger account must be balance shee
c ✘ Costing-based Profitability Analysis must be active.
Account-based Profitability Analysis must be active.
69 For which revenue-carrying cost objects does the system perform results analysi
Cost center
Business processes
c ✘ Internal order
c ✘ Work breakdown structure
c ✘ Customer service orders
70 What action do you perform to use the Cost-Based Percentage of Completion (PO
71 You want to enable WIP calculation in Product Cost by Period. What do you need
You have implemented Product Cost by Sales Order in conjunction with cost-bas
72 order item, you have the following:
73 Which of the following steps are part of the procedure to update the standard pri
c ✘ Record type
c ✘ Point of valuation
Costing key
Sales order type
By posting key
By document type
By company code
c ✘ By business transactions
77 Which object can you select for reporting in costing-based Profitability Analysis,
Cost element
c ✘ Record type
Company code
Period/year
78 Which parameters can you enter when you create a costing run?
c ✘ Costing variant
Valuation variant
Production version
c ✘ Transfer control
c ✘ Costing version
80 You are considering using commitment management with internal orders. What d
Activate commitment management in both the company code and the orde
Activate commitment management only in the order type.
c ✘ Activate commitment management in both the controlling area and the ord
Activate commitment management only in the controlling area.
81 In the material master record there are three planned prices. What do you use th
82 You want to set up budget availability control for your projects and internal orde
There are 2 correct answers to this question.
84 Which attributes can you configure in the activity type master record?
Company code
c ✘ Price indicator
c ✘ Valid cost center categories
c ✘ Activity type category
CO version
86 In the Product Cost by Order component, what does the system calculate depend
87 You want to create alternative plan versions for your controlling area, in addition
✘
✘
88 How does SAP S/4HANA select line-item-based data for costing-based Profitabili
It selects actual data from table ACDOCA and plan data from table COSP.
It selects actual data from table CE2XXXX and plan data from table CE3XXX
c ✘ It selects actual data from table CE1XXXX and plan data from table CE2XXX
It selects actual data from table ACDOCA and plan data from table ACDOCP
89 At which level do you define the valuation method for results analysis?
Company code
Sales organization
Operating concern
c ✘ Controlling area
93 You post a billing document in Sales and Distribution (SD). What data flows to Pr
Payment discount
c ✘ Accruals
Order quantity
c ✘ Revenues
c ✘ Sales deductions
c ✘ Provide the company with information on the performance of its market seg
Provide the company with a detailed view of its financial statements by resp
c ✘ Allow the company to determine if the sales force achieved their contributio
Allow the company to determine standard costs and revenues according to
You have implemented Product Cost by Sales Order in conjunction with revenue
95 order item, you have the following:
96 You are executing an indirect activity allocation. What do you post to the sender
c ✘ You post quantity and cost to both the sender and receiver.
You post both quantity and cost to the receiver, and cost only to the sender
You post both quantity and cost to the sender, and cost only to the receiver
You post cost only to both the sender and receiver.
You perform a settlement with a primary cost account which is different from the
97 is a valid receiver for the settlement?
WBS element
Internal order
Cost center
c ✘ Fixed asset
You have activated budget availability control for an internal order and entered
98 internal order in the current year.
How is that possible?
99 You are creating new activity type and want to maintain plan prices for a cost cen
c ✘ Price indicator
c ✘ Valid cost center categories
c ✘ Activity type category
CO Version
Company code
100 What are some of the characteristics of planning for internal orders?
101 What business structure is used to manage earnings from foreign markets?
reporting?
AP Fiori content.
AP S/4HANA.
e operation
he operation
signed to the operation
planning?
ring period-end closing?
nalysis to allocate cost center costs during period-end closing for your organization.
le to your internal order type. What do you use the status profile for?
ter record.
d hierarchy?
ing concern?
the material
l cost estimate and the costing run
material master record
emplate determination table
lates for activity-based costing?
company. Which setting in the cost center master data will you use to assign the same
ent splits?
ants of a controlling area
trolling areas
tion time.
closing in overhead cost accounting, which object can you assign to the cycle segment?
nternal orders?
ounting method in profitability management?
egment in configuration.
accounts.
eating them as cost elements.
ements, and NOT as general ledger accounts.
al ledger accounts.
ost centers. With which object do you differentiate the planning scenarios?
results analysis?
run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?
anizations leading to extra master data maintenance work. Which grouping functionality can
progress (WIP)?
s from a cost center to another cost center. Which allocation method will you use?
ct Cost by Period?
you maintain to ensure that financial statements can always be produced separately for each profit center
AP S/4HANA?
e activity type to ensure the quantities and values are posted in Management Accounting?
d on the quantity structure of the existing standard cost estimate. Which object do you use?
he universal journal?
item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfi
conjunction with cost-based POC results analysis in your organization. For a particular sales
projects and internal orders. What can you check using budget availability control?
master record?
n a costing variant?
results analysis?
ns in SAP S/4HANA?
ple segments
conjunction with revenue-based results analysis in your organization. For a particular sales
receiver.
d cost only to the sender.
cost only to the receiver.
which is different from the cost account you used to post the original expense. Which object
nternal order and entered an overall budget of 10000. Actuals of 10000 were posted for this
ility control
than the budget.
ocument yet.
s defined in the configuration.
in plan prices for a cost center. Which attribute must you configure in the activity type master record?
ternal orders?
om foreign markets?
*
ting in SAP S/4HANA?
y for each profit center?
irements must be fulfilled?
pe master record?